Installation Job Aid for VSP 4850GTS

Similar documents
Installation Job Aid for VSP 4450GTX-HT- PWR+

Installation Job Aid for Ethernet Routing Switch 3600 Series

Installation Job Aid for Ethernet Routing Switch 5900 Series

Installation Job Aid for Avaya Virtual Services Platform 8400

Installation Job Aid for Avaya Virtual Services Platform 7200 Series

Dell Networking S4810 Open Networking (ON) Getting Started Guide

Dell Networking S4100-ON Series. Set-Up Guide

Preparing to Install the VG248

S5048F-ON. Set-up Guide

S4112-ON Series. Setup Guide

VEP4600. Setup Guide

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

Installation and Maintenance

TRC-190 User s Manual

Installation Manual. Mounting Instructions Mechanical Mounting. Luminato. Teleste Corporation

TRC-190 User s Manual

LVN5200A-R2, rev. 1, Hardware Installation Guide

Replacing the Power Supply

Dell MD1280 Storage Enclosure Getting Started Guide

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

Installing Avaya Ethernet Routing Switch 4900 Series

FVT Slot Media Converter Chassis w/ Redundant Power User Manual

Installation Manual for D1800 Series High Power PoE Midspan Power Supply

Installing the IPS 4345 and IPS 4360

OV-MCR116. Media Converter Chassis System. User s Manual

Installing the ASA 5550

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

Junos WebApp Secure 5.0 Hardware Guide

3-Phase, Dual-Input 6-Slot Power Supply System STARTUP GUIDE

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

Installing and Configuring Rialto Analytic Appliances

HPE Port and 48-Port Switches Quick Setup Guide

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

Lightspeed Advanced Reporting Bottle Rocket Hardware Installation Guide

G5 PDU Installation Guide

Table of Contents Quick Install Guide page Introduction Safety Rack System Precautions ESD Precautions...

Installation Notes for the Catalyst 3750-X and 3560-X Switch Power Supply Modules

ClearCube F6151 Media Converter Chassis System with 10/100BaseTX to 100BaseFX Converter

INJ-24A Series Quick Installation Guide

60W Power over Ethernet Waterproof Adapter PoE IEEE BT Single Port Injector for Outdoor Application

Upgrading and Servicing Guide

Dell SC7020 Storage Controller Getting Started Guide

INSTALLATION GUIDE. AXIS 291 1U Video Server Rack ENGLISH FRANÇAIS DEUTSCH ITALIANO ESPAÑOL

Switch Installation. Preparing for Installation. Safety Warnings

Manual Version: V1.00. Video Decoder Quick Guide

Agilent 70612B K18 Switch Matrix

Installing and Managing the Switch

Installing a Network Module

Installing Avaya Virtual Services Platform 4850GTS Series

EMC1600 Series Media Converter and Ethernet Extender Chassis

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

Industrial 5-Port Fast Ethernet Switches with SFP Slot and optional 4 PoE PSE Ports. Basic Model: KSD-541 PoE Model: KSD-541-P. Installation Guide

Perle MCR200 Installation Guide

Installing the Cisco SFS 3504 Server Switch

Site Preparation CHAPTER

DMC-1000 Chassis-Based Media Converter

QUICK START GUIDE 7000 SERIES DEVICES. 3D7010/7020/7030 (Chassis: CHRY-1U-AC) 3D7115/7125, AMP7150 (Chassis: GERY-1U-4C8S-AC)

Installing Avaya Ethernet Routing Switch 4800 Series

Power Supply Installation

ExtremeSwitching 210 and 220 Series Switches: Hardware Installation Guide

Model 2380 Rack-Mount Kit

QUICK START GUIDE 7000 SERIES DEVICES

Installation and Getting Started Guide. HP ProCurve 600/610 External Power Supplies. PoE. Power over Ethernet Devices

Preparing to Install the Cisco AS5350XM Universal Gateway

User Guide CPSMP VAC Power Supply Module: PointSystem CPSMC Accessory CPSMC Accessory. Contents.

Upgrading and Servicing Guide

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

iconverter 2-Module Power Chassis

Install the Cisco ONS CL

Installing and Removing SDRAM and DRAM

100 - SERIES NETWORK SWITCHES QUICK START GUIDE

PV Rapid Shutdown device

InView Marquee Message Display

Summit Virtual Chassis Design and Installation Guide

PT-7728/7828 Quick Installation Guide

InnoMedia Business VoIP ATA Models

SYSTIMAX 360 ipatch Network Manager Module Faceplate Instructions

MC 11 EB-2 Power supply cabinet with external bus, AC version

M215-Z Safety Information (M LL-IG-ZC)

Quick Start Guide. C-100 Series Switches

hp uninterruptible power system r12000 xr models installation instructions

Installing the Cisco MDS 9020 Fabric Switch

Start Here. Features. Model DS108 Dual Speed Hub Installation Giude

E-Series Site Preparation Guide

M215 (M215-60) Safety

icore Kiosk system Installation Guide

Installing the Cisco Unified Videoconferencing 3545 MCU

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Upgrading and Servicing Guide

Dell SC5020 and SC5020F Storage Systems Getting Started Guide

Digital ac/dc (24V) Input Module

Dell SCv3000 and SCv3020 Storage System Getting Started Guide

CSM200 Expansion Tray

Thank you for selecting UTC RETAIL s innovative Model 1170 Point of Sale solution!

Rhino Redundancy Module PSM24-REM360S. Operating Instructions

Symmetra PX 160. Maintenance Bypass Enclosure. Installation 05/

300 - SERIES NETWORK SWITCHES QUICK START GUIDE

Dell SC460 Expansion Enclosure Getting Started Guide

AI130 AIswitch Series 130 Chassis Installation Guide

Transcription:

Installation Job Aid for VSP 4850GTS Notices Release 6.1.0.0 NN46251-308 Issue 02.01 November 2017 Notice paragraphs alert you about issues that require your attention. The following paragraphs describe the types of notices used in this guide. Note: Notes provide tips and useful information regarding the installation and operation of products. Electrostatic alert: ESD ESD notices provide information about how to avoid discharge of static electricity and subsequent damage to products. Caution notices provide information about how to avoid possible service disruption or damage to products. Warning: Warning notices provide information about how to avoid personal injury when working with products. Voltage: Danger High Voltage notices provide information about how to avoid a situation or condition that can cause serious personal injury or death from high voltage or electric shock. Danger: Danger notices provide information about how to avoid a situation or condition that can cause serious personal injury or death. 2017, Extreme Networks, Inc. All Rights Reserved. 1

Safety messages Warning: Installation must be performed by qualified service personnel only. Read and follow all warning notices and instructions marked on the product or included in the documentation. Voltage: This equipment relies on the building's installation for overcurrent protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15 A U.S. (240 VAC, 16 A International) is used on the phase conductors. This device is a Class A product. In a domestic environment, this device can cause radio interference, in which case the user may be required to take appropriate measures. When mounting this device in a rack, do not stack units directly on top of one another in the rack. Each unit must be secured to the rack with appropriate mounting brackets. Mounting brackets are not designed to support multiple units. Voltage: Use only power cords that have a grounding path. Without a proper ground, a person who touches the switch is in danger of receiving an electrical shock. Lack of a grounding path to the switch can result in excessive emissions. Warning: Disconnecting the power cord is the only way to turn off power to this device. Always connect the power cord in a location that can be reached quickly and safely in case of an emergency. Warning: Fiber optic equipment can emit laser or infrared light that can injure your eyes. Never look into an optical fiber or connector port. Always assume that fiber optic cables are connected to a light source. November 2017 Installation Job Aid for VSP 4850GTS 2

Risk of high current and board burn out if battery is replaced by an incorrect type. Dispose of used batteries according to the instructions. Warning: The lithium battery is not field replaceable. It must only be removed and replaced by authorized personnel. Contact Technical Support for assistance if the battery requires replacement. Before you begin Ensure the area where you install and use the Extreme Networks Virtual Services Platform 4000 switch meets the following environmental requirements: Ambient temperature between 32 and 122 F (0 and 50 C) Relative humidity between 0% and 95% noncondensing No nearby heat sources such as hot air vents or direct sunlight No nearby sources of severe electromagnetic noise No excessive dust Adequate power source within six feet; one 15-Amp circuit required for each power supply At least 2 inches (5.08 cm) on all sides of the switch unit for ventilation Adequate space at the front and rear of the switch for access to cables If you are installing a single VSP 4000 switch on a table or shelf, ensure the surface can support at least 15 to 20 pounds (7 to 9 kilograms). Installing the Virtual Services Platform 4000 on a table or shelf You can install a single VSP 4000 switch on any flat surface. The surface must support the combined weight of the switch and attached cables (from 15 and 20 pounds [7 to 9 kilograms]). To install a VSP 4000 on a table or shelf, perform this procedure. Do not place an Ethernet Power Supply Unit or Ethernet Redundant Power Supply on top of a VSP 4000. The switch housing of a VSP 4000 cannot support the weight of these units. 1. Remove the screws that hold the USB cover but do not remove the USB cover. On a factory-supplied 4850GTS series switch, do not remove the USB device cover or the USB device from the slot. Removing the USB device affects system operation November 2017 Installation Job Aid for VSP 4850GTS 3

and may even prevent the system from booting up successfully. Ensure that the USB device is inserted in the system at all times with the USB cover on. 2. Attach the included rubber footpads on the bottom of the switch at the locations indicated. 3. Set the switch on a table or shelf as illustrated below. Allow at least 2 inches (5.1 centimeters) on each side for proper ventilation and at least 5 inches (12.7 centimeters) at the back for power cord clearance. November 2017 Installation Job Aid for VSP 4850GTS 4

Installing the Virtual Services Platform 4000 in an equipment rack To install a VSP 4000 switch in an equipment rack, perform this procedure. Prerequisites for installing the Virtual Services Platform 4000 in an equipment rack: Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack. The rack is bolted to the floor and braced if necessary. The rack is grounded to the same grounding electrode used by the power service in the area. The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode. When you mount the device in a rack, do not stack units directly on top of one another. You must secure each unit to the rack with the appropriate mounting brackets. Mounting brackets cannot support multiple units. 1. Remove the screws that hold the USB cover but do not remove the USB cover. On a factory-supplied 4850GTS series switch, do not remove the USB device cover or the USB device from the slot. Removing the USB device affects system operation and may even prevent the system from booting up successfully. Ensure that the USB device is inserted in the system at all times with the USB cover on. 2. Attach the L-bracket to each side of the switch using a #2 Phillips screwdriver as illustrated below. Important: On a factory-supplied 4850GTS series switch, ensure that the L-bracket goes over the USB cover. November 2017 Installation Job Aid for VSP 4850GTS 5

3. Slide the switch into the rack as illustrated. 4. Insert and tighten the rack-mount screws. Installing SFP transceivers Install SFP transceivers by performing this procedure. 1. Remove the transceiver from the protective packaging. 2. Verify that the transceiver is the correct model for the network configuration. November 2017 Installation Job Aid for VSP 4850GTS 6

3. Grasp the transceiver between your thumb and forefinger. 4. Insert the transceiver into the proper module on the switch. Apply a light pressure to the transceiver until it clicks and locks into position in the module. 5. Remove the dust cover from the transceiver optical bores. Removing SFP transceivers Remove SFP transceivers by performing this procedure. 1. Disconnect the network fiber cable from the transceiver. 2. Use the locking mechanism on the transceiver to release it. The locking mechanism varies from model to model as illustrated below. 3. Slide the transceiver from the module slot. 4. If the transceiver does not slide easily from the module slot, use a gentle side-to-side rocking motion while firmly pulling the transceiver from the slot. 5. Attach a dust cover over the fiber-optic bores and store the transceiver in a safe place until you need it. Important: Discard transceivers in accordance with the proper laws and regulations. AC power supply specifications The following table describes the regulatory AC power specifications for the Virtual Services Platform 4000 Series 4850GTS and 4850GTS-PWR+ switches. The regulatory power specifications are based on the maximum rated capacity of the power supplies and are not based on typical power consumption which is lower. November 2017 Installation Job Aid for VSP 4850GTS 7

Table 1: AC power specifications for 4850GTS series Specifications 4850GTS 4850GTS-PWR+ Input Current 5A/2.5 A 12A/6A Input Voltage (rms) 100 to 240 VAC at 50 to 60 Hz 100 to 240 VAC at 50 to 60 Hz Power Consumption 94.6 W maximum 248 W maximum Thermal Rating 323 BTU/hr maximum 508 BTU/hr maximum Inrush Current 40 A maximum 70 A maximum Turn on Condition Important: 1 second maximum after application of AC power 1 second maximum after application of AC power 12-volt output rise time, from 10 to 90 percent, must be the maximum of 50 ms and monotonic under all defined input and output conditions. Efficiency 70 percent minimum 70 percent minimum VSP 4000 power supply power specification The VSP 4000 supports two external field-replaceable power supplies. One power supply ships with the chassis. You can install a secondary power supply to provide redundancy and load sharing, and to add Power over Ethernet Plus (PoE+) power budget on PWR+ models. 300 W AC power supply The VSP 4850GTS supports 300 W AC power supplies. Figure 1: 300 W AC power supply November 2017 Installation Job Aid for VSP 4850GTS 8

Connector The 300 W and 1000 W AC power supplies use an IEC 60320 C16 AC power cord connector. The AC power cord is in close proximity to the hot-air exhaust, and supports high operating temperatures. The 1000 W AC power supplies use an IEC 60320 C16 AC power cord connector. The AC power cord is in close proximity to the hot-air exhaust, and supports high operating temperatures. Figure 2: IEC 60320 C16 connector Power over Ethernet Plus specifications Table 2: VSP 4850GTS and 4850GTS-PWR+ models Maximum PoE+ W 855 W with one power supply 1855 W with two power supplies Average PoE+ W on 50 port model 15.4 W (802.3af) 17.8 W (802.3.at) One power supply 32.4 W (802.3at) Two power supplies VSP 4850GTS-PWR+ can support 802.3af 15.4 W on each port with one power supply installed. You can add a second power supply for redundancy. VSP 4850GTS-PWR+ can support 802.3at 32.4 W on each port with two power supplies installed. PoE+ power reduces to an average of 17.8W on each port with one power supply. Table 3: VSP 4450GSX-PWR+ model Maximum PoE+ W 835 W with one power supply 1835 W with two power supplies Average PoE+ W on 12 ports 17.8 W or 32.4 W (802.3.at) One power supply Installing the Virtual Services Platform 4000 power supply You must install at least one power supply before using the switch. VSP 4000 models support two field replaceable external power supplies. If supported, you can install an optional second power supply for redundancy, load sharing, or to provide additional PoE+ power budget. Perform the following procedure to install an external power supply into your switch. November 2017 Installation Job Aid for VSP 4850GTS 9

Note: VSP 4000 hardware can vary. This procedure only applies to hardware models with field replaceable power supplies. 1. If a blanking plate covers the required power supply slot, remove the blanking plate before attempting to insert the power supply. 2. Insert each power supply into a rear power supply slot. 3. Verify that each power supply is fully seated in the slot. Secure the power supply with the two thumb screws. Note: The switch chassis can prevent an incorrect installation of a power supply. If you insert a power supply upside down, it will not fully insert and the thumb screws will not engage. 4. Once you install a power supply, you can proceed with connecting AC power. Important: You can hot swap power supplies while the switch is operational. One power supply is required for continued switch operation. PoE+ load reductions can occur if you remove one power supply while the switch is operating with dual power supplies. Connecting to AC power To connect AC power to the switch, you need an appropriate AC power cord as described in the following table, also see the following table for plug specifications. Table 4: International power cord specifications Country and Plug Specification Specifications Typical Plug Continental Europe: CEE7 standard VII male plug Harmonized cord (HAR marking on the outside of the cord jacket to comply with the CENELEC Harmonized Document HD-21) United States of America, Canada, and Japan: NEMA5-15P male plug UL-recognized (UL stamped on cord jacket) CSA-certified (CSA label secured to the cord) 220 or 230VAC 50 Hz Single phase 100 or 120VAC 50 60 Hz Single phase Table continues November 2017 Installation Job Aid for VSP 4850GTS 10

Country and Plug Specification Specifications Typical Plug United Kingdom: BS1363 male plug with fuse Harmonized cord 240VAC 50 Hz Single phase Australia: AS3112-1981 male plug 240VAC 50 Hz Single phase Danger: Using power cords with a proper grounding path Use only power cords that have a grounding path. Without a proper ground, a person who touches the switch is in danger of receiving an electrical shock. Lack of a grounding path to the switch can result in excessive emissions. November 2017 Installation Job Aid for VSP 4850GTS 11