Long Gun Deployment Systems. Jim Gilliat BakerHughes Houston Texas Presentation Number: SLAP 06

Similar documents
I-Wheel Conveyance Technology Ultra-Flexible, Ultra-Reliable

Predicting Wellbore Dynamic-Shock Loads Prior to Perforating SPE

Mitigating the Risks Associated With the Acquisition of Formation Evaluation Data

Optis Electric Line HD

REDEFINING PUMP DOWN PERFORATING

Well Advisor Project. Ken Gibson, Drilling Technology Manager

DEEP EXPERIENCE. STRONG REPUTATION.

A Logging, Perforating, Pipe Recovery & Pressure Control Service Company.

PETROPHYSICAL DATA AND OPEN HOLE LOGGING BASICS COPYRIGHT. MWD and LWD Acquisition (Measurement and Logging While Drilling)

ICSI Addressable Disconnect Tool (ADT) Overview

ControlFire. Titan Division Presentation

ExL Petroleum, LP DAILY WELL COMPLETION REPORT (FRAC REPORT)

Digital Downhole Camera Technology

242 Winch 1 User Manual

PRODUCT OVERVIEW. Well Inspection Cameras & Systems. See what you re missing. Proudly made in the U.S.A.

1002/02 WIRELESSY CORRELATING GUN DEPTH ENSURES SAFE OPERATIONS AND REDUCES RIG TIME DEPTH-LOC CASE STUDY: SERVICE: DEPTH CORRELATION DRILL STEM TEST

SIMULATING PERFORATING SHOCK ON AN INTELLIGENT COMPLETIONS INTERVAL CONTROL VALVE

ControlFire. June 2013

Aberdeen Technical Centre. Jul Corporate Overview & Product Snapshot

PRODUCT OVERVIEW. Well Inspection Cameras & Systems. See what you re missing. Proudly made in the U.S.A.

SPE Copyright 2006, Society of Petroleum Engineers

Stackable with all of Tucker Technologies Integra Suite Logging tools 1

Model 120D and Model 120CEX Wireline Data Recorder. Operation and Maintenance Manual

Drillingsoftware Casing Design User Manual

In North America call toll free: Fax

245 Winch 50. User Manual

FTP Factory Trade-In Program

ENERGY WISE WORKSHOP 2003

WellCAM by Vision io Visual Logging Platform

Frequently Asked Questions

RST INSTRUMENTS LTD.

COPYRIGHT. Nodal Analysis Workshop. Horizontal and Fractured Wells. By the end of this lesson, you will be able to:

Highly Successful Reservoir Surveillance and Production Enhancement in a North Sea Brown Field Asset

ELECTRIC WINCHES. Range of compact, electric winches. TRB 250 to 960 kg TRB 250/350. TRB 500/960 kg Standard drum

Improving Data Quality in Challenging Wells. Logging Services. UltraSlim SM. Solving challenges.

DynaSelect System. Plug-n-Perf Optimized

Linear Measurement Technology Draw Wire Mechanics with Encoder or Analog Sensor

Design of simple drapery systems to guide the rock falls along the slope

Vacuum Maintenance Manual (EXCERPT Tim Benedict)

Charge Performance Data

Large Scale Test Simulations using the Virtual Environment for Test Optimization

MWD and Surveying Services

READ INSTRUCTIONS THOROUGHLY BEFORE OPERATING

Applied Ballistics Ultralite Engine

Configuration for Juniper SRX Series 6300-CX

ABB AG - EPDS. Gas-insulated switchgear Type ZX2

INSTALLING THE AUTOMATIC EXPOSURE CONTROL (ELECTRIC EYE) BATTERY (Fig. 4, 5)

LFC 6000 and LFC Enterprise software. Control fluids with your management software programs

INTELLISERV PRODUCT CATALOG

Design of Surface Seismic Programs for CO2 Storage Monitoring. WesternGeco North America Geophysics Manager Houston

Test devices and Multifunction timer relay

CONTAINER BASED SHOOTING RANGE COMPONENTS

Velomitor * Piezo-velocity Sensor

Cable pulling systems of the next generation Flexi Spinner Smart Speedy Easy Butler Spinner Roller

SMARTDRILL 21. Intelligent Automatic Drilling & Block Safety System. Website:

Petrel TIPS&TRICKS from SCM

ABB AG Calor Emag Medium Voltage Products Gas-insulated switchgear Type ZX2. ABB Gas-insulated switchgear type ZX2 1

MCFCW-20-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 60,000 BTUH

Sponsors: AGENDA October 1, 2014 Toftrees Conference Center State College, PA. Welcome

PDS100 Programmable Dispensing System SAFETY INSTRUCTIONS

MCFCW-06-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 18,000 BTUH

Installation- and Operation Instruction for the Remote Control System HM22XX

VersaPro Non-Metallic Fluorescent

Winch25 Double - appendix

Capacitance level switches LS 210 LS 220

WTS Inclinometer. All-weather radio telemetry Inclinometer system. Features. WTS Wireless Inclinometer. Dimensions

Haze 800 DMX. User Guide. English

Two legendary brands ONE REVOLUTIONARY TRIPOD. Introducing. Two legendary brands ONE REVOLUTIONARY TRIPOD. flowtech-tripod.com

AVO Modeling Scenarios AVO What Ifs? HRS-9 Houston, Texas 2011

Instruction Manual TI-7700R

NOTE ON PERFORMANCE TESTING

PHOENIX CONTACT - 10/2009

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

The New Generation of Rotary Systems May be Closer Than You Think Frank J. Schuh, Pat Herbert, John Harrell, The Validus International Company, LLC

Features: Quality Testing and Documentation

Information System BOHRIS. version: Program. Date:

Southwest Windpower Inc. Doc. # Southwest Windpower Inc. 27 Air Tower Analysis 7/7/03

3M Drive-Thru Headset G5. A new standard, inspired by you

Cisco Virtual Beacon Solution

Assembly and Usage Instructions. Product # Instruction # Revision A

TURNBUCKLES MM INCHES MM INCHES MM INCHES INCHES INCHES

SPACIDO 1D Course Correction Fuze 51st Annual Fuze Conference May 22-24, 2007 Nashville. Benjamin CAMPION. THALES Munitronics & Microtechnics

impact INSTRUCTIONS LiteTrek 4.0 Monolight lighting equipment and accessories

Ink-Dot Series II Driver

Bulletin 700-HA Tube Base Relay

Ball Screw Actuator Models Advantages:

Coke Drum Laser Profiling

5.1. Motor Protection and Monitoring. Contents. Product Overview. Monitoring Relays. D64R Series Digital Ground Fault Relays...

NR-TEC S2S SURFACE TO SANDFACE DATA LOGGER

SEM3 - Embedded Micro Metering Module

Load Pins Custom Build Load Pins

MODEL 245 / 345 High Range

serial number A1159T or lower, which includes all manufactured in 2008 Not compatible and not required. Figure 1 Auger Update Sites Call-Outs R B

Prodigy Color-on-Demand System Generation III

300 Chain Saw UT Page 1 of 17 Accessories I

J8 SWITCHES WITH TRIP FUNCTION UPGRADED TYPE

John Deere. MODEL: 510 Round Baler JD-P-PC1599

Introduction. June 27, 2012

ANCHORS EARTH HARDWARE POLELINE AERIAL DROP HARDWARE ATTACHMENTS DROP GROUNDING HARDWARE BANDING TOOLS ANCHORS WALL FASTENERS

XS Roof Type Overview

Transcription:

Long Gun Deployment Systems Jim Gilliat BakerHughes Houston Texas Presentation Number: SLAP 06

Wireline Deployment Risk Management Reduce Risk Pre-job planning highlights operational risk Risk mitigation technologies are selected Operation is carried out Post-job review identify lessons learned Reduces Cost The DRM process has resulted in significant cost savings and reductions in NPT. Significant reduction in perforating runs & stuck or fished toolstrings Deployment Risk Management has allowed wireline conveyed services to replace more expensive and time consuming methods.

Wireline Case Study The Perforating Challenge 21,200 ft MD 14,000 ft Step Out 10,600 ft long 79 tangent Sidetrack at 12,000 ft increased tortuousity issues. H2S & CO2 present in formation fluids 340 ft interval Weak Sand required oriented perforations Standard Approach Shoot oriented guns on coiled tubing, kill & pull due to high angle and short sump.

DRM Approach Modeling showed that gun string could be deployed without the tractor as long as flywheels could reduce friction by at least 50%. Past history showed this to be possible. At 20,000 feet, cable compression (drag), not tool string friction could prevent the assembly from reaching bottom. High predicted pull out (>18,000 lbs) force required a powered capstan as a contingency.

Wireline Case Study The DRM Approach 4 x 2 7/8 HOPS 10 /350 6spf wireline runs 140 ft, 1,700 lb tool strings, (limited by derrick) Tractor for contingency. Powered Capstan for contingency if release from weak point is required..490 Ultra-Strength Crush Resistant Wireline Flywheels ART (Addressable Release Tool) V1000 Inhibited Grease for H2S protection.

Powered Capstan Maintains constant cable tension on winch drum Operator friendly package design Allows deep deviated high tension wells to be managed Reduces rig down time Improves cable life Reduces conductor failure Improves productivity Eliminates drum crush Adds to wire line safety Cable head can be retained for speedy rig up Capstan and Power Pack both rated Zone 1

Addressable Release Tool Designed for use with high voltage devices. Can be run above and below the tractor. Can be run with a shock absorber for ballistic operations. Released via a specific operator selected digital code from a surface control box. Up to 7 ART s can be run in a single string.

Cable Size.474" Breaking strength 23,600 lbs Wt in fluid (lbs) 1026 lbs/1000m Tool weight 1,000 lbs Weakpoint Stud Size 6,000 lbs Cable Safety Factor 65% Depth Cable Pull at Pull with Pull with ART Adv. (65% SF) meters ft Weight depth ART (SF) ART lbs % 0 0 0 5,000 14,340 22,600 9,340 187% 1,000 3,280 1,026 5,000 13,314 21,574 8,314 166% 2,000 6,560 2,053 5,000 12,287 20,547 7,287 146% 3,000 9,840 3,079 5,000 11,261 19,521 6,261 125% 4,000 13,120 4,105 5,000 10,235 18,495 5,235 105% 5,000 16,400 5,132 5,000 9,209 17,469 4,209 84% 6,000 19,680 6,158 5,000 8,182 16,442 3,182 64% 7,000 22,960 7,184 5,000 7,156 15,416 2,156 43%

Flywheels 1. Aid perforating guns deployment in highly deviated or difficult well bores 2. Enable reliable wireline deployment at high deviations 3. Reduce the conveyance sensitivity to : Serpentine Boreholes (long-winding turns and multiple doglegs) Debris (cement or mud remnants, fill) High Frictional Loss Areas (corrosion, scale, burrs)

Flywheels Can reduce friction in the gun string by up to 60% Placed every 40 to 60 feet Allows deployment at up to 84 In some applications, flywheels can be placed on the wireline to further reduce drag.

Typical Long String Hook Up Up to 250 ft. of 2 7/8 self orienting guns successfully deployed on wireline. Addressable Release Tool

Case History North Sea Client looking to reduce cost on large workover project. Initial re-perforating planned with coiled tubing unit. Estimated 24 hours to deploy and recover 190 feet of 2 7/8 spf guns. Using the DRM approach, the gun assembly was deployed on wireline in less than 8 hours, cost savings to the client $400,000.00

Gun Brake System Gun Brake System The time spent on completions can be reduced by using the Gun Brake to run longer and heavier lengths of perforating guns on wireline. Perforate long intervals with one run An underbalance perforating system for longer intervals Reduce the amount of rig time due to elimination of multiple gun runs Help alleviate the mechanical forces on rope sockets and wireline during perforating of large gun sizes and/or long gun lengths

Case History Job Example: Perforate 200 of 4-5/8 16 SPF Standard w/l job = 5 runs at 2.5 hrs per run 12.5 to 13 hours of rig time Gun Brake job 1 run at 3.5 hr Time Savings = 9 hrs (9*$) Ex. $ 33,000 / hr $297,000.00 in savings

Examples of the Savings Venice, USA EPL, Bay Marchand 109 ft long, 3-3/8", 12 spf, perforating gun assembly was wireline conveyed into a well. Operating Time 7.0 hours. (½ the time compared to a TCP operation) Money Saved: $17,500 USD Brazil Macae, Brazil Albarcora Field, Brazil 145 ft long, 4-1/2, 12 spf, DP charges, 145 ft gross and 110 ft net interval, conveyed into a 11,500 ft deep completion. Operating Time - 6.5 hours, estimated rig time for conventional wireline was 30 hours. Money Saved: $100,000 USD

Job History Offering the service since 2005 for North Sea Operations. Longest deployment to date, 330 feet (100 metres) of 3 3/8 (86 mm ) 6 spf ( 20 spm) carriers. Typical deployment: up to 250 feet (76 metres) of 2 7/8 (73 mm) 6 spf ( 20 spm) carriers. Average rig time saving over conventional coiled tubing or TCP deployment, up to 72 hours. System is compatible with Dynamic Underbalance Operations where applicable. Can be fitted with Snap Shot inter-gun release devices for deployment and recovery under pressure.

Applications Vertical or low angle wells with little/no sump High angle wells where TCP guns won t drop Replacement for standard wireline deployed guns where the interval is long reducing runs Through tubing re-perforating in existing wells Through tubing perforating in new wells