Software Assurance Metrics And Tool Evaluation (SAMATE) Overview

Similar documents
Overview of the NIST Risk Management Framework as described in SP

Configuration Management

Knowledge Extraction and Analysis of Software Systems for Modernization and Risk Management

Beware of Cloud Computing Myths

Configuration Management

The IT Infrastructure Library - a tool for creating and maintaining value in IT services

Regional Contracting Opportunities. McGuire AFB, Ft. Dix and NAVFAC Mid-Atlantic plus Fort Drum

North Shore Chapter. CPIM Workshops - Spring 2006

Xerox Printer Install for MAC

SAMATE (Software Assurance Metrics And Tool Evaluation) Project Overview. Tim Boland NIST May 29,

CONTRACTORS ASSOCIATION OF WEST VIRGINIA PRESENTS THE

Fairfax County Comprehensive Transit Plan and Transit Development Plan

ACUIA Region 5 Meeting October 3-4, 2011 SEFCU, Albany, NY

Your name and address. This is where the reimbursement check will be mailed.

N Sam Houston Pkwy E

N Sam Houston Pkwy E

St. Louis DB2 User Group Meeting

MOST TRUSTED ADVISER IN THE TOLL INDUSTRY

CONTRACTORS ASSOCIATION OF WEST VIRGINIA PRESENTS THE

Style Guide. For Athletics logos and standards, please contact Athletics or visit

October 21-23, 2013 Holly Springs, NC

NEBB TECHNICAL RETRO-COMMISSIONING SYSTEMS (RCX) SEMINAR OF EXISTING BUILDING RC X SEMINAR DATES MONDAY WEDNESDAY SEPTEMBER 26 28, 2016

Utility Companies Management & Relationships Utilities Contact List August 8, 2014

Dulles Area Transportation Association

Danfoss Food Retail Winter/Spring

REGISTERED LEED GOLD IN STERLING, VA & Woodland Road

Silicon, Silanes, Silicones and You: Ordinary and Extraordinary Applications of Silicon and Silicon- Containing Compounds

STEP 1 STEP 2 STEP 3 STEP 4. Factory Installation & Service Training. Factory Installation & Service Training at the Colville, WA Factory

PLANNING COMMISSION WORK SESSION

507 N Sam Houston Pkwy E

Delta Sigma Theta Sorority, Inc. A Service Sorority Grand Chapter

UNPARALLELED LOCATION

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

CO2 Urban Synthesis and Analysis ("CO2-USA") Network

CUPROTECT SHIELDINGSYSTEMS USA

2011 Aetna Producer Certification Help Guide. Updated July 28, 2011

New York Building Congress May 24, Uday Durg, P.E. Senior Vice President & Chief Engineer MTA Capital

PLANNING COMMISSION WORK SESSION

Bremner Transformer Station and Cable Tunnel PROGRESS OF THE CLASS ENVIRONMENTAL ASSESSMENT STUDY

Carnegie Conference Center

Proposed FY 06 Project Development Program and FY 05 Project Development Program Update

LIST OF LICENSED LABORATORIES

Off-Line The SC Midlands Chapter of the Information Systems Audit & Control Association

REQUEST FOR PROPOSAL (RFP)

I-495 & I-270 Managed Lanes Study. Edit presentation title MM/DD/YYYY 1

Record of Public Comment on Central Corridor SDEIS

COMMITTEE ON EARTH SCIENCE AND APPLICATIONS FROM SPACE October 4 5, 2016 Keck Center 500 Fifth Street NW Washington D.C. Room 201

The Number Plane THE NUMBER PLANE PASSPORT.

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

September Dear Exhibitor:

New Jersey Subcontractors Association Post Office Box 200, Manasquan, NJ Phone * Fax *

Style Guide. For Athletics logos and standards, please contact Athletics or visit

Energy Report. AEE Central PA Chapter April 8th Meeting Announcement APRIL MEETING NOTICE

Please complete the application and return it to your local Good News Garage office:

LICENSING INFORMATION RESOURCE MANUAL

Traveler Information In Virginia

Appalachia Intermediate Unit 8

Ericsson Learning Services North America Student Information Packet

Join Us for our First Event of the Section s Season

SECTION 2 NAVIGATION SYSTEM: DESTINATION SEARCH

Off- Peak +46% Peak +24% NJT- North New vs. Old. NJT- North New vs. Old. NJT-North Off-Peak cost now 38% higher

ASH Group Information and FAQ's

Atlantic Capital Exchange ACE Secure Browser Quick Start Guide

Facilities Strategic Planning. Community Centers Stakeholder Group October 16, 2017 Jeanne Justice

Important Announcements

507 NORTH BELT 507 N SAM HOUSTON PKWY E, HOUSTON, TX 77060

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report

Northern Virginia Transportation Authority

SECTION 106 ACTIVITIES ANNUAL REPORT

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

K. E. G. S. KOMPUTER ENTHUSIASTS OF GREATER SEATTLE

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Christopher P. Hodges, PE, RRC, CFM, LEED AP, IFMA Fellow, FRICS Principal

Meeting Notifications for Cisco Unified MeetingPlace for Lotus Notes

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

TRAVEL AND EXPENSE REIMBURSEMENT INFORMATION

SANS Vendor Offerings Detail

Virginia Transit Update

Tolling 101: What You Need to Know. Warren Cooksey October 16, 2018

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

TWO RIVERS BUS STOPS AND BUS INFORMATION

VEITHsymposium General Information and Faculty Travel and Expense Policy

NEBB Sound and Vibration (S&V) Certified Professional Seminar

The Recovery and Monitoring Program of New Jersey (Keep this sheet for your files)

Cleanroom Performance

ATTENDEE REGISTRATION POLICY

Transit Development Plan/Transportation Demand. Chuck Steigerwald Director of Strategic Planning. Management Plan

By signing this form, I attest that I did participate in this education session, in its entirety. Signature: Date:

CCHMC Annual Badge Renewal Training

TOWARDS A TRANS-ATLANTIC SOLUTION TO UNIVOCALLY IDENTIFY MEDICINAL PRODUCTS

CONSOLIDATED MEDIA REPORT B2B Media 6 months ended June 30, 2018

Scottsdale Regional Training September 11 & 12, 2018 At SkySong in Scottsdale, AZ

NYC Metro Area Oracle Users Group Day

Presentation to the Maryland Competitiveness Coalition. Michele L. Whelley, President & CEO June 19, 2013

J.D. Power and Associates Reports: Overall Wireless Network Problem Rates Differ Considerably Based on Type of Usage Activity

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

A Plan to Connect Baltimore

InfoGenesis Las V egas

SECTION 106 ACTIVITIES ANNUAL REPORT

SALE LEASE CALL CENTER

Transcription:

American Society for Quality (ASQ) Washington, DC & Maryland Metro Section (509), Software Special Interest Group (SSIG) IEEE Computer Society Washington, DC & Northern Virginia Chapters Society for Software Quality (SSQ) Washington, DC Area Chapter Software Assurance Metrics And Tool Evaluation (SAMATE) Overview by: Tim Boland Tuesday May 29, 2012 Software Assurance Metrics And Tool Evaluation (SAMATE) is a broad and inclusive project at the U.S. National Institute of Standards and Technology (NIST), with the goal of improving software assurance by developing materials, specifications, and methods to test tools and techniques and measure their effectiveness. The presentation will review some SAMATE sub-projects/activities, including the SAMATE Reference Dataset, a public repository of thousands of example programs with known weaknesses, and the Static Analysis Tool Exposition (SATE). Several possible questions for research are also raised. Software metrics are incomplete without metrics of what are variously called weaknesses, bugs, flaws, or faults. Some issues with such metrics include how to: designate weaknesses, distinguish weaknesses, and identify locations of weaknesses. The presentation concludes with a list of concepts (such as location to fix or attack ) which may be a useful basis for studying weakness metrics. Information on the SAMATE Project may be accessed at: http://samate.nist.gov Tim Boland is a Computer Scientist in the Software and Systems Division, Information Technology Laboratory, National Institute of Standards and Technology, U.S. Department of Commerce. He has experience in researching various testing, measurement, and assessment issues involving software. Mr. Boland has an M.S. in Meteorology from Penn State University and an M.S. in Computer Science from the University of Maryland. Page 1 of 6

Tuesday May 29, 2012 5:30 PM Networking and Pizza(*) 5:50 6:50 PM Program (*) There is no cost to attend at McLean and Silver Spring. Locations: The presentation will originate at the McLean facility, with video tele-conferencing (VTC) between: MITRE-2, room 1N100 7515 Colshire Drive McLean, VA 22102 host: Scott Ankrum cell: 240-731-7581 MITRE, room 2503 260 Industrial Way West Eatontown, NJ 07724 host: Aaron Dagen desk: 732-578-6301 FDA, Bld 66, room G512 10903 New Hampshire Ave Silver Spring, MD 20993 host: James Simpson cell: 301-996-4976 MITRE, room 1M306 202 Burlington Rd (Rt. 62) Bedford, MA 01730 host: Tim Rice cell: 978-758-2704 If you can host another location via VTC, please contact Scott Ankrum (below) TO ATTEND THE MeetingPlace Collaboration CONFERENCE: 1. Go to: http://audioconference.mitre.org/ 2. Click on Attend Meeting. If MeetingPlace Collaboration Window does not automatically open, press connect. 3. Dial your telephone to connect to the audio of the meeting. Dial 703-983-6338 (x36338) from the Washington DC region. Dial 781-271-6338 (x16338) from the Bedford, MA region. Meeting ID: 509509, when prompted. Meeting Password: 05090509, when prompted. Visit http://audioconference.mitre.org to test your web browser for compatibility with the web conference. Follow this link to the browser test link on the page. Registration: Registration Website: http://www.asq509.org/ht/d/dosurvey/i/26913 You must register by noon on Monday, May 28. If you cannot attend at any location, select telephone dialin when you register. FDA (Silver Spring) cannot host non-citizen visitors. If not a US citizen, please provide your title, employer, and address. Allow 2 business days for registration before the meeting. For registration problems or further information contact Scott Ankrum at: ankrums@mitre.org or 703-983-6127 Software SIG Chairman: T. Scott Ankrum (ASQ & IEEE) Software SIG Committee: Chris Jones (ASQ & SSQ); Alfred Kromholz (SSQ); Tim Rice; James M. Simpson (ASQ); Rhonda Farrell (IEEE), Tom Neff (IEEE), Lance Kelson (SSQ & IEEE), Aaron Dagen (IEEE); Girish Seshagiri; John Forbes; Meg Weinberg; Joyce Byrne, Tom Everett Sponsored Jointly By: The American Society for Quality (ASQ), Washington DC & Maryland Metro Section (509), Software Special Interest Group (SSIG); IEEE Computer Society, Washington, DC & Northern Virginia Chapters; and Society for Software Quality (SSQ), Washington, DC Area Chapter. Members of the ASQ SSIG include software quality professionals, software engineers, and others interested in applying quality principles to the field of software development. See our web page: http://www.asq509.org/ht/d/sp/i/2499/pid/2499. We meet every month, usually at the MITRE facility in Tyson s Corner, Virginia, with VTC to other locations. Next Month: Cloud Computing Security Standards by Dawn Leaf, on Tuesday, June 26, 2012 Page 2 of 6

Directions to the MITRE-2 Facility in McLean, Virginia: Take the Beltway, I-495 to Virginia. Take Exit 46B (McLean, Route 123). Take Route 123 North, (also called Dolley Madison Blvd.) and go to the second traffic light at Colshire Drive. Turn right on Colshire Drive and continue through circle on Colshire. Park in front of or to the right of the buildings, before passing the gate. (The gates are closed at 7:00). Additional directions can be found at: http://www.mitre.org/about/locations/va_mclean_mitre2.html Page 3 of 6

Directions to the FDA facility in Silver Spring, MD: From the Capital Beltway, I-495, take New Hampshire Ave, Rt 650 north to Michelson Rd. From Columbia Pike, Rt 29, take New Hampshire Ave, Rt 650 south to Michelson Rd From the Capital Beltway, I-495, take New Hampshire Ave, Rt 650 north to Michelson Rd. From Columbia Pike, Rt 29, take New Hampshire Ave, Rt 650 south to Michelson Rd White Oak Building 66 (circled), room G512. This is a large conference room just beyond the Security desk on the right side of the grand atrium. After 6 PM, visitors may use the surface parking closest to the building 66 entrance which are reserved for commuters with car pools. The north east parking garage is also an option. Page 4 of 6

Directions to the MITRE Facility in Eatontown, New Jersey: From the New Jersey Turnpike If traveling from the SOUTH, get off the Turnpike at Exit 7A (195 toward Shore Points). Take 195 East towards the ocean and shortly after 195 turns into Route 138 (approximately 35 miles) watch for Route 18 North (Eatontown). Take Route 18 North to Exit 13A (Wayside West/Wyckoff Road). At end of ramp, bear left. At first traffic light (Hope Road) make a left turn. Make second left turn onto Industrial Way. The MITRE Corporation is next to the First Atlantic Credit Union on the left hand side of Industrial Way. There is a MITRE sign out front. There are two buildings on the left side of Industrial Way. The first building is MITRE, the second building is TYCO. Take a left turn into the parking lot of the first building, which is MITRE. If traveling from the NORTH, get off the Turnpike at Exit 11 (Garden State parkway exit). Follow the Garden State Parkway until Exit 105 (Eatontown). Follow the directions from the Garden State Parkway below. From the Garden State Parkway: Follow the Garden State Parkway from the North or from the South to Exit 105 (the exit numbers increase going from south to north). After paying the toll at Exit 105, make first right turn onto Hope Road. Follow Hope Road to Industrial Way (second left turn after crossing Wyckoff/Shafto Road). Make second left turn onto Industrial Way. The MITRE Corporation is next to the First Atlantic Credit Union on the left hand side of Industrial Way. There is a MITRE sign out front. There are two white buildings on the left side of Industrial Way. The first building is MITRE, the second building is TYCO. Take a left turn into the parking lot of the first building, which is MITRE. When you are facing the front of the MITRE building, the entrance to the ASQ meeting will be from the left parking lot opposite First Atlantic bank. Follow the signs to the conference room. Page 5 of 6

Directions to the MITRE complex in Bedford, Massachusetts: From New Hampshire to MITRE Complex: Take Route 3 South to Exit 26 (Route 62) Turn Left on Route 62. It is a short distance to the MITRE entrance on left--watch for building directories on MITRE grounds From Manchester Airport (NH) to MITRE Complex: Start out going West on Airport Rd. toward parking Turn slight right onto Brown Ave/NH-3A Merge onto NH-101 West via the ramp on the left toward Bedford/Nashua Take the Everett Turnpike South exit toward Merrimack/Nashua Merge onto Everett Turnpike (toll road) Everett Turnpike becomes US-3 South Take exit 26 (Route 62) toward Bedford/Burlington Turn Left onto (Route 62) Burlington Road At second set of traffic lights, turn left at MITRE Bedford Campus entrance--watch for building directories on MITRE grounds. Logan Airport to MITRE Complex: Exit airport towards Route 1A South/Sumner Tunnel (I-93) Boston. Proceed through tunnel towards Storrow Drive (I-93 North). Take I-93 North eleven miles to Exit 37B (Route 128 (I-95) South). Take Route 128 (I-95) South six miles to Exit 32A. Take Exit 32A, and proceed on Route 3 North. Take Route 3 North for two miles to Exit 26 (Route 62). Bear right on Route 62. Take Route 62 a short distance to the MITRE Bedford Campus entrance on left--watch for building directories on MITRE grounds. Page 6 of 6