DOE EM Web Refresh Project and LLNL Building 280

Similar documents
Development of Web Applications for Savannah River Site

Go SOLAR Online Permitting System A Guide for Applicants November 2012

NIF ICCS Test Controller for Automated & Manual Testing

Authentication Protocol for Industrial Control Systems without Encryption

CHANGING THE WAY WE LOOK AT NUCLEAR

D&D Knowledge Management Information Tool (KM-IT)

METADATA REGISTRY, ISO/IEC 11179

KCP&L SmartGrid Demonstration

Alignment and Micro-Inspection System

Portable Data Acquisition System

Using a 64-bit Disassembler to Employ Heuristic Analysis of Executable Programs using Hyperion

Adding a System Call to Plan 9

Waste Treatment Plant (WTP) Pre-Engineering Platform (PEP) Automated Operation Control via Programmable Logic Controllers (PLC)

Washington DC October Consumer Engagement. October 4, Gail Allen, Sr. Manager, Customer Solutions

@ST1. JUt EVALUATION OF A PROTOTYPE INFRASOUND SYSTEM ABSTRACT. Tom Sandoval (Contractor) Los Alamos National Laboratory Contract # W7405-ENG-36

COMPUTATIONAL FLUID DYNAMICS (CFD) ANALYSIS AND DEVELOPMENT OF HALON- REPLACEMENT FIRE EXTINGUISHING SYSTEMS (PHASE II)

High Scalability Resource Management with SLURM Supercomputing 2008 November 2008

The NMT-5 Criticality Database

FY97 ICCS Prototype Specification

NATIONAL GEOSCIENCE DATA REPOSITORY SYSTEM

PJM Interconnection Smart Grid Investment Grant Update

Large Scale Test Simulations using the Virtual Environment for Test Optimization

Testing PL/SQL with Ounit UCRL-PRES

Bridging The Gap Between Industry And Academia

I. PURPOSE III. PROCEDURE

TUCKER WIRELINE OPEN HOLE WIRELINE LOGGING

Intelligent Grid and Lessons Learned. April 26, 2011 SWEDE Conference

3D Visualization STUDENT SUMMER INTERNSHIP TECHNICAL REPORT DOE-FIU SCIENCE & TECHNOLOGY WORKFORCE DEVELOPMENT PROGRAM

and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

In-Field Programming of Smart Meter and Meter Firmware Upgrade

Entergy Phasor Project Phasor Gateway Implementation

Radiation Center Strategic Plan Mission, Vision, Goals and Strategies for Activities and Operations

Protecting Control Systems from Cyber Attack: A Primer on How to Safeguard Your Utility May 15, 2012

Final Report for LDRD Project Learning Efficient Hypermedia N avi g a ti o n

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho

SmartSacramento Distribution Automation

ENDF/B-VII.1 versus ENDFB/-VII.0: What s Different?

Opportunity to Participate in NRECA s RC3 SANS Voucher Program for FREE Cybersecurity Online Courses

Electronic Weight-and-Dimensional-Data Entry in a Computer Database

FSEC Procedure for Testing Stand-Alone Photovoltaic Systems

Real Time Price HAN Device Provisioning

The Nuclear Decommissioning Authority. Sir Anthony Cleaver, Chairman NDA

R. P. Evans (INEEL) J. G. Keller (INEEL) A. G. Stephens (ISU) J. Blotter (ISU) May 17, 1999 May 20, 1999

On Demand Meter Reading from CIS

Southern Company Smart Grid

POSITION DESCRIPTION

MULTIPLE HIGH VOLTAGE MODULATORS OPERATING INDEPENDENTLY FROM A SINGLE COMMON 100 kv dc POWER SUPPLY

NEODC Service Level Agreement (SLA): NDG Discovery Client Service

Stereo Vision Based Automated Grasp Planning

TECHNOLOGY SUPPORT SERVICE LEVEL AGREEMENT

Stewarding NOAA s Data: How NCEI Allocates Stewardship Resources

Scientific Data Policy of European X-Ray Free-Electron Laser Facility GmbH

ACCELERATOR OPERATION MANAGEMENT USING OBJECTS*

Advanced Synchrophasor Protocol DE-OE-859. Project Overview. Russell Robertson March 22, 2017

Systems Integration Tony Giroti, CEO Bridge Energy Group

GA A26400 CUSTOMIZABLE SCIENTIFIC WEB-PORTAL FOR DIII-D NUCLEAR FUSION EXPERIMENT

Accreditation Body Evaluation Procedure for AASHTO R18 Accreditation

Using Joinup as a catalogue for interoperability solutions. March 2014 PwC EU Services

Controlling the Project Pipeline: Managing Constraints to Maximize Outputs

Open Data Policy City of Irving

Government Resolution No of February 15, Resolution: Advancing National Regulation and Governmental Leadership in Cyber Security

Information to Insight

Collaborating with Human Factors when Designing an Electronic Textbook

79th OREGON LEGISLATIVE ASSEMBLY Regular Session. Senate Bill 90

Federal Government. Each fiscal year the Federal Government is challenged CATEGORY MANAGEMENT IN THE WHAT IS CATEGORY MANAGEMENT?

HPE Energy Efficiency Certification Service

Site Impact Policies for Website Use

Section I. GENERAL PROVISIONS

ESNET Requirements for Physics Reseirch at the SSCL

Annual Report for the Utility Savings Initiative

Graphical Programming of Telerobotic Tasks

LosAlamos National Laboratory LosAlamos New Mexico HEXAHEDRON, WEDGE, TETRAHEDRON, AND PYRAMID DIFFUSION OPERATOR DISCRETIZATION

Navigating through the Risks and Challenges of implementing Green IT Projects

Washington State Emergency Management Association (WSEMA) Olympia, WA

Optimizing Bandwidth Utilization in Packet Based Telemetry Systems. Jeffrey R Kalibjian

Competency Definition

PJM Interconnection Smart Grid Investment Grant Update

Mitigation Framework Leadership Group (MitFLG) Charter DRAFT

On-site Time and Material Rates for Equipment Not Covered under an HP Service Contract

REAL-TIME MULTIPLE NETWORKED VIEWER CAPABILITY OF THE DIII D EC DATA ACQUISITION SYSTEM

KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT)

Resource Management at LLNL SLURM Version 1.2

MAS. &lliedsignal. Design of Intertransition Digitizing Decomutator KCP Federal Manufacturing & Technologies. K. L.

WEBSITE DESIGN, DEVELOPMENT AND HOSTING SERVICES

Implementation of the AES as a Hash Function for Confirming the Identity of Software on a Computer System

NASA Policy Directive

Decommissioning Legacy Networks

Table of Contents 6.1 CORRESPONDENCE

Master Information Security Policy & Procedures [Organization / Project Name]

AUDIT UNITED NATIONS VOLUNTEERS PROGRAMME INFORMATION AND COMMUNICATION TECHNOLOGY. Report No Issue Date: 8 January 2014

CASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION. Alan Stuart, Managing Director System Infrastructure Innovators, LLC

Contents USER S MANUAL 1

Facility Security Policy

IEEE Electronic Mail Policy

Java Based Open Architecture Controller

Big Data Computing for GIS Data Discovery

University of Hawaii Hosted Website Service

DERIVATIVE-FREE OPTIMIZATION ENHANCED-SURROGATE MODEL DEVELOPMENT FOR OPTIMIZATION. Alison Cozad, Nick Sahinidis, David Miller

ISO INTERNATIONAL STANDARD. Information and documentation Records management Part 1: General

Global Standards Information. Standards Simulation Training for the USG ICES Workshop. July 6, 2010

Transcription:

STUDENT SUMMER INTERNSHIP TECHNICAL REPORT DOE EM Web Refresh Project and LLNL Building 280 DOE-FIU SCIENCE & TECHNOLOGY WORKFORCE DEVELOPMENT PROGRAM Date submitted: September 14, 2018 Principal Investigators: Alejandro Koszarycz, DOE Fellow Student Florida International University Mr. Andrew Szilagyi, Mentor DOE EM, Germantown, MD Florida International University Program Director: Leonel Lagos Ph.D., PMP Submitted to: U.S. Department of Energy Office of Environmental Management Under Cooperative Agreement # DE-EM0000598

DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, nor any of its contractors, subcontractors, nor their employees makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe upon privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any other agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.

ABSTRACT This report provides an overview of the 2018 summer internship served with the Department of Energy s Office of Environmental Management in the Office of Infrastructure and D&D (EM- 4.11) based at the Germantown, Maryland, facility headquarters. Over the duration of the internship, the tasks assigned included: 1) supporting the web refresh project, specifically updating the Facility Infrastructure Management & D&D section, and 2) the Lawrence Livermore National Laboratory Building 280 project. This report will explore each of the project tasks to provide a brief overview of the entire internship experience and what was accomplished during the summer. iii

TABLE OF CONTENTS ABSTRACT... iii TABLE OF CONTENTS... iv LIST OF FIGURES...v 1. INTRODUCTION...1 2. EXECUTIVE SUMMARY...2 3. INTERNSHIP DESCRIPTION...3 4. RESULTS...8 5. CONCLUSIONS...9 6. REFERENCES...10 iv

LIST OF FIGURES Figure 1. DOE EM website taxonomy.... 3 Figure 2. Snagit screen capture software.... 4 Figure 3. DOE EM website inventory.... 5 Figure 4. DOE EM public website form (PWF).... 6 Figure 5. LLNL Building 280.... 7 Figure 6. Interior cracking for LLNL Building 280.... 7 Figure 7. DOE EM 4.11 website inventory.... 8 v

1. INTRODUCTION Over the duration of the summer internship with the DOE EM Office of Infrastructure and Deactivation and Decommissioning (D&D) in Germantown, MD, Alejandro Koszarycz had the opportunity to work alongside Andrew Szilagyi (DOE EM 4.11). The project tasks assigned over the summer reflected a wide spectrum of duties. The two main project tasks included the web refresh project for the DOE EM website, headed by Lauren Milone, and the Lawrence Livermore National Laboratory (LLNL) Building 280 D&D project, headed by Claude Magnuson. The web refresh project was a collaborative task assigned to archive the outdated web content across the DOE EM website while updating and providing new content corresponding to the taxonomy of the website. The website is broken into 4 main sections: Services, Program Scope, Mission, and About Us. Each main section includes various subsections to organize additional information. Mr. Koszarycz was tasked with updating web content, pictures, and videos while working with in-house contractors and staff to represent the mission and accomplishments of the facility infrastructure management and D&D sectors. The LLNL Building 280 project had recently gotten approval to proceed with D&D and was beginning to receive allocations of funding. Mr. Koszarycz was tasked with organizing and maintaining a log/record of information from weekly and monthly meetings and circulating emails related to this project. He was specifically charged with taking notes during the weekly and monthly teleconference meetings among the project stakeholders as well as summarizing progress, information, and action items for the rest of the EM 4.11 staff to send reports in a timely fashion. 1

2. EXECUTIVE SUMMARY This research work has been supported by the DOE-FIU Science & Technology Workforce Initiative, an innovative program developed by the US Department of Energy s Environmental Management (DOE-EM) and Florida International University s Applied Research Center (FIU- ARC). During the summer of 2018, a DOE Fellow intern Alejandro Koszarycz spent 10 weeks doing a summer internship in Germantown, MD, working for the Department of Energy under the supervision and guidance of Andrew Szilagyi of EM-4.11, Office of Infrastructure and D&D. The intern s project was initiated on May 31, 2018 and continued through August 10, 2018 with the objective of maintaining the website inventory and refreshing/updating website content for EM- 4.11, as well as supporting the initiation of planning for the LLNL Building 280 deactivation and decommissioning. 2

3. INTERNSHIP DESCRIPTION Web Refresh Project The DOE EM external public website was last updated prior to the internship in 2016. Many dramatic changes have occurred since the website had last been updated: a new federal governmental administration with a shift in the scope and focus of EM, and new EM leadership. The website needed to reflect these changes and prioritize the new focus for EM work. Everyone collaborating in the web refresh project was tasked with archiving outdated web content across the EM website while updating and providing new content for the designated subsections of the new taxonomy (i.e., website organization). The first major task was to do a redesign of the taxonomy of the website. This entailed changing the focus and scope of the EM website due to policy and governmental changes. After multiple weeks of meetings and insights from all offices across EM, a final taxonomy was agreed to which provided the blueprint of the new website. Figure 1. DOE EM website taxonomy. 3

In order to update or make changes to information in the subsections of the taxonomy, every link on the website needed to be archived. This was achieved through the use of the Snagit tool. The Snagit tool is a screen shot program used to capture images and record videos. This tool was chosen to archive the old information on the website just in case there was a later need to retrieve it, such as during a future update of the website. Snagit provided the ability to capture entire web pages in both vertical and horizontal formats. Figure 2. Snagit screen capture software. 4

Once each link from a website subsection was snagged, archived, and put in its corresponding folder, the web inventory of that section was updated in order to keep track of all of the links in the corresponding section and document project progress. The web inventory had thousands of links and the project team had to go through each link individually to complete the web refresh project. This effort entailed reading the information from each link in the web inventory, assessing whether the information was outdated and needed to be archived or if it could be kept and updated with newer content from the monthly updates of active projects. The web inventory was used as a tool to track the work as well as to ensure that no data was inadvertently being deleted and wiped from the website without being archived. Figure 3. DOE EM website inventory. 5

Once the archival effort was complete, work shifted to updating the information and adding new content to web pages that were kept. The EM public website form (PWF) was used for this effort. Each web page was reviewed and the changes that needed to be made were documented, including everything from a simple new description for a figure caption to re-designing an entire webpage. The EM-4.11 staff worked collaboratively with the in-house contractors to accurately represent the mission and accomplishments of the facility infrastructure management and D&D sectors. Figure 4. DOE EM public website form (PWF). 6

LLNL Building 280 Project The LLNL Building 280 site was the location of a Livermore Pool-Type Reactor (LPTR), a pooltype research reactor cooled and moderated with light water. This facility served as an instrument for fundamental neutron-irradiation research and as a tool for measurement and calibration from 1956 until being decommissioned in 1980. Figure 5. LLNL Building 280. Early efforts in the LLNL Building 280 included neutron diffraction, fission, and capture gammaray studies. In the 1960 s, radiochemical and physical measurements on nuclear-explosive tests were performed and, in the 1970 s, trace-element measurements, radiation-damage studies, and radiochemical studies of the shorter lived fission products were executed. Fourteen beryllium reflector elements may be stored at the bottom of the reactor pool. As of 2011, the LLNL Building 280 was classified as a Tier I Non-nuclear Hazard. Inspections of the facility have identified large cracks in the concrete of the lower structure (Figure 6). Figure 6. Interior cracking for LLNL Building 280. The plan for the LLNL Building 280 project was to begin the process of selecting the contractors to perform the scope of work and to identify any constraints in beginning a full D&D effort. 7

4. RESULTS Web Refresh Project Figure 7 displays a brief screenshot captured from the EM 4.11 website inventory using the Snagit tool. Over 75% of the prior website content for EM 4.11 was archived and removed from the website. After reviewing the entire website, a huge amount of information was removed for a variety of reasons, with the most common including outdated information (within a 3 to 5 year timeframe), broken links within the webpage, design flaws, and information that was not relevant to the subsection category. Figure 7. DOE EM 4.11 website inventory. The remaining 25% of the webpages for EM-4.11 were either kept as is or updated with newer content. The project team worked collaboratively to update and modify embedded files as well as to provide more in depth information for the users with interactive newsletters, pictures, and videos. LLNL Building 280 Project The objectives of the weekly meetings for the LLNL Building 280 project were to status the progress being made on tasks ranging from funding, creating a schedule for all project parties, renting office space, hiring technical assistance, setting up a file sharing system, updating contracts that need to be signed by multiple parties, and assessing environmental review/nepa coverage. These meetings included all project stakeholders and aimed to clearly define the roles and responsibilities of each in order to delegate and complete these tasks in a time efficient fashion in order to progress to the active D&D of the site. From the first meeting to the last meeting, significant progress was made in all areas; for example, funding began to slowly trickle in for the removal of a trailer area on the designated land. All of the tasks listed above were completed by the end of the summer internship and the project team was waiting for approval from upper management to continue with more designated tasks. The only major issue encountered was the disbursement of funds due to prioritization of other EM projects. 8

5. CONCLUSIONS The web refresh project conducted during the summer internship at DOE HQ in Germantown, MD, had primary goals of creating a more user friendly website to navigate, reducing the number of links and repeated information, providing more up to date information/facts, and removing outdated information and broken links across the entire EM 4.11 website. The EM 4.11 section of the website was condensed by almost 80% and now provides the users with more accurate and up to date information on all of the active projects across the DOE complex through factsheets, PDF s, and newsletters. Navigation of the website was also made easier by reducing the number of links on the webpages and removing all broken links. In addition, users now have more up to date information regarding the project sites. 9

6. REFERENCES 1. Department of Energy Office of Environmental Management https://www.energy.gov/em/office-environmental-management 2. Deactivation and Decommissioning, Department of Energy https://www.energy.gov/em/services/site-facility-restoration/deactivation-decommissioningdd 10