IDIS an introduction Olivier Laborie General Manager (Electricity) Itron Dubai Aqeel Jafar Khan Business Development Manager (Electricity) Itron Dubai Jan-11 1
C S S In a world flooded with standards OPEN PEN me meter Open Public Extended Network metering ing Non-electricity meters G/W/H meter M1 G/W/H meter comms M/441 architecture M2 E2 E1 Electricity meters E-meter comms E- meter H1 External inhome/building display DLMS UA 1000-2 Ed. 7.0:2010 DLMS UA 1000-1 Ed. 10.0:2010 EN 13757-1:2002 1:2002 EN 13757-2:2002 EN 13757-3:2004 EN 13757-5:2008 IEC 61334-4-32 Ed. 1.0:1996 IEC 61334-4-511 Ed. 1.0:2000 IEC 61334-4-512 Ed. 1.0:2001 IEC 61334-5-1 1 Ed. 2.0:2001 IEC 62056-21 Ed. 1.0:2002 IEC 62056-46 Ed. 1.1:2007 IEC 62056-53 Ed. 2.0:2006 IEC 62056-61 Ed. 2.0:2006 IEC 62056-62 Ed. 2.0:2006 EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Mandate M/441 Smart Metering Coordination Group CEN, CENELEC, ETSI, ESMIG, FACOGAZ, AQUA, OPENmeter, CEER/ERGEG, EURELECTRIC, MARCOGAZ, EUROGAS, WELMEC, EVVE, AJE, CEER/ERGEG Gateway G1 G2 Head End System DC Smart grids Load/Generation & Control H2 Home Automation TC294 TC205 TC13 M2M H2 M2M, Smart Sma Metering to interoperability Jan-11 2
IDIS reduce Integration Costs Proprietary Interface IC Integration Costs Proprietary Interface SYST TEM A Standard Interface IC Standard Interface SYST TEM B Standard Interface Standard Interface by closing the gaps left open in the standards Jan-11 3
How to achieve the goal: 1. Limit the scope of application -> use cases 2. Select from the existing standards 3. Define the options left by the standards 4. Provide a specification 5. Provide interoperability testing 6. Manage the test label IDIS Association Bahnhofstrasse 28 6304 Zug / Switzerland Jan-11 4
Scope of IDIS: Package 1 Package 2 ERP Enterprise Resource Planning MDM Meter Data Management system I4 HES/MDC Head End System / Meter Data Collection I3.2 Concentrator API PLC comms I3 PLC Concentrator I3.1 E-Meter Electricity Meter I2 I1 Submeters G, H, W Home IHD, PEM Submeters: Gas, Heat, Water Home automation: In-house display, Personal Energy Mgt Jan-11 5
IDIS package 1: Use Cases based on: UC1 UC2 UC3 UC4 OPEN meter Open Public Extended Network metering Meter Registration Remote Tariff Programming Meter Reading g( (on demand) for multi-utility meters Meter reading (for billing) for multi-utility meters UC5 Disconnection and Reconnection (E, G) UC6 UC7 UC8 UC9 UC10 Clock Synchronization Quality of Supply Load Management by relay (E only) Firmware update Meter supervision Jan-11 6
IDIS Specifications R1 - Package 1: Publication: December 2010 Publication: October 2010 Publication: October 2010 Jan-11 7
The IDIS PLC profile Jan-11 8
IDIS Object List: 277 objects, 1183 attributes, 76 methods type default value lient Public c Pre-esta abl. client Managt t. client Clock M 8 0 0 0:1.0.0.255 1 logical_name 1 octet_string[6] "0000010000FF" Get 2 time 1 octet_string[12] Set Get, Set 3 time_zone 1 long 60 Set Get, Set 4 status 1 unsigned Get 5 daylights_savings_begin 1 octet_string[12] "FFFF03FE070200000 Set Get, Set 6 daylights_savings_end 1 octet_string[12] "FFFF0AFE070300000 Set Get, Set 7 daylights_savings_deviation 1 integer 60 Set Get, Set 8 daylights_savings_enabled 1 boolean 1 Set Get, Set 9 clock_base 1 enum 1 Get Jan-11 9
The IDIS interoperability testing IDA Test Institute Interoperability Testing Tool Test Report meter under test Reference IEC 61334-5-1 PLC Modem Reference PLC network Jan-11 10
The IDIS test label Association IDA Test Institute Test Report membership ID 1234 Test Report IDA Test Institute Interoperability Testing Tool Test Report meter under test Reference IEC 61334-5-1 PLC Modem Reference PLC network Jan-11 11
IDIS Roadmap IDIS Release 1 Package 1 Package 2 PLC S-FSK Profile 2010 Objects List Edition 1 2010 DC Application Interface 2010 IPv4 Profile 2011 Objects List Edition i 2 2011 DC-HES Interface 2011 HAN Interface 2011 IDIS Release 2 PLC OFDM Profile 2012 IPv6 Profile 2012 Jan-11 12
Thank You Jan-11 13