Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

Similar documents
For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

Instructions. Interconnection Customer declares its intention to interconnect with the AEP Distribution System.

Midwest Energy, Inc. Distributed Generation Interconnection Expedited & Standard Process Application

Interconnection Application

Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011

Legal Name of the Customer (or, if an individual, individual's name):

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

Document C0. Use for:

Oncor Application for Interconnection of Distributed Generation

Checklist for Submission to Utility

1. Coordination of series-rated devices is permitted where indicated on Drawings.

CenterPoint Energy P O Box 1700 Houston, TX

Superseding REVISED SHEET NO. 34D-8 REVISED SHEET NO. 34D-8 Effective May 27, 2010 Effective December 3, 2011

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

WN U-60 Original Sheet No. 152

Free Standing Emergency Department DGL Project No SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL

LONG ISLAND POWER AUTHORITY INTERCONNECTION REQUIREMENTS FOR NEW DISTRIBUTED GENERATION GREATER THAN 300 KVA OPERATING IN PARALLEL WITH LIPA S RADIAL

INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM. July 2011 UPDATED STANDARDS

PG&E Transmission Interconnection Handbook

U.S. Virgin Islands Water and Power Authority

SOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Interconnection Standards for Delmarva Power & Light Company s Delaware Operating Territory

DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

POWER SYSTEMS STUDY: SIGNIFICANT (OR TOTAL) DELETION OF EXISTING TEXT

Minnesota DER Interconnection Process Kristi Robinson, P.E.

Green Power Connection Net Energy Metering Online Application Training

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

System Protection and Control Subcommittee

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Medium Voltage Metal-Enclosed Thyristor-Switched Harmonic Filter Banks

JK Series POWER DISTRIBUTION. Solid State Starters Medium Voltage A

Short-Circuit Calculation Methods

NEW ERA METER. Installation & Operation Guide NE METER

SECTION ( ) LIGHTING CONTROL PANELBOARD

Project Center User Guide

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

Technical Guideline For Interconnection Of Generators To The Distribution System

SECTION DISTRIBUTION SWITCHBOARDS

SECTION ELECTRIC METERING

ENERGY SERVICES. Project Center User Guide. This guide is intended to help customers / contractors operate the

Power System Network Simulator (PSNsim)

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures

SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM

PLT. Breaker-based transfer switch open, closed or soft transition amps. Specification sheet

Branch Procedure. Document No. Issue No. : : 29/06/ /06/2021 (Supersedes CEOP8012, Generation Connection: Protection Guidelines, Issue 4.

SR489 SR489. Generator Management Relay. Economical protection, metering, and monitoring functions for small and medium sized generators.

PUBLIC SERVICE OF NEW HAMPSHIRE. Technical Requirements for Non Utility Generation Interconnecting to the PSNH Distribution System

Elmhurst Mutual Power & Light nd Street South Tacoma, WA

Medium Voltage Metal-Enclosed Power Capacitor Banks

Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards

PRC Coordination of Protection Systems for Performance During Faults

Facility Connection Requirements

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

Medium Voltage Metal-Enclosed Harmonic Filter Systems

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

PG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug.

The City of Winnipeg Dry Type Transformers up to 600 V Primary Section Bid Opportunity No Page 1 of 2

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

THE INTERCONNECTION HANDBOOK

DISTRIBUTED ENERGY RESOURCES NEM PLUS APPLICATION MANUAL

APPENDIX B-1 TECHNICAL CONNECTION REQUIREMENTS. for GENERATION & INTERCONNECTION FACILITIES

Certification Exams. Detailed Content Outlines Level 2 Certified Assistant Technician Level 3 Certified Technician Level 4 Certified Senior Technician

FORM FOR PROPOSAL FOR 2014 NATIONAL ELECTRICAL CODE

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

Understanding SCCR. THE BEST ELECTRICAL CONTROLS BUSINESS ON THE PLANET! Unmatched Service Superior Product Quality Advantage Pricing

SECTION VARIABLE FREQUENCY DRIVES

AcquiSuite Ally 48 Advanced Branch Circuit Monitor

PowerFlex 400 AC Drive Guide Specification

UL 508 A standard-compliant design of industrial control panel

Grid Interconnection of Renewable Generation

Electric T&D Capacity, Reliability, UG Asset Bulletin

SECTION SWITCHBOARDS

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum)

Standard Development Timeline

EM6400 series Multi-Function meters

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

ABB Industrial Systems Inc. Standard Drives. ACH500-06E Effective 6/1/95

SECTION SOLID-STATE REDUCED VOLTAGE STARTERS

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

State of Minnesota Interconnection Process for Distributed Generation Systems

SECTION 16496E ATS MOLDED CASE WITH ATC 900 CONTROLLER

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

reliable company...caterpillar

SECTION DISCONNECT SWITCHES

ETAP PowerStation 4.0

Glencoe Light and Power

1-Line Load Calculation Software. User s Manual APPROVED. Copyright 2013 Durand & Associates. Page 1

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

Electrical Plan Review

Standard Development Timeline

Generation, Transmission, and End User Facilities

The PCI Series. Precise power control for complex SCR applications. Phase Angle Fired SCR Power Controls AMPS VAC

Small Hydro Regulatory and Permitting Requirements California

WESTERN AREA POWER ADMINISTRATION Meter Policy

Transcription:

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW The Customer Generator applicant ("Applicant") hereby makes application to the T & D Utility to install and operate a generating facility interconnected with the transmission and distribution utility system. This application will be considered as an application for interconnection of generators under Expedited interconnection review provided the generator is not greater than MW but shall serve as an Application for Standard interconnection review if greater than 10 MW or if Expedited review does not qualify the generator for interconnection. An application is a Complete Application when it provides all applicable information required below. (Additional information to evaluate a request for interconnection may be required and will be so requested from the Interconnection Applicant by Utility after the application is deemed complete). Once complete, please sign and include your $ application fee and mail to the following address applicable for your service territory: Emera Maine Distribution Interconnection Coordinator PO Box 932 Bangor, ME 04402 0932 (Make check payable to: Emera Maine) 1. Legal Name of Interconnecting Applicant (or, if an Individual, Individual's Name) a. Name: b. Company (If Applicable): c. Contact Person: d. Account Number: (Existing Account Number, if generator to be interconnected on the Customer side of a utility revenue meter.) e. Address: f. City, State, Zip: g. Telephone (Day): h. Telephone (Evening): i. Fax: j. E Mail Address: k. Type of Interconnect Service Applied for (choose one): Network Resource Energy Only Load Response (no export) Net metering

2. Contact (if different from Interconnection Customer) a. Name: b. Account Number: c. Address: d. City, State, Zip: e. Telephone (Day): f. Telephone (Evening): g. Fax: h. E Mail Address: i. Owner of the facility (include percent ownership by any electric utility): 3. Installing Electrical Contractor Information a. Company: b. Representative: c. Title: d. Street Address: e. Mailing Address (if different from street address): f. Email: g. Phone #: h. Fax #: 4. Timing a. Requested In Service Date: 5. Generating Qualifications a. Manufacturer: b. Model Name and No.: c. Version No.: d. Serial No.: Page 2 of 8

e. Nameplate Output Power Rating: (summer) kw or: kva (winter) kw or: kva f. Individual Generator Power Factor: Rated Power Factor: Leading Lagging g. Generating Facility/Inverter AC output voltage: Volts h. Generating Facility Type: 1. Single Phase Three Phase 2. Synchronous Induction Inverter Other i. Total Number of Generators in wind farm to be interconnected pursuant to this Interconnection Request: Elevation: Single Phase: Three Phase: j. Inverter Manufacturer, Model and number (if used): k. Battery Storage rating (if applicable): kw, and AH or kwh 1. Describe operating mode on the one line diagram l. List of adjustable set points for the protective equipment or software: m. Rated current: (amps) n. Location (if different from above): o. Interconnection Customer or Customer Site Load: kw (if none, so state) p. Typical Reactive Load (if known): q. Maximum Physical Export Capability Requested: kw r. Prime Mover: Photovoltaic/Reciprocating Engine/Fuel Cell/Turbine/Other (describe) s. Energy Source: Photovoltaic/Wind/Hydro/Diesel/Natural Gas/Fuel Oil/Reciprocating Engine Other (describe) t. Is the equipment UL1741 Listed? Yes / No If YES, attach any documentation provided by the generator manufacturer describing the UL1741 listing for the generating facility to this application. u. Single line diagram for interconnection Page 3 of 8

v. List components of the Small Generating Facility Equipment Package that are currently certified: Equipment Type Certifying Entity Is the prime mover compatible with the certified protective relay package? Yes No Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Application. 6. Small Generating Facility Characteristic Data (for inverter based machines) Max design fault contribution current: Instantaneous or RMS? Harmonics Characteristics: Start up requirements: 7. Small Generating Facility Characteristic Data (for rotating machines) RPM Frequency: (*) Neutral Grounding Resistor (If Applicable): 8. Synchronous Generators: Direct Axis Synchronous Reactance, Xd: P.U. Direct Axis Transient Reactance, X' d: P.U. Direct Axis Subtransient Reactance, X" d: P.U. Negative Sequence Reactance, X2: P.U. Zero Sequence Reactance, X0: P.U. KVA Base: Field Volts: Field Amperes: 9. Induction Generators: Motoring Power (kw): Page 4 of 8

I 2t or K (Heating Time Constant): Rotor Resistance, Rr: Stator Resistance, Rs: Stator Reactance, Xs: Rotor Reactance, Xr: Magnetizing Reactance, Xm: Short Circuit Reactance, Xd": Exciting Current: Temperature Rise: Frame Size: Design Letter: Reactive Power Required In Vars (No Load): Reactive Power Required In Vars (Full Load): Total Rotating Inertia, H: Per Unit on kva Base Note: Please contact the T & D Utility prior to submitting this Interconnection Application to determine if the specified information in Section 9 above is required. 10. Excitation and Governor System Data for Synchronous Generators Only Provide appropriate IEEE model block diagram of excitation system, governor system and power system stabilizer (PSS) in accordance with the regional reliability council criteria. A PSS may be determined to be required by applicable studies. A copy of the manufacturer's block diagram may not be substituted. 11. Interconnection Facilities Information Transformer Data (If Applicable, for Interconnection Customer Owned Transformer): Will a transformer be used between the generator and the Point of Common Coupling? Yes No Will the transformer be provided by the Interconnection Customer? Yes No Is the transformer: single phase three phase? Size: kva Transformer Impedance: percent on kva Base If Three Phase: Transformer Primary: Volts Delta Wye Wye Grounded Page 5 of 8

Transformer Secondary: Volts Delta Wye Wye Grounded Transformer Tertiary: Volts Delta Wye Wye Grounded Transformer Fuse Data (If Applicable, for Interconnection Customer Owned Fuse): (Attach copy of fuse manufacturer's Minimum Melt and Total Clearing Time Current Curves) Manufacturer: Type: Size: Speed: Interconnecting Circuit Breaker (if applicable): Manufacturer: Type: Load Rating (Amps): Interrupting Rating (Amps): Trip Speed (Cycles): Interconnection Protective Relays (If Applicable): If Microprocessor Controlled: List of Functions and Adjustable Setpoints for the protective equipment or software: Set point Function Minimum Maximum 1. 2. 3. 4. 5. 6. If Discrete Components: (Enclose Copy of any Proposed Time Overcurrent Coordination Curves) Page 6 of 8

Current Transformer Data (If Applicable): Enclose copy of Manufacturer Excitation and Ratio Correction Curves Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Potential Transformer Data (If Applicable): Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: General Information Checklist Please sign on the line beside each item listed below verifying that a complete package has been submitted and the Customer(s) are aware of all requirements: If a 50 kw or smaller interconnection generator, enclose copy of site electrical one line diagram showing the configuration of all Small Generating Facility equipment, current and potential circuits, and protection and control schemes. If the Small Generating Facility is larger than 50 kw, the one line diagram must be signed and stamped by a licensed Professional Engineer. Is a One Line Diagram Enclosed? Yes No Enclose copy of any site documentation that indicates the precise physical location of the proposed Small Generating Facility (e.g., USGS topographic map or other diagram or documentation). Yes No Proposed location of protective interface equipment on property (include address if different from the Interconnection Customer's address) Enclose copy of any site documentation that describes and details the operation of the protection and control schemes. Yes No Enclose copies of schematic drawings for all protection and control circuits, relay current circuits, relay potential circuits, and alarm/monitoring circuits (if applicable). Yes No Page 7 of 8

Information Required Prior to Physical Interconnection Installing Electrician: Firm: License No.: Mailing Address: City: State: Zip Code: Telephone: Applicant Signature I hereby certify that, to the best of my knowledge, all the information provided in the Interconnection Application is true and correct. I also agree to install a Warning Label provided by (utility) on or near my service meter location. Generating systems must be compliant with IEEE, NEC, ANSI, and UL standards, where applicable. By signing below, the Applicant also certifies that the installed generating equipment meets the appropriate preceding requirement(s) and can supply documentation that confirms compliance. Signed: Date: FOR COMPANY USE ONLY Contingent Approval to Interconnect the Small Generating Facility Interconnection of the Certified, Inverter Based Generating Facility is approved contingent upon the proper execution of the Level 2, 3 and 4 Interconnection Agreement and return the Certificate of Completion (or other evidence of local code official approval), when the Inverter Based Generating Facility has been installed. Company Signature: Title: DG Interconnection and NEB Billing Coordinator Date: Queue number: Company waives inspection/witness test? Yes No Level 2 3 4 APPLICATION rev 052418 Page 8 of 8