Record of Public Comment on Central Corridor SDEIS

Similar documents
Section 4: Citizen s Guide to SDEIS

11.0 PUBLIC AND AGENCY COORDINATION AND COMMENTS

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

Corridor Management Committee. December 17, 2014

Hennepin Avenue Downtown

Corridor Management Committee. January 14, 2016

SWLRT Community Advisory Committee Meeting. June 27, 2013

Corridor Management Committee. January 12, 2017

Metropolitan Council. Transportation Division Proposed Transit Capital Program

Downtown Boise Multimodal Center

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008

Construction Phase Public Outreach Plan

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Community Advisory Committee. June 5, 2017

November 28, 2012 ALTERNATIVES ANALYSIS PUBLIC MEETING

Metrobus 30s Line Enhancements

Recommendation to Board. Final Action

Executive Director s Report May 23, 2017

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

PROJECT TIMELINE. Next steps. Plan. Start of Service

Corridor Management Committee Meeting. June 4, 2014

Joint Business and Community Advisory Committee Meeting. April 15, 2015

Downtown to NAIT LRT Concept Plan Attachment 4 Public Involvement Summary

Metropolitan Council meeting: February 22, 2012

ÆÅ65. St. Anthony Falls Laboratory Twin Cities Campus. Real Estate Inventory. University of Minnesota. M i s s i s s i p p i R i v e r

MARTA BOARD OF DIRECTORS OCTOBER 4, 2018

The Blue Line Extension

System Expansion Implementation Plan. Board Meeting, April 2017

STUDY REPORT #1 ADDENDUM

CLAYTON COUNTY TRANSIT INITIATIVE. Technical Advisory Committee/ Stakeholder Advisory Committee Webinar August 29, 2017

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

A Plan to Connect Baltimore

Creating Dallas-Fort Worth s Transportation System: Celebrating Partnerships and Milestones

Applications for Road Closures and Routing and Common Operating Picture for the I- 35W Bridge Collapse

Bike Sharing Feasibility Study and Implementation Plan 2012

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association

APPENDIX C SOURCES & REFERENCES CITED

DART s Program of Inter-Related Projects. Joint DART and Transportation and Trinity River Project Committee 10 November 2014

Business Advisory Committee. October 1, 2013

The Maryland Transit Administration. A Plan to Connect Baltimore

// Atlanta BeltLine Quarterly Briefing

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

C Line Rapid Bus 90% Design

Dakota County Transportation CIP Process Requests from cities/townships

High Speed Rail Update

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014

MOTION NO. M Agreement with the Microsoft Corporation and the City of Redmond for the Overlake Transit Center within the East Link Extension

Contents. 1. Routing and Siting Process Routing and Siting Process Highlights Timeline Constraints Map

Click to edit Master title style Click to edit Master title style

Maximizing Asset ROI for Self & Clients in a Public Sector Setting. July 16 th San Diego

Proposed FY 06 Project Development Program and FY 05 Project Development Program Update

Dulles Area Transportation Association

Bill Jackson Asst. Statewide Utility Engineer, Office of Construction MDOT SHA

PLANNING COMMISSION JUNE 7, 2018 PUBLIC HEARING

Denver s Future. City Club of Denver

Transportation Demand Management (TDM) Plan

ATLANTA BELTLINE A g e n cy C o o r d i n at i o n P l a n

Phase Two: Plan Recommendations Public Comment Summary Report June 23, 2016

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

MVTA-Prior Lake-Shakopee Merger. SCALE Presentation, October 10, 2014

Community Update. May 31, 2011

Cedar Rapids ITS Deployment Project

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3

Municipal Service Park 3 December Consolidation of City services to one centralized complex

Fairfax County Comprehensive Transit Plan and Transit Development Plan

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: June 17, 2009

Approval of Medical Center New Entrance Agreement

Minneapolis Clean Energy Partnership Energy Vision Advisory Committee (EVAC) 4/16/2015

Station Location Feasibility Study

Multimodal TOD Principles for Denver Union Station Rail~Volution November 7, 2006

Metro Transit Police Update

SITE DESCRIPTION. Vicinity

STATEWIDE CENTERLINE INITIATIVE EDITED: MAY 17, 2013

Community Update. June 8, 2011

1.0 PURPOSE AND NEED

Westside Subway Extension of the Metro Purple Line

STATE STREET CORRIDOR

Major Comments and Responses 2018 Update. Transportation Advisory Board September 19, 2018

Scoping Information Report

Managed Lane owner decision needed San Mateo County s options Understanding revenues & costs Pros & cons of County s options Proposed next steps

Memorandum CITY OF DALLAS

METRO SHORT RANGE TRANSIT PLAN FY Executive Summary May 2009 DIVERSIFIED TRANSPORTATION SOLUTIONS

City Council Report 915 I Street, 1 st Floor

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

Mitigation Framework Leadership Group (MitFLG) Charter DRAFT

4400 WEST 78TH STREET, MINNEAPOLIS, MN

BEVRLYRLY STAFF REPORT. Meeting Date: August 4, 2015 Item Number: To: From:

Crystal Springs Upland School Transportation Demand Management Plan. March 2016

Metrolinx / Toronto Transit Plan April 28, Jack Collins Vice President, Rapid Transit Implementation

Agenda Overview. Process Update Overview of Revised Goals Transportation Trends Small Group Breakout Questions and Comments Next Steps Meeting Close

TRANSIT CENTER DISTRICT PLAN

SECTION 106 ACTIVITIES ANNUAL REPORT

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY

2017 STP PROJECT APPLICATION (OREGON)

CITY COUNCIL AGENDA REPORT GWEN PEIRCE, CITY CLERK ROBIN PARKER, ADMINISTRATIVE SERVICES DIRECTOR DEBORAH STELLER, MEDIA OPERATIONS DIRECTOR

Cornerstone of downtown; Gateway to the state

Dallas Streetcar Central Link Locally Preferred Alternative Selection

Bus Circulator Feasibility Study Scope of Work March 12, 2018

EXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF DOWNTOWN LOS ANGELES/ARTS DISTRICT

Transcription:

Executive Summary

Page 1 Executive Summary Project Background The Ramsey County Regional Rail Authority (RCRRA) initiated the Central Corridor scoping process in 2001 and conducted the Alternatives Analysis and Draft Environmental Impact Statement (AA/DEIS) over the following four years. RCRRA s role as project lead ended in 2006 with a series of public hearings and the selection of the locally preferred alternative, light rail transit operating on University and Washington avenues. Since 2006, when the Metropolitan Council became the project lead, the Central Corridor Project Office identified several issues that resulted in changes to the alignment and required additional analysis and disclosure of potential impacts. A Supplemental Draft Environmental Impact Statement (SDEIS) outlining these issues related to the Central Corridor Light Rail project was published on July 11, 2008. The Metropolitan Council held three public hearings prior to taking formal action to revise the locally preferred alternative on August 27, 2008. Public and agency comments on the AA/DEIS and the SDEIS will be responded to in the preparation of the Final Environmental Impact Statement later this year. Changes disclosed Key changes that the SDEIS disclosed include: 1. Revised connection of the Central Corridor to the Hiawatha LRT in Minneapolis. 2. Transit/pedestrian mall at the University of Minnesota with LRT running on Washington Avenue. 3. Potential additional stations at Hamline Avenue, Victoria Street or Western Avenue in St. Paul. 4. Changes to the LRT alignment and location of stations within the Capitol area. 5. Changes to the LRT alignment and location of stations in downtown St. Paul, including a diagonal alignment through the 4 th and Cedar streets block and the consolidation of two stations into one on that block. 6. Preliminary locations for traction power substations needed to power the LRT trains. 7. Impact of potential three-car train operations on the Central Corridor. 8. Need for and impacts of constructing a storage and maintenance facility in downtown St. Paul. 9. Need for and impacts of modifications and/or improvements required to the Washington Avenue Bridge for LRT purposes.

Page 2 Public Outreach Efforts A 45-day public comment period followed the publication of the SDEIS. In accordance with State and Federal law, public hearings were held to gather feedback regarding the issues documented. An open house was held prior to each public hearing in order to give the public the opportunity to ask project staff informal questions and become informed about the project. The dates and locations of the SDEIS public hearings are listed below: Monday, August 4, Noon (12:00 p.m.), Wilder Foundation, 451 Lexington Parkway N., St. Paul. Thursday, August 7, 6:00 p.m., Brian Coyle Center, 420 15 th Avenue S., Minneapolis. Saturday, August 9, 2:00 p.m., Goodwill Easter Seals, 553 Fairview Avenue N., St. Paul. Hearings locations were determined according to placement and accessibility along the corridor. Legal notice of the hearings and the comment process was provided in three publications; Minneapolis Star Tribune St. Paul Pioneer Press Finance and Commerce An electronic copy of the document was posted on the Metropolitan Council s website at http://www.metrocouncil.org/transportation/ccorridor/suppdeisjul08.htm. Paper copies of the SDEIS were made available for public review at the following locations: In St. Paul Metropolitan Council library, 390 N. Robert Street Central Corridor Project Office, 540 Fairview Avenue North, Ste 200 MnDOT's Transportation Building Library, 395 John Ireland Boulevard Hamline-Midway Library, 1558 West Minnehaha Avenue Merriam Park Library, 1831 Marshall Avenue Rice Street Library, 1011 Rice Street Rondo Community Library, 461 North Dale Street St. Paul Central Library, 90 West 4 th Street St. Anthony Park Branch Library, 2245 W. Como Avenue Central Corridor Resource Center, 1080 University Avenue In Minneapolis

Page 3 Franklin Library, 1314 E. Franklin Avenue Minneapolis Central Library, 300 Nicollet Mall Southeast Library, 1222 4 th Street SE Hennepin County Law Library, 300 S 6 th St., Government Center In addition, seven community outreach coordinators managed efforts to inform the public about the SDEIS and encourage feedback regarding the issues. Community outreach coordinators distributed flyers to business owners, posted flyers in public locations, and informed residents along the corridor. A description of the SDEIS content and process was included in the Central Corridor LRT project monthly publication Making Tracks. Subsequently, the publication was sent to 90 media contacts at radio, television, and wire service outlets as well as newspaper and online publications. Public Comment Summary As of August 20, 2008, 61 comments were received. Some of the consistent concerns regarding the SDEIS raised by public comment include: Impact on University Ave. business/concern about loss of parking-16 Build additional stations (environmental justice issues)-15 Impact of project on existing bus service/reduction in bus service-11 Environmental justice concerns (including gentrification)-10 Pedestrian/bicycle safety-9 The following list shows a total of the specific concerns voiced as a part of the SDEIS public comment process. Build additional stations (evironmental justice issues)-15 Impact of project on businesses on University Ave./concern about loss of parking- 15 Impact of project on existing bus service/reduction in bus service-11 Environmental justice concerns (including gentrification)-10 Pedestrian/bicycle safety-9 LRT not right solution-7 Concerns about noise/vibration impacts -6 Concern about traffic displacement caused by U of M pedestrian mall/regional traffic patterns-6 Concerns about Historic Preservation-6 difficult north-south pedestrian movements (divides University Ave.)-4 Concerns about cost of the project/taxes-4 supports LRT-3 Supports Transit Oriented Development on West Bank -3

Page 4 Ensure attractive/pedestrian friendly streetscaping features-3 Impact of ROW acquisition - Downtown St. Paul (Diagonal)-3 Community involvement in public art process-3 Impact of ROW acquisition - Downtown St. Paul (Diagonal)-3 concern regarding loss of skyway network-3 Concerns about overflow parking/hide and riders -2 Travel-time concerns-2 Concerned about location of maintenance facility (Downtown St. Paul)-2 Concerns about ADA/loading accessibility for Central Presbyterian Church -2 support alternative alignment other than University Ave. -2 Concerns that no reduction in impervious surface will affect watershed area-2 Primary station at Hamline Ave. rather than Lexington Pkwy.-1 Ensure adequate mitigation measures for U of M hospital -1 oppose connection with Hiawatha LRT in SDEIS-1 Oppose alignment down Cedar St. in St. Paul -1 Concerns about SDEIS understatment of impact of utilities work on consumer prices-1 Eliminate pedestrian crossing in favor of on-street parking-1 support tunnel option through the U of M-1 supportive of continuing process of consultation to identify/resolve sec. 106 cultural resource effects-1 support redevelopment of Granary Rd. beyond I-35W-1 Concern about access to businesses-1 Concern about community involvement process-1 Concern about shift of Rice St. station-1 Oppose redevelopment of Granary Rd beyond I-35W-1 Support extension of E River Rd to Main St. -1 support 3-car train platforms-1 Increase bicycle access along the corridor-3 build park and ride lot at Midway Center bus barn site-1 support at-grade alignment through U of M campus-1 Concern about EMI and RFI impacts-1 Need for a pedestrian bicycle overpass on University Ave. in Marcy Holmes Neighborhood-1 Two public agencies provided comments on the SDEIS USDA Army Corps of Engineers City of St. Paul City of Minneapolis Ramsey County Regional Rail Authority Hennepin County Minnesota Historical Society State Historic Preservation Office

Page 5 Minnesota Department of Transportation St. Paul Heritage Preservation Commission Comments were accepted through August 25, 2008 by: Speaking in person at one of the public hearings. Calling the Central Corridor LRT Project Office and leaving a message on the comment line at 651-602-1645. Emailing comments to Kathryn O Brien at kathryn.obrien@metc.state.mn.us or Mailing comments to: Kathryn O Brien Central Corridor LRT Project Office 540 Fairview Ave. N., Ste. 200 St. Paul, MN 55104 Central Corridor LRT Project Overview The Central Corridor Light Rail Transit Project linking downtown St. Paul and downtown Minneapolis via Washington and University avenues would be the fourth in a planned network of rail and bus ``transitways in the Twin Cities. Construction would begin in 2010 on the planned 11-mile Central Corridor line, with service beginning in 2014. The line would connect with the Hiawatha LRT line at the Metrodome station in Minneapolis and the Northstar commuter rail line, which will begin operation in late 2009, at the new Downtown Minneapolis multimodal station. The Metropolitan Council would be the grantee of federal funds. The regional government agency is charged with leading the design and building of the line in partnership with the Minnesota Department of Transportation. The Central Corridor Management Committee, which includes the mayors of St. Paul and Minneapolis and commissioners from Ramsey and Hennepin counties, provides advice and oversight. The Central Corridor LRT Project Website is www.centralcorridor.org