ONE SD-LAN Wall Mount Splitter Housing (1LAN-SPLT C)

Similar documents
Pretium Rack-mountable 1U Housing Hardware

Mini Wall-mount Building Terminal (WBM)

Sheath Removal of 3456-Fiber RocketRibbon Extreme-Density Cable

OptiSheath Advantage Sealed 4-, 6-, 8- and 12-Port Multiport Terminals

Wall Mounted Building Entrance Enclosure Instructions

with Fiber Management Bar

3 Angled Connector Housing (MC) Installation

Optical Line Splitter Installation Instructions

FiberExpress Brilliance Connectors

Outdoor FDH Termination Pole-Mount Cabinet With Universal Splitter Chassis User Manual

LegacyPlus 7-OR SERIES RETURN TRANSMITTER INSTRUCTION MANUAL 7-OR-RT/xxx

Fiber Management Tray (FMT) User Manual

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

INSTALLATION INSTRUCTIONS

High Density PEACOC v. 3.0 Fiber Patch Panel& FleT

Pretium EDGE Tap Module Installation and Testing

G12/G12x USER S MANUAL

HD Flex Zero RU Cassette Holder and Bracket

MASTERLINE Ultimate Hybrid High Voltage 4/12 (MLUH HV 4/12) blunt cut at BTS side

SYSTIMAX 360 ipatch Network Manager Module Faceplate Instructions

Plasma Panel Replacement Guide DU-42PX12X

Replacing the Power Supply

Dual Mount Universal Kit Aftermarket CMOS Camera with Optional Parking Gridlines Installation Instructions (Kit # )

3M Fibrlok II Angle Fiber Splice 2529-AS 3M Fibrlok 250 µm Angle Fiber Splice 2540-AS

Testing Optical Feeds in Wireless Systems Remote Radio Units (RRU) and Distributed Antenna Systems (DAS)

M215 (M215-60) Safety

DirectCommand Installation RoGator Model Year Ag Leader Technology

SD Splicing Cassette

M204SMB Surface Mount Box Instructions

Spec Sheet. OmniReach FTTX Solutions DLX Fiber Optic Connector

FL1000 Wall-Mount Box Installation and Operation Guide

SYSTIMAX 360 ipatch 96F LC Upgrade Kit

Installing the Cisco MDS 9020 Fabric Switch

Vacuum Maintenance Manual (EXCERPT Tim Benedict)

Thanks for shopping with Improvements! Lighted Canterbury Christmas Greenery Doorway Arch Item #548443

SCT-MMA / SCT-SMA Fiber Optic Adapters

E1135C PDU and Pod Upgrade Procedure

Two Rack Unit (2RU) Fiber Management Tray (FMT) User Manual

M250 (M LL) Safety

Outdoor PTZ. Mounting on the Ceiling Using Pendant Mount. Installation Guide. For Models: I93, I94, I95, I96, KCM /12/03

The Nureva Span ideation system. Installation guide. Single panoramic system

3M Add-On Terminals 4220P (100, 200, 300 & 400 pairs)

M215 Safety (M LL-S22-IG / S23-IG / S24-IG)

Series Amp Pad Mount Quick Connect Input and Output Power Panels

OMM200 and OMM200T. Metallurgical Microscope

Enphase S-Series Microinverter and Engage Cable Safety

Indoor Protected Entrance Terminal 4588 Series

BPL SERIES INSTALLATION INSTRUCTIONS THIS SHEET CONTAINS IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS.

Next Generation Frame Fiber Termination Block With MPO Connectors (FTB w/mpo) User Manual

Crimplok ST* and SC Non-Adhesive Fiber Optic Single & Multi-mode Connectors

Rack Mount Cabinet with Fiber Mgmt System, accepts up to 3 Adapter Plates. Rack Mount Cabinet with Fiber Mgmt System, accepts up to 6 Adapter Plates

AMP NETCONNECT* Gen II Vertical Storage Area Management (SAM) System

IR Varifocal IP66 Weatherproof Cameras

Ag Leader Technology. DirectCommand Installation RoGator Model Years

Cutter Option Installation Instructions

Series Amp Quick Connect Input and Output Power Panels

Part Name/Description Part Number Quantity

The following symbols are used to show dangerous operation or handling. Make sure you understand them before reading the guide.

HD40H(X) Performance Series Camera. User Guide

Fiber Optic and CAT 5-6 Installer Premise Cabling

Sarix Professional IMP Series 3.75 Indoor Dome. Quick Start Guide IMP121-1IS IMP221-1IS IMP321-1IS IMP521-1IS C2291M-B-EN (12/16)

4888 and 4988 Outdoor Protected Entrance Terminals

TABLE OF CONTENTS SECTION 1 TABLETOP CONFIGURATION SECTION 2 TABLETOP CONFIGURATION ACCESSORIES SECTION 3 SLIDE CONFIGURATION

TECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2

DRH Hardware Maintenance Guide

LED Lighting Kit For Elara NanoEdge Fixed Frame. Installation Guide. Attention: Read this guide before assembling your screen.

Panduit Certified Installer. Fiber Certification Review

HX WCS Indoor DAS Remote Unit Quick Installation Sheet

Your Global Flow Control Partner. Series 50 Valve Status Monitor Operation and Maintenance Manual

PM-212-MPO Pocket Optical Power Meter INSTRUCTION MANUAL

VEP4600. Setup Guide

DirectCommand Installation DirectCommand Complete Wiring Harness

Mounting on the Ceiling Using Flush Mount (Face Down)

Gateway Profile 4 service guide

User s Guide. Mobile Rack Device Mounting Kit for Echo Express III-R and xmac Pro Server. Quick Start Guide Video Available Online!

OmniReach Outdoor FDH Termination Cabinet With Pre-installed Cables

3M Duplex Polishing Machine 6851-E with Universal Dual Holder Instructions

M215-Z Safety Information (M LL-IG-ZC)

Removal and Installation 8

JAN 16 Rev B

USER MANUAL VIBRATION CONTROL RMA-POWER-BOX 107/230

MulTI-Touch Projected Capacitive Touch Screen Integration Guide

Schwintek Bed Tilt OEM INSTALLATION MANUAL

LASERJET ENTERPRISE M604, M605, M606

Fiber Optic Prism Switch USER S MANUAL

CSS1 Contractor Series Light Sources and CSM1 Contractor Series Optical Power Meters User s Guide

Installation Instructions for Slimbox 24 Fiber Outdoor Enclosure

Panduit PreConfigured Industrial Distribution Frame (IDF) Installation Instructions Part Numbers ZDF48-RA and ZDF48-EA ZDF48-6RA and ZDF48-6EA

Contents. Communications, Modular (excludes 17B, 17C, MK 21 and KMB BandMasks ) 1.1 Daily Maintenance. 1.2 Monthly Maintenance (or

Treadmill Integrated LCD Screen Option. Cardio Theater Integrated Bracket Assembly Instructions

NG3 High-Density Fiber Distribution Frame System Termination, Termination/Splice, VAM, and MPO Panels

OLS Series Light Sources, OPM Series Optical Power Meters, and Related Test Kits User s Guide

Self-Leveling Cross Line Laser Level with 3 Vertical Lines Model No Instruction Manual

SCdefault. 900 Installation instructions. Accessories Part No. Group Date Instruction Part No. Replaces :36-26 May

3M Indoor Building Entrance Terminal (IBET) 4790V and 4790VL Series

CNK200 Cable-Nook Interconnect Box

Navigator II INstallatIoN MaNUal For static and PaN/tIlt configurations

Installing the PSU for the S50 and S50N

Solarlok PV BAR Junction Box Assemblies

RSL PSM-2 Power Supply Module Project: Modifying a FlatCap2

Transcription:

CMA-477-AEN 1 General Figure 1 STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 1

2 Carton Contents Installation instruction Wall Mount Splitter housing Cable installation hardware 3 Tools and Materials Required 3.1 Tools Can wrench Measuring tape Appropriate tool kit with fiber stripping tools 3.2 Materials Hardware for end-point cable installation Mounting hardware appropriate for the surface upon which the housing will be installed 4 Mounting the Housing Select the appropriate location for the housing to be installed according to your installation plan. Choose a vertical surface near approved ground but away from downspouts, permanent water sprinklers, or other water sources. Ensure the housing is easily accessible from the front to allow technicians to connect customers as they subscribe for service. Using the housing as a template (Figure 2), ensure the unit is square and mark the locations for the mounting hardware. Install appropriate anchors (not provided) to the surface to which the housing will be attached. Use shims (not provided) on uneven surfaces to ensure the housing is square and to prevent warpage. Place the unit on the mounting surface over previously determined mounting location. Insert the mounting hardware through the mounting ears and tighten securely to the mounting surface/wall before installing cable into the cabinet. Figure 2 STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 2

4.1 Wall Mounting PSU6 (Remote Power Option) Remove the rack-mounting brackets and set the screws aside. Using the four screws (previously set aside), assemble the wall-mount brackets onto the sides of the PSU6 so that the unit can be mounted belly-to-wall. See Figure 3. Notes: The unit should be mounted on the wall with the DC connectors facing sidewards. See Figure 5. Make sure that there is enough space at the rear to insert/extract the PSMs. Figure 3 Dual Gang Box Mounting Using the wall-mount bracket keyholes as a guide, mark the holes to be drilled on the wall. Mount the PSU 7 inches horizontally from the Wall. See Figure 4 Notes: This distance will affect the strip lengths of the composite drop cables. If mounting is more than 7 inches from splitter housing strip lengths wil Need to be adjusted to allow for necessary copper conductor length to reach PSU6 power ports Step 4 Insert appropriate bolts and mount unit. Figure 4 Housing and PSU6 Wall Mounting STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 3

5 Accessing the Housing Use a 3/8-in can wrench to loosen the security screw on the front cover. Depress the access latches on the side of the unit and open the front cover (Figure 5). Open the interior security door inside the cabinet with the can wrench to access the bottom chamber. Figure 5 ONT Fiber Port STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 4

6 Installing Feeder Cable Remove the hole plug for the feeder entry port. Install an appropriate size fitting and conduit (if conduit is used) per standard local practices and ensure proper sealing. Feed the end-point cables into the housing through the fitting. Figure 6 Strip 65 inches of the feeder cable jacket with proper cable entry tools Step 4 Route one loop of the fiber around the radius guides in clockwise direction. Bring fibers to splitter pigtail connection in inside center of housing Step 5 Step 6 Figure 7 Terminate fiber and connect to splitter input adapter. Route and secure spare fibers so they will not be damaged. STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 5

7 Installing End-Point Cable Spare end-point fiber connectors can be stored in a parking area on the front of the connector plate. Individual connectors can be accessed as new subscribers are activated. WARNING: Never look directly into the end of a fiber that may be carrying laser light. Laser light can be invisible and can damage your eyes. Viewing it directly does not cause pain. The iris of the eye will not close involuntarily as when viewing a bright light. Consequently, serious damage to the retina of the eye is possible. Should accidental eye exposure to laser light be suspected, arrange for an eye examination immediately. WARNING: DO NOT use magnifiers in the presence of laser radiation. Diffused laser light can cause eye damage if focused with optical instruments. Should accidental eye exposure to laser light be suspected, arrange for an eye examination immediately. CAUTION: Recommend the use of safety glasses (spectacles) conforming to ANSI Z87 for eye protection from accidental injury when handling chemicals, cables, or working with fiber. Pieces of glass fiber are very sharp and have the potential to damage the eye. CAUTION: The wearing of cut-resistant safety gloves to protect your hands from accidental injury when using sharp-bladed tools and armored cable is strongly recommended. Use extreme care when working with severed armor. There will be a sharp edge where armor is cut. To minimize the chance of injury from the cut armor, cover the exposed edge with a wrap of electrical tape. To minimize the chance of injury from sharpbladed tools, always cut away from yourself and others. Dispose of used blades and armor scrap properly. CAUTION: Fiber optic cable is sensitive to excessive pulling, bending, and crushing forces. Consult the cable specification sheet for the cable you are installing. Do not bend the cable more sharply than the minimum recommended bend radius. Do not apply more pulling force to the cable than specified. Do not crush the cable or allow it to kink. Doing so may cause damage that can alter the transmission characteristics of the cable; the cable may have to be replaced. STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 6

Remove one of the hole plugs from the bottom of the housing. Install an appropriate size fitting and conduit (if conduit is used) per standard local practices and ensure proper sealing. Feed the endpoint cables into the bottom chamber through the fitting. Strip 95 inches of the end-point cable jacket from the cables with proper cable entry tools and procedures exposing the fiber and copper conductors. Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Route one loop of fiber/copper around the radius guides in counter clockwise direction. Place spiral wrap around the bundle of fibers where they will transition from the bottom chamber to the customer/drop adapter field. Secure spiral wrap to inner security door to prevent fiber from being pinched when closing the door Route the fibers to the front of the housing, trimming lengths as needed and terminate fibers. Align the key on the connector with the key on the connector adapter. Install the connector into the adapter. Park unused terminated fibers in the parking area. Route copper through one of the drop port holes out of the housing. Place spiral wrap around copper conductor bundles and secure. Route copper conductor bundle to PSU6 and terminate into power port connectors. Note: See PSU6 Quick Start Guide Figure 8 STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 7

Figure 9 8 Connecting End-point Connectors during Initial Installation Select the appropriate connector from the parking area (Figure 10). Figure 10 STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 8

Step 4 Step 5 Remove the dust cap from the appropriate connector adapter. Clean each adapter before mating as described in Section 9. Align the key on the connector with the key on the connector adapter. Install the connector into the adapter. Record the connector terminations on the identification label inside the front cover (Figure 10) as they are made. Close the front cover and secure it by tightening the external security screw with the can wrench (approximately 15 in-lb torque). 9 Connecting End-Point Connectors after Initial Installation Use a 3/8-in can wrench to loosen the external security screw and then depress the access latches to open the door. Follow Steps 2 through 6 in Section 6 to connect end-points. 10 Connector Care and Cleaning WARNING: Isopropyl alcohol is flammable with a flashpoint at 54ºF. It can cause irritation to eyes on contact. In case of contact, flush eyes with water for at least 15 minutes. Inhalation of vapors irritates the respiratory tract. Exposure to high concentrations has a narcotic effect, producing symptoms of dizziness, drowsiness, headache, staggering, unconsciousness, and possibly death. Always keep dust caps on connectors and adapters when not in use. Ensure dust caps are clean before reuse. Use optical cleaning materials as standardized by your company. Clean the connector before every mating, especially for test equipment patch cords (jumpers). A minimum level of cleaning is listed below. Local procedures may require more rigorous cleaning methods. Remove plugs from the connector adapter. Wipe the connector ferrule twice with a lint-free wiping material moistened with isopropyl alcohol. Then wipe across the end of the ferrule. Repeat previous step with a dry wipe. STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 9

11 Testing 11.1 Provisioning Tests Equipment should be tested from the source (or central office) to receiver at the time of provisioning to verify signal continuity and acceptable loss limits. Use an optical power meter to verify signal continuity and determine whether loss measurements are within specified local standards. 11.2 Troubleshooting Tests An optical power meter can be used to perform the first step in troubleshooting. A power meter designed for measuring only dbm power levels is suitable for maintenance purposes. For high attenuation: Remove connector and reclean connector and adapter. Verify cable ties are not too tight. Maintain appropriate fiber bend radius. Make sure there are no sharp bends. Once a fault is isolated to the installed cable link, an optical time domain reflectometer (OTDR) is needed. An OTDR can locate fiber events and measure the losses attributable to cable, connectors, splices, and/or other components. The graphical display of loss over a cable s entire length provides the most revealing analysis and documentation available on a cable link, commonly referred to as its signature trace. Corning recommends performing an OTDR analysis to document the integrity of the cable system, locate and measure each event or component, and uncover faults throughout the cable. Follow the instructions provided with the OTDR tester you are using. 12 Maintenance and Repair Procedures 12.1 Maintain the Housing No routine maintenance of this product is required to keep it in operational order. In the event of loss of service or low performance, test the connections as described in Section 10. Reenter the bottom chamber, if necessary, to determine which components are defective. 12.2 Reenter the Housing Use a 3/8-in can wrench to loosen the external security screw and then depress the access latches to open the front cover. 12.3 Replace Components Contact Corning Engineering Services at 1-800-743-2671 for instructions to repair or replace broken or defective components. STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 10