Title: Source: Abstract: Recommendation: Notice: Page 1. APPROVED SUMMARY OF 3GPP2 TSG-C MEETINGS for 5 October 2004 Interim Plenary Conference Call

Similar documents
APPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call

APPROVED SUMMARY OF 3GPP2 TSG-C MEETING for 28 December 2001 conference call.

3GPP2 Access Network Interfaces TSG (TSG-A) #69 Meeting Summary

APPROVED SUMMARY OF TSG-S MEETING for February 2006 in Jeju, Korea

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China

July 2004 TSG-X Meeting Summary

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Meeting Summary Orlando, FL USA

APPROVED SUMMARY OF TSG-S MEETING for September 2006 in Xi an, China

Guilin, China September 9, GPP2 TSG-SX. Meeting Summary #2 Miami, Florida

TSG-S Meeting Summary: July Seoul, Korea Page 1. APPROVED SUMMARY OF TSG-S MEETING for the period of July 2001 in Seoul, Korea.

3GPP2 Access Network Interfaces TSG (TSG-A) #39 Draft Meeting minutes

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Meeting Summary Wailea, HI

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI

3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT

Miami, Florida June 3, GPP2 TSG-SX. Meeting Summary #1 Busan, Korea

3GPP2 Access Network Interfaces TSG (TSG-A) #30 Draft Meeting minutes

TSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada

3GPP2 Access Network Interfaces TSG (TSG-A) #24 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #25 Draft Meeting minutes

DRAFT SUMMARY OF 3GPP2 TSG-C MEETINGS for 8-12 July 2002 in San Diego, CA (USA)

3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington

Abstract: This document is a summary of the 3GPP2 TSG-S meetings that were held during the period of 6-9 February 2012.

Towards 5G NR Commercialization

Agenda: 1) Determine what the appropriate format and content for the draft should be; and 2) Determine how the editorial team should move forward

3GPP2 From Geneva to San Francisco. Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee

Summary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China

IEEE Broadband Wireless Access Working Group <

3GPP Contribution Analysis Who Leads the Mobile Infrastructure Race?

Impact of SEP conflicts on ICT innovation in Europe European Commission: Joint Research Center, Sevilla 27 October 2014

SMARTPHONE MARKETS AND TECHNOLOGIES

IEEE Broadband Wireless Access Working Group < WirelessMAN coexistence function primitives consolidation

ARIB TR-T13-C.R v1.0. cdma2000 Multimedia Services Evaluation Methodology: Software Tools

GPS AND MOBILE HANDSETS

Relay Support for Distributed Scheduling and its Bandwidth Request/Allocation Mechanism

C LDPC Coding Proposal for LBC. This contribution provides an LDPC coding proposal for LBC

8 Results of the 2009 Study. 8.1 Summary

IEEE Presentation Submission Template (Rev. 8.3)

IEEE C802.16h-06/063r1. IEEE Broadband Wireless Access Working Group <

Dusseldorf, Germany Agenda item: th -20 th June, Status Report of SMG11 at SMG#32

SMALL CELLS AND WI-FI OFFLOADING

3GPP2 Overview. Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom

IEEE Broadband Wireless Access Working Group < Huawei LB26b, Working Group Letter Ballot on P802.

Mobile Broadband Wireless: Path toward 4G

IEEE Broadband Wireless Access Working Group <

3GPP2 TSG-P Wireless Packet Data Networking TITLE: SOURCE: ABSTRACT: RECOMMENDATION:

IEEE Broadband Wireless Access Working Group < Fix broken message flow in HO decision & initiation

IEEE C802.16e-04/446r2. IEEE Broadband Wireless Access Working Group <

Nomor 3GPP Newsletter March 2008 Major decisions within 3GPP RAN

A response to a Call for Technical Proposal, 06_027.pdf

Document Control Sheet. BCS, The Chartered Institute for IT. BCS Health Executive. Terms of Reference

IEEE C802.16maint-06/055. IEEE Broadband Wireless Access Working Group <

IEEE Broadband Wireless Access Working Group < IEEE Working Group Letter Ballot #24, on P802.

IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)

IEEE C802.16e-05/401r3

Partnership. Organizational Partners (SDOs) Market Representative Partners. Regional standards organizations:

3GPP Work Item Description. Title: Study on Licensed-Assisted Access using LTE

WLAN Coexistence Liaison Report

Data Submitted Voice: Fax: SungCheol Chang Chulsik Yoon,

IEEE C802.16maint-05/091r1. IEEE Broadband Wireless Access Working Group <

IEEE C802.16i-06/014r3

Mar 3,2005 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE

IEEE C802.16maint-05/091. IEEE Broadband Wireless Access Working Group <

IEEE P802.3cm 400G over MMF Task Force Agenda & General Information

IEEE C802.16h-07/043r1. IEEE Broadband Wireless Access Working Group <

Round Trip Delay Optimization

IEEE Broadband Wireless Access Working Group <

Building a Global Leader

IEEE C802.16e-05/401r2

Global Update CDMA 450

IEEE Broadband Wireless Access Working Group < Changes in Definition of Data Delivery Services

IEEE Broadband Wireless Access Working Group < Early transmission of higher layer packets in the idle mode

IEEE C802.16e-04/472. IEEE Broadband Wireless Access Working Group <

IEEE e Security Review

ECLIPSE FOUNDATION, INC. INDIVIDUAL COMMITTER AGREEMENT

IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)

Message definition to support MS network entry in centralized allocation model

"Submit annually to the IEEE Standards Department an electronic roster of individuals participating on standards projects"

Simulating coexistence between y and h systems in the 3.65 GHz band An amendment for e

IEEE Broadband Wireless Access Working Group < Handoff SDL charts proposal

3GPP/3GPP2 Harmonization Meeting November 2001 Page 1

3GPP2 Drafting Rules. SC.R1005-A Version 1.0 March GPP2

5G Broadcast Status in 3GPP. Dr. David Gomez-Barquero Amsterdam, 16 th Sep 2018

From: Jean Johnson Sent: Wednesday, July 12, :06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson

IEEE Broadband Wireless Access Working Group <

MMS MM1 Stage. 3 Using OMA/WAP COPYRIGHT. 3GPP2 X.S Version 2.0 Version Date: June 2004

IEEE C802.16j-07/209r3. IEEE Broadband Wireless Access Working Group <

System Release Guide for the (R4) Release of the cdma2000 System Specifications

The Global Research Council

Test Plan for CDMA Mobile Stations

BIAS TC Meeting Minutes Meeting #52 October 12, Cathy called the meeting to order at 10:05 am. John Mayer Splain agreed to take notes.

Data Integrity in MAC IEEE Presentation Submission Template (Rev. 8)

3GPP Work Item Description. Title: Study on Indoor Positioning Enhancements for UTRA and LTE

Proposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC

IEEE /15. IEEE Broadband Wireless Access Working Group < Title Interpretation of IEEE Standard 802.

Page 1 of 1 16-Jan-01

A General Frame Structure for IEEE802.16j Relaying Transmission

IEEE Future Meetings

IEEE C802.16e-04/195r1. IEEE Broadband Wireless Access Working Group <

Transcription:

Page Title: APPROVED SUMMARY OF GPP TSG-C MEETINGS for October 00 Interim Plenary Conference Call 0 0 0 Source: Clifton J. Barber SECRETARY Representing KDDI CJ Barber Consulting Services 0 Saint Andrews Court Jonesboro, GA 0- (0) 0- (0) -0 fax cbarber@cjbarberconsulting.com Abstract: This document is a summary of the GPP TSG-C meeting that was held on October 00 via conference call. Recommendation: Review and adopt. Notice: 00 GPP Copyright Statement KDDI grants a free, irrevocable license to GPP and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of GPP publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. KDDI is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner's standard which incorporates this contribution. This document has been prepared by KDDI to assist the development of specifications by GPP. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on KDDI. KDDI specifically reserves the right to amend or modify the material contained herein and to any intellectual property of KDDI other than provided in the copyright statement above. 00 GPP TSG-C_MtgSum-000-Interim.lwp

Page On October 00, GPP TSG-C meetings were held via conference call. This document is intended to summarize those proceedings. 0 0 0 OPENING PLENARY. CALL TO ORDER AND OPENING REMARKS: The meeting was called to order at :0 PM US east coast time on October 00 by TSG-C Chair, BK Yi (LGE). The Chair and Vice Chair both requested and were granted contribution numbers at the time that the meeting was started. KDDI registered a complaint that the Chair and Vice Chair did not comply with the TSG-C rules to have contribution numbers assigned and contributions uploaded for interim Plenaries by COB on the night before. However, KDDI did not request to have the late contributions excluded due to lack of accessibility and preview by the membership.. ATTENDANCE REGISTRATION AND ROLL CALL: A roll call of companies indicated that companies included on the list of quorum members were present (% participation). The Secretary noted that no proxy statements had been received.. INTRODUCTION AND NUMBERING OF CONTRIBUTIONS: Contributions were loaded onto the GPP LAN server and listed in the document register (C00-0000-000R).. AGENDA APPROVAL: The proposed agenda (C00-0000-00R) was presented. DECISION: The agenda was approved without objection as submitted (C00-0000-00R).. ASSIGNMENTS OF CONTRIBUTIONS TO AGENDA ITEMS: Contributions were assigned to agenda items as noted on the agenda.. NEW BUSINESS: TSG-C WI PROCESS DISCUSSION A contribution regarding TSG-C WI Process Guideline (C00-0000- 00) was presented by TSG-C Vice Chair, Dennis Gentzler (ALLTEL). The contributor indicated that this contribution had been prepared in light of contributions and discussions from the last face-to-face meeting. There was substantial discussion regarding this contribution. Three () areas of concern were noted: The contribution noted that a WI proposal must be addressed by the third meeting cycle after initial presentation to Plenary. The contributor noted his intent that it must be addressed within three () meeting cycles maximum including the initial meeting of presentation. 00 GPP TSG-C_MtgSum-000-Interim.lwp

Page 0 0 0 Lucent indicated that the spirit of the WPD was that all WI proposals are approved and may not be rejected. The Chair indicated that this automatic adoption applied only to GPP WIs that are processed by TSG-S and he noted that TSG-C WI proposals can be rejected by the TSG-C Plenary. KDDI suggested that TSG-C must not be allowed to reject any WI proposal that represents the air interface development effort for a GPP approved WI. Due to lack of time, no other Old Business contributions were presented.. FUTURE MEETING SCHEDULE: - October 00-0 December 00 0- January 00 Shanghai Purple Mountain Hotel in Shanghai, China Hyatt Regency Kauai in Kauai, HI, USA The Fairmont Hotel in Vancouver, BC, Canada. REMANDED ACTION FROM THE GPP SC: E-mail correspondence to the GPP SC e-mail exploder dated October 00 regarding cancellation of GPP SC conference call (C00-0000-00) was presented from the GPP SC Chair as FYI for the TSG. Correspondence to all TSGs dated October 00 regarding ACTION ITEM: Referencing of OMA documents in GPP documents (C00-0000-00) was presented from the GPP SC Chair. ACTION: This contribution was remanded to all WGs for review and action by the closing Plenary of the October 00 face-to-face meeting in Shanghai.. ASSIGNMENTS: Although not specifically reviewed during this conference call, the following action items were active when the meeting was adjourned The Vice Chair requested that TSG-C participants that have questions or concerns regarding the TSG-C WI Process Guideline (C00-0000-00) should e-mail those questions and/or comments to him in advance of the Shanghai meeting. The following contributions related to TSG-C WI Process Discussion are still OPEN at the Plenary level: Recommendation for TSG-C WI management (C00-000-) from the TSG-C Chair. TSG-C WI Process (C00-0000-0R) from Motorola. Approval of Existing Work Items in TSG-C (C00-0000-00) TSG-C WI Process Guideline (C00-0000-00) Proposed process for TSG-C WIs (C00-0000-00) The following WI Proposals requests are still OPEN at the Plenary level: WI request for C.R00-E Parameter Administration (C00-000-) from Motorola, Ericsson, and QUALCOMM. 00 GPP TSG-C_MtgSum-000-Interim.lwp

Page 0 0 0 WI request for Rate Set Extension for VMR-WB (C00000-) from Nokia, Motorola, and QUALCOMM. WI request for DO Rev A Addendum(C00-0000-00) from Lucent, Nortel, and QUALCOMM. WI request for DO Rev A AN MPS (C00-0000-00) from Airvana, Lucent, Nortel, and QUALCOMM. WI request for DO Rev A AT MPS (C00-0000-00) from Airvana, Lucent, Nortel, and QUALCOMM. WI request for DO Rev A TAS (C00-00000) from Airvana, Lucent, Nortel, and QUALCOMM. WI request for Key Exchange (C00-0000-0) from Airvana, Lucent, and QUALCOMM. WI request for Enhanced BCMCS Work Item Request (C00-0000- 0R) from QUALCOMM, KDDI, KTF, and SKT. WI request for cdma000 Rev. D point release (C00-0000-0) from QUALCOMM. WI request for cdma000 Rev. D BS MPS (C00-0000-0) from QUALCOMM. WI request for cdma000 Rev. D BS MPS (C00-0000-0) from QUALCOMM. A WI request for cdma000 Rev. D point release (C00-0000-0R) from Lucent, Ericsson, and QUALCOMM. A WI request for HRPD Rev. A point release (C00-0000-R) from Lucent, Nokia, Samsung, and QUALCOMM. A WI request for a new revision to C.S00 Band Class specification (C00-0000-) from Lucent, Nortel Networks, and QUALCOMM. A WI request for C.S000-D BS MPS for cdma000 Rev. D (C00-0000-00) from QUALCOMM, Motorola, and Agilent Technologies A WI request for C.S00-D MS MPS for cdma000 Rev. D (C00-0000-00) from QUALCOMM, Motorola, and Agilent Technologies 0. ADJOURNMENT: The Plenary was adjourned by direction of the Chair on October 00 at :0 PM US east coast time. 00 GPP TSG-C_MtgSum-000-Interim.lwp

Page A listing of the contributions that were distributed is itemized below: NUMBER OPENING PLENARY - GPP-C00-0000- 000 00 00 00 00 00 00 00 00 DOCUMENT REGISTER AGENDA Approval of Existing Work Items in TSG-C Minimum performance specification C.S000-D (BS MPS for cdma000 Rev. D) WI proposal Minimum performance specification C.S00-D (MS MPS for cdma000 Rev. D) WI proposal Correspondence to all TSGs dated October 00 regarding ACTION ITEM: Referencing of OMA documents in GPP documents E-mail correspondence to the GPP SC e-mail exploder dated October 00 regarding cancellation of GPP SC conference call TSG-C WI Process Guideline Proposed process for TSG-C WIs SUBJECT SOURCE SECRETARY CHAIR QUALCOMM QUALCOMM, MOTOROLA, AND AGILENT TECHNOLOGIES QUALCOMM, MOTOROLA, AND AGILENT TECHNOLOGIES SC CHAIR SC CHAIR VICE CHAIR CHAIR 00 GPP TSG-C_MtgSum-000-Interim.lwp

Page GPP QUORUM ROLL CALL TSG-C (CDMA000) 0-Oct-0 COMPANY Attendance Consecutive Voting Quorum Status 0/0/00 Mtgs Missed Status at Mtg Start AGILENT TECHNOLOGIES 0 ALLTEL 0 AXALTO 0 BELL MOBILITY 0 0 0 DOCOMO US LABORATORIES 0 EACCESS 0 0 0 ERICSSON 0 FUJITSU 0 GEMPLUS 0 HITACHI 0 HUAWEI 0 0 INTERDIGITAL 0 KDDI 0 KYOCERA 0 LG ELECTRONICS 0 LG TELECOM 0 LUCENT 0 MOTOROLA 0 NAVINI NETWORKS 0 0 0 NEC 0 NEXTEL 0 NOKIA 0 NORTEL NETWORKS 0 QUALCOMM 0 RESEARCH IN MOTION ROHDE & SCHWARZ SAMSUNG 0 SK TELECOM 0 0 SIRF TECHNOLOGY ` 0 SPIRENT COMMUNICATIONS 0 SPRINT 0 TEXAS INSTRUMENTS 0 TOSHIBA 0 VERIZON WIRELESS 0 0 VIA TELECOM 0 ZTE 0 0 TOTALS QUORUM CALCULATION % ADDITIONS ETRI OBSERVERS AND GUESTS QUORUM STATUS NOTES: - HIGHLIGHTED ZERO = Must attend consecutive mtgs to be added to quorum list - NON-HIGHLIGHTED ZERO = Will be added to quorum list if they attend the next mtg - P = proxy letter in force 00 GPP TSG-C_MtgSum-000-Interim.lwp