Newsletters published twice a year

Similar documents
SmartNet Pilots: The demonstration of the different TSO-DSO coordination schemes and market structures

Project Title: INFRASTRUCTURE AND INTEGRATED TOOLS FOR PERSONALIZED LEARNING OF READING SKILL

Deliverable D10.1 Launch and management of dedicated website and social media

WP6 D6.2 Project website

MAtchUP D8.2: Project website WP 8, T th March 2018 (M6)

TEN-E Thematic Group for Smart Grids meeting

Coordinating Optimisation of Complex Industrial Processes

Deliverable Monitoring of active participation of future suppliers of R&D. Author: Mr. Christophe Veys

Early Detection and Integrated Management of Tuberculosis in Europe. PJ Early diagnosis of tuberculosis. D2.2 Website.

Results of Pilot C (Spain)

Metal Recovery from Low Grade Ores and Wastes Plus

The EU OPEN meter project

Future role of DSO with large-scale DERs workshop

D7.6: Dissemination Pack

WORLD TELECOMMUNICATION STANDARDIZATION ASSEMBLY Hammamet, 25 October 3 November 2016

D5.2 FOODstars website WP5 Dissemination and networking

DELIVERABLE. D3.1 - TransformingTransport Website. TT Project Title. Project Acronym

CREATE Compact REtrofit Advanced Thermal Energy storage. European Commission Archive 1x

D8.1 Project website

DREAM - FP D8.1 DREAM website DREAM

DG CONNECT (Unit H5) Update on Data Centre Activities

DELIVERABLE 5.2 Establishment of a common graphical identity WP5 Dissemination

A new mining concept for extraction metals from deep ore deposits by using biotechnology. D6.6 Brochures, leaflets and newsletter and film

Project web pages. Deliverable 6.1/WP6.

Deliverable 7.1 M3 m-resist website

Energy Data Innovation Network GA N

High Level ehealth Conference Summary... 3 Coordinator, Leader contact and partners... 6 Outputs... 7

D2.2 Web Platform development

DELIVERABLE REPORT. Due date:

INSPIRE status report

Policy drivers and regulatory framework to roll out the Smart Grid deployment. Dr. Manuel Sánchez European Commission, DG ENERGY

Deliverable No. 6.3 E-newsletter 2

An Introduction to Network Codes & The Links Between Codes

INNOVER-EAST. WP5 Dissemination. Deliverable D5.3 Basic Dissemination Material

TRUE Deliverable 1.3 (D3) Project Website (Public)

CGM and Energy Data Architecture a TSO Perspective

FP7 Information & Communication Technologies. Rules of the Programme

SLHC-PP DELIVERABLE REPORT EU DELIVERABLE: Document identifier: SLHC-PP-D v1.1. End of Month 03 (June 2008) 30/06/2008

Stakeholder consultation process and online consultation platform

IRMOS Newsletter. Issue N 5 / January Editorial. In this issue... Dear Reader, Editorial p.1

Deliverable No: D8.5

Smart Metering and Smart Grids: the Enel

International Policy Division, Global ICT Strategy Bureau

Friedrich Smaxwil CEN President. CEN European Committee for Standardization

D7.2 CREATE project leaflet and website

The Research Infrastructures Programe and its NCP Network RICH

EVACUATE PROJECT WEBSITE

Fostering Competitiveness, Growth and Jobs. Wrocław, Poland, 15 October 2014

Deliverable No. 4.1 SciChallenge Web Platform Early Prototype (Additional Report)

The PICTURE project, ICT R&I priorities in EaP, areas of cooperation

oordination upport Status: February 2017

Distribution Networks: the hidden challenges and solutions

HEALTH INFORMATION INFRASTRUCTURE PROJECT: PROGRESS REPORT

D6.1. Project website and internal IT communication infrastructure HINT. 36 months FP7/

National Council for Special Education. NCSE Support Service Advisor Job Description and General Notes

Towards a European e-competence Framework

EU policy and the way forward for smart meters and smart grids

Recent developments CEN and CENELEC

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

D46 Project identity and website

D 9.1 Project website

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM

Fluid Management component improvement for Back up fuel cell systems

Birgit Morlion. DG Communications Networks, Content and Technology (DG CONNECT)

TERMS OF REFERENCE Design and website development UNDG Website

13543/17 PhL/at 1 DG G 3 B

Copernicus Space Component. Technical Collaborative Arrangement. between ESA. and. Enterprise Estonia

D33.1. Project website and internal and external IT communication infrastructure PRACTICE. 36 months FP7/

GRID4EU - Large-Scale Demonstration of Advanced Smart Grid Solutions with wide Replication and Scalability Potential for EUROPE

Energy Management of Microgrids in a Smart City Environment

Deliverable D7.1 Graphical Identity

Day in the life of SOGL (System Operations Guideline) Topic: Operational Planning (Part 2)

Integrating the Drivers of eparticipation at Regional Level in Europe IDEAL-EU

Telecommunication Development Bureau (BDT)

D9.2 IMPLEMENTATION OF PROJECT WEBSITE

Cloud-based Rapid Elastic MAnufacturing

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017

D7.8 Brochure, Poster and e-newsletters 1

INtelligent solutions 2ward the Development of Railway Energy and Asset Management Systems in Europe.

Small or. Collaborative. Polito D7.1. Submission Due Nature R D. Project. Tel: +39 Fax: +39

Integrating Green Urban Data Centers into Smart Electricity Grids & Smart Sustainable Cities

Media (NEM) Initiative

Get your ticket to innovation!

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

Network Code on Operational Security. User s Group System Operations 06/11/2013

draft architecture and expected results

EPSO Gilles Guillard Hudson Nikola Trbovic Prometric Nicoletta Vullo. #EATPconf

Enhancing Critical Infrastructure Protection with innovative SECurity framework

Development, testing and quality assurance report

A European Perspective on Smart Grids

Promoting Advanced Vehicle Safety Technologies

Security Assurance Framework for Networked Vehicular Technology

ehealth Network ehealth Network Governance model for the ehealth Digital Service Infrastructure during the CEF funding

COMMUNICATION STRATEGY

IRMOS Newsletter. Issue N 2 / February Editorial. In this issue... Dear Reader, Editorial p.1

13174/15 AT/tl 1 DGE 2B

Drivers and regulatory framework to roll out the Smart Grid deployment in Europe

Deliverable 8.1: Project website and promotional material

Data Migration Plan Updated (57) Fingrid Datahub Oy

PRELIDA. D2.3 Deployment of the online infrastructure

Transcription:

Smart TSO-DSO interaction schemes, market architectures and ICT Solutions for the integration of ancillary services from demand side management and distributed generation Newsletters published twice a year D7.3 Authors: Distribution Level Responsible Partner Checked by WP leader Verified by the appointed Reviewers Approved by Project Coordinator PU Ilina Hristova (EUI) Ilina Hristova (EUI) Date: 27.04.2017 N/A Gianluigi Migliavacca (RSE) Date: 27.04.2017 This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 691405

Issue Record Planned delivery date 30/06/2016 Actual date of delivery 25/07/2016 (re-submission after second newsletter) Status and version Provisional (further re-submission after next newsletters) Version Date Author(s) Notes Provisional 25.07.2016 Ilina Hristova Provisional 20.04.2017 Ilaria Conti

About SmartNet The project SmartNet (http://smartnet-project.eu) aims at providing architectures for optimized interaction between TSOs and DSOs in managing the exchange of information for monitoring, acquiring and operating ancillary services (frequency control, frequency restoration, congestion management and voltage regulation) both at local and national level, taking into account the European context. Local needs for ancillary services in distribution systems should be able to co-exist with system needs for balancing and congestion management. Resources located in distribution systems, like demand side management and distributed generation, are supposed to participate to the provision of ancillary services both locally and for the entire power system in the context of competitive ancillary services markets. Within SmartNet, answers are sought for to the following questions: Which ancillary services could be provided from distribution grid level to the whole power system? How should the coordination between TSOs and DSOs be organized to optimize the processes of procurement and activation of flexibility by system operators? How should the architectures of the real time markets (in particular the markets for frequency restoration and congestion management) be consequently revised? What information has to be exchanged between system operators and how should the communication (ICT) be organized to guarantee observability and control of distributed generation, flexible demand and storage systems? The objective is to develop an ad hoc simulation platform able to model physical network, market and ICT in order to analyse three national cases (Italy, Denmark, Spain). Different TSO-DSO coordination schemes are compared with reference to three selected national cases (Italian, Danish, Spanish). The simulation platform is then scaled up to a full replica lab, where the performance of real controller devices is tested. In addition, three physical pilots are developed for the same national cases testing specific technological solutions regarding: monitoring of generators in distribution networks while enabling them to participate to frequency and voltage regulation, capability of flexible demand to provide ancillary services for the system (thermal inertia of indoor swimming pools, distributed storage of base stations for telecommunication). Partners Copyright 2017 SmartNet Page 2

Table of Contents 1 Introduction... 5 2 Newsletter 1 July 2016... 6 3 Newsletter 2 March 2017... 8 Copyright 2017 SmartNet Page 3

Executive Summary As part of task 7.1., General communication and dissemination activities, EUI, in cooperation with the Project Coordinator (RSE) and with the contribution of all the WP leaders, will create a series of newsletter targeting both the specialized and the general public. The present document outlines the structure of the project newsletters, the target audience as well as the Stakeholders consultations launched together with the newsletters. Copyright 2017 SmartNet Page 4

1 Introduction As part of the project general communication and dissemination activities (Task 7.1.), all the project partners under the leadership of WP7 will prepare a series of newsletters to be published every 6 months during the duration of the project. The first issue of the SmartNet newsletter, prepared by the WP leaders and the Project Coordinator, which presents the latest research developments, dissemination activities and launches the first consultation of the project stakeholders was published on the 25.07.2016. The second issue was published on 08.03.2017. Copyright 2017 SmartNet Page 5

2 Newsletter 1 July 2016 The project newsletter opens with a general address of the Project Coordinator introducing the project and launching the two stakeholders consultations. The two stakeholders consultations cover the topics of Basic schemes for TSO-DSO coordination and ancillary services provision and Market design. To give maximum flexibility and facilitate the stakeholders, the consultations are done in a way to allow them to contribute either online or by email. The first results of the stakeholders consultations are expected by the end of September 2016. Furthermore, the newsletter presents a series of 4 articles on the following topics: Towards (Close) Harmony: Options for Enhanced TSO-DSO Coordination Stairway to Heaven: First Steps in Building up the Three Technological Pilots ICT Enabling Flexible Energy Grids Small Market Changes, Giant Leaps for DERS targeting both the specialized and general public. The four articles are also available in the newly created blog available on the project webpage. Finally, the newsletter provides also information on the project meeting in Copenhagen (http://smartnetproject.eu/news/coordination-meeting-copenhagen/) and promotes the SmartNet invited full-afternoon session at the European Utility Week in Barcelona (15 November 2016) (http://smartnetproject.eu/news/smartnet-project-barcelona/) The newsletter was created and distributed using MailChimp. The target audience for the newsletter was of slightly less than 5.000 contacts (approximately 50 SmartNet Stakeholders, approximately 120 contacts of SmartNet Partners and EUI FSR Energy List of approximately 4.700 contacts). The newsletter is also available on the project homepage and will be shared with the project social media. The following parameters will be monitored: open rate, click rate, 24 hour performance, top links clicked. In other words, we will monitor users activity by see how many contacts actually received, opened, clicked on some links and which ones. The parameters will allow to monitor and compare all the newsletters among themselves. Copyright 2017 SmartNet Page 6

Copyright 2017 SmartNet Page 7

3 Newsletter 2 March 2017 The project newsletter opens with a general address of the Project Coordinator introducing the results of the first year of activities of the project, particularly the following deliverables: (D1.1) an analysis of system services requested at 2030 (D1.3) an in-depth analysis of TSO-DSO coordination schemes (D3.1) a screening of ICT requirements to implement them The newsletter also provides information on the project meeting in Helsinki (http://smartnetproject.eu/news/highlights-from-the-smartnet-meeting-in-helsinki/) and includes video interviews with the WP leaders and the stakeholders. Furthermore, the newsletter promotes the SmartNet invited roundtable Innovation in Grid Services in Brussels (13 March 2017) (http://smartnet-project.eu/news/innovation-grid-services-round-tablebrussels/) as well as the recording of the last online event organised in collaboration with the Florence School of Regulation (http://smartnet-project.eu/news/interactive-online-debate-tso-dso-coordination/) Finally, the newsletter presents a series of 2 articles targeting both the specialised and general public: Where are we going? The Key is Flexibility The articles are also available in the SmartNet blog available on the project webpage (http://smartnetproject.eu/blog/) The newsletter was created and distributed using MailChimp. The target audience for the newsletter was of slightly less than 5.000 contacts (approximately 50 SmartNet Stakeholders, approximately 120 contacts of SmartNet Partners and EUI FSR Energy List of approximately 4.700 contacts). The newsletter is also available on the project homepage and will be shared with the project social media. The following parameters will be monitored: open rate, click rate, 24-hour performance, top links clicked. In other words, we will monitor users activity by seeing how many contacts received, opened, clicked on some links and which ones. The parameters will allow to monitor and compare all the newsletters among themselves. Copyright 2017 SmartNet Page 8

Copyright 2017 SmartNet Page 9