TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

Similar documents
Modifications to TOP and IRO Standards

Standard TOP Transmission Operations

primary Control Center, for the exchange of Real-time data with its Balancing

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor

TOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements. FRCC Spring RE Workshop April 17-18, 2018

Project Consideration of Commission Directives in Order No. 693

Standards Authorization Request Justification

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities

Standards Authorization Request Form

Modifications to TOP and IRO Standards

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

TOP for Transmission Operators

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP

Enhanced Curtailment Calculator Update

Standard INT Dynamic Transfers

Standard COM-002-2a Communications and Coordination

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

Standard INT Dynamic Transfers

Cyber Security Reliability Standards CIP V5 Transition Guidance:

5. Effective Date: The first day of the first calendar quarter after applicable regulatory approval.

Project Posting 8 Frequently Asked Questions Guide

New Brunswick 2018 Annual Implementation Plan Version 1

Physical Security Reliability Standard Implementation

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

Draft CIP Standards Version 5

Québec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan Annual Implementation Plan

Peak Reliability Coordination Services in the West March 30, 2018

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Reliability Coordinator Procedure

Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1

NERC and Regional Coordination Update. Operating Committee Preston Walker January 9, 2018

A. Introduction. B. Requirements and Measures

Steve Ashbaker Director Operations. NASPI Workgroup Meeting February 21, 2013 Atlanta, GA

Standard Development Timeline

Reliability Standard Audit Worksheet 1

Standards Authorization Request Form

Reliability Standard Audit Worksheet 1

Standard Authorization Request Form

Standard Authorization Request Form

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010

Implementation Plan for COM-001-2

Critical Infrastructure Protection (CIP) Version 5 Revisions. Standard Drafting Team Update Industry Webinar September 19, 2014

Outage Coordination External Workshop. Jason Ausmus Manager, Operations Planning

Standard CIP Cyber Security Critical Cyber As s et Identification

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia

Bulk Electric System Definition Changes and Reporting

Proposed Convention for Numbering of NERC Reliability Standards Draft September 9, 2004

NERC and Regional Coordination Update

Unofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols

Implementation Plan. Project CIP Version 5 Revisions. January 23, 2015

Standard CIP Cyber Security Critical Cyber As s et Identification

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

Implementation Plan. Project CIP Version 5 Revisions 1. January 23, 2015

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

Interchange Distribution Calculator Billing

Unofficial Comment Form Project Real-time Monitoring and Analysis Capabilities IRO and TOP-010-1

Proposed Clean and Redline for Version 2 Implementation Plan

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Reliability Coordinator Procedure PURPOSE... 1

Comment Form for 1 st Draft of Standard for Backup Facilities (Project )

DRAFT Reliability Standard Audit Worksheet 1

CIP Cyber Security Recovery Plans for BES Cyber Systems

Standard Development Timeline

COM Interpersonal Communications Capabilities

requirements in a NERC or Regional Reliability Standard.

Standard COM Communication and Coordination

REVISIONS TO TOP/IRO RELIABILITY STANDARDS

Operating Reliability Subcommittee Presentations. February 10-11, 2015

Compliance Enforcement Initiative

Open Access Transmission Tariff of Southern Companies

Reliability Standard Audit Worksheet 1

Standards Development Update

EIM Entity Readiness Criteria May 6, 2015

Summary of FERC Order No. 791

Project Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives

DRAFT Risks and Mitigations for Losing EMS Functions

Standard Development Timeline

Project , COM Operating Personnel Communications Protocols Rationale and Technical Justification

COM Communications and Coordination

NERC Management Response to the Questions of the NERC Board of Trustees on Reliability Standard COM September 6, 2013

Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities

Peak Reliability IRO Project Overview Oct 25, 2016

Standard Development Timeline

OPUC Workshop March 13, 2015 Cyber Security Electric Utilities. Portland General Electric Co. Travis Anderson Scott Smith

Standard INT Interchange Authority Distributes Arranged Interchange

NERC Overview and Compliance Update

Reliability Standards Development Plan

RC Coordination Efforts

2016 Fall ITO Stakeholder Meeting. Topics in Operations

Standard EOP Disturbance Reporting

CIP Cyber Security Incident Reporting and Response Planning

Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project )

Standard CIP Cyber Security Critical Cyber Asset Identification

Project Retirement of Reliability Standard Requirements

Standard CIP Cyber Security Critical Cyber Asset Identification

NB Appendix CIP NB-0 - Cyber Security Recovery Plans for BES Cyber Systems

Transcription:

TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering

New/Revised TOP & IRO Standards November 19, 2015, FERC Order 817 Approves changes to TOP & IRO standards Accepts NERC s recommendation for the NERC Project 2015-09: SOL Drafting Team to address clarity and consistency of SOLs and IROLs 2

General Changes 3 Fewer in number, simpler, cleaner, less prescriptive, more streamlined Alignment with new COM-002-4 (effective 7/1/2016): no more Reliability Directive, replaced with Operating Instruction Authority who can issue Operating Instructions, who must comply with them SOL exceedance is a shared responsibility between TOPs and RCs NERC SOL White Paper

Major Change Highlights for RCs IRO-017-1: Outage Coordination R1. Each Reliability Coordinator shall develop, implement, and maintain an outage coordination process for generation and Transmission outages within its Reliability Coordinator Area. The outage coordination process shall: 1.1. Identify applicable roles and reporting responsibilities including: 1.1.1. Development and communication of outage schedules. 1.1.2. Assignment of coordination responsibilities for outage schedules between Transmission Operator(s) and Balancing Authority(s). 1.2. Specify outage submission timing requirements. 1.3. Define the process to evaluate the impact of Transmission and generation outages within its Wide Area. 1.4. Define the process to coordinate the resolution of identified outage conflicts with its Transmission Operators and Balancing Authorities, and other Reliability Coordinators. 4

Major Change Highlights for BAs and TOPs New TOP-003-3 Purpose: To ensure that the Transmission Operator and Balancing Authority have data needed to fulfill their operational and planning responsibilities TOPs and BAs have documented data specifications Mirrors IRO-010-2 for RCs 5

Major Change Highlights for BAs IRO-017-1 R2. Perform the functions specified in its RC s outage coordination process TOP-002-4 R4. Have an Operating Plan(s) for the next-day TOP-002-4 R5. Notify entities identified in the Operating Plan(s) to their role in those plan(s) TOP-002-4 R7. Provide its Operating Plan(s) for next-day operations to its RC 6

Major Change Highlights for TOPs 7 Prior to same-day and real-time: IRO-017-1 R2. Perform the functions specified in its RC s outage coordination process TOP-002-4 R1. Have an Operational Planning Analysis (OPA) to identify SOL exceedances TOP-002-4 R2. Have Operating Plan(s) to address potential SOL exceedances identified in the OPA TOP-002-4 R3. Notify entities identified in the Operating Plan(s) to their role in those plan(s) TOP-002-4 R6. Provide its Operating Plan(s) for next-day operations to its RC

Major Change Highlights for TOPs Real-time: TOP-001-3 R13. Ensure that a Real-time Assessment (RTA) is performed at least once every 30 minutes TOP-001-3 R14. Initiate its Operating Plan to mitigate a SOL exceedance identified as part of its Real-time monitoring or RTA 8

Revised Definitions Operational Planning Analysis (OPA) Current Revised 9 An analysis of the expected system conditions for the next day s operation. (That analysis may be performed either a day ahead or as much as 12 months ahead.) Expected system conditions include things such as load forecast(s), generation output levels, Interchange, and known system constraints (transmission facility outages, generator outages, equipment limitations, etc.). An evaluation of projected system conditions to assess anticipated (pre-contingency) and potential (post-contingency) conditions for next-day operations. The evaluation shall reflect applicable inputs including, but not limited to, load forecasts; generation output levels; Interchange; known Protection System and Special Protection System status or degradation; Transmission outages; generator outages; Facility Ratings; and identified phase angle and equipment limitations. (Operational Planning Analysis may be provided through internal systems or through third-party services.)

Revised Definitions Real-time Assessment (RTA) Current Revised An examination of existing and expected system conditions, conducted by collecting and reviewing immediately available data. An evaluation of system conditions using Realtime data to assess existing (pre-contingency) and potential (post-contingency) operating conditions. The assessment shall reflect applicable inputs including, but not limited to: load, generation output levels, known Protection System and Special Protection System status or degradation, Transmission outages, generator outages, Interchange, Facility Ratings, and identified phase angle and equipment limitations. (Real-time Assessment may be provided through internal systems or through third-party services.) 10

Perform RTA every 30 minutes Typically this is: o SE o RTCA Variety of solutions can be considered to meet entity RTA obligations Peak s SE, RTCA, and study tools are offered to TOPs and BAs to help meet RTA functional needs 11

Perform RTA every 30 minutes (Contd.) Peak s tools can serve as back-up to entity s RTA during TOP s primary tool outage to meet 30 minute requirement 12 o Enhanced Curtailment Calculator (ECC) o Peak potentially performing backup role Use of Peak s Hosted Advanced Applications o Real-time analysis and monitoring of SOLs and IROLs o Outage Studies o Access to Peak Displays o Awareness of wide-area system topology changes

Challenges with RAS modeling in RTA A very large number of schemes Coordination of newly added schemes and automatic actions Correct modeling information (logic diagrams, documentation, etc.) Operator training Awareness of arming in real-time? Awareness of reliability issues with RAS due to changing system conditions Transient phenomena based RAS schemes 13

IRO-017-1 - Peak Implementation Heavy focus on new IRO-017-1: Outage Coordination TOPs, BAs, and RC need to be compliant with IRO-017-1 by April 1, 2017 Broad stakeholder team Small development team Peak COS survey 14

Outage Coordination Project Milestones Milestone Outage Coordination Process Outline developed Post initial draft of Outage Coordination Process for stakeholder comment Date Completed 6/17/2016 1 st round Stakeholder comments due 7/15/2016 Post 2 nd draft of Outage Coordination Process for stakeholder comment 8/12/2016 2 nd round Stakeholder comments due 9/2/2016 Post final Outage Coordination Process 10/3/2016 Process implementation date 2/7/2017 IRO-017-1 mandatory and compliance in effect 4/1/2017 15

Questions?