Installation Job Aid for VSP 4450GTX-HT- PWR+

Similar documents
Installation Job Aid for VSP 4850GTS

Installation Job Aid for Ethernet Routing Switch 3600 Series

Installation Job Aid for Ethernet Routing Switch 5900 Series

Installation Job Aid for Avaya Virtual Services Platform 8400

Installation Job Aid for Avaya Virtual Services Platform 7200 Series

Dell Networking S4810 Open Networking (ON) Getting Started Guide

Dell Networking S4100-ON Series. Set-Up Guide

Preparing to Install the VG248

S5048F-ON. Set-up Guide

S4112-ON Series. Setup Guide

VEP4600. Setup Guide

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

Dell MD1280 Storage Enclosure Getting Started Guide

Installation and Maintenance

LVN5200A-R2, rev. 1, Hardware Installation Guide

TRC-190 User s Manual

TRC-190 User s Manual

Replacing the Power Supply

Installing Avaya Ethernet Routing Switch 4900 Series

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

Installation Manual. Mounting Instructions Mechanical Mounting. Luminato. Teleste Corporation

Installation Manual for D1800 Series High Power PoE Midspan Power Supply

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

Installing the IPS 4345 and IPS 4360

FVT Slot Media Converter Chassis w/ Redundant Power User Manual

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

Installing and Configuring Rialto Analytic Appliances

3-Phase, Dual-Input 6-Slot Power Supply System STARTUP GUIDE

Lightspeed Advanced Reporting Bottle Rocket Hardware Installation Guide

Installation Notes for the Catalyst 3750-X and 3560-X Switch Power Supply Modules

Table of Contents Quick Install Guide page Introduction Safety Rack System Precautions ESD Precautions...

HPE Port and 48-Port Switches Quick Setup Guide

OV-MCR116. Media Converter Chassis System. User s Manual

G5 PDU Installation Guide

INSTALLATION GUIDE. AXIS 291 1U Video Server Rack ENGLISH FRANÇAIS DEUTSCH ITALIANO ESPAÑOL

Installing the ASA 5550

QUICK START GUIDE 7000 SERIES DEVICES. 3D7010/7020/7030 (Chassis: CHRY-1U-AC) 3D7115/7125, AMP7150 (Chassis: GERY-1U-4C8S-AC)

Switch Installation. Preparing for Installation. Safety Warnings

Junos WebApp Secure 5.0 Hardware Guide

QUICK START GUIDE 7000 SERIES DEVICES

iconverter 2-Module Power Chassis

ClearCube F6151 Media Converter Chassis System with 10/100BaseTX to 100BaseFX Converter

60W Power over Ethernet Waterproof Adapter PoE IEEE BT Single Port Injector for Outdoor Application

Dell SC7020 Storage Controller Getting Started Guide

Model 2380 Rack-Mount Kit

Power Supply Installation

Dell SC5020 and SC5020F Storage Systems Getting Started Guide

Preparing to Install the Cisco AS5350XM Universal Gateway

Dell SCv3000 and SCv3020 Storage System Getting Started Guide

Installing Avaya Virtual Services Platform 4850GTS Series

Manual Version: V1.00. Video Decoder Quick Guide

INJ-24A Series Quick Installation Guide

Installing a Network Module

ExtremeSwitching 210 and 220 Series Switches: Hardware Installation Guide

Upgrading and Servicing Guide

Installing the Cisco SFS 3504 Server Switch

Perle MCR200 Installation Guide

100 - SERIES NETWORK SWITCHES QUICK START GUIDE

Site Preparation CHAPTER

Quick Start Guide. C-100 Series Switches

Agilent 70612B K18 Switch Matrix

Dell SC460 Expansion Enclosure Getting Started Guide

InnoMedia Business VoIP ATA Models

Installation and Getting Started Guide. HP ProCurve 600/610 External Power Supplies. PoE. Power over Ethernet Devices

Installing Avaya Ethernet Routing Switch 4800 Series

User Guide CPSMP VAC Power Supply Module: PointSystem CPSMC Accessory CPSMC Accessory. Contents.

Installing and Managing the Switch

hp uninterruptible power system r12000 xr models installation instructions

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

E-Series Site Preparation Guide

Industrial 5-Port Fast Ethernet Switches with SFP Slot and optional 4 PoE PSE Ports. Basic Model: KSD-541 PoE Model: KSD-541-P. Installation Guide

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

300 - SERIES NETWORK SWITCHES QUICK START GUIDE

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

EMC1600 Series Media Converter and Ethernet Extender Chassis

Upgrading and Servicing Guide

USP-070-B08 USP-104-B10, USP-104-M10 USP-156-B10

InView Marquee Message Display

SYSTIMAX 360 ipatch Network Manager Module Faceplate Instructions

Summit Virtual Chassis Design and Installation Guide

Install the Cisco ONS CL

Dell Storage Center. Getting Started Guide. SCv2000 and SCv2020 Storage System. Regulatory Model: E09J, E10J Regulatory Type: E09J001, E10J001

MC 11 EB-2 Power supply cabinet with external bus, AC version

Installing the Cisco MDS 9020 Fabric Switch

Start Here. Features. Model DS108 Dual Speed Hub Installation Giude

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

Switch Installation. Preparing. Safety Warnings CHAPTER

Model 2380 Rack-Mount Kit

DMC-1000 Chassis-Based Media Converter

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

CSM200 Expansion Tray

Rhino Redundancy Module PSM24-REM360S. Operating Instructions

Installing a Network Module

Media Conversion Rack-Mount Chassis AT-MCR12. Installation Guide Rev. A

AI130 AIswitch Series 130 Chassis Installation Guide

Thank you for selecting UTC RETAIL s innovative Model 1170 Point of Sale solution!

Dell Networking S3100 Series Installation Guide. June 2016

PV Rapid Shutdown device

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B.

Transcription:

Installation Job Aid for VSP 4450GTX-HT- PWR+ Notices Release 6.1.0.0 NN46251-305 Issue 02.01 November 2017 Notice paragraphs alert you about issues that require your attention. The following paragraphs describe the types of notices used in this guide. Notes provide tips and useful information regarding the installation and operation of products. Electrostatic alert: ESD ESD notices provide information about how to avoid discharge of static electricity and subsequent damage to products. Caution: Caution notices provide information about how to avoid possible service disruption or damage to products. Warning: Warning notices provide information about how to avoid personal injury when working with products. Voltage: Danger High Voltage notices provide information about how to avoid a situation or condition that can cause serious personal injury or death from high voltage or electric shock. 2017, Extreme Networks, Inc. All Rights Reserved. 1

Danger: Danger notices provide information about how to avoid a situation or condition that can cause serious personal injury or death. Safety messages Warning: Installation must be performed by qualified service personnel only. Read and follow all warning notices and instructions marked on the product or included in the documentation. Voltage: This equipment relies on the building's installation for overcurrent protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15 A U.S. (240 VAC, 16 A International) is used on the phase conductors. Caution: This device is a Class A product. In a domestic environment, this device can cause radio interference, in which case the user may be required to take appropriate measures. Caution: When mounting this device in a rack, do not stack units directly on top of one another in the rack. Each unit must be secured to the rack with appropriate mounting brackets. Mounting brackets are not designed to support multiple units. Voltage: Use only power cords that have a grounding path. Without a proper ground, a person who touches the switch is in danger of receiving an electrical shock. Lack of a grounding path to the switch can result in excessive emissions. Warning: Disconnecting the power cord is the only way to turn off power to this device. Always connect the power cord in a location that can be reached quickly and safely in case of an emergency. Warning: Fiber optic equipment can emit laser or infrared light that can injure your eyes. Never look into an optical fiber or connector port. Always assume that fiber optic cables are connected to a light source. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 2

Caution: Risk of high current and board burn out if battery is replaced by an incorrect type. Dispose of used batteries according to the instructions. Warning: The lithium battery is not field replaceable. It must only be removed and replaced by authorized personnel. Contact Technical Support for assistance if the battery requires replacement. Before you begin Ensure the area where you install and use the Extreme Networks Virtual Services Platform 4000 switch meets the following environmental requirements: Ambient temperature between 0 and 70 C Relative humidity between 0% and 95% noncondensing No nearby heat sources such as hot air vents or direct sunlight No nearby sources of severe electromagnetic noise No excessive dust Adequate power source within six feet; one 15-Amp circuit required for each power supply At least 2 inches (5.08 cm) on all sides of the switch unit for ventilation Adequate space at the front and rear of the switch for access to cables If you are installing a single VSP 4000 switch on a table or shelf, ensure the surface can support at least 15 to 20 pounds (7 to 9 kilograms). Installing the VSP 4450GTX-HT-PWR+ Do not use the ERS to VSP conversion kit with this chassis. The kit is incompatible with the VSP 4450GTX-HT-PWR+. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 3

Installing the Virtual Services Platform 4000 on a table or shelf You can install a single VSP 4000 switch on any flat surface. The surface must support the combined weight of the switch and attached cables (from 15 and 20 pounds [7 to 9 kilograms]). A factory-supplied 4450GTX-HT-PWR+ switch has a USB slot but no USB device or cover. To install a VSP 4000 on a table or shelf, perform this procedure. 1. Attach the included rubber footpads on the bottom of the switch at the locations indicated. 2. Set the switch on a table or shelf as illustrated below. Allow at least 2 inches (5.1 centimeters) on each side for proper ventilation and at least 5 inches (12.7 centimeters) at the back for power cord clearance. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 4

Installing the Virtual Services Platform 4000 in an equipment rack To install a VSP 4000 switch in an equipment rack, perform this procedure. A factory-supplied 4450GTX-HT-PWR+ switch has a USB slot but no USB device or cover. Prerequisites for installing the VSP 4000 switch in an equipment rack: Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack. The rack is bolted to the floor and braced if necessary. The rack is grounded to the same grounding electrode used by the power service in the area. The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode. 1. Attach the L-bracket to each side of the switch using a #2 Phillips screwdriver as illustrated below. 2. Slide the switch into the rack as illustrated. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 5

3. Insert and tighten the rack-mount screws. Installing SFP transceivers Install SFP transceivers by performing this procedure. 1. Remove the transceiver from the protective packaging. 2. Verify that the transceiver is the correct model for the network configuration. 3. Grasp the transceiver between your thumb and forefinger. 4. Insert the transceiver into the proper module on the switch. Apply a light pressure to the transceiver until it clicks and locks into position in the module. 5. Remove the dust cover from the transceiver optical bores. Removing SFP transceivers Remove SFP transceivers by performing this procedure. 1. Disconnect the network fiber cable from the transceiver. 2. Use the locking mechanism on the transceiver to release it. The locking mechanism varies from model to model as illustrated below. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 6

3. Slide the transceiver from the module slot. 4. If the transceiver does not slide easily from the module slot, use a gentle side-to-side rocking motion while firmly pulling the transceiver from the slot. 5. Attach a dust cover over the fiber-optic bores and store the transceiver in a safe place until you need it. Important: Discard transceivers in accordance with the proper laws and regulations. Power specifications for VSP 4450GTX-HT- PWR+ The following table describes the regulatory AC power specifications for the VSP 4450GTX-HT- PWR+ switch. The regulatory power specifications are based on the maximum rated capacity of the power supplies and are not based on typical power consumption which is lower. Table 1: AC power specifications Input Current: Input Voltage (rms): Power Consumption: 4450GTX-HT-PWR+ 16.66A/8.33A 100 to 240VAC at 50 to 60 Hz Without PoE+ - Typical: 100W - Maximum: 145W With PoE+ - Typical power utilization depends on the number of ports using PoE+. - Maximum power utilization depends on the number of PSUs deployed and the temperature range in which the switch operates. With one operating PSU, the maximum power consumption is: Table continues November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 7

Thermal Rating: Inrush Current: Turn on Condition: Efficiency: 4450GTX-HT-PWR+ 860W between 0 C to 50 C 400W between 50 C to 70 C With two operating PSUs, the maximum power consumption is: 1660W between 0 C to 50 C 832W between 50 C to 70 C 341.2 BTU/Hr typical and 494.8 BTU/Hr maximum 70A maximum 1 second maximum after application of AC power 70 percent minimum Virtual Services Platform power supply power specification The VSP 4450GTX-HT-PWR+ supports two external field replaceable power supplies. One power supply ships with the chassis. You can install a secondary power supply to provide redundancy, load sharing, and to add Power over Ethernet Plus (PoE+) power budget on PWR+ models. 1000W AC power supply VSP 4450GTX-HT-PWR+ supports dual 54V 1000W Power over Ethernet Plus (PoE+) AC power supplies. Important: Ensure that you use only 1000W power supplies (both primary and secondary) on VSP 4450GTX-HT-PWR+ models. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 8

Figure 1: 1000W AC power supply Connector The 1000W AC power supply uses an IEC 60320 C16 AC power cord connector. The AC power cord is in close proximity to the hot air exhaust, and supports high operating temperatures. Figure 2: IEC 60320 C16 connector Power over Ethernet Plus specifications Table 2: VSP 4450GTX-HT-PWR+ model 0 C to 50 C 50 C to 70 C 1 PSU 860W 400W 2 PSU 1660W 832W Table 3: VSP 4450GTX-HT-PWR+ model with 1 PSU 0 C to 50 C 50 C to 70 C PoE support on 48 ports 23 ports PoE+ support on 26 ports 13 ports November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 9

Table 4: VSP 4450GTX-HT-PWR+ model with 2 PSUs 0 C to 50 C 50 C to 70 C PoE support on 48 ports 48 ports PoE+ support on 48 ports 26 ports VSP 4450GTX-HT-PWR+ can support 802.3af 17.8W or 32.4W on each port with one power supply installed. You can add a second power supply for redundancy. Installing the VSP 4450GTX-HT-PWR+ power supply You must install at least one power supply before using the switch. VSP 4000 PWR+ models support two field replaceable external power supplies. If supported, you can install an optional second power supply for redundancy, load sharing, or to provide additional PoE+ power budget. Perform the following procedure to install an external power supply into your switch. The VSP 4000 hardware can vary. This procedure only applies to hardware models with field replaceable power supplies. 1. If a blanking plate covers the required power supply slot, remove the blanking plate before attempting to insert the power supply. 2. Insert each power supply into a front power supply slot. 3. Verify that each power supply is fully seated in the slot. Secure the power supply with the two thumb screws. The switch chassis can prevent an incorrect installation of a power supply. If you insert a power supply upside down, it will not fully insert and the thumb screws will not engage. 4. Once you install a power supply, you can proceed with connecting AC power. Important: You can hot swap power supplies while the switch is operational. One power supply is required for continued switch operation. PoE+ load reductions can occur if you remove one power supply while the switch is operating with dual power supplies. Connecting to AC power To connect AC power to the switch, you need an appropriate AC power cord as described in the following table, also see the following table for plug specifications. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 10

Table 5: International power cord specifications Country and Plug Specification Specifications Typical Plug Continental Europe: CEE7 standard VII male plug Harmonized cord (HAR marking on the outside of the cord jacket to comply with the CENELEC Harmonized Document HD-21) United States of America, Canada, and Japan: NEMA5-15P male plug UL-recognized (UL stamped on cord jacket) CSA-certified (CSA label secured to the cord) United Kingdom: BS1363 male plug with fuse Harmonized cord 220 or 230VAC 50 Hz Single phase 100 or 120VAC 50 60 Hz Single phase 240VAC 50 Hz Single phase Australia: AS3112-1981 male plug 240VAC 50 Hz Single phase Danger: Using power cords with a proper grounding path Use only power cords that have a grounding path. Without a proper ground, a person who touches the switch is in danger of receiving an electrical shock. Lack of a grounding path to the switch can result in excessive emissions. November 2017 Installation Job Aid for VSP 4450GTX-HT-PWR+ 11