Kansas Division. January 31, 2018

KANSAS CITY METROPOLITAN REGION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS Thursday, September 07, :30 PM

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Dakota County Transportation CIP Process Requests from cities/townships

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

KANSAS MAP CHANGES KANSAS DEPARTMENT OF TRANSPORTATION ROUTE COUNTY PROJECT WORK TYPE I 635 WYANDOTTE K GR&SU

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice

DESIGN CRITERIA MEMORANDUM

Transportation Improvement Program. Project Lookup Lists

TRANSPORTATION DEPARTMENT Business Plan

($ millions) DRPA Rebuild PATCO Cars

Northwest Needs Improvements Survey

STUDY REPORT #1 ADDENDUM

Appendix D Supportive Transportation Materials

Transportation Improvement Program. Project Lookup Lists

2014 BOND PROGRAM UPDATE

Metropolitan Council. Transportation Division Proposed Transit Capital Program

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3

PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION

Scoping and Design Projects October Administrative Amendment Non MPO Project Changes

STATE STREET CORRIDOR

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Hennepin Avenue Downtown

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

DISTRIBUTION OF QUANTITIES

Bentley OpenRoads Workshop 2017 FLUG Fall Training Event

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE

APPENDIX E. Expenditures by Department

APPENDIX F. Expenditures by Year

Gaston County GIS. Interactive Mapping Website

Bentley ConceptStation Workshop 2017 FLUG Spring Training Event

Page 2D-12 Revised the following language in the last sentence on the page from; as shown in Figure 2D-3. To; as shown in Chapter 2H, Figure 2H-35.

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:

EXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF DOWNTOWN LOS ANGELES/ARTS DISTRICT

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

PUBLIC WORKS ORGANIZATIONAL CHART

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

C Line Rapid Bus 90% Design

MSAG and Map Clean-Up Projects

HISTORIC AMERICAN ENGINEERING RECORD INDEX TO PHOTOGRAPHS. BLACK AND WHITE PHOTOGRAPHS OF HElM BRIDGE

West Seattle and Ballard Link Extensions. Downtown Open House and Neighborhood Forum September 11, 2018

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

South Mountain Freeway Interchange Selection

Cedar Rapids ITS Deployment Project

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Site 40. Recreational Center

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

2017 STP PROJECT APPLICATION (OREGON)

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

Recommendation to Board. Final Action

Final Major New Program List

6.9 Intelligent Transportation Systems

Context Sensitive Case Study: Grand Avenue Bridge

DISTRIBUTION OF QUANTITIES

Community Advisory Committee. June 5, 2017

GATEWAY. Action Plan JULY Gateway Action Plan DRAFT - July Portland Development Commission

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE

Looking Ahead. A Context for the Next Twenty Year Needs Assessment. July 2013

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

PROJECT TIMELINE. Next steps. Plan. Start of Service

GATEWAY PROGRAM OVERVIEW AND UPDATE

Mobile Mapping Solutions for Ohio s Integrated Transportation Network. Brian Foster, CP

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission

8a: Road Projects Time Horizon 1: (Funded TIP) Page 81

8/8/2018 Council Approval Presentation. 8/14/2018 MOVEBR Infrastructure Enhancement and Traffic Mitigation Plan 1

SUMMIT TECHNOLOGY CAMPUS 777 NW BLUE PARKWAY I 850 NW CHIPMAN ROAD LEE S SUMMIT MO 64086

Metropolitan Council Transportation Committee. September 12, 2016

Corridor Management Committee. December 17, 2014

Record of Public Comment on Central Corridor SDEIS

Fox River Grove, 20 Years Later. Brian Vercruysse, PE November 3, 2015 Arlington, TX

PE Exam Review - Surveying Demonstration Problem Solutions

MOTION NO. M Task Order 2 with the City of Des Moines for the Federal Way Link Extension

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Public Works 2017 Budget Presentation. Public Works What We Do

Development of Standardized Bridge Systems

Sewer System Capital Budget Process

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Appendix D. Transportation Study

NEW TxDOT CONGESTION RELIEF PROGRAM

US 101 HOV PROJECT Status Report SBCAG BOARD MEETING JANUARY 21, 2016

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel

NCTCOG MTP Policy Bundle Application for TXDOT

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association

Transcription:

How to Read the TIP Project Lis ngs The project lis ng is a complete list of all projects in the TIP amendment. The state is noted in the heading. Bistate projects are listed first, followed by Kansas, then projects. Below is a sample TIP amendment project lis ng. The numbered fields are described in the key below. SAMPLE TIP AMENDMENT PROJECT LISTING DRAFT 2011 2nd Quarter 1 TIP #: 590161 2 Juris: CLAY COUNTY 3 Location/Improvement: SMITHVILLE LAKE TRAIL (HWY W TO 188TH ST.) County: CLAY 4 Project : PEDESTRIAN AND/OR BIKE WAYS Length (miles): 5 ID#: STP-3301(428) 6 State ID #: 7 12 Smithville Lake Trail (Hwy W to 188th St.) 8 9 10 Cost (IN THOUSANDS) 2011 TE-MO $202.7 13 New project 2011 LOCAL $133.5 $202.7 $133.5 11 $336.2 14 1 2 TIP #: The number assigned to TIP project, which is how an agency identifies a project. Juris: The lead public agency or municipality responsible for the project. 8 9 : Shows when each phase is scheduled to be obligated. : Indicates whether federal funds will be used in each phase. 3 Location/Improvement: Name of project, identifying what it is and where it is located. 10 : Indicates funding source abbreviation for each phase. 4 Project : Projects are classified into descriptive categories. 11 Total estimated federal and non-federal funds being spent on the project. 5 ID#: Identification number within a federal funding program. 12 Provides a short outline of the project. This may include type, scope and major features of the project. 6 State ID#: Identification number within a state funding program. 13 Describes what is being modified by the amendment. 7 : Shows phases of project, classified into categories. 14 Indicates the reason(s) for inclusion in the amendment.

Kansas TIP #: 380153 State #: KA-4220-02 2023 2017 2017 2023 Juris: KDOT FRP-A422(002) Co: JOHNSON KANSAS CITY METROPOLITAN REGION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS - 3rd Quarter Location/Improvement: I-35: FROM 0.4 MILES SOUTH OF I-35/75TH ST., NORTH TO 0.2 MILES SOUTH OF I-35/67TH ST. Project : Reconstruction FRP-KS $870.3 STATE-KS (AC) $803.3 STATE-KS $89.3 STATE-KS (AC) $67.0 STATE-KS $7.4 CREDIT ($870.3) STATE-KS $74.4 Length (mi): 1 Widening of northbound and southbound lanes from 3 to 4-lane, increase northbound vertical clearance under 75th Street and modification of NB onramp and SB on & off-ramps. Project is authorized for PE, ROW & UTIL ONLY. Project created after the completion of the location study under KA- 4220-01. The PE work phase will utilize AC in the amount of $803.3 K with conversion to FRP-KS in 2023. The UTIL work phase will utilize AC in the amount of $67 K with conversion to FRP-KS in 2023. The total project cost, including all work phases, is estimated at $17,406.2 K. This estimate should be used for planning purposes only. Adjust budget, scope and schedule to reflect the latest estimates $870.3 $171.1 $1,041.4 TIP #: 380157 State #: KA-4844-01 Juris: KDOT Co: JOHNSON Location/Improvement: US-69: BRIDGE #136 LOCATED AT JUNCTION US-69/I-35 IN JOHNSON COUNTY Project : (Bridge) STATE-KS (AC) $1,960.0 STATE-KS $490.0 NHPP-KS $1,960.0 STATE-KS $300.0 CREDIT ($1,960.0) Redeck, Paint Superstructure, Rebuild Abutments/Encase Beams, New Approach Slabs, Pavement Patching and/or Replacement. The CONST phase will utilize AC in the amount of $1,960 K with conversion to NHPP in. Adjust schedule to reflect the latest estimates $1,960.0 $790.0 $2,750.0 TIP #: 380159 State #: KA-4877-01 Juris: KDOT Co: JOHNSON Location/Improvement: BRIDGE #234 ON K-10 IN JOHNSON COUNTY Project : Bridge Rehabilitation STATE-KS $74.8 STATE-KS (AC) $299.2 NHPP-KS $299.2 STATE-KS $70.0 CREDIT ($299.2) Rail & Curb Repair, Mill & Patch Deck, Concrete Overlay, Replace EWS Joints & Patch EWS Headers and North East Gutter Repair. The CONST phase will utilize AC in the amount of $299.2 K with conversion to NHPP in. $299.2 $144.8 $444.0 Monday, August 06, 11:07 AM Page 1 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas TIP #: 380160 State #: KA-4871-01 Juris: KDOT $105.0 Co: JOHNSON Location/Improvement: SOUND WALL REPAIR IN JOHNSON COUNTY Project : Bridge Rehabilitation STATE-KS $90.0 STATE-KS $15.0 $105.0 Drill and grout anchor bars, replace soldier pile, steel caps, and masonry plates and replace precast wall panels TIP #: 380161 State #: KA-4878-01 Juris: KDOT Co: JOHNSON Location/Improvement: BRIDGE #325 LOCATED 1.5 MILES SOUTH WEST OF THE JOHNSON COUNTY LINE Project : Bridge Rehabilitation STATE-KS $32.5 STATE-KS (AC) $130.2 NHPP-KS $130.2 STATE-KS $29.6 CREDIT ($130.2) Expansion Joint Replacements and Patch the Deck as needed. Project will utilize AC in the amount of $130.2 K with conversion to NHPP in $130.2 $62.1 $192.3 TIP #: 380162 State #: KA-4872-01 Juris: KDOT Co: JOHNSON Location/Improvement: 207TH ST RECONSTRUCTION, HOMESTEAD LN TO WAVERLY RD Project : Reconstruction LOCAL $2,244.0 STATE-KS $8,976.0 LOCAL $116.0 STATE-KS $464.0 Reconstruction of Homestead Lane south of the diverging diamond interchange to 207th Street and 207th Street from Homestead Lane to Waverly Road. Project will include new bridge over Bull Creek and new 4-lane industrial parkway with turning lanes at major private entrances. $11,800.0 $11,800.0 Monday, August 06, 11:07 AM Page 2 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas TIP #: 380163 State #: KA-4876-01 Juris: KDOT Co: JOHNSON Location/Improvement: BRIDGE #103 (151ST STREET) LOCATED 8.05 MILES NORTH OF THE MIAMI/JOHNSON COUNTY LINE Project : Bridge Rehabilitation STATE-KS $102.4 STATE-KS (AC) $409.6 NHPP-KS $409.6 STATE-KS $80.0 CREDIT ($409.6) Curb repair, rail section repair/replace, mill deck, patch deck (polyester concrete), polyester concrete overlay and replace approach slabs. The CONST phase will utilize AC in the amount of $409.6 K with conversion to NHPP in. $409.6 $182.4 $592.0 TIP #: 380164 State #: KA-4696-02 Juris: KDOT $60.4 $0.6 Co: JOHNSON Location/Improvement: I-435 IN JOHNSON COUNTY GUARDRAIL UPGRADES Project : (Roadway) NHPP-KS $60.4 STATE-KS $0.6 $61.0 Guardrail Upgrades on I-435 in Johnson County TIP #: 349235 State #: N-0641-01 2017 2017 Juris: OLATHE STP-N064(101) Co: JOHNSON Location/Improvement: K-7 (PARKER ST), DENNIS TO SANTA FE TURN LANE ADDITIONS Project : Traffic Management STPM-KS $2,000.0 LOCAL $3,600.0 LOCAL $700.0 LOCAL $975.0 LOCAL $375.0 Length (mi): 1.0 This project will include the addition of turn lanes along K-7 (Parker St.) between Dennis Ave and Santa Fe. Right and left turn lanes will be installed at 8 potential intersections along the corridor. This project will also include updates to the ADA ramps and traffic signals as needed throughout the corridor. Adjust budget and schedule to reflect the latest estimates $2,000.0 $5,650.0 $7,650.0 Monday, August 06, 11:07 AM Page 3 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas TIP #: 180074 State #: KA-4947-01 Juris: KDOT Co: LEAVENWORTH Location/Improvement: BRIDGE #026 ON K-92 IN LEAVENWORTH COUNTY Project : Bridge Rehabilitation STATE-KS $57.0 NHPP-KS $228.0 STATE-KS $40.0 Replace Compression Joints (PPC Headers), Approach Slab Compression Joint (PCC Headers), Correct Drainage Issues at Pier 11 (Add grates, re-route the drain pipe) $228.0 $97.0 $325.0 TIP #: 162004 State #: U-2113-01 2010 2017 Juris: LANSING HPD-U211(301) Co: LEAVENWORTH Location/Improvement: DESOTO ROAD FROM IDA STREET TO EISENHOWER ROAD Project : Road Widening & Resurfacing HP-KS $1,272.1 HSIP-KS $200.0 LOCAL $6,312.2 HP-KS $730.9 LOCAL $723.0 LOCAL $305.3 Length (mi): 2 Widen DeSoto Road from two lanes to three lanes, install sidewalk on both sides of the road, install curb and gutter, flatten shoulder slopes, provide appropriate signage, and replace or partially replace existing traffic signal at intersection of Desoto Road and Eisenhower Road. Also includes box culvert stream crossings, storm sewers, and retaining walls. Include engineering, utlity relocation and right-of-way phases. Update the construction cost to the most current estimate and include construction engineering into the construction phase $2,203.0 $7,340.5 $9,543.4 TIP #: 996104 State #: Juris: BIKEWALKKC $250.0 $62.5 Co: REGIONAL Location/Improvement: SRTS: LOCAL SPOKES ACROSS THE KC REGION - KANSAS Project : Safety LOCAL $62.5 CMAQ-KS $250.0 $312.5 Length (mi): Local Spokes is a comprehensive SRTS education program that empowers youth to bike to school and improve their neighborhood. Components: -Bicycle Safety Education -Youth Ambassador Training -Public Engagement -Final Project. Arrival/dismissal evaluations and built environment assessments will inform programmatic need and implementation stage. New project N/A Monday, August 06, 11:07 AM Page 4 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas TIP #: 280133 State #: KA-3228-02 2030 2016 2016 2030 Juris: KDOT NHPP-4353(370) Co: WYANDOTTE Location/Improvement: I-435/STATE AVENUE INTERCHANGE, 0.5 MILES NORTH OF I-70 Project : (Roadway) NHPP-KS $2,682.0 STATE-KS (AC) $2,682.0 STATE-KS $298.0 CREDIT ($2,682.0) Construct a Diverging Diamond Interchange (DDI), including ramp improvements. Project is authorized for PE Only. The total project cost, including all work phases, is estimated at $38,170 K. This estimate should be used for planning purposes only. The PE work phase will utilize AC in the amount of $2,682 K with conversion to NHPP in 2030. Adjust budget to reflect the latest estimates $2,682.0 $298.0 $2,980.0 TIP #: 280134 State #: KA-4691-01 Juris: KDOT Co: WYANDOTTE Location/Improvement: I-435 IN WYANDOTTE COUNTY: 1.) I-435 FROM THE KANSAS RIVER BRIDGE N TO THE MISSOURI STATE LINE 2.) I-435 FROM.5 MILES NORTH OF THE K-5/I-435 JUNCTION TO THE MISSOURI STATE LINE. Project : Bridge Rehabilitation STATE-KS (AC) $7,903.7 STATE-KS $878.2 NHPP-KS $7,903.7 STATE-KS $83.6 CREDIT ($7,903.7) Length (mi): 11 Scope of work includes replacing the bridge approaches, 3 inch overlay, first lift spray paver and PCCP patching. The CONST phase will utilize AC in the amount of $7,903.7 K with conversion to NHPP in. Adjust budget to reflect the latest estimates $7,903.7 $961.8 $8,865.5 TIP #: 280138 State #: KA-2130-03 Juris: KDOT Co: WYANDOTTE Location/Improvement: I-70- LEWIS & CLARK VIADUCT REPAIR ON BRS #173, 177 &178 Project : Bridge Rehabilitation STATE-KS $311.3 STATE-KS (AC) $2,801.7 NHPP-KS $2,801.7 STATE-KS $56.6 CREDIT ($2,801.7) Bridge Repairs. The CONST phase will utilize AC in the amount of $2,801.7 K with conversion to NHPP in. Adjust budget and schedule to reflect the latest estimates $2,801.7 $367.9 $3,169.6 Monday, August 06, 11:07 AM Page 5 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas TIP #: 280139 State #: KA-4504-01 Juris: KDOT Co: WYANDOTTE Location/Improvement: I-70: BRIDGE #157 ON I-70 LOCATED AT I-70 WEST BOUND AND I-635 SOUTH BOUND Project : Bridge Rehabilitation STATE-KS $168.1 STATE-KS (AC) $1,513.2 NHPP-KS $1,513.2 STATE-KS $105.0 CREDIT ($1,513.2) Replace Deck and Barriers, Paint Girders and Bearings, Replace 13 Foot Approach Slabs and Abutment Backwall Protection. The CONST phase will utilize AC in the amount of $1513.2 K with conversion to NHPP in. Adjust budget and schedule to reflect the latest estimates $1,513.2 $273.1 $1,786.3 TIP #: 280142 State #: KA-4940-01 Juris: KDOT Co: WYANDOTTE Location/Improvement: BRIDGE #042 (42ND STREET) LOCATED 0.2 MILES NORTH OF OLD K-32 IN WYANDOTTE COUNTY Project : Bridge Rehabilitation STATE-KS $62.0 STATE-KS (AC) $248.0 NHPP-KS $248.0 STATE-KS $50.0 CREDIT ($248.0) Joint Replacement, Patch Deck as needed, Abutment #1: Reset Rockers, Clean & Paint Bearings, Clean Abutment Seat. Rebuild/Encase Abutment 1, Replace Approach Slabs $248.0 $112.0 $360.0 TIP #: 280143 State #: KA-4939-01 Juris: KDOT Co: WYANDOTTE Location/Improvement: BRIDGE #130 (TURKEY CREEK) ON US-69 LOCATED AT JUNCTION MERRIAM LANE/US-69 Project : Bridge Rehabilitation STATE-KS $130.0 STATE-KS (AC) $520.0 NHPP-KS $520.0 STATE-KS $100.0 CREDIT ($520.0) Replace Expansion Joints (3), Replace Bearings, Paint Girder Ends, Pier Repair, Concrete Surface Repair at both Abutments, Clean and Paint Bearings, Clean Bearing Seats and Replace Approaches $520.0 $230.0 $750.0 Monday, August 06, 11:07 AM Page 6 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas TIP #: 280144 State #: KA-4946-01 Juris: KDOT Co: WYANDOTTE Location/Improvement: RCB #534 (MILL CREEK DRAINAGE) LOCATED 3.75 MILES EAST OF I-435 IN WYANDOTTE COUNTY Project : Bridge Rehabilitation STATE-KS $6.5 NHPP-KS $58.5 STATE-KS $25.0 Replace Exit Left Wing (Failed) and Tie back Opposing Wing (Exit Left) $58.5 $31.5 $90.0 TIP #: 280145 State #: KA-4941-01 Juris: KDOT Co: WYANDOTTE Location/Improvement: BRIDGE #043 (SPEAKER ROAD) LOCATED 0.39 MILES NORTH OF OLD K-32 IN WYANDOTTE COUNTY Project : Bridge Rehabilitation STATE-KS $79.0 STATE-KS (AC) $316.0 NHPP-KS $316.0 STATE-KS $45.0 CREDIT ($316.0) Expansion Joint Replacement, Concrete Surface Repair, Abutment #1: Reset Rockers, Clean & Paint Bearings and Clean Abutment Seat. The CONST phase will utilize AC in the amount of $316 K with conversion to NHPP in. $316.0 $124.0 $440.0 TIP #: 280146 State #: KA-4881-01 Juris: KDOT Co: WYANDOTTE Location/Improvement: DISCOVERY PHASE OF THE 18TH STREET BRIDGE REPLACEMENT Project : Bridge Rehabilitation NHPP-KS $600.0 STATE-KS $150.0 STATE-KS (AC) $600.0 CREDIT ($600.0) Length (mi): 1 Preliminary (Discovery Report) for the replacement of the US-69 (18th Street) River Bridge in Wyandotte County The PE phase will utilize AC in the amount of $600 K with conversion to NHPP in. $600.0 $150.0 $750.0 Monday, August 06, 11:07 AM Page 7 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas TIP #: 280147 State #: KA-4691-02 Juris: KDOT $175.6 $1.7 Co: WYANDOTTE Location/Improvement: 1) I-435: BEGINNING AT THE NORTH EDGE OF THE KANSAS RIVER BRIDGE THENCE NORTH TO THE STATE LINE. 2) I-435: BEGINNING 0.51 MILE NORTH OF JUNCTION K-5/I-435 THENCE NORTH TO THE STATE LINE. Project : (Roadway) NHPP-KS $175.6 STATE-KS $1.7 $177.3 Guardrail Upgrade on I-435 in Wyandotte County Length (mi): 11 TIP #: 259200 State #: N-0634-01 Juris: UNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITY TA-N063(401) $500.0 $730.3 Co: WYANDOTTE Location/Improvement: SAFE ROUTES KCK PHASE E: EDISON, WHITE & NOBLE PRENTIS Project : Safety TA-KS $500.0 LOCAL $485.0 LOCAL $160.6 LOCAL $84.7 $1,230.3 Length (mi): Project addresses the lack of sidewalks around schools along with a SRTS program that addresses childhood health problems, air quality, safety education and limited transportation choices. This inlcudes construction of new sidewalks and ADA pedestrian ramps within a quarter-mile radius of the following elementary schools: Edison, WA White and Noble Prentis to provide safer access for pedestrians and young bicyclists to and from schools. Adjust budget to reflect the latest estimates NA TIP #: 259205 State #: Juris: UNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITY Co: WYANDOTTE Location/Improvement: METROPOLITAN AVENUE AREA BIKEWAY IMPROVEMENTS Project : Pedestrian and/or Bikeways TA-KS $56.0 LOCAL $66.5 CMAQ-KS $210.0 Length (mi): 2.2 Designate an on-street bikeway along Metropolitan Ave/Strong Ave from 12th Street to 42nd Street. Inccrease federal funding using CMAQ funding returned from other projects. $266.0 $66.5 $332.5 Monday, August 06, 11:07 AM Page 8 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690374 State #: 4I2291 Co: CASS Location/Improvement: I-49: SCOPING FOR CAPACITY IMPROVEMENTS FROM 155TH STREET TO NORTH CASS PARKWAY Project : NHPP-MO $80.0 STATE-MO $20.0 NHPP-MO $70.0 STATE-MO $17.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 I-49: Scoping for capacity improvements from 155th Street to North Cass Parkway in Belton. Updating $230.0 $57.0 $287.0 TIP #: 790096 State #: 4I3129 Co: CASS Location/Improvement: SCOPING FOR INTERCHANGE IMPROVEMENTS AT I-49 AND M-58 Project : Reconstruction NHPP-MO $8.0 NHPP-MO $8.0 NHPP-MO $56.0 STATE-MO $14.0 NHPP-MO $8.0 Scoping for interchange improvements an I-49 and M-58 in Belton. Add preliminary engineering for $80.0 $20.0 $100.0 Monday, August 06, 11:07 AM Page 9 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 790098 State #: 4S3272 Co: CASS Location/Improvement: MO-58: INTERSECTION IMPROVEMENTS AT PRAIRIE ROAD. Project : Safety HSIP-MO $1,916.0 STATE-MO $213.0 HSIP-MO $130.0 STATE-MO $14.0 HSIP-MO $9.0 STATE-MO $1.0 HSIP-MO $46.0 STATE-MO $6.0 HSIP-MO $180.0 STATE-MO $20.0 HSIP-MO $14.0 STATE-MO $1.0 Length (mi): 1 MO-58: INTERSECTION IMPROVEMENTS AT PRAIRIE ROAD, RAYMORE. Added the construction phase $2,295.0 $255.0 $2,550.0 TIP #: 790101 State #: 4S3250 Co: CASS Location/Improvement: MO-7: IMPROVEMENTS FROM I-49 TO INDEPENDENCE STREET. Project : Reconstruction STATE-MO $662.0 STATE-MO (AC) $2,647.0 STP-MO $2,910.0 STATE-MO (AC) $52.0 STATE-MO $13.0 NHPP-MO $8.0 STATE-MO $43.0 STATE-MO (AC) $173.0 STATE-MO $6.0 STATE-MO (AC) $26.0 CREDIT ($2,910.0) STATE-MO (AC) $12.0 STATE-MO $3.0 Length (mi): 1 MO-7: Pavement resurfacing, sidewalks, and shoulder improvements from I- 49 to Independence Street, Harrisonville. Added the construction phase $2,918.0 $729.0 $3,647.0 Monday, August 06, 11:07 AM Page 10 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 790103 State #: 4S3286 Co: CASS Location/Improvement: RT-J: REPLACE BRIDGE DECK OVER YOUNG BRANCH Project : Reconstruction NHPP-MO $506.0 STATE-MO $127.0 NHPP-MO $41.0 STATE-MO $10.0 NHPP-MO $8.0 NHPP-MO $8.0 NHPP-MO $8.0 Rt-J: Replace bridge deck over Young Branch,.12 mile south of 217th Street and.34 mile northeast of Branic Drive. Project invloves bridge A2331. Added the construction phase $571.0 $143.0 $714.0 TIP #: 790106 State #: 4P3212D Co: CASS Location/Improvement: MO 2: INTERSECTION SIGHT DISTANCE IMPROVEMENTS AT BLINKER LIGHT ROAD NEAR HARRISONVILLE. Project : Safety HSIP-MO $489.0 STATE-MO $54.0 HSIP-MO $41.0 STATE-MO $5.0 HSIP-MO $29.0 STATE-MO $3.0 HSIP-MO $15.0 Intersection sight distance improvements at Blinker Light Road near Harrisonville. $574.0 $64.0 $638.0 Monday, August 06, 11:07 AM Page 11 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 790108 Location/Improvement: RT. A: PAVEMENT RESURFACING FROM RTE. 18 TO RTE. B. State #: 4S3308 Co: CASS Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rte. 18 to Rte. B. STATE-MO $151.0 STATE-MO (AC) $605.0 STP-MO $671.0 STATE-MO $16.0 STATE-MO (AC) $66.0 CREDIT ($671.0) $671.0 $167.0 $838.0 TIP #: 790109 Location/Improvement: RT. D: PAVEMENT RESURFACING FROM RTE. Y TO RTE. A. State #: 4S3306 Co: CASS Project : Resurfacing Length (mi): 13 Pavement resurfacing from Rte. Y to Rte. A. STATE-MO (AC) $972.0 STATE-MO $243.0 STP-MO $1,076.0 STATE-MO (AC) $104.0 STATE-MO $27.0 CREDIT ($1,076.0) $1,076.0 $270.0 $1,346.0 TIP #: 790110 State #: 4S3302 Co: CASS Location/Improvement: RT. E: PAVEMENT RESURFACING FROM MO 58 TO THE JACKSON COUNTY LINE. Project : Resurfacing STATE-MO $91.0 STATE-MO (AC) $366.0 STP-MO $405.0 STATE-MO $10.0 STATE-MO (AC) $39.0 CREDIT ($405.0) Pavement resurfacing from MO 58 to the Jackson County Line. Length (mi): 4 $405.0 $101.0 $506.0 Monday, August 06, 11:07 AM Page 12 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 790111 Location/Improvement: RT. F: PAVEMENT RESURFACING FROM OLD RTE. 7 TO RTE. B State #: 4S3303 Co: CASS Project : Resurfacing Length (mi): 6 Pavement resurfacing from Old Rte. 7 to Rte. B STATE-MO (AC) $207.0 STATE-MO $52.0 STP-MO $229.0 STATE-MO (AC) $22.0 STATE-MO $6.0 CREDIT ($229.0) $229.0 $58.0 $287.0 TIP #: 790112 Location/Improvement: RT. N: PAVEMENT RESURFACING FROM RTE. Z TO HENRY COUNTY LINE. State #: 4S3311 Co: CASS Project : Resurfacing Length (mi): 8 Pavement resurfacing from Rte. Z to Henry County Line. STATE-MO (AC) $238.0 STATE-MO $59.0 STP-MO $264.0 STATE-MO (AC) $26.0 STATE-MO $6.0 CREDIT ($264.0) $264.0 $65.0 $329.0 TIP #: 790113 Location/Improvement: RT. O: PAVEMENT RESURFACING FROM RTE. 2 TO RTE. A. State #: 4S3317 Co: CASS Project : Resurfacing Length (mi): 9 Pavement resurfacing from Rte. 2 to Rte. A. STATE-MO (AC) $330.0 STATE-MO $82.0 STP-MO $365.0 STATE-MO (AC) $35.0 STATE-MO $9.0 CREDIT ($365.0) $365.0 $91.0 $456.0 Monday, August 06, 11:07 AM Page 13 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 790114 State #: 4S3307 Co: CASS Location/Improvement: RT. Y: PAVEMENT RESURFACING FROM RTE. YY TO KANSAS STATE LINE Project : Resurfacing STATE-MO (AC) $717.0 STATE-MO $179.0 STP-MO $794.0 STATE-MO (AC) $77.0 STATE-MO $19.0 CREDIT ($794.0) Pavement resurfacing from Rte. YY to Kansas State Line Length (mi): 8 $794.0 $198.0 $992.0 TIP #: 790115 State #: 4S3273 Co: CASS Location/Improvement: MO 58: GEOMETRICS AT THE INTERSECTION OF WARD RD. NEAR RAYMORE Project : (Roadway) HSIP-MO $3,100.0 STATE-MO $345.0 HSIP-MO $201.0 STATE-MO $23.0 HSIP-MO $6.0 STATE-MO $1.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $180.0 STATE-MO $20.0 HSIP-MO $21.0 Geometrics at the intersection of Ward Rd. near Raymore $3,553.0 $396.0 $3,949.0 Monday, August 06, 11:07 AM Page 14 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 520048 State #: 4S3299 Co: CLAY Location/Improvement: KANSAS STREET: PAVEMENT RESURFACING, SIDEWALKS, CURB AND GUTTER AND TRAFFIC SIGNAL IMPROVEMENTS Project : Reconstruction LOCAL $3,063.0 STPM-MO $3,000.0 STATE-MO $157.0 NHPP-MO $627.0 STATE-MO $86.0 NHPP-MO $342.0 LOCAL $52.0 NHPP-MO $207.0 Length (mi): 1 Pavement resurfacing, sidewalks, curb and gutter and traffic signal improvements between I-35 and MO 291 in Liberty. $3,000,000 STP and $3,063,000 City of Liberty funds. Added the construction phase $4,176.0 $3,358.0 $7,534.0 TIP #: 590175 State #: 4I2006 Co: CLAY Location/Improvement: I-35: INTERCHANGE SOUTH OF M-92 AT 19TH Project : New LOCAL $18,117.0 LOCAL $10.0 LOCAL $2,472.0 LOCAL $770.0 LOCAL $684.0 Length (mi): 1 I-35; Scoping for an interchange south of M-92 at 19th St in Kearney Updating PE estimate $22,053.0 $22,053.0 Monday, August 06, 11:07 AM Page 15 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590198 State #: 4S3083 Co: CLAY Location/Improvement: MO 152: BRIDGE, INTERCHANGE AND UPGRADING SIDEWALKS TO ADA TRANSITION PLAN COMPLIANCE OVER I-35 IN LIBERTY. PROJECT INVOLVES BRIDGE A0495. Project : (Bridge) LOCAL $3,000.0 NHPP-MO $10,091.0 STATE-MO $181.0 NHPP-MO $724.0 STATE-MO $429.0 NHPP-MO $1,718.0 NHPP-MO $8.0 Length (mi): 8 Bridge, interchange and upgrading sidewalks to ADA Transition Plan compliance over I-35 in Liberty. Project involves bridge A0495. $217,000 in Statewide Transportation Alternatives funds, $3,000,000 in STP Urban funds and $3,000,000 in City of Liberty funds. Updating project budget and schedule. $12,541.0 $3,612.0 $16,153.0 TIP #: 590199 State #: 4S3088 Co: CLAY Location/Improvement: US 169: AUXILLIARY LANES Project : New STATE-MO $151.0 NHPP-MO $605.0 STATE-MO $11.0 NHPP-MO $46.0 STATE-MO $37.0 NHPP-MO $148.0 Length (mi): 1 US-169: Add auxiliary lanes from north of I-29 to south of Englewood Road in Kansas City. New Projet $799.0 $199.0 $998.0 Monday, August 06, 11:07 AM Page 16 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590233 State #: 4P3203 2017 2017 Co: CLAY Location/Improvement: INTERSECTION IMPROVEMENTS AT M-291 AND KANSAS STREET IN LIBERTY Project : Reconstruction NHPP-MO $2,420.0 STATE-MO $605.0 NHPP-MO $482.0 STATE-MO $120.0 NHPP-MO $142.0 STATE-MO $35.0 NHPP-MO $25.0 STATE-MO $6.0 NHPP-MO $52.0 STATE-MO $13.0 Intersection improvements at M-291 and Kansas Street in Liberty Updating estimate $3,121.0 $779.0 $3,900.0 TIP #: 590235 State #: 4I3219 2017 2017 Co: CLAY Location/Improvement: BRIDGE IMPROVEMENTS ON I-35 AT 128TH STREET Project : Reconstruction NHPP-MO $497.0 STATE-MO $124.0 NHPP-MO $49.0 STATE-MO $12.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $1.6 STATE-MO $0.4 Bridge improvements on I-35 at 128th Street. Involves bridge R0476. Updating estimate $627.6 $156.4 $784.0 Monday, August 06, 11:07 AM Page 17 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590238 State #: 4P3213 2017 2017 Co: CLAY Location/Improvement: M-92 : SAFETY IMPROVEMENTS ON M-92 FROM COMMERCIAL AVENUE TO RTE. 69 Project : Road Widening & Resurfacing HSIP-MO $6,357.0 STATE-MO $706.0 HSIP-MO $632.0 STATE-MO $70.0 HSIP-MO $254.0 STATE-MO $28.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $9.0 STATE-MO $1.0 HSIP-MO $49.0 STATE-MO $5.0 Length (mi): 19 Adding shoulders and culvert extensions and intersection improvements from Commercial Avenue to Rte. 69. Resurfacing from Rte. DD to Nation Rd. Added the construction phase $7,346.0 $815.0 $8,161.0 TIP #: 590240 State #: 4I3189 2017 2017 Co: CLAY Location/Improvement: I-435: BRIDGE DECK REPLACEMENTAT THE MISSOURI RIVER Project : Bridge Rehabilitation STATE-MO $5,508.0 NHPP-MO $22,032.0 STATE-MO $916.0 NHPP-MO $3,664.0 NHPP-MO $8.0 NHPP-MO $8.0 Length (mi): 1 Bridge deck replacement at the River. Project involves twin bridges A0767 Added the construction phase $25,712.0 $6,428.0 $32,140.0 Monday, August 06, 11:07 AM Page 18 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590241 State #: 4P3235 Co: CLAY Location/Improvement: MO-92: PROJECT TO ADD SIDEWALKS BETWEEN MO 33 AND MARIMAC DRIVE IN KEARNEY Project : Pedestrian and/or Bike Ways STPM-MO $367.0 LOCAL $312.0 NHPP-MO $36.0 STATE-MO $9.0 NHPP-MO $204.0 STATE-MO $51.0 LOCAL $30.0 Length (mi): 1 Add sidewalk, drainage and turning lane along the Rte. 92 corridor from Rte. 33 to Marimack Drive. Added the construction phase $607.0 $402.0 $1,009.0 TIP #: 590242 State #: 4P3249 Co: CLAY Location/Improvement: MO-291: PAVEMENT IMPROVEMENTS FROM LEONARD STREET TO ROUTE 78 Project : Resurfacing NHPP-MO $6,178.0 STATE-MO $1,545.0 NHPP-MO $416.0 STATE-MO $104.0 NHPP-MO $64.0 STATE-MO $16.0 NHPP-MO $80.0 STATE-MO $20.0 NHPP-MO $8.0 Pavement resurfacing from Leonard Street to Route 78 Added the construction phase Length (mi): 11 $6,746.0 $1,687.0 $8,433.0 Monday, August 06, 11:07 AM Page 19 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590243 State #: 4P3260 Co: CLAY Location/Improvement: MO-291: PAVEMENT RESURFACING FROM I-435 TO ORACHARD AVE. Project : Resurfacing Length (mi): 7 Pavement resurfacing from I-435 to Orchard Avenue. NHPP-MO $2,812.0 STATE-MO $703.0 NHPP-MO $188.0 Added the construction phase STATE-MO $46.0 NHPP-MO $32.0 STATE-MO $8.0 NHPP-MO $32.0 STATE-MO $8.0 NHPP-MO $8.0 $3,072.0 $767.0 $3,839.0 TIP #: 590248 State #: 4S3088B Co: CLAY Location/Improvement: US 169: AUXILLIARY LANES Project : New STATE-MO $228.0 NHPP-MO $912.0 STATE-MO $30.0 NHPP-MO $118.0 Length (mi): 1 US-169: Ramp acceleration lane extension between Englewood Road and I- 29. $1,030.0 $258.0 $1,288.0 Monday, August 06, 11:07 AM Page 20 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590249 State #: 4P3295D Co: CLAY Location/Improvement: RT A: IMPROVE INTERSECTION SIGHT DISTANCE AT 112TH STREET. Project : Safety STATE-MO $99.0 NHPP-MO $886.0 STATE-MO $7.0 NHPP-MO $66.0 NHPP-MO $22.0 STATE-MO $7.0 NHPP-MO $54.0 STATE-MO $3.0 NHPP-MO $28.0 Improve intersection sight distance at 112th Street. $416,000 in Open Container funds. $1,056.0 $118.0 $1,174.0 TIP #: 590250 State #: 4S3320 Co: CLAY Location/Improvement: RT. CC: PAVEMENT RESURFACING FROM RT. C TO RT. 33. Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rt. C to Rt. 33. STATE-MO $30.0 STATE-MO (AC) $118.0 STP-MO $134.0 STATE-MO $4.0 STATE-MO (AC) $16.0 CREDIT ($134.0) $134.0 $34.0 $168.0 Monday, August 06, 11:07 AM Page 21 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590251 Location/Improvement: RT. D: PAVEMENT RESURFACING FROM RT. 69 TO RAY COUNTY LINE State #: 4S3322 Co: CLAY Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rt. 69 to Ray County line STATE-MO $10.0 STATE-MO (AC) $41.0 STP-MO $51.0 STATE-MO $4.0 STATE-MO (AC) $15.0 CREDIT ($51.0) $51.0 $19.0 $70.0 TIP #: 590252 Location/Improvement: RT. E: PAVEMENT RESURFACING FROM 164TH STREET TO MO 92. State #: 4S3319 Co: CLAY Project : Resurfacing Length (mi): 3 Pavement resurfacing from 164th Street to MO 92. STATE-MO $27.0 STATE-MO (AC) $108.0 STP-MO $123.0 STATE-MO $4.0 STATE-MO (AC) $15.0 CREDIT ($123.0) $123.0 $31.0 $154.0 TIP #: 590253 Location/Improvement: RT. JJ: PAVEMENT RESURFACING FROM RT. H TO MO 210 State #: 4S3316 Co: CLAY Project : Resurfacing Length (mi): 4 Pavement resurfacing from Rt. H to MO 210 STATE-MO $39.0 STATE-MO (AC) $157.0 STP-MO $175.0 STATE-MO $5.0 STATE-MO (AC) $18.0 CREDIT ($175.0) $175.0 $44.0 $219.0 Monday, August 06, 11:07 AM Page 22 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590254 State #: 4S3318 Co: CLAY Location/Improvement: RT. RA: PAVEMENT RESURFACING FROM 161ST STREET IN GREENVILLE TO MO 92. Project : Resurfacing STATE-MO $11.0 STATE-MO (AC) $37.0 STP-MO $44.0 STATE-MO $1.0 STATE-MO (AC) $7.0 CREDIT ($44.0) Pavement resurfacing from 161st Street in Greenville to MO 92. Length (mi): 1 $44.0 $12.0 $56.0 TIP #: 590255 State #: 4Q3234 Co: CLAY Location/Improvement: INSTALL KANSAS CITY SCOUT ITS DEVICES ON VARIOUS ROUTES NORTH OF THE MISSOURI RIVER IN CLAY AND PLATTE COUNTIES. Project : Traffic Management NHPP-MO $2,400.0 STATE-MO $600.0 STP-MO $2,450.0 NHPP-MO $200.0 STATE-MO $50.0 NHPP-MO $0.8 STATE-MO $0.2 CREDIT ($2,450.0) Install Kansas City Scout ITS devices on various routes north of the River in Clay and Platte Counties. $5,050.8 ($1,799.8) $3,251.0 TIP #: 590256 State #: 4I2006Z Co: CLAY Location/Improvement: I-35: NEW INTERCHANGE SOUTH OF M-92 AT 19TH Project : New NHPP-MO $3,218.0 NHPP-MO $2,500.0 NHPP-MO $2,500.0 Length (mi): 1 MoDOT payment to the City of Kearney for acceleration of city funds for the new I-35 interchange south of M-92 at 19th St in Kearney $8,218.0 $8,218.0 Monday, August 06, 11:07 AM Page 23 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 990311 Location/Improvement: US 169: INTERSECTION SAFETY IMPROVEMENTS AT 188TH STREET. State #: 4P3295 Co: CLAY Project : Safety Intersection safety improvements at 188th Street. STATE-MO $123.0 HSIP-MO $1,100.0 STATE-MO $8.0 Updating project estimate and schedule HSIP-MO $75.0 STATE-MO $3.0 HSIP-MO $28.0 STATE-MO $3.0 HSIP-MO $27.0 STATE-MO $120.0 HSIP-MO $480.0 STATE-MO $1.0 HSIP-MO $4.0 $1,714.0 $258.0 $1,972.0 TIP #: 970103 State #: Juris: BIKEWALKKC Co: JACKSON Location/Improvement: TROOST BRIDGE PLACEMAKING Project : Pedestrian and/or Bikeways TCSP-MO $54.9 TCSP-MO $35.8 TCSP-MO $88.3 Length (mi): Enhance the area of the Troost Bridge over Brush Creek and the connection to the Brush Creek Grail with the addition of a bike share station, bike parking, and other placemaking elements. N/A $179.0 $179.0 Monday, August 06, 11:07 AM Page 24 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 590217 State #: 4I3120 2017 2017 Co: JACKSON Location/Improvement: I-29 PAVEMENT IMPROVEMENTS Project : Resurfacing NHPP-MO $2,519.0 STATE-MO $280.0 NHPP-MO $219.0 STATE-MO $24.0 NHPP-MO $36.0 STATE-MO $4.0 NHPP-MO $17.0 I-29 pavement improvements from Vivion Road to I-29/I-35 interchange in Kansas City Updating estimate $2,791.0 $310.0 $3,101.0 TIP #: 690394 State #: 4I2337 Co: JACKSON Location/Improvement: I-435; CORRIDOR IMRPOVEMENTS FROM THE KANSAS STATE LINE TO JUST WEST OF I-49 Project : New Bridge NHPP-MO $24,308.0 STATE-MO $6,077.0 NHPP-MO $19,193.0 STATE-MO $4,798.0 NHPP-MO $14,250.0 STATE-MO $750.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $30.0 NHPP-MO $120.0 STATE-MO $1,210.0 NHPP-MO $4,841.0 STATE-MO $20.0 NHPP-MO $80.0 Length (mi): 4 CORRIDOR IMRPOVEMENTS FROM THE KANSAS STATE LINE TO JUST WEST OF I-49. PROJECT INVOLVES TWIN BRIDGES A1240, A1662, A1427, and A0610. Updating project budget $62,832.0 $12,895.0 $75,727.0 Monday, August 06, 11:07 AM Page 25 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690407 State #: 4P2316 $3,572.0 Co: JACKSON Location/Improvement: I-670; PAYBACK TO THE CITY OF KANSAS CITY FOR THE REPLACEMENT OF WYANDOTTE AND CENTRAL BRIDGES Project : STATE-MO $3,572.0 $3,572.0 Length (mi): 1 Payback to the city of Kansas City for the replacement of Wyandotte and Central bridges Updating payback amount TIP #: 690418 State #: 4P3015 Co: JACKSON Location/Improvement: US-24: BRIDGE REPLACEMENT AT VARIOUS LOCATIONS Project : New Bridge STATE-MO $1,232.0 NHPP-MO $4,929.0 STATE-MO $90.0 NHPP-MO $359.0 STATE-MO $23.0 NHPP-MO $92.0 STATE-MO $146.0 NHPP-MO $584.0 STATE-MO $38.0 NHPP-MO $148.0 Length (mi): 1 Bridge replacements and roadway grade improvements at the Union Pacific Railroad, Drainage Ditch and Fire Prairie Creek, 0.3 mile east of Winfrey Road, 0.1 mile west of Osage Street near Buckner. Project involves bridges J0806, J0807, J0810, J0811 and J0844 Added the construction phase $6,112.0 $1,529.0 $7,641.0 Monday, August 06, 11:07 AM Page 26 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690420 State #: 4P3009 Co: JACKSON Location/Improvement: US-50: BRIDGE REPLACEMENT AT CHIPMAN ROAD IN LEE'S SUMMIT Project : Reconstruction STATE-MO $437.0 NHPP-MO $1,748.0 NHPP-MO $8.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $6.0 NHPP-MO $26.0 Bridge replacement at Chipman Road in Lee's Summit. Project involves bridges A3262 and A2482. Added the construction phase $1,902.0 $475.0 $2,377.0 Monday, August 06, 11:07 AM Page 27 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690421 State #: 4I3024 2023 2023 2023 2023 Co: JACKSON Location/Improvement: I-70; BRIDGE REPLACEMENT AT BLUE RIDGE BOULEVARD/US 40 LOCATIONS Project : Reconstruction STATE-MO $388.0 NHPP-MO $3,489.0 NHPP-MO $108.0 NHPP-MO $108.0 NHPP-MO $18.0 NHPP-MO $18.0 STATE-MO $12.0 STATE-MO $12.0 STATE-MO $22.0 NHPP-MO $198.0 STATE-MO $33.0 NHPP-MO $293.0 NHPP-MO $469.0 STATE-MO $52.0 Bridge replacement at Blue Ridge Boulevard/US 40 in Independence. Project involves bridge L0997. Added the construction phase $4,701.0 $523.0 $5,224.0 TIP #: 690459 State #: 4I3127 Co: JACKSON Location/Improvement: I-29: PAVEMENT PRESERVATION TREATMENT SOUTH OF GUINOTTE AVENUE TO THE DOWNTOWN LOOP Project : Reconstruction NHPP-MO $1,107.0 STATE-MO $123.0 NHPP-MO $78.0 STATE-MO $9.0 NHPP-MO $9.0 STATE-MO $1.0 NHPP-MO $14.0 STATE-MO $1.0 NHPP-MO $9.0 STATE-MO $1.0 Length (mi): 1 Pavement preservation treatment south of Guinotte Avenue to the Downtown Loop Added the construction phase $1,217.0 $135.0 $1,352.0 Monday, August 06, 11:07 AM Page 28 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690461 State #: 4I3126 Co: JACKSON Location/Improvement: I-435; PAVEMENT RESURFACING FROM RTE. 78 TO RAYTOWN ROAD IN KANSAS CITY Project : Resurfacing NHPP-MO $1,835.0 STATE-MO $204.0 NHPP-MO $177.0 STATE-MO $20.0 NHPP-MO $12.0 STATE-MO $3.0 Length (mi): 3 I-435; Pavement improvements from Rte. 78 to Raytown Road in Kansas City. This project will be incorporated into the I-70 and I-435 interchange project 4I1597C Updated budget $2,024.0 $227.0 $2,251.0 TIP #: 690463 State #: 4I3124 Co: JACKSON Location/Improvement: I-70: PAVEMENT RESURFACING FROM EAST OF BLUE RIDGE CUTOFF TO STERLING ROAD IN KANSAS CITY. Project : Resurfacing NHPP-MO $1,207.8 STATE-MO $134.2 NHPP-MO $83.7 STATE-MO $9.0 STATE-MO $12.9 STP-MO $116.1 Length (mi): 1 Pavement resurfacing from east of Blue Ridge Cutoff to Sterling Road in Kansas City. Updating scope and budget $1,407.6 $156.1 $1,563.7 TIP #: 690464 State #: 4I3125 Co: JACKSON Location/Improvement: I-70: PAVEMENT RESURFACING FROM THE KANSAS STATE LINE TO MANCHESTER TRAFFICWAY Project : Resurfacing NHPP-MO $8,241.0 STATE-MO $916.0 NHPP-MO $764.0 STATE-MO $85.0 NHPP-MO $45.0 STATE-MO $5.0 NHPP-MO $27.0 STATE-MO $3.0 Length (mi): 8 Pavement resurfacing from the Kansas State line to Manchester Trafficway Added the construction phase $9,077.0 $1,009.0 $10,086.0 Monday, August 06, 11:07 AM Page 29 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690486 State #: 4I3217 Co: JACKSON Location/Improvement: BRIDGE REPLACEMENT ON I-49 AT 140TH ST. Project : Reconstruction STATE-MO $315.0 NHPP-MO $1,261.0 STATE-MO $60.0 NHPP-MO $240.0 STATE-MO $57.0 NHPP-MO $228.0 STATE-MO $10.0 NHPP-MO $42.0 NHPP-MO $8.0 Bridge replacement at 140th Street, 1.3 miles south of Main Street and 0.9 mile north of 147th Street in Grandview. Project involves bridge A0119. Updating budget $1,779.0 $444.0 $2,223.0 TIP #: 690489 State #: 4S3210 2017 2017 Co: JACKSON Location/Improvement: MO-7: PAVEMENT AND SIGNAL IMPROVEMENTS FROM VICTOR DRIVE TO WYATT ROAD IN BLUE SPRINGS. Project : Resurfacing NHPP-MO $1,230.0 STATE-MO $307.0 NHPP-MO $90.0 STATE-MO $22.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $8.0 NHPP-MO $1.6 STATE-MO $0.4 Length (mi): 3 Pavement and signal improvements from Victor Drive to Wyatt Road in Blue Springs. Added the construction phase $1,369.6 $341.4 $1,711.0 Monday, August 06, 11:07 AM Page 30 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690490 State #: 4S3167 2017 2017 Co: JACKSON Location/Improvement: MO-7: ADD INTERSECTION TURN LANES AND NEW SIGNALS AT 8TH STREET/SOUTH AVENUE IN BLUE SPRINGS. Project : Vehicle Operations NHPP-MO $318.0 STATE-MO $80.0 NHPP-MO $24.0 STATE-MO $6.0 NHPP-MO $18.0 STATE-MO $4.0 NHPP-MO $8.0 NHPP-MO $8.8 STATE-MO $2.2 NHPP-MO $30.0 STATE-MO $8.0 Add intersection turn lanes and new signals at 8th Street/South Avenue in Blue Springs. Added the construction phase $406.8 $102.2 $509.0 TIP #: 690491 State #: 4I3222 2017 2017 Co: JACKSON Location/Improvement: I-70: PAVEMENT RESURFACING AND GUARDRAIL FROM RTE. 7 TO LAFAYETTE COUNTY LINE. Project : Resurfacing NHPP-MO $5,325.0 STATE-MO $1,331.0 NHPP-MO $361.0 STATE-MO $90.0 NHPP-MO $80.0 STATE-MO $20.0 NHPP-MO $49.0 STATE-MO $12.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $1.6 STATE-MO $0.4 Length (mi): 9 Pavement resurfacing and guardrail from Rte. 7 to Lafayette County line. Added the construction phase $5,818.2 $1,453.8 $7,272.0 Monday, August 06, 11:07 AM Page 31 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690495 State #: 4S3218 2017 2017 Co: JACKSON Location/Improvement: BLUE RIDGE BLVD: BRIDGE REPLACEMENT OVER RTE. 78, 1.1 MILES EAST OF I-435 AND 0.3 MILE WEST OF ARLINGTON AVENUE. Project : Reconstruction NHPP-MO $2,325.0 STATE-MO $581.0 NHPP-MO $171.0 STATE-MO $43.0 NHPP-MO $428.0 STATE-MO $107.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $160.0 STATE-MO $40.0 Bridge demolition at I-70 over Truman Road in Kansas City. Project involves bridge A0295. Added the construction phase $3,125.6 $781.4 $3,907.0 TIP #: 690504 State #: 4P3268 Co: JACKSON Location/Improvement: ADA TRANSITION PLAN AND SIDEWALK IMPROVEMENTS AT VARIOUS LOCATIONS IN THE URBAN KANSAS CITY DISTRICT. Project : Pedestrian and/or Bike Ways NHPP-MO $7,701.0 STATE-MO $1,925.0 NHPP-MO $525.0 STATE-MO $131.0 NHPP-MO $8.0 NHPP-MO $8.0 NHPP-MO $17.0 STATE-MO $4.0 ADA Transition Plan and sidewalk improvements at various locations in the Urban Kansas City District. Potential Design/Build project. $9,356,000 from Statewide Transportation Alternatives funds. Updating budget $8,259.0 $2,064.0 $10,323.0 Monday, August 06, 11:07 AM Page 32 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690506 State #: 4S3287 Co: JACKSON Location/Improvement: US-24: BRIDGE REPLACEMENT OVER DELAWARE AVENUE/TRUMAN LIBRARY DRIVE 3.6 MILES EAST OF I-435 NEAR INDEPENDENCE. Project : Reconstruction NHPP-MO $1,465.0 STATE-MO $366.0 NHPP-MO $106.0 STATE-MO $26.0 NHPP-MO $160.0 STATE-MO $40.0 NHPP-MO $8.0 Bridge replacement over Delaware Avenue/Truman Library Drive 3.6 miles east of I-435 near Independence. Project involves bridge L0840. Added the construction phase $1,739.0 $434.0 $2,173.0 TIP #: 690508 State #: 4S3283 Co: JACKSON Location/Improvement: MO-350: SLIDE REPAIR ON WESTBOUND RAMP TO 63RD STREET. Project : (Roadway) Slide repair on westbound ramp to 63rd Street. NHPP-MO $574.0 STATE-MO $143.0 NHPP-MO $49.0 Added the construction phase STATE-MO $13.0 NHPP-MO $0.8 STATE-MO $0.2 $623.8 $156.2 $780.0 Monday, August 06, 11:07 AM Page 33 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690514 State #: 4S3282 Co: JACKSON Location/Improvement: PAVEMENT RESURFACING FROM BANNISTER ROAD TO BLUE RIVER ROAD. Project : Resurfacing STATE-MO $330.0 STATE-MO (AC) $1,319.0 STP-MO $1,429.0 STATE-MO (AC) $90.0 STATE-MO $22.0 STATE-MO (AC) $12.0 STATE-MO $3.0 STATE-MO (AC) $8.0 STP-MO $8.0 CREDIT ($1,429.0) Pavement resurfacing from Bannister Road to Blue River Road. Added the construction phase Length (mi): 1 $1,437.0 $359.0 $1,796.0 TIP #: 690519 State #: 4S3085 Co: JACKSON Location/Improvement: US 169: BUCK O'NEIL BRIDGE ENVIRONMENTAL STUDY AND SHORT TERM REHABILITATION Project : Reconstruction NHPP-MO $30,554.0 STATE-MO $7,638.0 NHPP-MO $11,536.0 STATE-MO $2,884.0 NHPP-MO $2,902.0 STATE-MO $725.0 NHPP-MO $2,745.0 STATE-MO $686.0 NHPP-MO $0.8 STATE-MO $0.2 NHPP-MO $2,262.0 STATE-MO $565.0 Length (mi): 4 Bridge improvements over the River, 3.1 miles south of MO 9 and 0.1 miles north of I-70. Project involves bridges A4649 and A4646. Cost Share funds in amount of $750,000 for the NEPA study. Potential Design Build project Added the construction phase $49,999.8 $12,498.2 $62,498.0 Monday, August 06, 11:07 AM Page 34 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690523 State #: 4S3328 Co: JACKSON Location/Improvement: MO 12: RESURFACING FROM I-435 TO SPRING STREET. Project : Resurfacing Length (mi): 4 Resurfacing from I-435 to Spring Street. STATE-MO $346.0 STATE-MO (AC) $1,385.0 STP-MO $1,487.0 Added the construction phase STATE-MO $23.0 STATE-MO (AC) $94.0 STATE-MO $1.0 STATE-MO (AC) $4.0 STATE-MO $1.0 STATE-MO (AC) $4.0 CREDIT ($1,487.0) $1,487.0 $371.0 $1,858.0 TIP #: 690524 State #: 4P3295B Co: JACKSON Location/Improvement: ADDING WRONG WAY, DO NOT ENTER AND ONE WAY SIGNING TO VARIOUS RAMP LOCATIONS, NOT INCLUDING I-70 AND I-29. Project : Safety NHPP-MO $731.0 STATE-MO $81.0 NHPP-MO $53.0 STATE-MO $6.0 NHPP-MO $4.5 STATE-MO $0.5 Adding Wrong Way, Do Not Enter and One Way Signing to various ramp locations, not including I-70 and I-29. $788.5 $87.5 $876.0 Monday, August 06, 11:07 AM Page 35 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690525 State #: 4P3214C Co: JACKSON Location/Improvement: SIGNAL UPGRADES TO PORTIONS OF RTE. 24, RTE. 40 AND RTE. 78 IN THE URBAN KANSAS CITY AREA. Project : Vehicle Operations STATE-MO (AC) $595.0 STATE-MO $149.0 NHPP-MO $643.0 STATE-MO (AC) $44.0 STATE-MO $11.0 STATE-MO (AC) $4.0 STATE-MO $1.0 CREDIT ($643.0) Signal upgrades to portions of Rte. 24, Rte. 40 and Rte. 78 in the urban Kansas City area. $643.0 $161.0 $804.0 TIP #: 690526 State #: 4S3314 Co: JACKSON Location/Improvement: RTE. H: PAVEMENT RESURFACING FROM RTE. 24 TO I-70. Project : Resurfacing Length (mi): 9 Pavement resurfacing from Rte. 24 to I-70. NHPP-MO $790.0 STATE-MO $197.0 STP-MO $875.0 NHPP-MO $85.0 STATE-MO $22.0 CREDIT ($875.0) $1,750.0 ($656.0) $1,094.0 TIP #: 690527 Location/Improvement: RTE. F: PAVEMENT RESURFACING FROM 31ST STREET TO RTE. 50. State #: 4S3310 Co: JACKSON Project : Resurfacing Length (mi): 8 Pavement resurfacing from 31st Street to Rte. 50. NHPP-MO $833.0 STATE-MO $208.0 STP-MO $923.0 NHPP-MO $90.0 STATE-MO $22.0 CREDIT ($923.0) $1,846.0 ($693.0) $1,153.0 Monday, August 06, 11:07 AM Page 36 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690528 State #: 4S3326 Co: JACKSON Location/Improvement: MO-7: ADD TURN LANES AT STRINGTOWN ROAD AND 155TH STREET (COUNTY LINE ROAD). Project : Safety HSIP-MO $959.0 STATE-MO $106.0 HSIP-MO $69.0 STATE-MO $8.0 HSIP-MO $57.0 STATE-MO $5.0 HSIP-MO $29.0 STATE-MO $3.0 HSIP-MO $47.0 STATE-MO $5.0 Add turn lanes at Stringtown Road and 155th Street (County Line Road). $1,004,000 in Open Container funds. $1,161.0 $127.0 $1,288.0 TIP #: 690529 State #: 4P3266B Co: JACKSON Location/Improvement: I-435: BRIDGE REHABILITATION AT I-470 AND I-49 Project : Bridge Rehabilitation STATE-MO (AC) $800.0 STATE-MO $200.0 STP-MO $903.0 STATE-MO (AC) $103.0 STATE-MO $26.0 CREDIT ($903.0) Length (mi): 3 Bridge rehabilitation at I-470 and I-49. Project involves bridges A6245, A6249, A6250, A6252 and A6254. $903.0 $226.0 $1,129.0 Monday, August 06, 11:07 AM Page 37 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 690530 State #: 4I3325 Co: JACKSON Location/Improvement: I-29: ADDING WRONG WAY, DO NOT ENTER AND ONE WAY SIGNING AT VARIOUS RAMP LOCATIONS ALONG I-29. Project : Safety NHPP-MO $460.0 STATE-MO $51.0 NHPP-MO $35.0 STATE-MO $4.0 NHPP-MO $18.0 Adding Wrong Way, Do Not Enter and One Way Signing at various ramp locations along I-29. $513.0 $57.0 $570.0 TIP #: 690531 State #: 4S3309 Co: JACKSON Location/Improvement: RTE. BB: PAVEMENT RESURFACING FROM RTE. 24 TO DUNCAN AVENUE. Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rte. 24 to Duncan Avenue. STATE-MO (AC) $507.0 STATE-MO $127.0 STP-MO $562.0 STATE-MO (AC) $55.0 STATE-MO $14.0 CREDIT ($562.0) $562.0 $141.0 $703.0 TIP #: 990292 State #: 4P3212 Co: JACKSON Location/Improvement: RTE. H: IMPROVE SIGHT DISTANCE AT PINK HILL ROAD. Project : Safety Improve sight distance at Pink Hill Road. HSIP-MO $1,409.0 STATE-MO $157.0 HSIP-MO $126.0 Updating budget STATE-MO $14.0 HSIP-MO $53.0 STATE-MO $7.0 HSIP-MO $271.0 STATE-MO $30.0 $1,859.0 $208.0 $2,067.0 Monday, August 06, 11:07 AM Page 38 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 490146 State #: 4I3122 2017 2017 Co: PLATTE Location/Improvement: I-435: PAVEMENT RESURFACING FROM I-29 TO COOKINGHAM DRIVE IN KANSAS CITY. Project : Resurfacing NHPP-MO $4,670.0 STATE-MO $519.0 NHPP-MO $392.0 STATE-MO $43.0 NHPP-MO $44.0 STATE-MO $5.0 NHPP-MO $22.0 STATE-MO $3.0 Length (mi): 6 Pavement resurfacing from I-29 to Cookingham Drive in Kansas City. Added the construction phase $5,128.0 $570.0 $5,698.0 TIP #: 490157 State #: 4I3216 2017 2017 Co: PLATTE Location/Improvement: I-29: PAVEMENT OVERLAY AND MILLING FROM PLATTE COUNTY LINE TO RTE. 273. Project : Reconstruction NHPP-MO $7,086.0 STATE-MO $787.0 NHPP-MO $548.0 STATE-MO $61.0 NHPP-MO $90.0 STATE-MO $10.0 NHPP-MO $50.0 STATE-MO $6.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $1.6 STATE-MO $0.4 Pavement overlay and milling from Platte County line to Rte. 273. Added the construction phase Length (mi): 10 $7,777.2 $864.8 $8,642.0 Monday, August 06, 11:07 AM Page 39 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 490158 State #: 4I3197 2017 2017 Co: PLATTE Location/Improvement: MO 273: BRIDGE REPLACEMENT OVER I-29, IN TRACY. Project : Reconstruction NHPP-MO $3,502.0 STATE-MO $876.0 NHPP-MO $793.0 STATE-MO $198.0 NHPP-MO $368.0 STATE-MO $92.0 NHPP-MO $60.0 STATE-MO $15.0 NHPP-MO $55.0 STATE-MO $7.0 NHPP-MO $16.0 STATE-MO $4.0 Bridge replacement over I-29, in Tracy. Project involves bridge A0108. Added the construction phase $4,794.0 $1,192.0 $5,986.0 TIP #: 490160 State #: 4S3202 Co: PLATTE Location/Improvement: MO 9: SIGNALIZING INTERSECTION AND IMPROVING GEOMETRICS AT MATTOX RD. AND RTE. 9 Project : (Roadway) NHPP-MO $845.0 STATE-MO $61.0 LOCAL $150.0 NHPP-MO $240.0 STATE-MO $60.0 NHPP-MO $56.0 STATE-MO $14.0 NHPP-MO $8.0 Signalizing intersection and improving geometrics at Mattox Rd. and Rte. 9 Updating project estimate and schedule $1,149.0 $287.0 $1,436.0 Monday, August 06, 11:07 AM Page 40 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 490161 State #: 4S3223 2017 2017 Co: PLATTE Location/Improvement: MO 9: PAVEMENT RESURFACING AND ADA TRANSITION PLAN IMPROVEMENTS FROM RTE. FF TO RTE. 45. Project : Resurfacing NHPP-MO $1,221.0 STATE-MO $305.0 NHPP-MO $154.0 STATE-MO $38.0 NHPP-MO $114.0 STATE-MO $29.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $19.0 STATE-MO $5.0 Length (mi): 2 Pavement resurfacing and ADA Transition Plan improvements from Rte. FF to Rte. 45. Added the construction phase $1,511.2 $377.8 $1,889.0 TIP #: 490166 State #: 4I3291 Co: PLATTE Location/Improvement: I-29: BRIDGE REPLACEMENT 1.8 MILES WEST OF RTE. 169 NEAR RIVERSIDE. Project : Reconstruction LOCAL $310.0 NHPP-MO $2,788.0 NHPP-MO $184.0 STATE-MO $21.0 NHPP-MO $256.0 STATE-MO $29.0 NHPP-MO $9.0 STATE-MO $1.0 NHPP-MO $270.0 STATE-MO $30.0 Bridge replacement 1.8 miles west of Rte. 169 near Riverside. Project involves twin bridges A1669. Added the construction phase $3,507.0 $391.0 $3,898.0 Monday, August 06, 11:07 AM Page 41 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 490167 State #: 4I3297 Co: PLATTE Location/Improvement: I-29: BRIDGE REPLACEMENT 0.8 MILE WEST OF RTE. 169 NEAR NORTHMOOR. Project : Reconstruction NHPP-MO $3,872.0 STATE-MO $430.0 NHPP-MO $257.0 STATE-MO $29.0 NHPP-MO $65.0 STATE-MO $7.0 NHPP-MO $459.0 STATE-MO $51.0 NHPP-MO $9.0 STATE-MO $1.0 Bridge replacement 0.8 mile west of Rte. 169 near Northmoor. Project involves bridge L0690. Added the construction phase $4,662.0 $518.0 $5,180.0 TIP #: 490169 State #: 4S3284 Co: PLATTE Location/Improvement: US 69: DRAINAGE IMPROVEMENTS AT FRONTIER STREET IN NORTHMOOR. Project : Reconstruction STATE-MO (AC) $505.0 STATE-MO $126.0 STP-MO $583.0 STATE-MO (AC) $78.0 STATE-MO $20.0 NHPP-MO $0.8 STATE-MO $0.2 CREDIT ($583.0) Drainage improvements at Frontier Street in Northmoor. Added the construction phase $583.8 $146.2 $730.0 Monday, August 06, 11:07 AM Page 42 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

TIP #: 490173 State #: 4P3275 Co: PLATTE Location/Improvement: RTE. 92: ADD NEW ROUNDABOUT AT THE INTERSECTION OF RTE. 45 SPUR. Project : Safety HSIP-MO $1,432.0 STATE-MO $159.0 HSIP-MO $138.0 STATE-MO $15.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $180.0 STATE-MO $20.0 Add new roundabout at the intersection of Rte. 45 Spur. Added the construction phase $1,840.0 $204.0 $2,044.0 TIP #: 490174 State #: 4P3276 Co: PLATTE Location/Improvement: RTE. 92: PAVEMENT RESURFACING FROM MISSOURI RIVER TO RTE. 273 Project : Reconstruction NHPP-MO $2,530.0 STATE-MO $633.0 NHPP-MO $168.0 STATE-MO $42.0 NHPP-MO $8.0 NHPP-MO $4.0 STATE-MO $1.0 NHPP-MO $8.0 Rte. 92: Pavement resurfacing from River to Rte. 273 Added the construction phase Length (mi): 8 $2,718.0 $680.0 $3,398.0 Monday, August 06, 11:07 AM Page 43 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter