Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Similar documents
Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon

ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Tamil Nadu: Current Power scenario and projects in pipeline

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Copy: with a request to kindly make it convenient to attend the above meeting

Distribution List: Southern Region. 2. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Advanced Ultra Power Transmission Consultancy

qlq:~ ~ CbI"lq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

National Load Despatch Centre Power System Operation Corporation

List of members of TCC

Distribution List: Constituents of Southern region.

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE

Applications Granted Medium Term Open Access (MTOA) by POWERGRID

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR **********

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

INDIA TOURISM DEVELOPMENT CORPORATION LIMITED Unit : Ashok Travels & Tours, Bangalore

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH. Letter No /G.39/G.393/2018-1, dated

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II)

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS)

Vidyut Kaushal. Power sector skill council (PSSC) Completes Skill Gap Analysis for Power Sector

Q3 FY Press & Analysts Meet Mumbai January 28, 2016

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m.

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ************

Overview of Bangladesh Preparation for Interconnection with India. Arun Kumar Saha DGM Planning ( In Charge) PGCB

POWER TRANSMISSION IN INDIA 2018

Highlights of Telecom Subscription Data as on 31 st October, 2018

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on

Tower-C, DLF Cyber City, Phase-II Gurgaon Phone : , ,

Reliance Infrastructure Limited

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

From: Laura Manz, Vice President of Market & Infrastructure Development

Distribution List : Sterlite Energy Ltd. Jindal India Thermal Power Ltd. Navabharat Power Private Limited GMR Kamalanga Energy Ltd.

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / COO (BDD)

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT

ADB s Energy Program in Myanmar

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

Distribution List R.K.M. Powergen Pvt. Ltd. Jindal Power Ltd. Athena Chhattisgarh Power Pvt Ltd SKS Power Generation (Chhattisgarh) Ltd.

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

European Developments

Highlights of Telecom Subscription Data as on 28 th February, 2018

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

Memorandum. This memorandum requires Committee action.

CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB

Renewable Energy Investment Trends in sub-saharan Africa

FORUM LOAD DESPATCHERS (FOLD)

Description of the Application Process for Small Embedded Generators

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION

InSolare (IEPL) ISO certified and MNRE Channel partner

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi.

MISO PJM Joint and Common Market Cross Border Transmission Planning

Invitation of sealed quotations for Renewal of Symantec Back up Executive.

June 2012 First Data PCI RAPID COMPLY SM Solution

PCC Decision Log

Request For Quotation from Service Providers. for. Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation for UTIITSL

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

SERVICE TERMS AND SLA FOR LEASE OF DARK FIBER

Distribution List: Constituents of Northern Region.

up of SPMU in States/UTs under NeGP A

BOXING FEDERATION OF INDIA

Green Power Market Development Group - Scaling up Renewable Energy Sector in India 04 th December An initiative supported by

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

Kent Wind Energy Networking Event. Wednesday 26 th September

Address and Tel.No. of the Director, Legal Metrology GOI

UNCONTROLLED IF PRINTED

READY MIX CONCRETE (RMC) PLANT CERTIFICATION SCHEME. Rules for Use of the RMC Plant Certification Mark/Logo

Handout on. Mobile Number Portability. For Sales Channels

Telecom Sector Outlook and Spectrum Trading: the Case of Pakistan

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

6 Version 1.0 (September 20, 2002) 0 days $0 0 days 01 Oct '02 01 Oct ' days $

RSL NSW SUB-BRANCH STANDARD OPERATING PROCEDURES

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

The latest update of power market in Latvia

e-filing Process At a glance

Electric Sample Form No Agreement for Unmetered Low Wattage Equipment Connected to Customer-Owned Street Light Facilities

Sub: Review of Performance of GRIDCO for the FY held on

NETWORK INTEGRATION TRANSMISSION SERVICE. Preamble

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

Privacy Policy. Act shall mean the Information Technology Act, 2000 and Rules thereunder as amended from time to time.

STANDARD OPERATING PROCEDURE CERTIFICAT ION OF SOLAR PV / WIND SYSTEM VENDORS/ INSTALLERS /SERVICE PROVIDERS

GRAS Education and Training Services Pvt. Limited ( GRAS Academy ) In Partnership with National Skills Development Corporation (NSDC)

Embracing Competition Stakeholder Engagement Workshop no May 2018

Financial Planning Institute of Southern Africa SETTING THE STANDARD. Continuous Professional Development (Cpd) Policy

Subject: Reformulation of existing Postpaid Broadband Plans and launch of a new Unlimited Broadband Plan reg.

INDIAN SOCIETY FOR NON-DESTRUCTIVE TESTING Mumbai Chapter ANNOUNCEMENT NDT LEVEL III REFRESHER/TRAINING COURSES AT MUMBAI, INDIA February / March 2019

Transcription:

Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Distribution List - SR:. GM, (Commercial) NTPC Limited (Kudgi TPS) NTPC Bhavan, Core-7, Scope Complex 7, Institutional Area, Lodhi Road New Delhi-0 003 Email: cvanand@ntpc.co.in rohitchabra22@gmail.com 3. Managing Director, Andhra Pradesh Solar Power Corporation Pvt Ltd Room No: 28, 2 nd Floor, Vidyut Soudha, Khairatabad, Hyderabad- 500 082 Email: adviser@apgenco.gov.in ande_venkateswarlu@yahoo.com Tel : 040-2349940 / +9-9848543434 5. CGM (Comml. & RAC) Telangana State Southern Power Distribution Company Ltd. #6--50, Ground Floor, TSSPDCL Corporate Office, Mint Compound, Hyderabad-500063 Email: cgmcomml@tssouthernpower.com seipc@tssouthernpower.com Tel : 040-2343453 / +9-944086220 7. AGM Regulatory Affairs, Regen Wind Farm (VAGARAI) Pvt. Ltd. #S-7, Krishna Arcade, II Floor, #0 Rajabhatar ST, T. Nagar, Chennai 600 07 Email: dheeraj.j@regenpowertech.com Ravi.as@regenpowertech.com Tel : 0990778484/ 09840940609 9. Chief Executive Officer Meenakshi Energy Ltd. Thamminapatanam (V) Chillakur (M) SPSR Nellore, Andhra Pradesh-52442 Email: kamal.kant@indiapower.com indu.chakraborty@indiapower.com Tel: 977220522 / 9836384567. Managing Director VSF Projects Limited Plot no. 89/A, Aiswarya Sagar Society Road 2, Banjara Hills Hyderabad 500 034. Email: vsfprojectsltd9@gmail.com Tel : 09866222235 2. General Manger NLC India Limited Commercial Department Corporate Office, Block -, NLC Ltd., Neyveli - 60780. Email: commercial@nlcindia.com cgm.pse.co@nlcindia.com Tel: 0442 253429 / 9486086856 4. CEO, Karnataka Solar Power Development Corporation Limited 2 nd Floor, South Block, Beeja Raja Seeds Complex, Bellary Road, Hebbala, Bengaluru- 560 024 Email: kredmld@gmail.com agm.spkredl@gmail.com Tel : 080-2220809/ 944845535 6. Vice President (Projects) East Coast Energy Private Limited, #7--24, B Block, 5th Floor, Roxana Towers, Green Lands, Begumpet, Hyderabad- 500 06 Email:srinivasan.r@eastcoastenergy.in sherrysrini@gmail.com Tel: 0990833929 8. GM Mytrah Energy (India) Ltd. #206, st Floor, Prestige Meridian, MG Road, Bangalore 560 00 Email:v.kiran@mytrah.com k.bhargav@mytrah.com Tel: 9900066530/990006653/9538044488 0. Surana Power Limited No: 29, Whites Road, 2nd floor, Royapettah, Chennai 600 04. Email: loganathan@suranapower.com Tel: 0956600083 2. Senior Vice President, M/s Samalkot Power Ltd. (SPL) PB 22, IDA Peddapuram, ADB road, Samalkot, E.G. Dt.,- 533 440 Andhra Pradesh Email : dwarakanath.cheruvu@reliancada.com sameer.ku.gupta@relianceada.com Mob: 8822392354 / 7498246536

3. AVP - Project Development Renew Power Ventures Pvt. Ltd. 0th Floor, DLF Square, Jacranda Marg, Sector-25, DLF Phase-2, Gurgaon Haryana Email:rakesh@renewpower.in vinod@renewpower.in Mob: 097486060 / 09903955

Page of 7 Minutes of 23 rd Joint Co-ordination Committee meeting of Generation Projects granted Connectivity/ LTA in Southern (SR) to be held on 29.06.208 at POWERGRID, Gurgaon. The 23 rd Joint Co-ordination Committee meeting of generation projects in Southern was held at POWERGRID Office, Gurgaon on 29 th June, 208. The list of participants of the meeting is enclosed at Annexure-I. 2. After welcoming the participants, it was informed that Minutes of the 22 nd Meeting of the Joint Co-ordination Committee of generation projects which were granted LTA in Southern held on 28.03.208, were circulated vide letter ref. no. C/CTU/SR/OA/22JCC dated 25.04.208. As no observations/comments were received on the minutes, the minutes were confirmed as circulated. 3. It was re-iterated that JCC forum has been created for co-ordination purpose to attempt matching of generation schedules with the associated transmission system, and accordingly, the information given by generation developers is being taken into cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic schedule & other status of generation project /dedicated line. However, for any substantial issue, it may kindly be submitted to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content; therefore it was advised that such communication may strictly follow CERC Regulatory provisions (Regulation 8) specifically regarding notice, clearly therein mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges. An advisory in this regard is already available at CTU website. 4. It was also emphasized that Joint Coordination Committee meetings were institutionalized by the Hon ble Central Electricity Regulatory Commission to enable better coordination of generation and transmission projects in terms of the applicable CERC Regulations, Detailed Procedure and BPTAs/LTAAs. In this regard, it is also pertinent to mention that the BPTAs/LTAAs executed with the generation project developers/companies monitored hereunder provides that if any of the developers fail to construct/ complete/ commission the generating station/dedicated transmission line or makes an exit or abandons its project, then POWERGRID shall have the right to collect the transmission charges and/or damages as the case may be in accordance with the CERC Regulations, Orders etc. Further, as per the BPTAs/LTAAs, the construction phase bank guarantee submitted by the project developers/lta customers is also encashable in case of adverse progress/abandonment of individual generations project(s)/unit(s) assessed during the Joint Coordination Committee meetings. It was also informed that in light of a number of recent CERC orders, wherein the Hon ble Comission has emphasized upon strict implementation of the various Regulations, Procedures and statutory Agreements, CTU shall assess the progress of various generation projects and take appropriate actions in terms of the applicable provisions/clauses of the Regulations/Procedure/Agreements. 5. CTU informed that recently in number of cases, generation developers have submitted online additional details in respect of Connectivity (CON-4) only when the generation projects are on the verge of commissioning. Thus, a very short period of time is available for processing and issuance of Connection Offer (CON-5) and subsequent signing of Connection

Agreement. As per the CERC Connectivity Regulations/ Detailed Procedure, 2009, the CON-4 details are to be furnished to CTU at least 2 (two) years prior to physical interconnection which may be adhered to by all the applicants. 6. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein. 7. It is noted that some of the generation developers / applicants have been repetitively not attending the JCC Meetings. All such generation developers / applicants were requested to attend the future meetings so as to have a better co-ordination otherwise suitable action may be taken as per CERC Regulations/Detailed Procedure. 8. All those generation projects that have achieved COD of total capacity and their respective dedicated transmission lines have also been commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being called for further JCC meetings (Details of all such generation projects as per Table T). 9. Regarding execution of TSA, it was informed that under the applicable provisions of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 200 and CERC Orders pronounced thereupon, TSA notified under Regulation 3 is the default transmission agreement and mandatorily applies to all DICs. 0. It was clarified that in terms of the recent CERC Orders and directions, the liability to pay transmission charges shall commence irrespective of opening of LC and signing of TSA. In default thereof, necessary action in terms of CERC Regulations including curtailment of STOA may be taken. Regardless of the said CERC Orders, all DICs are duty bound to establish payment security mechanism (LC) under Regulation 2 (8) of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 200 to facilitate smooth transaction of power on LTA basis.. Further, it was also brought to the attention of all the participants that CERC has pronounced Order in Petition 229/RC/205 wherein inter alia it has been re-emphasized that all Designated ISTS Customers (DICs) are bound to establish payment security mechanism (LC) and pay transmission charges from the date of commissioning of associated transmission system or scheduled date under BPTA, whichever is later. In case of default in payment of transmission charges and/or maintaining LC, the DICs TSA shall be liable for termination/suspension and shall be disabled from injecting/drawing to/ from the ISTS through any type of access. 2. The LTA customers were requested to update the progress of their generation projects, dedicated transmission system and the deliberations are summarised below : Page 2 of 7

Status of the Generation Projects 2 Meenakshi Energy Private Limited (2x50 + 2x350) Meenakshi Energy Pvt. Ltd. HIGH CAPACITY TRANSMISSION CORRIDOR VI (Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh) Quantum (MW) SR WR NR 546 86 77 83 364 364 0 0 NIL Comm. schedule U-/2: commissioned U-3: Sync on 24 th Mar 8 Expected COD Apr 8 U-4: Sept 8 (COD) Comm. schedule U-/2: commissioned U-3: Sync on 24 th Mar 8 Sep 8 (COD) U-4: Sept 8 (COD) Dedicated / Connectivity line & Status SEPL/MEPL- Nellore 400kV quad D/c line - commissioned MEL claimed that it has relinquished the entire LTA quantum in July 207 by filing an application before CERC. In this regard, it was clarified that no Order had been issued in MEL s application. Also, MEL had not clearly provided an undertaking to bear relinquishment charges. It was emphasized that relinquishment necessarily accompanies liability to pay relinquishment charges as per CERC Orders. MEL also requested for nonencashment of its construction phase BG. In this regard, it was clarified that CTU shall act in terms of the provisions of the BG/BPTA/Procedure and applicable Court Orders. HIGH CAPACITY TRANSMISSION CORRIDOR VIII (Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh) East Coast Energy Private Quantum (MW) 240.8 SR WR NR 240. 8 0 0 AP: 300 MW Kerala : 00 MW Comm. schedule Page 3 of 7 Comm. schedule Dedicated / Connectivity line & Status ECEPL-Srikakulam PS 400kV quad D/c line Sep 8 AP RFQ short list : 488.55 MW. TSA has not been signed yet.

Limited (2x660 MW) Quantum (MW) SR WR NR Comm. schedule Comm. Dedicated / schedule Connectivity line & Status As informed in the 9 th JCC meeting (6.06.207), project is stalled for the time being and action is being taken for revival of the project. It is gathered that the generation project developer has been referred to NCLT. No further progress has been intimated by ECEPL. Other Generation Projects Granted Connectivity & LTA Generation Projects granted /LTA Quantum (MW) SR WR NR ER Dedicated / Connectivity line & Status NTPC Limited (Kudgi TPS) (3x800 MW) 2392.49 (358.87 unallocate d) 2033.6 2 0 0 0 Allocation Kar-200 TN-300 Ker-05 Tel-234 AP-20 Unallocated- 360 U: Jul 7 (COD) U2: Dec 7 (COD) U3: Jul 8 (COD ant) Status sent by mail: U: Jul 7 (COD) U2: Dec 7 (COD) U3: Jul 8 (COD ant) Kudgi TPS - Narendra (New) 400 kv 2xD/c quad lines -. Entire LTA has already been operationalized. Page 4 of 7

Quantum (MW) SR WR NR ER Dedicated / Connectivity line & Status 2 3 4 Neyveli Lignite Corporation Limited (400 MW Replacement) (2X500MW) Telangana State Southern Power Distribution Company Ltd. (TSSPDCL) Andhra Pradesh Solar Power Corporation Pvt Ltd 334 (60 unallocate d) 334 0 0 0 2000 2000 0 0 0 500 500 0 0 0 TN-53.07 AP-52.46 TS-6.3 Kar-70.54 Ker-32.38 Pud-4.24 000 000 Target (Nov 8) Telangana 250 (AP) NOC not furnished by APSPCPL Page 5 of 7 U: Jul 8 (Sync) Oct 8 (CoD) U2: Aug 8 (Sync) Jan 9 (COD) Ph-I (250 MW) Ph-II (750 MW) Jun/Jul 9 NIT already issued. Award to be placed by U: Sep 8 (Sync) Oct 8 (CoD) U2: Nov 8 (Sync) Jan 9 (COD) Status sent by mail: Ph-I (250 MW) Ph-II (750 MW) Mar 9 Provision of 7x67 MVA (single phase), 400/220 kv transformers at NNTPS switchyard; x80 MVAR Bus Reactor at generation switchyard; LILO of existing Neyveli TS-II Pondycherry 400 kv S/c at NNTPS 400 kv Ex-bus at Marwa Thermal Power plant connected to Chhattisgarh STU(for 000MW) and 000 MW on target basis 400/220KV NP Kunta Pooling Station through LILO of Cuddapah Kolar 400 kv S/c NLC Switchyard test charged. CTU informed that as per the grant of regulatory approval, transmission charges shall be applicable till COD (to be borne by the applicant). 000 MW operationalized and TSSPDCL has sought relinquishment of 000 MW vide letter dt. 26.05.208 without payment of relinquishment charges. It has been intimated to TSSPDCL that relinquishment cannot be effected without liability to pay relinquishment charges as may be determined by CERC in Petition 92/MP/205. For 750 MW: NTPC has issued LOA on 05.06.208 to Spring Energy(250MW), Ayan Renewable(250MW) & Soft Bank Energy(250 MW).

Quantum (MW) SR WR NR ER Dedicated / Connectivity line & Status Jun/Jul 8 Ph-III (500 MW) 350MW Apr 8 50 MW Jun/Jul 8 00 MW to be retendered NIT already issued. Ph-III (500 MW) 300MW 50 MW 29.06.208 50 MW 5.08.208 00 MW to be retendered line For 500MW: 300 MW commissioned FRV Solar (50MW), ACME Solar (00MW), TATA Power (00MW) & Azure Power(50MW). Balance 200MW ACME Solar(50MW) Jul 8, FRV Solar (50MW) Aug 8 and 00MW SECI has cancelled tenders as all VGF schemes are under review by MNRE. As per the grant of regulatory approval, transmission charges shall be applicable till the COD of the generation project (to be borne by the applicant). Page 6 of 7

Quantum (MW) SR WR NR ER Dedicated / Connectivity line & Status 5 6 Karnataka Solar Power Development Corporation Limited Mytrah Energy(India) Pvt. Ltd. (300MW) 2000 2000 0 0 0 75 30 0 0 45 75 0 50 (Kar) Representati ve provided details for 300MW UP: 00 MW Bihar: 50 MW Jharkhand: 50 MW Assam: 50 MW Target: 50MW (ER) Status sent by mail: 600 MW: in Dec 7 / Jan 8 (NTPC) 400 MW: Dec 8 (expected) (200 MW: SECI, 200 MW: KREDL) 27.2MW(53*2.4 MW): July8 24.8MW(52*2.4 MW): Sep/Oct 8 48MW: Future bids Page 7 of 7 Status sent by mail: 600 MW: in Dec 7 / Jan 8 (NTPC) 550 MW: Apr 9 850 MW: Jul 9 (expected) 50 MW: Sep 8 50 MW: Dec 8 LILO of 400kV Gooty Tumkur (Vasantnarsapur) D/c at Tumkur (Pavagada) Pooling station, x500 MVA, 400/220KV Pooling station at Tumkur (Pavagada), x25 MVAR BR at Tumkur (Pavagada), 220 kv Bays (8 Nos.) at Tumkur (Pavagada) PS for interconnection with Solar project** - **4 nos. 220 kv bays for Phase-I (000 MW) and balance 4 nos. bays for Phase-II (000 MW) Mytrah wind farms Tirunelveli PS 230kV D/c line ready Tower foundations 30/30 completed Tower Erection 30/30 completed Stringing Out of 3000 Acres of land to be obtained on annual lease basis 2726 Acres has been obtained from land owner. There are 8nos ICTs at solar park whose status is as below: (i) 4nos 220/66kV 3 nos commissioned, and balance will be commissioned by Jul 8. (ii) 4nos 220/33 kv - will be commissioned by Aug 8. CTU informed that as per the grant of regulatory approval, transmission charges shall be applicable till COD (to be borne by the applicant). Land possessed for approx. 244.8MW (02 locations, 2.4 MW/location). MEIPL has been reminded that transmission charges shall be applicable till COD of generation project. Transmission system

Quantum (MW) SR WR NR ER Dedicated / Connectivity line & Status completed. Line ready for charging and terminal bays are under implementation. for LTA already commissioned. No land available. 7 Renew Power Ventures Pvt. Ltd 400 (NR 200MW ER 50MW WR 50MW) 0 50 200 50 Nil 25 MW: Dec 9 25 MW: Mar 20 00 MW: Sep 20 50 MW: Sep 20 25 MW: Dec 9 25 MW: Mar 20 00 MW: Sep 20 50 MW:Sep 20 Renew Power Ventures Pvt. Ltd Pugalur 230kV D/c line along with bays at Pugalur & Generation switchyard. Work has not started as yet. Bay implementation agreement and LTA agreement has been signed with POWERGRID. The dedicated transmission works are yet to be awarded. Transmission charges to be borne by the applicant till COD of capacity. Generation Projects granted only Connectivity Connectivity Connectivity Quantum (MW) Comm. Schedule (TA/Intimation) Dedicated / Connectivity line & Status (Under the scope of developers) VSF Projects Ltd. (x350 MW) 350 After establishment of Nellore PS, likely by Sept 4 Generation switchyard Nellore PS 400kV D/c line Sept 8 Representative repetitively not attending JCCs, accordingly it may be referred to Connectivity/ LTA committee of SR constituents for review of the connectivity granted. 2 Surana Power Ltd. (2x20 MW) 350 After establishment of Raichur (New), likely by Jan, 4 (Project stalled as informed vide letter dtd 9.09.207) Generation switchyard Raichur 400 kv D/c line Representative repetitively not attending JCCs, accordingly it may be referred to Connectivity/ LTA committee of SR constituents for review of the connectivity granted. Page 8 of 7

3 4 Connectivity M/s Regen Wind Farms (Vagarai) Pvt. Ltd. M/s Samalkot Power Limited Connectivity Quantum (MW) 600 Comm. Schedule (TA/Intimation) Phase- 3.03.7 Phase-2 30.09.7 Phase-3 3.03.8 Phase-4 30.09.8 Phase-5 3.03.9 224 Feb-207 Phase-(96 MW) 3.03.8 Phase-2 (92 MW cum) 30.06.8 Phase-3 (336 MW) 30.09.8 Phase-4 (452MWcum) 3.2.8 Phase-5 (600 MW cum) 28.02.9 4 nos of GT (265 each) is commissioned but COD yet to be declared. Balance 2x265 GT + 3x270 ST shall be commissioned in 30 months from date of notification of New Gas policy from GOI which is expected in May/Jun 8 Phase-(96 MW) 3.03.8 no further progress reported. Phase-2 (92 MW cum) 30.06.8 no further progress reported. Phase-3 (336 MW) 30.09.8 no further progress reported. Phase-4 (452MWcum) 3.2.8 Phase-5 (600 MW cum) 28.02.9 no further progress reported. 4 nos of GT (265 each) is commissioned but COD yet to be declared. Balance 2x265 GT + 3x270 ST shall be commissioned in 30 months from date of notification of New Gas policy from GOI which is expected in Oct 8 Dedicated / Connectivity line & Status (Under the scope of developers) M/s REGEN Wind Farms (Vagarai) Pvt. Ltd. Regen PS Pugalur 230 kv D/c (Twin Moose) line (including line bays at both the ends). Dedicated line is yet to be awarded. Samalkot-Vemagiri-II (PG) 400 kv D/c Quad line (including line bays at both ends) x25 MVAR bus reactor at generation switchyard Bay agreement already executed. Connection agreement executed. Land acquisition 788 acres of land is in possession (out of a total requirement of 500 acres). Conveyance of land has taken place. LTA agreement not signed by applicant despite notices dated 05.0.8, 07.02.8 & 9.06.8. to sign LTA agreement by 29.06.8 failing which LTA to be cancelled. LTA has been revoked vide letter dated 04.07.208 on account of nonsigning of LTA Agreement. Schedule is dependent on New Gas policy from GOI. Page 9 of 7

Table T List of generation projects commissioned along with the dedicated/connectivity lines and further coordination not required HIGH CAPACITY TRANSMISSION CORRIDOR VI (Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh) Simhapuri Energy Private Limited (4x50 MW) Quantu m (MW) 546 400 SR WR NR 4 400 35 0 0 NIL Last updated status Dedicated / Connectivity line & Status (as per 2 th JCC) SEPL/MEPL-Nellore 400kV quad D/c line & commissioned LTA of 46 MW has been relinquished vide letter dated 26.06.208 2 Thermal Powertech Corpn. India Ltd (2x660 MW) 240 25 5 0 Andhra Pradesh : 230.55 MW Telangana : 839.45 MW U-: Mar 5 (COD) U-2: Sep 5 (COD) (as per 3 th JCC) TPCIL-Nellore PS 400kV quad D/c line by POWERGRID & commissioned 3 NCC Power Projects Limited (2x660 MW) (Sembcorp Gayatri Power Ltd) 740 740 0 0 NIL As per 20th JCC U-: U-2: on Feb 7 (COD 7.02.7) NCC-Nellore PS 400kV quad D/c line by POWERGRID & commissioned HIGH CAPACITY TRANSMISSION CORRIDOR VII (Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu) Coastal Energen Private Limited (2x600 MW) Quantu m (MW) 00 558 SR WR NR 820 558 280 0 0 Tamil Nadu : 558 MW Last updated status (U & 2: ) Dedicated / Connectivity line & Status CEPL-Tuticorin PS 400kV quad D/c line (27km) Oct 6 As per CERC directions in IA no /208 in Petition no.246/mp/206, LTA of 542 MW has been relinquished. 2 Ind-Barath Power (Madras) Limited (2x660 MW) 900 225 270 405 NIL Ind-Barath-Tuticorin PS 400kV quad D/c line - Uncertain Ind Barath informed that the generation project has been abandoned. Page 0 of 7

HIGH CAPACITY TRANSMISSION CORRIDOR XI (Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, TN) PEL Power Limited (3x350 MW) Quantu m (MW) SR WR NR 987 700 0 287 NIL Last updated status Dedicated / Connectivity line & Status Project uncertain. PEL-Nagapattinam PS 400kV quad D/c line CERC has pronounced order in Petition 35/MP/203 filed by PELPL wherein CERC has inter alia declined the relief under force majeure clause of BPTA to PELPL and has held that PELPL may seek relinquishment of LTA which shall be effective from 26.7.203 and subject to relinquishment charges as per decision in CERC Petition 92/MP/205. PEL has filed appeal against order of CERC in APTEL. 2 IL & FS Tamil Nadu Power Company Limited (2x600 MW) 50 080 540 540 575 540 0 0 Tamil Nadu: 540 MW U-: Sep 5 (COD) U-2: Apr 6 (COD) IL&FS-Nagapattinam PS 400kV quad D/c line LTA of 540 MW has been relinquished vide letter dated 22.05.207 Status of the Associated Transmission System HIGH CAPACITY TRANSMISSION CORRIDOR VI (Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh) Common System Associated with ISGS Projects in Krishnapatnam Area of Andhra Pradesh: All elements have been commissioned. The details of elements are as below : Page of 7

Scope of Transmission System Establishment of 765/400 kv, 2x500 MVA pooling station at Nellore by LILO of Simhapuri-Nellore 400 kv D/c quad line 2 Nellore Pooling station Kurnool 765 kv D/c line 3 Kurnool Raichur 2 nd 765 kv S/c line 4 Associated 765 kv & 400 kv bays at Nellore Pooling station, Kurnool and Raichur stations HIGH CAPACITY TRANSMISSION CORRIDOR VII (Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu) Common system associated with Coastal Energen Pvt. Ltd. (CEPL) and Ind-Bharat Power (Madras) Ltd. generation projects in Tuticorin Area Part-A : All elements of Part-A have been commissioned. The details of elements are as below : 2 Scope of Transmission System Establishment of 765 kv pooling station in Tuticorin (Initially charged at 400 kv) including x80 MVAR bus reactor LILO of both circuits of Tuticorin JV Madurai 400 kv D/c (quad) line at Tuticorin Pooling Station Common system associated with Coastal Energen Pvt Ltd.(CEPL) and Ind-Bharat Power (Madras) Ltd. generation projects in Tuticorin Area Part-B 2 Scope of Transmission System Establishment of 765/400 kv Pooling Station at Salem (Initially charged at 400 kv). Tuticorin Pooling station Salem Pooling station 765 kv D/c line initially charged at 400 kv. 3 Interconnection of Salem pooling station with existing Salem 400/230 Page 2 of 7

4 kv substation through 400 kv D/c (quad) line. Salem pooling station Madhugiri pooling station 765 kv S/c initially charged at 400 kv. Jun 8 Sept 8 HIGH CAPACITY TRANSMISSION CORRIDOR VIII (Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh) Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited Generation Projects In Srikakulam Area Part-A&C: All elements of Part-A &C have been commissioned/ready for commissioning. The details of elements are as below : Scope of Transmission System Establishment of 765/400 kv Pooling Station at Srikakulam with 2x500 MVA transformation capacity ICTs of Srikakulam are not being used in absence of generation, planned to be commissioned alongwith Srikakulam Garividi line 2 Srikakulam Pooling Station Angul 765 kv D/c line Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited Generation Projects In Srikakulam Area Part-B Scope of Transmission System 2 nd Angul Jharsuguda 765 kv D/c line Jun 8 Sept 8 2 2 nd Jharsuguda Dharamjaigarh 765 kv D/c line Jun 8 Sept 8 3 Associated 400kV & 765 kv bays at Angul, Jharsuguda & Dharamjaigarh substations. Jun 8 Sept 8 HIGH CAPACITY TRANSMISSION CORRIDOR XI (Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, Tamil Nadu) Common Transmission System Associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu Part-A(a) : All elements of Part-A(a) have been commissioned. The details of elements are as below : Scope of Transmission System Page 3 of 7

2 Establishment of 765/400kV GIS Pooling station at Nagapattinam (initially charged at 400 kv) LILO of Neyveli Trichy 400kV S/c line at Nagapattinam Pooling Station for interim arrangement which later shall be bypassed Transmission System under the Scope of Private Sector: Scope of Transmission System Nagapattinam Pooling Station Salem 765kV D/c line (Charged at 400kV) 2 Salem Madhugiri 765 kv S/c line (TBCB) (Initially charged at 400 kv) Sept 8 Status of other Transmission System associated with LTA customers No LTA Transmission System Neyveli Lignite LILO of Neyveli Pondicherry at NNTPS Jun 8 Corporation Limited (Replacement) NNTPS switchyard Ariyalur (Villupuram) April 9 2 Andhra Pradesh Solar Power Corporation Pvt Ltd Phase-I (250 MW) Establishment of 3x500 MVA, 400/220KV Substation at NP Kunta Pooling Station LILO of 400KV Kadapa(Cuddapah) - Kolar S/c line at NP Kunta Pooling Station 2 nos. 220kV line bays at NP Kunta Pooling Station x25 MVAR Bus Reactor at NP Kunta Pooling Station ±00 MVAR STATCOM at 400kV NP Kunta Pooling Station Phase-II (750 MW) LILO of Kadapa(Cuddapah) Hindupur 400kV LILO In: Apr 8 Jul 8 D/c (Quad) line at NP Kunta Pooling Station LILO Out: Jul 8 6 nos. 220kV line bays at NP Kunta Pooling Apr 8/Jul 8 Jul 8 Page 4 of 7 400kV D/c line Ariyalur (Villupuram) 400kV S/S 2x500 MVA April 9 April 9 Under TANTRANSCO scope Generation project delayed

No LTA Transmission System Station Phase-III(500 MW) Augmentation of transformation capacity at NP Apr 8 Kunta station with 4th, x500 MVA, 400/220kV transformer 4 nos. 220kV line bays at NP Kunta Pooling Station Apr 8 Generation project delayed 3 Karnataka Solar Power Development Corporation Limited Phase-I (000 MW) a.tumkur (Pavagada) Pooling station-hiriyur 400 kv D/c (as part of Tumkur(Pavagada) Pooling station Mysore line) b.lilo of 400kV Bellary Pool Tumkur (Vasantnarsapur) D/c (Quad)(both circuits)[kptcl line] at Tumkur Pooling station* c.augmentation of 2x500 MVA, 400/220 kv transformer at Tumkur (Pavagada) Pooling station *KPTCL would complete Bellary pooling station Tumkur (Vasantnarsapur) line D/c(Quad) by December- 206 Phase-II (000 MW) a.hiriyur Mysore 400 kv D/c line $ b. Fixed series capacitor (40%) on 400kV Tumkur (Pavagada) - Tumkur (Vasantnarsapura) D/c (Quad) line at Tumkur(Pavagada) PS end c.augmentation of 2x500 MVA, 400/220KV transformer at Tumkur (Pavagada) Pooling station d.x25mvar bus reactor (2nd) at Tumkur (Pavagada) Pooling Station e.third 400/220 kv, x500 MVA transformer at Tumkur (Vasantnarsapur) f.x80 MVAR switchable Line reactor at Mysore end of Hiriyur- Mysore D/c line for each circuit Dec 8 2X500MVA ICT 3 rd ICT expected in June 8 Jan 9 Sept 9 Jan 9 Sep 9 Jan 9 Jan 9 Dec 8 2X500MVA ICT 3 rd ICT test charged in Jul 8 Jan 9 Sept 9 Jan 9 Jan 9 Jan 9 Jan 9 $ (after completion of this line, one circuit of this line Page 5 of 7

No LTA Transmission System would be connected with one ckt of Tumkur Hiriyur line so as to maketumkur-mysore direct line) **For additional ATS for Tumkur(Pavagada): 400kV Tumkur (Pavagada) Devanhalli D/c (Quad) line with some portion on multi-circuit towers was agreed. 4 Mytrah Energy(India) Ltd Establishment of 2x500 MVA, 400/230 kv (GIS) S/s at Tirunelveli Pooling Station. Tirunelveli pooling station-tuticorin pooling station 400 kv 2xD/c (Quad) lines 2x25 MVAR Bus Reactors at 400kV Tirunelveli Pooling Station Expected in Jun 8 in Mar 8 in Mar 8 Page 6 of 7

Annexure-I List of Participants in the 23 rd Joint Co-ordination Committee meeting of Generation projects granted LTA in SR held on 29.06.208 Name Designation Organization E-mail. Shri Deepak Gopalani VP Samalkot Power Limited deepak.gopalani@relianceada.com 2. Shri Dheeraj Jain AGM regulatory Affairs Regen Wind Farms (Vagarai) Pvt. Dheeraj.j@regenpowertech.com Ltd. 3. Shri Kiran. V GM Mytrah Energy(India) Pvt. Ltd. v.kiran@mytrah.com 4. Shri Dharmendra Gupta Manager Mytrah Energy(India) Pvt. Ltd. dharmendra.gupta@mytrah.com 5. Shri K.A.Vishwanath Sr. Manager Renew Power Ltd. k.vishwanath@renewpower.in 6. Shri Himanshu Mishra GM Commercial & Reg Meenakshi Energy Ltd. Himanshu.mishra@meenakshienergy.com 7. Shri Jyotirmay Bhaumik Director Meenakshi Energy Ltd. jbhaumik@indiapower.com 8. Shri D.S. Ramakrishnan ADGM NLC India Ltd. ramakrishnan.d.s@nlcindia.com cgm.pse.co@nlcindia.com 9. Shri Mukesh Khanna GM (CTU-Plg.) Power Grid Corporation of India Ltd. mkhanna@powergridindia.com 0. Ms.Jyoti Prasad DGM (CTU-Plg.) Power Grid Corporation of India Ltd. nishantjyoti@yahoo.com. Shri Anil Kumar Meena CDE (CTU-Plg.) Power Grid Corporation of India Ltd. anilsehra@powergridindia.com 2. Shri Sandeep Kumawat Dy. Mgr (SG) Power Grid Corporation of India Ltd. sandeepk@powergridindia.com 3. Shri Parijat Dy. Mgr (BDD) Power Grid Corporation of India Ltd. p.parijat@powergridindia.com 4. Shri Ajay Dahiya Dy. Mgr (CTU-Plg) Power Grid Corporation of India Ltd. ajay.dahiya@powergridindia.com 5. Shri Ankush Patel Sr. Engineer (CTU-Plg) Power Grid Corporation of India Ltd. venkateshgorli@powergridindia.com 6. Shri Venkatesh Gorli Sr. Engineer (CTU-Plg) Power Grid Corporation of India Ltd. ankush.patel@powergridindia.com 7. Shri Swapnil Verma Sr. Officer (Law) Power Grid Corporation of India Ltd. swapnilverma@powergridindia.com Page 7 of 7