Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon

Similar documents
Copy to : ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary

Tamil Nadu: Current Power scenario and projects in pipeline

Distribution List: Southern Region. 2. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Copy: with a request to kindly make it convenient to attend the above meeting

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Distribution List: Constituents of Southern region.

Advanced Ultra Power Transmission Consultancy

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

List of members of TCC

qlq:~ ~ CbI"lq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

Reliance Infrastructure Limited

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting to discuss disruption of power supply affecting BMRCL services

Overview of Bangladesh Preparation for Interconnection with India. Arun Kumar Saha DGM Planning ( In Charge) PGCB

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR **********

GUIDE TO REGISTRATION AS UTILITY AND APPLICANT ON SHORT TERM OPEN ACCESS SOFTWARE

Applications Granted Medium Term Open Access (MTOA) by POWERGRID

POWER TRANSMISSION IN INDIA 2018

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

National Load Despatch Centre Power System Operation Corporation

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

Highlights of Telecom Subscription Data as on 31 st October, 2018

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS)

Q3 FY Press & Analysts Meet Mumbai January 28, 2016

Distribution List : Sterlite Energy Ltd. Jindal India Thermal Power Ltd. Navabharat Power Private Limited GMR Kamalanga Energy Ltd.

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. ADMINISTRATIVE BRANCH. Letter No /G.39/G.393/2018-1, dated

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Tower-C, DLF Cyber City, Phase-II Gurgaon Phone : , ,

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

UPDATES EPC Contract Signed August 2017

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Renewable Energy Investment Trends in sub-saharan Africa

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

INDIA TOURISM DEVELOPMENT CORPORATION LIMITED Unit : Ashok Travels & Tours, Bangalore

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II)

CHAPTER 4 INCREASE IN CRITICAL CLEARING TIME USING SVC AND STATCOM IN TNEB

Minutes of the Special Meeting on URTDSM / SCADA / Communication held on

ADB s Energy Program in Myanmar

Distribution List: Constituents of Northern Region.

Highlights of Telecom Subscription Data as on 28 th February, 2018

HARTEK POWER PVT LTD POWER SYSTEM BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ************

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / COO (BDD)

INDIAN SOCIETY FOR NON-DESTRUCTIVE TESTING Mumbai Chapter ANNOUNCEMENT NDT LEVEL III REFRESHER/TRAINING COURSES AT MUMBAI, INDIA February / March 2019

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

Description of the Application Process for Small Embedded Generators

Request For Quotation from Service Providers. for. Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation for UTIITSL

Established in 1995, Suzlon Energy Limited, was the first Indian company to make a place for itself in the global wind energy industry.

June 2017 Hon ble President of India inaugurated Phase 1 of Bengaluru Metro

Vidyut Kaushal. Power sector skill council (PSSC) Completes Skill Gap Analysis for Power Sector

6 Version 1.0 (September 20, 2002) 0 days $0 0 days 01 Oct '02 01 Oct ' days $

Appendix 08: Details of Location under Each Category

Memorandum. This memorandum requires Committee action.

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi.

ENGINEERING SOLUTIONS INDIA PVT. LTD.

FORUM LOAD DESPATCHERS (FOLD)

ICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

NOTICE OF THE 117TH ANNUAL GENERAL MEETING OF SHAREHOLDERS

GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS

From: Laura Manz, Vice President of Market & Infrastructure Development

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

STCP22-1 Issue 003 Production of Models for GB System Planning

World Bank. Regional Interconnections in South Asia. Anjum Ahmad Senior Energy Specialist World Bank, Islamabad

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT

Feasibility Study on Load Flow and Short Circuit Project

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m.

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

APPLICATION FORM - SIGNATURE / ENCRYPTION CERTIFICATE

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Solution Renewables. tgood.com

Distribution List R.K.M. Powergen Pvt. Ltd. Jindal Power Ltd. Athena Chhattisgarh Power Pvt Ltd SKS Power Generation (Chhattisgarh) Ltd.

Green Power Market Development Group - Scaling up Renewable Energy Sector in India 04 th December An initiative supported by

Connecting and Managing Offshore Wind Danish Embassy - 4 th December 2012

Interconnection and Transmission

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

up of SPMU in States/UTs under NeGP A

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

Progress Report on the GCC Electricity Grid Interconnection in the Middle East

Ahmedabad Amritsar Bangalore Bathinda

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

LEGAL AND REGULATORY FRAMEWORK AND OPPORTUNITIES FOR OFF-GRID POWER GENERATION IN NIGERIA

Request For Quotation from Service Providers. for

InSolare (IEPL) ISO certified and MNRE Channel partner

RfP No. APSFL/CCTVPMA/231/2016, Dated:

Address and Tel.No. of the Director, Legal Metrology GOI

"'-- :...:. ~ ~ ~ '''''tlr'

B-1-1. Janet L. Fraser Director, Regulatory Affairs Phone: Fax:

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION

Transcription:

Distribution List: 1. Managing Director Andhra Pradesh Solar Power Corporation Pvt Ltd Room No: 218, 2 nd Floor, Vidyut Soudha, Khairatabad, Hyderabad- 500 082 Tel : 040-23499401 / +91-9848543434 Email: adviser@apgenco.gov.in ande_venkateswarlu@yahoo.com 3. VP & Head-Power Evacuation Suzlon Power Infra Ltd. One Earth opp. Magarpatta City Hadapsar, Pune-411028 Maharasthra, India Tel:020-40125034 / +919850829701 Email: pnaresh@suzlon.com drvbrao@suzlon.com 5. AGM Regulatory Affairs, Regen Wind Farm (VAGARAI) Pvt. Ltd. #S-7, Krishna Arcade, II Floor, #10 Rajabhatar ST, T. Nagar, Chennai 600 017 Mob : 09910778484/ 09840940609 Email: dheeraj.j@regenpowertech.com Ravi.as@regenpowertech.com 7. AVP - Project Development Renew Power Ventures Pvt. Ltd. 10th Floor, DLF Square, Jacranda Marg, Sector-25, DLF Phase-2, Gurgaon Haryana Mob: 09711486060 / 09910391155 Email: rakesh@renewpower.in vinod@renewpower.in 9. Assistant General Manager Orange Sironj Wind Power Pvt. Ltd. 301B, 3 rd Floor, D-21 Corporate Park, Sector-21, Dwarka, New Delhi 110075 Ph.: 9650015982 Email: lalitbirla@orangerenewable.net pavangupta@orangerenewable.net 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon 2. CEO Karnataka Solar Power Development Corporation Limited 2 nd Floor, South Block, Beeja Raja Seeds Complex, Bellary Road, Hebbala, Bengaluru- 560 024 Tel : 080-22208109/ 9448451535 Email: kredmld@gmail.com agm.spkredl@gmail.com 4. Vice President (Projects) East Coast Energy Private Limited, H. 7-1-50, Flat 203, Myneni Apartments, Dharam Karam Road, Ameerpet, Hyderabad, Telangana 500016 Mob: 09910833929 Email: srinivasan.r@eastcoastenergy.in sherrysrini@gmail.com cs.department@eastcoastenergy.in 6. GM Mytrah Energy (India) Ltd. #206, 1 st Floor, Prestige Meridian, MG Road, Bangalore 560 001 Mob: 9900066530/9900066531/9538044488 Email: v.kiran@mytrah.com k.bhargav@mytrah.com 8. Senior Vice President M/s Samalkot Power Ltd. (SPL) PB 22, IDA Peddapuram, ADB road, Samalkot, E.G. Dt.,- 533 440 Andhra Pradesh Mob: 8822392354 / 7498246536 Email : dwarakanath.cheruvu@reliancada.com sameer.ku.gupta@relianceada.com 10. General Manger NLC India Limited Commercial Department Corporate Office, Block - 1, NLC Ltd., Neyveli - 607801. Tel: 04142 253429 / 9486086856 Email: commercial@nlcindia.com cgm.pse.co@nlcindia.com 12. DGM Wind Business Development Sprng Renewable Energy Private Ltd. 201, Level 2, Pentagon, P-2, Magarapatta City, Hadapsar, Pune - 411013

Ph.: 7042656060, 7042196726 Email: p.wangyal1976@gmail.com neerav.nanavaty@engie.com Ph.: 7391944882 Email: elivingston@sprngenergy.com sumitjoge@sprngenergy.com 13. CEO (Renewable Energy) Shapoorji Pallonji Infrastructure Capital Company Private Limited. SP Center, 41/44, Mino Desai Marg, Colaba Mumbai, Maharashtra 400005 Ph.: 8110977816, 7738567939 Email: jagjeet.singh@shapoorji.com harikrishnan.nair@shapoorji.com

Page 1 of 24 Minutes of the 25 th Joint Co-ordination Committee meeting of Generation Projects granted Connectivity/ LTA in Southern (SR) held on 20.12.2018 at POWERGRID, Gurgaon 1. The 25 th Joint Co-ordination Committee meeting of generation projects in Southern was held at POWERGRID Office, Gurgaon on 20 th December, 2018. The list of participants of the meeting is enclosed at Annexure-I. 2. After welcoming the participants, it was informed that Minutes of the 24 th meeting of the Joint Co-ordination Committee of IPPs granted LTA in SR held on 28.09.2018 were circulated vide letter ref. no. C/CTU/SR/OA/24JCC dated 05.11.2018. As no comments were received, same were confirmed as circulated. 3. It was re-iterated that JCC forum has been created for co-ordination purpose to attempt matching of generation schedules with the associated transmission system, and accordingly, the information given by generation developers is being taken into cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic schedule & other status of generation project /dedicated line. However, for any substantial issue, it may kindly be submitted to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content, therefore, it was advised that such communication may strictly follow CERC Regulatory provisions (Regulation 18) specifically regarding notice, clearly therein mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges. An advisory in this regard is already available at CTU website. 4. It was also emphasized that Joint Coordination Committee meetings were institutionalized by the Central Electricity Regulatory Commission to enable better coordination of generation and transmission projects in terms of the applicable CERC Regulations, Detailed Procedure and BPTAs/LTAAs. It was also mentioned that the BPTAs/LTAAs executed with the generation project developers/companies monitored hereunder provides that if any of the developers fail to construct/ complete/ commission the generating station/dedicated transmission line or makes an exit or abandons its project, then POWERGRID shall have the right to collect the transmission charges and/or damages as the case may be in accordance with the CERC Regulations, Orders etc. Further, as per the BPTAs/LTAAs, the construction phase bank guarantee submitted by the project developers/lta customers is also encashable in case of adverse progress/abandonment of individual generations project(s)/unit(s) assessed during the Joint Coordination Committee meetings. It was also informed that in light of a number of recent CERC orders, wherein the Hon ble Commission has emphasized upon strict implementation of the various Regulations, Procedures and statutory Agreements, CTU shall assess the progress of various generation projects and take appropriate actions in terms of the applicable provisions/clauses of the Regulations/Procedure/Agreements. 5. CTU informed that recently in number of cases, generation developers have submitted online additional details in respect of Connectivity (CON-4) only when the generation projects are on the verge of commissioning. Thus, a very short period of

time is available for processing and issuance of Connection Offer (CON-5) and subsequent signing of Connection Agreement. As per the CERC Connectivity Regulations/ Detailed Procedure, 2009, the CON-4 details are to be furnished to CTU at least 2 (two) years prior to physical interconnection which may be adhered to by all the applicants. 6. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein. 7. It was informed that some of the generation developers / applicants have been repetitively not attending the JCC Meetings. All such generation developers / applicants were requested to attend the future meetings so as to have a better coordination otherwise suitable action may be taken as per CERC Regulations/Detailed Procedure. 8. All those generation projects that have achieved COD of total capacity and their respective dedicated transmission lines have also been commissioned, may not be required to attend JCC meeting as the coordination work has already been over. Therefore, they are not being called for further JCC meetings (Details of all such generation projects as per Table T1). 9. Regarding execution of TSA, it was informed that under the applicable provisions of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 and CERC Orders pronounced thereupon, TSA notified under Regulation 13 is the default transmission agreement and mandatorily applies to all DICs. 10. It was clarified that in terms of the recent CERC Orders and directions, the liability to pay transmission charges shall commence irrespective of opening of LC and signing of TSA. In default thereof, necessary action in terms of CERC Regulations including curtailment of STOA may be taken. Regardless of the said CERC Orders, all DICs are duty bound to establish payment security mechanism (LC) under Regulation 12 (8) of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 to facilitate smooth transaction of power on LTA basis. 11. Further, it was also brought to the attention of all the participants that CERC has pronounced Order in Petition 229/RC/2015 wherein inter alia it has been re-emphasized that all Designated ISTS Customers (DICs) are bound to establish payment security mechanism (LC) and pay transmission charges from the date of commissioning of associated transmission system or scheduled date under BPTA, whichever is later. In case of default in payment of transmission charges and/or maintaining LC, the DICs TSA shall be liable for termination/suspension and shall be disabled from injecting/drawing to/ from the ISTS through any type of access. 12. It was also informed that the stage-ii grantee covered under clause 9.2.2 of the Detailed Procedure for grant of Connectivity to RE projects are required to achieve the milestones given in the clause 9.3.2 of the Procedure and submit the proof to CTU within 9 months from date of grant of stage-ii Connectivity failing which Stage-II Connectivity shall be revoked by the CTU. Page 2 of 24

13. The LTA customers were requested to update the progress of their generation projects, dedicated transmission system and the deliberations are summarised below : Status of the Generation Projects / LTA HIGH CAPACITY TRANSMISSION CORRIDOR VIII (Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh) SR WR NR beneficiary Comm. schedule Comm. schedule (25 th JCC) Dedicated / Connectivity line & Status TSA has not been signed yet. As informed in the 19 th JCC meeting (16.06.2017), project is stalled for the time being and action is being taken for revival of the project. It is gathered that the generation project developer has been referred to NCLT. 1 East Coast Energy Private Limited (2x660 MW) 1240.8 1240. 8 0 0 AP: 300 MW Kerala : 100 MW AP RFQ short list : 488.55 MW Not attended (As per 19 th JCC : U-1: Sep 18 U-2: Mar 19) Not attended ECEPL-Srikakulam PS 400kV quad D/c line No further progress has been intimated by ECEPL.As project has been stalled for a long time, action shall be initiated in terms of adverse progress of the generator as per BPTA and CERC Regulations/ Detailed procedure. Further, letter towards operationalization of the LTA has already been issued on 15.10.2018 for which LC is yet to be opened by the applicant. Page 3 of 24 LC Default notice has been issued vide letter dated 11.12.2018. Action may be initiated in terms of adverse progress as per relevant BPTA clause and applicable CERC Regulations and Detailed Procedure.

Other Generation Projects Granted Connectivity & LTA Generation Projects granted /LTA / LTA SR WR NR ER beneficiary (25 th JCC) Dedicated / Connectivity line & Status 1 3 Neyveli Lignite Corporation Limited (400 MW Replacement) (2X500MW) Andhra Pradesh Solar Power Corporation Pvt. Ltd. 334 334 0 0 0 1500 1500 0 0 0 TN-53.07 AP-52.46 TS-61.31 Kar- 70.54 Ker-32.38 Pud-4.24 Unallocated - 60 750 (APDISCOMS ) Not attended Status sent by mail: U1: Dec 18 U2: Dec 18 Not attended U1: Jan 19 (synch) and Feb 19 (COD) U2: Mar 19 (COD) Not attended Provision of 7x167 MVA (single phase), 400/220 kv transformers at NNTPS switchyard; 1x80 MVAR Bus Reactor at generation switchyard. LILO of existing Neyveli TS-II Pondycherry 400 kv S/c at NNTPS 400/220KV NP Kunta Pooling Station through LILO of Cuddapah Kolar 400 kv S/c line The transmission system for connectivity has been commissioned. Electrical inspection clearance from CEA is awaited. 200 MW of Phase-I out of 250 MW was commissioned on 07.06.2016 and balance 50 MW was commissioned on 10.08.2016. Further PPA signed between NTPC & APDISCOMs for Ph-I (250 MW) signed on 24.04.2015. As per information furnished vide email dated 02.08.2018, 350 Page 4 of 24

/ LTA SR WR NR ER beneficiary Dedicated / (25 th JCC) Connectivity line & Status MW of Phase-III out of 500 MW was commissioned on 01.07.2018, 50 MW is expected in Sep 18 and balance 100 MW is yet to be tendered Further PPA signed between NTPC & APDISCOMs for Ph-II (500 MW) signed on 27.10.2016. 250 MW, 750 MW & 500 MW LTA has been made effective from 11.07.2016, 04.08.2018 & 01.10.2018 respectively. Page 5 of 24

/ LTA SR WR NR ER beneficiary Dedicated / (25 th JCC) Connectivity line & Status As informed by the applicant in the last attended meeting, 4 Karnataka Solar Power Development Corporation Limited 2000 2000 0 0 0 1150 (Karnataka) Not attended. Status sent by mail: 600 MW: in Dec 17 / Jan 18 (NTPC) 550 MW: Apr 19 500 MW: Aug 19 350 MW: Oct 19 (expected) Not attended LILO of 400kV Gooty Tumkur (Vasantnarsapur) D/c at Tumkur (Pavagada) Pooling station, 1x500 MVA, 400/220KV Pooling station at Tumkur (Pavagada), 1x125 MVAR BR at Tumkur (Pavagada), 220 kv Bays (8 Nos.) at Tumkur (Pavagada) PS for interconnection with Solar project** - **4 nos. 220 kv bays for Phase-I (1000 MW) and balance 4 nos. bays for Phase- II (1000 MW) There are 8 nos ICTs at solar park whose status is as below: (i) 4nos 220/66kV Energized on 01.12.17, 08.12.17, 29.01.18 & 17.09.18. (ii) 4nos 220/33 kv - will be commissioned by Nov 18. 600 MW LTA has been made effective from 12.07.2018 and 400 MW from 28.09.2018. Transmission charges shall be applicable from the date of start of LTA as per the intimation in case of delay in commissioning of generation from schedule. Page 6 of 24

/ LTA SR WR NR ER beneficiary Dedicated / (25 th JCC) Connectivity line & Status Mytrah wind farms Tirunelveli PS 230kV D/c line 5 Mytrah Energy(India) Ltd (300MW) 250 0 0 10 0 15 0 UP: 100 MW Bihar: 50 MW Jharkhand: 50 MW Assam: 50 MW 125 MW: 30.10.2018 125 MW: 31.12.2018 125 MW: 15.01.2019 125 MW: 31.05.2019 (i) Route Survey: Completed (ii) Section 68 : Obtained (iii) of Foundations ed): 30/30 (iv) of Tower Erections ed): 30/30 (v) Stringing(ckm) ed): completed Progress of generator pooling station erection: - (vi) Land for PS: Acquired (vii) Switchyard, Main Transformers & Low Voltage Switchgear:230 /33kV, 2nos. 150 MVA Date of FC: 23.10.2017 Pooling station, ISTS bays and line commissioned on 17.11.2018. CTU informed that entire 250 MW LTA has been made effective (75 MW on 10.06.2018, 50 MW on 30.09.18 & balance 125 MW on 01.12.2018) and MEIPL has the liability to pay the applicable transmission charges till commissioning of entire generation project. Page 7 of 24

/ LTA SR WR NR ER beneficiary Dedicated / (25 th JCC) Connectivity line & Status 6 Renew Power Ventures Pvt. Ltd 400 (NR 200MW ER 150MW WR 50MW) 0 50 200 150 Nil Page 8 of 24 250 MW: Jul 20 150 MW: Dec 20 Not attended Status sent through mail 250 MW: Jul 20 150 MW: Mar 21 Renew Power Ventures Pvt. Ltd Pugalur 230kV D/c line along with bays at Pugalur & Generation switchyard. (i) Route Survey: not completed (ii) Section 68 : not obtained (iii) of Foundations ed): Not provided (iv) of Tower Erections ed): ): Not provided (v) Stringing(ckm) ed): ): Not provided Progress of generator pooling station erection: - (i) Land for PS: 9 acres (yet to be acquired ) (ii) Switchyard, Main Transformers EPC Award Date: Yet to be awarded Date of FC: Not achieved Acquisition of Land for renewable generating station: Land Required(acres): Not provided Land : Acquired(acres): Yet to be acquired WTGs Total/Supplied/Erect ed : Not Provided Bay implementation agreement: signed.connection Agreement Status: applied Not The dedicated transmission works are yet to be awarded. CTU informed that transmission charges shall be

/ LTA SR WR NR ER beneficiary Dedicated / (25 th JCC) Connectivity line & Status & Low Voltage Switchgear: Not provided Work has not started as yet. applicable from the date of start of LTA as per the intimation in case of delay in commissioning of generation from schedule. 7 Orange Sironj Wind Power Pvt. Ltd. 200 MW (NR-100 MW, ER-100 MW) 100 100 Haryana : 100 MW Bihar : 100 MW Page 9 of 24 200 MW : 22.02.2019 200 MW : 22.02.2019 Orange Sironj Tuticorin-II PS 230kV S/c line: Line awarded. (i) Route Survey: Completed (ii) Section 68 : Obtained (iii) of Foundations ed): 100/52 (iv) of Tower Erections ed): 100/36 (v) Stringing(ckm) ed): 28/0 km Dedicated line expected by 22.02.2019 Progress of generator pooling station erection: - (i) Land for PS: EPC Award Date: 22-11-2017 Date of FC: 01-03- 2018 Acquisition of Land for renewable generating station: Land Required(acres): Land 472.61 Acquired(acres): 472.61 WTGs Total/Supplied/Erect ed: not provided Bay implementation agreement: signed.connection Agreement Status: yet to be signed (CON-5 issued) Installation of wind

/ LTA SR WR NR ER beneficiary Dedicated / (25 th JCC) Connectivity line & Status 3.62(acquired) (ii) Switchyard, Main Transformers & Low Voltage Switchgear: 2x100MVA, 230/33kV Stringing yet to be done. Pooling station expected by 22.02.2019 mast completed OSWPL has been reminded that transmission charges shall be applicable from the date of start of LTA as per the intimation in case of delay in commissioning of generation from schedule. 8 Green Infra Renewable Energy Limited 249.9 MW (NR-149.9 MW, ER-100 MW) 149.9 100 UP: 99.9 MW Bihar: 50 MW Jharkhand: 50 MW Delhi: 50 MW 249.9 MW : 03.10.2018 Not attended () Green Infra Tuticorin-II PS 230kV S/c line Project has been commissioned. Therefore, Coordination not required from next JCC. 9 Betam Wind Energy Private Limited 250.2 MW 100 150.2 Nil Not attended. Status submitted by email: 150 MW:31.07.2019 100.2 MW: 31.08.2019 150 MW:31.07.2019 100.2 MW: 31.08.2019 Betam Wind Tuticorin-II PS 230kV S/c line: Awarded (i) Route Survey: completed (ii) Section 68 : obtained (iii) of Foundations ed): Not provided (iv) of Tower EPC Award Date: Awarded to Vestas (30.11.2018) Date of FC: End of December,2018 Acquisition of Land for renewable generating station: Land Required(acres): 560 Land Acquired(acres): Page 10 of 24

/ LTA SR WR NR ER beneficiary Dedicated / (25 th JCC) Connectivity line & Status Erections ed): Not provided (v) Stringing(ckm) ed): Not started Expected by Jul 19 Progress of generator pooling station erection: - (i) Land for PS: Acquired (ii) Switchyard, Main Transformers & Low Voltage Switchgear: Not provided 240 WTGs Total/Supplied/Erect ed :Not provided Bay implementation at ISTS: Signed and advance paid.connection Agreement Status: applied Not EPC contractor for total Plant including EHV transmission line awarded in Nov 18. Transmission charges shall be applicable from the date of start of LTA as per the intimation in case of delay in commissioning of generation from schedule. 10 Sprng Renewable Energy Private Limited 300 MW 300 Nil Page 11 of 24 102 MW : Oct 19 102 MW : Nov 19 96 MW : Dec 19 102 MW : 30.11.19 102 MW : 31.12.19 96 MW : 07.01.20 Sprng Renewable Pugalur 230kV S/c line: 20.08.19 (i) Route Survey: Completed (ii) Section 68 : Applied EPC Award Date: 02.08.18 Date of FC: Mar 19 Acquisition Land renewable of for

11 / LTA Suzlon Power Infrastructure Ltd. Chandragiri Wind Farm SR WR NR ER beneficiary 75 0 0 40 35 Nil Not attended Not attended Dedicated / (25 th JCC) Connectivity line & Status (iii) of Foundations ed): 130/0 (iv) of Tower Erections ed): 130/0 (v) Stringing(ckm) ed): 31/0 Progress of generator pooling station erection: 15.08.2019 (awarded on 17.12.18) (i) Land for PS: 9 Acres (Sale deed completed) (ii) Switchyard, Main Transformers & Low Voltage Switchgear: 2 nos. of 230/33kV Suzlon Power Infrastructure Ltd.(Chandragiri wind farm)- Tirunelveli P.S.(New) 230 kv D/c Line including generating station: Land Required(acres): 600 Land Acquired(acres): 246 WTGs Total/Supplied/Erect ed : 23/3/3 Bay implementation agreement: signed & advance paid.connection Agreement Status: applied Not has not attended the meeting after 21 st JCC meeting held on 20.12.2017. No update Page 12 of 24

12 13 / LTA M/s Suzlon Power Infrastructure Ltd. Kumarapuram Wind Farm M/s Suzlon Power Infrastructure Ltd. Kadambur Wind Farm SR WR NR ER beneficiary 75 0 0 40 35 Nil Not attended Not attended 75 0 0 40 35 Nil Not attended Not attended Dedicated / (25 th JCC) Connectivity line & Status line bays at both ends (22.4kms 83 towers) Mar 18 Route Survey: Completed Suzlon Power Infrastructure Ltd. (Kumarapuram wind farm)- Tirunelveli PS(New) 230 kv D/c Line including line bays at both ends Dec 18. Work has not started as yet. Survey work nearing completion route & profile under finalization. M/s Suzlon Power Infrastructure Ltd. (Kadambur wind farm)-tirunelveli P.S.(New) 230 kv D/c Line including line bays at both ends Work has not started as yet. Survey work nearing completion route & profile under finalization. has not attended the meeting after 21 st JCC meeting held on 20.12.2017. No update Page 13 of 24

Generation Projects granted only Connectivity Connectivity Connectivity Comm. Schedule (TA/Intimation) (25 th JCC) Dedicated / Connectivity line & Status 1 2 M/s Regen Wind Farms (Vagarai) Pvt. Ltd. M/s Samalkot Power Limited 600 Phase-1 31.03.17 Phase-2 30.09.17 Phase-3 31.03.18 Phase-4 30.09.18 Phase-5 31.03.19 Not attended Not attended 2214 Feb-2017 Not attended Not attended M/s REGEN Wind Farms (Vagarai) Pvt. Ltd. Regen PS Pugalur 230 kv D/c (Twin Moose) line (including line bays at both the ends): Mar 18 (i) Route Survey: (ii) Section 68 : (iii) of Foundations ed): (iv) of Tower Erections ed): (v) Stringing(ckm) ed): ---- Progress of generator pooling station erection: (i) Land for PS: (ii) Switchyard, Main Transformers & Low Voltage Switchgear: Samalkot-Vemagiri-II (PG) 400 kv D/c Quad line (including line bays at both ends) 1x125 MVAR bus reactor at generation switchyard As informed by the applicant in the 23 rd JCC meeting, EPC Award Date: Not provided Date of FC: Not provided Acquisition of Land for renewable generating station: Land Required(acres): 1500 Land Acquired(acres): 788 WTGs Total/Supplied/Erected Bay implementation agreement: Signed (advance also paid).connection Agreement: Conveyance of land has taken place. LTA grant has been revoked vide letter dated 04.07.2018 on account of non-signing of LTA Agreement. No update since 23 rd JCC held on 29.06.2018. As informed by the applicant in the 23 rd JCC meeting, Schedule is dependent on New Gas policy from GOI. No update since 23 rd JCC held on 29.06.2018. Page 14 of 24

Connectivity Connectivity Comm. Schedule (TA/Intimation) (25 th JCC) Dedicated / Connectivity line & Status Mytrah Energy Palakkad PS 220kV S/c line 3 4 Mytrah Energy (India) Private Limited Shapoorji Pallonji Infrastructure Capital Company Pvt Ltd 300 31.03.2020 300 MW : 29.02.2020 250 01.10.2020 Attending first time Page 15 of 24 300 MW : 29.02.2020 250 MW: 01.10.2020 (i) Route Survey: completed (ii) Section 68 : revised application to be submitted for D/c (iii) of Foundations ed): Not provided (iv) of Tower Erections ed): Not provided (v) Stringing(ckm) ed): Not provided Progress of generator pooling station erection: (i) Land for PS: Acquired (ii) Switchyard, Main Transformers & Low Voltage Switchgear Line & PS is yet to be awarded. Shapoorji Tuticorin II 220kV D/c line: 01.09.2020 (i) Route Survey: Not completed (ii) Section 68 : Not obtained (iii) of Foundations ed): Not provided EPC Award Date: not provided Date of FC: 04.04.2019 Acquisition of Land: Land Required(acres): 600 Land Acquired(acres): Not yet acquired, land acquisition under process WTGs Total/Supplied/Erected : Not provided Bay implementation agreement: Signed and advance paid.connection Agreement: not applied Land acquisition under process. Generation project yet to be awarded. EPC Award Date: Not awarded Date of FC: Not achieved (25.05.2019) Acquisition of Land: Land Required(acres): 1100 Land Acquired(acres): Not yet acquired, land acquisition under process

Connectivity Connectivity Comm. Schedule (TA/Intimation) (25 th JCC) Dedicated / Connectivity line & Status (iv) of Tower Erections ed): Not provided (v) Stringing(ckm) ed): Not provided Progress of generator pooling station erection: (i) Land for PS: 5 acres (yet to be a)cquired (ii) Switchyard, Main Transformers & Low Voltage Switchgear Line & PS is yet to be awarded. WTGs Total/Supplied/Erected : Not provided Bay implementation agreement: Not signed (to be awarded).connection Agreement: Not applied Land acquisition under process. Page 16 of 24

Table T1 List of generation projects commissioned along with the dedicated/connectivity lines and further coordination not required HIGH CAPACITY TRANSMISSION CORRIDOR VI (Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh) / LTA Quantu m SR WR NR beneficiar y Last updated status Dedicated / Connectivity line & Status 1 Meenakshi Energy Private Limited (2x150 + 2x350) 546 186 177 183 2 Meenakshi Energy Pvt. Ltd. 364 364 0 0 NIL U-1/2: commissioned U-3: Sync on 24 th Mar 18 Sep 18 (COD) U-4: Sept 18 (COD) SEPL/MEPL-Nellore 400kV quad D/c line - commissioned Entire LTA of 910 MW has been relinquished vide letter dated 30.06.2018. 3 4 Simhapuri Energy Private Limited (4x150 MW) Thermal Powertech Corpn. India Ltd (2x660 MW) 546 400 411 400 135 0 1240 1125 115 0 0 NIL Andhra Pradesh : 230.55 MW Telangana : 839.45 MW (as per 12 th JCC) U-1: Mar 15 (COD) U-2: Sep 15 (COD) (as per 13 th JCC) SEPL/MEPL-Nellore 400kV quad D/c line commissioned TPCIL-Nellore PS 400kV quad D/c line by POWERGRID & commissioned LTA of 146 MW has been relinquished vide letter dated 26.06.2018. 400 MW LTA revoked and TSA terminated Page 17 of 24

/ LTA Quantu m SR WR NR beneficiar y Last updated status Dedicated / Connectivity line & Status 5 NCC Power Projects Limited (2x660 MW) (Sembcorp Gayatri Power Ltd) 740 740 0 0 NIL As per 20th JCC U-1: U-2: on Feb 17 (COD 17.02.17) NCC-Nellore PS 400kV quad D/c line by POWERGRID & commissioned 1 2 / LTA Coastal Energen Private Limited (2x600 MW) Ind-Barath Power (Madras) Limited (2x660 MW) HIGH CAPACITY TRANSMISSION CORRIDOR VII (Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu) Quantu m 1100 558 SR WR NR 820 558 280 0 0 beneficiary Tamil Nadu : 558 MW Last updated status (U1 & 2: ) 900 225 270 405 NIL Not attended Dedicated / Connectivity line & Status CEPL-Tuticorin PS 400kV quad D/c line (27km) Oct 16 Ind-Barath-Tuticorin PS 400kV (quad) D/c line - Uncertain As per CERC directions in IA no 1/2018 in Petition no.246/mp/2016, LTA of 542 MW has been relinquished. Ind Barath informed that the generation project has been abandoned. DIC status has been ceased and LTA has also been revoked. 1 / LTA PEL Power Limited (3x350 MW) HIGH CAPACITY TRANSMISSION CORRIDOR XI (Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, TN) SR WR NR beneficiary 987 700 0 287 NIL Last updated status Dedicated / Connectivity line & Status Project uncertain. Page 18 of 24 PEL-Nagapattinam PS 400kV quad D/c line CERC has pronounced order in Petition 315/MP/2013 filed by PELPL wherein CERC has inter alia declined the relief under force majeure clause of BPTA to PELPL and has held that PELPL has sought relinquishment of LTA which shall be effective from 26.7.2013 and subject to relinquishment charges as per

decision in CERC Petition 92/MP/2015. PEL has filed appeal against order of CERC in APTEL. 2 IL & FS Tamil Nadu Power Company Limited (2x600 MW) 1150 1080 540 540 575 540 0 0 Tamil Nadu: 540 MW U-1: Sep 15 (COD) U-2: Apr 16 (COD) IL&FS-Nagapattinam PS 400kV quad D/c line DIC status has been ceased and LTA has also been revoked. LTA of 540 MW has been relinquished vide letter dated 22.05.2017 Status of the Associated Transmission System HIGH CAPACITY TRANSMISSION CORRIDOR VI (Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh) Common System Associated with ISGS Projects in Krishnapatnam Area of Andhra Pradesh: All elements have been commissioned. The details of elements are as below : 1 Scope of Transmission System Establishment of 765/400 kv, 2x1500 MVA pooling station at Nellore by LILO of Simhapuri-Nellore 400 kv D/c quad line 2 Nellore Pooling station Kurnool 765 kv D/c line 3 Kurnool Raichur 2 nd 765 kv S/c line 4 Associated 765 kv & 400 kv bays at Nellore Pooling station, Kurnool and Raichur stations HIGH CAPACITY TRANSMISSION CORRIDOR VII (Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu) Common system associated with Coastal Energen Pvt. Ltd. (CEPL) and Ind-Bharat Power (Madras) Ltd. generation projects in Tuticorin Area Part-A : All elements of Part-A have been commissioned. The details of elements are as below : Page 19 of 24

Scope of Transmission System 1 Establishment of 765 kv pooling station in Tuticorin (Initially charged at 400 kv) including 1x80 MVAR bus reactor 2 LILO of both circuits of Tuticorin JV Madurai 400 kv D/c (quad) line at Tuticorin Pooling Station Common system associated with Coastal Energen Pvt Ltd.(CEPL) and Ind-Bharat Power (Madras) Ltd. generation projects in Tuticorin Area Part-B : All elements commissioned Scope of Transmission System 1 Establishment of 765/400 kv Pooling Station at Salem (Initially charged at 400 kv). 2 Tuticorin Pooling station Salem Pooling station 765 kv D/c line initially charged at 400 kv. 3 Interconnection of Salem pooling station with existing Salem 400/230 kv substation through 400 kv D/c (quad) line. 4 Salem pooling station Madhugiri pooling station 765 kv S/c initially charged at 400 kv. HIGH CAPACITY TRANSMISSION CORRIDOR VIII (Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh) Common System Associated with East Coast Energy Private Limited And NCC Power Projects Limited Generation Projects In Srikakulam Area Part-A&C: All elements commissioned Scope of Transmission System 1 Establishment of 765/400 kv Pooling Station at Srikakulam with 2x1500 MVA transformation capacity 2 Srikakulam Pooling Station Angul 765 kv D/c line Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited Generation Projects In Srikakulam Area Part-B : All elements commissioned Scope of Transmission System 1 2 nd Angul Jharsuguda 765 kv D/c line Page 20 of 24

2 2 nd Jharsuguda Dharamjaigarh 765 kv D/c line 3 Associated 400kV & 765 kv bays at Angul, Jharsuguda & Dharamjaigarh substations. HIGH CAPACITY TRANSMISSION CORRIDOR XI (Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, Tamil Nadu) Common Transmission System Associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu Part-A1(a) : All elements of Part-A1(a) have been commissioned. The details of elements are as below : Scope of Transmission System 1 Establishment of 765/400kV GIS Pooling station at Nagapattinam (initially charged at 400 kv) LILO of Neyveli Trichy 400kV S/c line at Nagapattinam Pooling Station for interim arrangement which later shall 2 be bypassed Transmission System under the Scope of Private Sector: Scope of Transmission System (25 th JCC) 1 Nagapattinam Pooling Station Salem 765kV D/c line 2 Salem Madhugiri 765 kv S/c line (TBCB) Nov 18 Jan 19 Status of other Transmission System associated with LTA customers No LTA Transmission System 1 Neyveli Lignite LILO of Neyveli Pondicherry at NNTPS Corporation Limited (Replacement) NNTPS switchyard Ariyalur (Villupuram) Jul 19 2 Andhra Pradesh Solar Power Corporation Pvt Ltd Page 21 of 24 (25 th JCC) Jul 19 400kV D/c line Ariyalur (Villupuram) 400kV S/S 2x500 MVA Jul 19 Jul 19 Under TANTRANSCO scope Phase-I (250 MW) Establishment of 3x500 MVA, 400/220KV Substation at NP Kunta Pooling Station

No LTA Transmission System (25 th JCC) LILO of 400KV Kadapa(Cuddapah) - Kolar S/c line at NP Kunta Pooling Station 2 nos. 220kV line bays at NP Kunta Pooling Station 1x125 MVAR Bus Reactor at NP Kunta Pooling Station ±100 MVAR STATCOM at 400kV NP Kunta Pooling Station Phase-II (750 MW) LILO of Kadapa(Cuddapah) Hindupur 400kV D/c (Quad) line at NP Kunta Pooling Station 6 nos. 220kV line bays at NP Kunta Pooling Oct 18 Station Phase-III(500 MW) Augmentation of transformation capacity at NP Kunta station with 4th, 1x500 MVA, 400/220kV transformer 4 nos. 220kV line bays at NP Kunta Pooling Station 3 Karnataka Solar Power Development Corporation Limited Phase-I (1000 MW) a.tumkur (Pavagada) Pooling station-hiriyur 400 kv D/c (as part of Tumkur(Pavagada) Pooling station Mysore line) b.lilo of 400kV Bellary Pool Tumkur (Vasantnarsapur) D/c (Quad)(both circuits)[kptcl line] at Tumkur Pooling station* c.augmentation of 2x500 MVA, 400/220 kv transformer at Tumkur (Pavagada) Pooling station *KPTCL would complete Bellary pooling station Tumkur (Vasantnarsapur) line D/c(Quad) by December- 2016 Phase-II (1000 MW) a.hiriyur Mysore 400 kv D/c line $ b. Fixed series capacitor (40%) on 400kV Tumkur (Pavagada) - Tumkur (Vasantnarsapura) D/c (Quad) line at Page 22 of 24 Mar 19 Sept 19 Jun 19 Sept 19

No LTA Transmission System (25 th JCC) Tumkur(Pavagada) PS end c.augmentation of 2x500 MVA, 400/220KV transformer at Tumkur (Pavagada) Pooling Jan 19 Mar/Apr 19 station d.1x125mvar bus reactor (2nd) at Tumkur Jan 19 Apr 19 (Pavagada) Pooling Station e.third 400/220 kv, 1x500 MVA transformer at Jan 19 Mar 19 Tumkur (Vasantnarsapur) f.1x80 MVAR switchable Line reactor at Mar 19 Jun 19 Mysore end of Hiriyur- Mysore D/c line for each circuit $ (after completion of this line, one circuit of this line would be connected with one ckt of Tumkur Hiriyur line so as to maketumkur-mysore direct line) **For additional ATS for Tumkur(Pavagada): 400kV Tumkur (Pavagada) Devanhalli D/c (Quad) line with some portion on multi-circuit towers was agreed. 4 Mytrah Energy(India) Ltd Establishment of 2x500 MVA, 400/230 kv (GIS) S/s at Tirunelveli Pooling Station. Tirunelveli pooling station-tuticorin pooling station 400 kv 2xD/c (Quad) lines 2x125 MVAR Bus Reactors at 400kV Tirunelveli Pooling Station Jun 19 Jun 19 Page 23 of 24

Annexure-I List of Participants in the 25 th Joint Co-ordination Committee meeting of Generation projects granted LTA in SR held on 20.12.2018 Name Designation Organization E-mail 1. Dhananjay kumar Regualatory Affairs ENGIE/BETAM dhananjay.kumar@engie.com Director 2. Raju Parmar Manager ENGIE/BETAM raju.parmar@engie.com 3. Gurudarshan.M Manager Shapoorji Pallonji Infrastructure gurudarshan.madapura@shapoorji.com 4. R.Senthil kumar DGM/Electrical PSE/NLC India rsenthilkr@nlcindia.com 5. Shailesh Shekhar Manager Orange Sironj Wind Power Pvt.Ltd shaileshshekhar@orangerenewable.net 6. Anish Pasrija DGM-BD Orange Sironj Wind Power Pvt.Ltd anishpasrija@orangerenewable.net 7. Ashish Shukla Sr.Manager Orange Sirnoj Wind Power Pvt.Ltd shukla.ashish@siemensgamesa.com 8. Thiyagarajan.S Head-PE Sprng Renewable Energy Pvt.Ltd thiyagarajans@sprngenergy.com 9. Shri Dharmendra Gupta Manager Mytrah Energy(India) Pvt. Ltd. dharmendra.gupta@mytrah.com 10. Shri Pawan Gupta Dy. Manager Orange Sironj Wind Power Pvt. Ltd. pavangupta@orangerenewable.net 11. Shri Mukesh Khanna CGM (CTU-Plg.) Power Grid Corporation of India Ltd. mkhanna@powergridindia.com 12. Shri Anil Kumar Meena DGM (CTU-Plg.) Power Grid Corporation of India Ltd. anilsehra@powergridindia.com 13. Shri Narendra babu DGM (CMG) Power Grid Corporation of India Ltd. nbabu@powergridindia.com 14. Shri Parijat Mgr (BDD) Power Grid Corporation of India Ltd. p.parijat@powergridindia.com 15. Shri Ajay Dahiya Mgr (CTU-Plg) Power Grid Corporation of India Ltd. ajay.dahiya@powergridindia.com 16. Shri Ankush Patel Dy. Mgr (CTU-Plg) Power Grid Corporation of India Ltd. ankush.patel@powergridindia.com 17. Shri Swapnil Verma Dy. Mgr (Law) Power Grid Corporation of India Ltd. swapnilverma@powergridindia.com 18. Ms Himanshi Ast. Manager (CTU-Plg) Power Grid Corporation of India Ltd. himanshi@powergridindia.com Page 24 of 24