Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration

Similar documents
A Short History of IBM i Security

RED HAT ENTERPRISE LINUX. STANDARDIZE & SAVE.

Core Services for ediscovery Perfection

Balancing RTO, RPO, and budget. Table of Contents. White Paper Seven steps to disaster recovery nirvana for wholesale distributors

Upgrading to UrbanCode Deploy 7

Consolidating servers, storage, and incorporating virtualization allowed this publisher to expand with confidence in a challenging industry climate.

white paper Rocket Rocket U2 High Availability / Disaster Recovery Best Practices

Total Cost of Ownership: Benefits of ECM in the OpenText Cloud

Create the ideal conditions for your network to grow.

WHITE PAPER Cloud FastPath: A Highly Secure Data Transfer Solution

Availability and the Always-on Enterprise: Why Backup is Dead

Total Cost of Ownership: Benefits of the OpenText Cloud

Test Plan & Fallback Plan

A Model for Resilience

WHITE PAPER. Header Title. Side Bar Copy. Header Title 5 Reasons to Consider Disaster Recovery as a Service for IBM i WHITEPAPER

How to Protect Your Small or Midsized Business with Proven, Simple, and Affordable VMware Virtualization

Hitachi Adaptable Modular Storage and Hitachi Workgroup Modular Storage

A Ready Business rises above infrastructure limitations. Vodacom Power to you

Next Generation Backup: Better ways to deal with rapid data growth and aging tape infrastructures

Understanding Virtual System Data Protection

Data Center Consolidation and Migration Made Simpler with Visibility

Cloud-based data backup: a buyer s guide

University Information Systems. Administrative Computing Services. Contingency Plan. Overview

Hitachi Adaptable Modular Storage and Workgroup Modular Storage

FIVE BEST PRACTICES FOR ENSURING A SUCCESSFUL SQL SERVER MIGRATION

TECHNICAL ADDENDUM 01

A guide for assembling your Jira Data Center team

SYMANTEC: SECURITY ADVISORY SERVICES. Symantec Security Advisory Services The World Leader in Information Security

DISASTER RECOVERY TESTING, YOUR EXCUSES, AND HOW TO WIN

The case for cloud-based data backup

HP Application Lifecycle Management. Upgrade Best Practices

Executing Large-Scale Data Center Transformation Projects with PlateSpin Migrate 12

Controlling Costs and Driving Agility in the Datacenter

The Data Protection Rule and Hybrid Cloud Backup

3 Ways Businesses Use Network Virtualization. A Faster Path to Improved Security, Automated IT, and App Continuity

ProDeploy Suite. Accelerate enterprise technology adoption with expert deployment designed for you

The Red RepoRT: MAKING DESKTOP VIRTUALIZATION A REALITY. The Benefits The Approaches. The Challenges The Services VOL

Real-time Protection for Microsoft Hyper-V

CAPABILITY STATEMENT

Data safety for digital business. Veritas Backup Exec WHITE PAPER. One solution for hybrid, physical, and virtual environments.

a how-to guide Plan a Successful Data Center Relocation

The Evolution of IT Resilience & Assurance

Experience server virtualization

Symantec Data Center Migration Service

Best Practices for Server Migration with Windows Server 2012

Why Continuity Matters

Getting Hybrid IT Right. A Softchoice Guide to Hybrid Cloud Adoption

Asigra Cloud Backup Provides Comprehensive Virtual Machine Data Protection Including Replication

ENHANCING INTELLIGENCE IN THE INTERNET OF THINGS The Business of Embedded Virtualization Alexander Damisch, Director, Industrial Vertical, Wind River

Cisco Director Class SAN Planning and Design Service

The Value Of NEONet Cybersecurity. Why You Need To Protect Your The Value Of NEOnet Cybersecurity. Private Student Data In Ohio

Realizing the Value of Standardized and Automated Database Management SOLUTION WHITE PAPER

New Zealand Government IBM Infrastructure as a Service

OpenDrives storage solutions facilitate smart business continuity strategies.

Enabling the Always-On Enterprise

The Data Explosion. A Guide to Oracle s Data-Management Cloud Services

ARCHIVE ESSENTIALS

Get more out of technology starting day one. ProDeploy Enterprise Suite

Fifteen Best Practices for a Successful Data Center Migration

Design Build Services - Service Description-v7

About HP Quality Center Upgrade... 2 Introduction... 2 Audience... 2

Why Enterprises Need to Optimize Their Data Centers

IBM i OS Journaling and High Availability

INTRODUCING VERITAS BACKUP EXEC SUITE

Take Back Lost Revenue by Activating Virtuozzo Storage Today

Overcoming the Challenges of Server Virtualisation

HP virtualization with VMware. Enabling end-to-end virtualization of IT resources

The Evolution of IT Resilience & Assurance

The Fruits of Their Labor

Rethinking VDI: The Role of Client-Hosted Virtual Desktops. White Paper Virtual Computer, Inc. All Rights Reserved.

Creating and Testing Your IT Recovery Plan

An Introduction to High Availability for Power Systems Running IBM i Get to know the core components of HA solutions and important installation

Symantec Backup Exec System Recovery

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION

9 th CA 2E/CA Plex Worldwide Developer Conference 1

White P C aper Title Here arbonite Cloud Migration Te T c e hnica ic l a G l g uide VM VM

KEYCLOUD BACKUP AND RECOVERY AS-A-SERVICE (BRAAS): A fully-managed backup and recovery solution for your mission critical data

Cloud for Government: A Transformative Digital Tool to Better Serve Communities

Slashing Downtime from 24 Hours to 24 Minutes:

High Availability- Disaster Recovery 101

Modernizing Servers and Software

HP Simply StoreIT: Cut through the confusion of storage

Migration. 22 AUG 2017 VMware Validated Design 4.1 VMware Validated Design for Software-Defined Data Center 4.1

Go Cloud. VMware vcloud Datacenter Services by BIOS

THE CHALLENGES WITH A COLOCATION ROLL-OUT: And how to simplify the deployment and maintenance of IT equipment at the colocation facility

THE AUTOMATED TEST FRAMEWORK

Migration With Duda.

THE OTTAWA SENATORS SCORE ON A CLOUD ASSIST FROM BRITESKY TECHNOLOGIES

Ten Things to Know Before Deploying Active Directory. written by Dmitry Sotnikov. White Paper

Best practices in IT security co-management

Veritas Backup Exec. Powerful, flexible and reliable data protection designed for cloud-ready organizations. Key Features and Benefits OVERVIEW

Protect enterprise data, achieve long-term data retention

Kroll Ontrack VMware Forum. Survey and Report

Maximize Your Assets Securely and Cost Effectively

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality,

DATA CENTRE SOLUTIONS

Hosted VoIP for Schools

Information Technology Engineers Examination. Database Specialist Examination. (Level 4) Syllabus. Details of Knowledge and Skills Required for

Symantec NetBackup 7 for VMware

Outwood Grange Academies Trust ensures teaching continuity with Arcserve UDP

Transcription:

Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration

With the introduction of IBM s POWER9 processor in early 2018, the IBM Power Systems platform took a major leap forward in performance, scalability, and adaptability. If your company has been putting off a major IBM Power Systems hardware upgrade until POWER9, your wait is over. Of course, before you can start reaping the benefits of POWER9, you must first tackle the sometimes formidable project of migrating your IBM i data, applications, and system configurations to the new hardware. If you are planning to do your migration manually using backups from tape (or virtual tape) which is the traditional approach you likely know this process can be particularly stressful. In addition to all of the work required to prepare for the migration, a significant amount of downtime is standard with tape-based migrations. Stress levels climb even higher during the migration should complications arise that further extend the downtime window as is often the case when tape is involved. These and other concerns about migrations are reflected in the results of a recent Syncsort survey of nearly 200 IT professionals who manage IBM Power Systems: 60% say they have delayed migrations for various reasons, with the largest reason being concerns about downtime. 44% say their previous migration caused six hours or more of downtime (26% say their downtime was longer than 13 hours). 46% say they spent 51 hours or longer to plan and execute their last migration (25% say their migration took over 100 hours to plan and execute). 31% say they have experienced a migration failure, with the most common cause for the failure being the inability to restart critical applications on the new server within the required timeframe. Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 02

Step 01: Assess Project Scope and Prepare for Migration In any migration, it is critical to thoroughly understand the environment(s) to be migrated and make all necessary preparations. The time and attention invested in premigration assessment and preparation, as well as resolution of any potential complications in advance, will pay big dividends during the execution of the migration. The following are some of the important questions you should ask as you assess your environment and prepare for your IBM i migration: Critical objects Do you know how to identify the critical data and system objects that need to be migrated? PTFs Are your OS patches current on both the old and the new machine? Third-party software Is your third-party software compatible with POWER9? Do you need new license keys in order for those third-party applications to run on the new machine? Storage, memory, and processor How will these resources be allocated on the new machine? Interfaces to (or interdependencies with) other systems Do you understand how these will be affected by the new machine and have a plan to activate them upon go-live? Security settings Have you ensured that your environment(s) on the new machine will have all necessary security functions in place to eliminate vulnerabilities at go-live? Bandwidth Will the new system require additional bandwidth? This is particularly important if the new machine is in a different location from the old machine. External hardware Have you verified compatibility of all hardware that will be connected to the new machine (e.g., external drives, communication devices, networking devices, etc.)? Backup media compatibility Will your backup media work on the new machine or do you need to make arrangements to transfer the data to different media? External connectivity Have you assessed how VPNs, FTP, and other types of connectivity will be affected? Data preparation Will you want to find and delete obsolete files and/or do a file reorganization prior to migrating? High availability (HA) Do you have all necessary licenses and settings to start replication from the new machine to your backup machine once you cut over? Infrastructure lock Will you be able to ensure any configuration changes are tightly controlled through a change-management process? This will help minimize surprises after the migration. Other considerations Are there new application versions to consider? Are any new applications being added to the new machine? Is anything being retired before moving to the new machine? Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 03

Step 02: Select Your Migration Method Concurrent with assessing the environment(s) to be migrated, you must also determine how you are going to move the data and other essential objects to the new machine. There are essentially two methods for accomplishing this: Tape method This commonly used migration approach requires doing a full-system save to tape of your current machine and restoring it on the new machine. Extensive downtime is required with this method, which begins at the start of the system-save process, extending through the restore process on the new machine, and only ending once everything has been configured and tested and users have been allowed on the new system. It s no wonder that tape-based migrations require evenings, weekends, and holidays to execute and are often plagued by unexpected outcomes. Replication method Whether or not you already own a real-time replication solution for disaster recovery or high availability, this technology can be utilized to efficiently synchronize your environment with the new machine without interfering with normal business activity. All subsequent transactions and other activity is continuously replicated in real time to your new machine until you have completed all testing and are ready to make the final switch, which typically requires only minutes of downtime. Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 04

Compare Migration Methods Tape-Method Migration Downtime measured in HOURS Install OS and Patches on New Server Install Applications on New Server Shut Down Applications Copy Data Merge Data and Applications Test/Verify Reroute Users and Applications Online Hours of Downtime Replication-Method Migration Downtime measured in MINUTES Install Replication on Old Server Install OS and Replication on New Server Start Replication Sync Complete Continuous Replication Test/Verify Online Minutes of Downtime Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 05

Step 03: Create and Execute Your Migration Plan Once you know the details about the environment(s) to be migrated and have made all necessary preparations, including the selection of your migration method, the next step is to create a migration-execution plan and schedule. Below is a list of important questions to consider when creating and executing your migration plan. Keep in mind that no two environments are the same, and therefore no two migrations are the same, which is why it s essential to create a unique plan for your specific environment and needs. Also keep in mind that what you include in your plan will vary based on the migration method chosen. For example, the questions below that are related to extended downtime and its impact on staff and business operations are primarily a tape-method concern. For a replicationmethod migration, the impacts on staff and operations are dramatically smaller. Have you created a detailed migration plan that can be easily followed by your team? Your plan should be in written form and contain as much detail as possible so there is little room for guesswork. It s also helpful to write your plan in a way that it can be followed even if you or another key member of the migration team is absent. Have you coordinated the migration schedule with other areas of IT as well as line-of-business and other managers? You want to avoid having the migration take place during any times in which there are conflicting priorities. Do you have an internal communications plan? Tapemethod migrations that cause extended downtime require advance notice and clear channels of communication with all affected parties, especially if contingency plans are required to handle prolonged downtime or unforeseen complications. Does each person involved with the migration understand and own their part in the migration project? This includes having a clear understanding of the goals, requirements, and potential points of impact of the migration. Is extra time built into your migration schedule to deal with the unexpected? When scheduling too tightly, small delays can easily escalate into big problems, especially when doing tape-method migrations. Do you have adequate rest periods for the migration team built into your schedule? If the migration requires team members to put in long days, adequate rest periods reduce the chance of staff getting overly tired and making mistakes when the pressure is on. With replication-method migrations, testing can be conducted during normal business hours and the minutes required for cutover can be scheduled at your convenience. Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 06

Have advance arrangements been made with key hardware and software vendors for off-hours support? In case issues arise while these products run on the new machine having access to support could be critical. Have arrangements been made for any scheduled jobs that would normally run during the migration? For instance, you want to avoid having an essential, longrunning maintenance job holding things up at a critical point of the migration cutover process. Do you have a plan to ensure any unprinted, businesscritical spool files (e.g., checks, invoices, pick lists, reports, etc.) are printed before the cutover to the new machine? You ll want to do this in case something delays the new machine getting online and you can t roll back to the old machine. This consideration applies only to tape-method migrations because replication-method migrations automatically synchronize all spool files with the new machine. Have you run your new POWER9 machine for several days prior to the migration? In the event there are any defective components or other issues, you ll want these to be discovered well before you start relying on the new machine for production workloads. With replication-method migrations, your new machine can be allowed to run throughout the test period while it is kept synchronized with the old machine. Do you have a roll-back plan in case an issue arises during the migration that requires temporarily aborting the migration process and restarting workloads on the old machine? Roll-back plans are mostly needed when doing tape-method migrations. With replication-method migrations, you can do as many tests of the cutover process as you need before the final cutover so you ll be confident everything will work as expected. And if an issue should arise after final cutover, it s a quick, simple process to switch back to the old machine. Have you validated the plan by distributing it to your team for input? The things that team members point out that weren t considered in the initial draft of the plan may surprise you. Even better is to have your team be involved in the migration-plan creation process. Also consider bringing in a trusted IT business partner with experience in migrations to review your plan; their extra set of eyes can be invaluable. Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 07

Step 04: Test the Migration Before going live with your migrated IBM i environment(s) on your new POWER9 hardware, it is essential to conduct a series of tests to ensure that everything will function as expected. Based on the migration method selected, the timing of these tests will vary. With a tape-method migration, testing will need to be done during your downtime window. With a replication-method migration, testing can be done during normal business hours without impacting users. Common migration tests include: Connectivity and communications testing Verify all connected devices and networks are functioning properly. Security testing Ensure all security functions are properly configured. Ideally, this should be done before allowing users on the system or connecting the system to networks, interfaces, external communications, etc. Data integrity testing Confirm the data is in the same state after the migration as it was before. For instance, you may verify that the queries executed on the new database in the new system yield the same results as the older one, and the number of records in the database on the new and old system is the same. Application verification testing (AVT) Test applications to ensure each functions properly in the new environment and, if required, communicates as expected with other systems. AVT also ensures that any new management or monitoring tools have been installed and can communicate with the servers. User acceptance testing (UAT) This test should be completed after AVT by a select number of users to confirm that access to the system and functionality of the applications perform as expected. All testing should be carefully documented. When issues are found and addressed, testing should be repeated to ensure the problem was resolved. If any of the testing fails, especially if you are doing a tape-method migration, you will need to be prepared to execute your roll-back plan to bring your old machine back online while you re-evaluate your migration process. When doing a tape-method migration, make sure you have a roll-back plan in case a major issue arises that requires restarting workloads on the old hardware. Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 08

Migrate While Active The Modern, Low-Stress Path to POWER9 Syncsort s Migrate While Active service provides you with an IBM i migration expert who works closely with your team to prepare for and successfully execute your replication-method migration. Utilizing our advanced replication technologies, all required objects, data, and configurations are replicated to the designated environment(s) on your new POWER9 machine without downtime. Once the initial replica has been created, each subsequent change to data, objects, and settings on the old machine is replicated in real time to the new machine. This dynamic synchronization continues right up until final cutover. During this process, your regular business operations will continue without interruption while your Syncsort migration expert works closely with your team to monitor synchronization and facilitate testing using a virtual switch process. You can take as long as you need to test your applications and other processes on the new hardware, at the new OS level, and in new formats, before ever executing the actual cutover. As you conduct your tests, the auditing capabilities of the replication software automatically verify data integrity between machines. Only when you are fully satisfied that everything is functioning properly on the new machine will your Syncsort IBM i migration expert execute the final cutover process. Typically, any downtime required during the cutover is kept to a few minutes. Syncsort IBM i migration experts bring the combined experience of thousands of migrations, assisting you every step of the way: Pre-migration preparation Replication software installation and configuration Synchronization monitoring Verification testing on new system before cutover Final cutover to your new system Besides the enormous benefit of virtually eliminating migration downtime, Syncsort s Migrate While Active service significantly reduces the work and anxiety that otherwise accompanies the preparation and execution of tape-method migrations. And not only will you rest easy knowing you have a seasoned migration expert assisting you at every step, you and your team will be free to focus valuable time and attention on other IT priorities. Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 09

Summary The performance and other improvements of POWER9 are exciting, but the process of migrating to your new machine using backup tapes isn t. A tapemethod migration is a time-consuming, often-risky process that requires significant planning and preparation, as well as careful execution and thorough testing. Given the extensive downtime this type of migration requires and the complications that commonly occur, it s no wonder that IBM i shops are looking for a better, more modern alternative such as the kind that Syncsort provides with Migrate While Active. By pairing Syncsort s advanced replication technology with an IBM i migration expert, Migrate While Active dramatically streamlines migration preparation and execution time, reduces risk, and best of all, removes the downtime pain. As the industry leader, Syncsort has migrated hundreds of companies and thousands of IBM i environments to new IBM Power Systems hardware. Our experts know how to find and resolve any gotchas before they ever become a problem either during or after the migration. Just think of the peace of mind this can bring to you, your colleagues, and your management. To learn more about Migrate While Active, visit: www.syncsort.com Syncsort Four Essential Steps for Removing Risk and Downtime from Your POWER9 Migration 10

About Syncsort Syncsort is the global leader in Big Iron to Big Data software. We organize data everywhere to keep the world working the same data that powers machine learning, AI and predictive analytics. We use our decades of experience so that more than 7,000 customers, including 84 of the Fortune 100, can quickly extract value from their critical data anytime, anywhere. Our products provide a simple way to optimize, assure, integrate and advance data, helping to solve for the present and prepare for the future. Learn more at syncsort.com. www.syncsort.com 2018 Syncsort Incorporated. All rights reserved. All other company and product names used herein may be the trademarks of their respective companies.