Agreements and Queue Management

Similar documents
Agreements and Queue Management

Agreements & Queue Management

Generator Interconnection Process. Wholesale Transmission Overview

New Resource Implementation & Market Modeling

Business Practice Manual For. Generator Interconnection and Deliverability Allocation Procedures (GIDAP) BPM)

Stakeholder Comments Template

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Small Hydro Regulatory and Permitting Requirements California

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

July 26, Dear Mr. Millar:

Interconnection Re-MAT September 11, 2013

Specific topics covered in this brief include:

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

The NYISO shall assign a Queue Position based upon the date and time of receipt of the

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

ATTACHMENT I: Generator Interconnection Procedures (GIP)

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

ELECTIVE INTERCONNECTION FACILITIES

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Cyber Security Reliability Standards CIP V5 Transition Guidance:

Grid Interconnection of Renewable Generation

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

2018 Interconnection Process Enhancements (IPE) Webconference November 12, 2018, :00 p.m. 4:00 p.m. (Pacific Time)

BPM Change Management Meeting

From: Laura Manz, Vice President of Market & Infrastructure Development

Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative. Revised Scope and Schedule

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Standards Authorization Request Form

Appendix 1 Interconnection Request INTERCONNECTION REQUEST

Interconnection and Transmission

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements

Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process

Open Access Transmission Tariff of Southern Companies

Standards Authorization Request Form

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION NOTICE INVITING POST-TECHNICAL CONFERENCE COMMENTS. (June 3, 2016)

Large Generator Interconnection Generator, Transmission, & Distribution Asset Responsibilities

Standard Development Timeline

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

Generation Interconnection Process. NEMSTF Education Session 1 January 19, 2012

Resource Adequacy Pre-Market Simulation Training Workshop

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Indefinite Delivery, Indefinite Quantity (IDIQ)

1. Responsibilities. Settlement Quality Meter Data (SQMD) Plan Submission & Approval Process (External) Operating Procedure

Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation

Proposed Clean and Redline for Version 2 Implementation Plan

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949

Solar*Rewards Community MN Application Manual

Standard INT Dynamic Transfers

Rocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Checklist for Submission to Utility

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Arizona Public Service ) Docket No. ER Company )

IATF Transition Strategy Presenter: Cherie Reiche, IAOB

Standard INT Dynamic Transfers

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

Reliability Coordinator Procedure PURPOSE... 1

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

Generation Interconnection Feasibility Study Report

FNM Expansion Training Webinar

Reliability Standard Audit Worksheet 1


Timber Products Inspection, Inc.

Standard COM-002-2a Communications and Coordination

Clean Power Call BC Transmission Corporation & BC Hydro Joint Information Session July 8, 2008

The Open Group Certification for People. Training Course Accreditation Requirements

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

IATF Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB

Critical Cyber Asset Identification Security Management Controls

User Access Administrator (UAA) Form and Access to Resource Interconnection Management System (RIMS 5)

WELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER

New Jersey LFN Packet Check List

Standard INT Interchange Authority Distributes Arranged Interchange

Reliability Standard Audit Worksheet 1

Balancing Programme 1

RIMS: Transmission Implementation Module

TIGRS REGISTRY REQUIREMENTS FOR QUALIFIED REPORTING ENTITIES

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Table of Contents. Purpose. Certification of Metering Facilities. Procedure No Version No. 1.4 Effective Date 2/14/2018. Operating Procedure

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

NorthWestern Energy (NWMT)

PRIVATE MOBILE CONNECTION (formerly COMMERCIAL CONNECTIVITY SERVICE (CCS)) CUSTOM APN ATTACHMENT

SCS FSC Chain-of-Custody Guidance for Certification of Multiple Sites FSC-STD V2-1

EIM Entity Readiness Criteria May 6, 2015

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP

132 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Interconnection Standards for Delmarva Power & Light Company s Delaware Operating Territory

Response to Stakeholder Comments on Draft and Revised Draft Tariff Language CCE3 and RSI Clarifications

March 15, 2011 VIA ELECTRONIC FILING

Competitive Solicitation Process Enhancements. Status Update / Issue Paper

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Standard Authorization Request Form

ERO Enterprise Strategic Planning Redesign

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

Physical Security Reliability Standard Implementation

Guidance of NOP Certification system Page 1/8

Transcription:

Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019

Interconnection Process Map You are here Page 2

Agenda 2018 Interconnection Process Enhancements Contract Negotiation Regulatory Contracts Queue Management Page 3

2018 Interconnection Process Enhancements (IPE) Page 4

2018 IPE Changes New Resource Implementation (NRI) requirements Suspension requirements Timing of fuel type changes Elimination of balance sheet financing options Energy only conversion cost responsibility Post COD modification measures Repowering deposit Repowering evaluation criteria BPM change Replacing existing generator with energy storage - BPM change Page 5

Contract Negotiation Shoukat Ansari, Senior Contracts Negotiator Page 6

Generator Interconnection Agreement (GIA) A Project interconnecting to the CAISO Controlled Grid shall execute a 3-party generator interconnection agreement between the Interconnection Customer, the Participating TO and the CAISO The Generator Interconnection Agreement consists of: Pro forma approved by Federal Energy Regulatory Commission Appendices specific to an Interconnection Customer and Generating Facility at a single Point of Interconnection The GIA is specific to an interconnection customer and its generating facility and may cover more than one Resource ID and CAISO Queue Position A Project interconnecting to the non-caiso controlled grid may execute a 2 party agreement with the Participating TO or the UDC Page 7

Generating Unit Conversions to the CAISO Markets Qualifying Facilities (QFs) and other existing generators usually convert upon termination or expiration of their power purchase agreements and interconnection agreements based on Section 25.1.2 of CAISO Tariff Interconnection Service capacity based on existing operating capacity and historical generation of the generating facility An email request to RegulatoryContracts@caiso.com initiates the conversion process Page 8

Generating Unit Conversions (Continued) Generating Unit Conversions require other Market Agreements and participation in the NRI Process 2018 IPE filing with FERC clarifies and requires the NRI process* NRI process duration is being reduced from 203 to 84 calendar days around September/October 2019 timeframe Page 9

GIA Implications for Transmission Plan Deliverability Allocation Choices Choose 1 Park Seek Transmission Plan Deliverability in next cycle Receive Transmission Plan Deliverability Allocation Results Withdraw Accept some or all TP deliverability allocation or proceed as Energy Only (EO) Negotiate and Execute GIA Page 10

GIA Tender In-Service date (future date) Negotiation 120 CD Account for milestones leading to construction start 60 CD Longest lead facility or network upgrade from study report Tender date for GIA (must be a future date) Page 11

GIA Tender (Calculation Example) In-Service date April 1, 2022 180 CD 6 months Longest lead construction time for interconnection facility or network upgrade Tender date for GIA April 1, 2019 30 months Page 12

GIA Negotiation The Participating TO tenders the GIA to the parties Contract Negotiators of the three parties negotiate the draft and come to an agreement on a draft Participating TO approves the draft and sends to CAISO Contract Negotiator does a final check, prepares signing statements, gets information requests from the Participating TO and IC and sends the package to RC Page 13

Questions? Page 14

Regulatory Contracts PJ Topping, Contracts Analyst Page 15

GIA Execution Process CAISO prepares executable document All parties obtain signatures from authorized representative All parties must sign via DocuSign within 10 Business Days of receipt All parties receive email notification through DocuSign when the GIA is fully executed CAISO reports agreement execution to FERC Agreement are distributed for execution via email through Final version of executed GIA is available for parties to download or print DocuSign Account is not mandatory in order to use their service Page 16

Market Agreements Terms for participating in CAISO markets Participating Generator Agreement (PGA) or Net Scheduled Participating Generator Agreement (NSPGA) Participating Load Agreement (PLA) (e.g., pumps, pump-generating, energy storage) Meter Service Agreement for a CAISO Metered Entity (MSACAISOME) Meter Service Agreement for Scheduling Coordinators (MSASC) Scheduling Coordinator Agreement (SCA) Page 17

Contract Changes Submit requests to RegulatoryContracts@caiso.com Changes to Customer Information Assignments to affiliates and non affiliates - Assignee must meet the PTO s Interconnection Financial Security ( IFS ) posting requirements Entity Name changes only Ownership changes Required Documentation (varies on type of change) Secretary of State certificate Proof of ownership Sale agreement Membership interest agreement Page 18

Questions? Page 19

Queue Management Joanne Bradley, Lead Queue Management Specialist Page 20

Affected Systems Affected System Potentially Affected System Identified Affected System Page 21

Affected System Process Potentially Affected System CAISO invites Potentially Affected Systems to scoping meeting and Phase I results meeting Must identify as Identified Affected Systems within 60 calendar days of notification from the CAISO after initial Interconnection Financial Security has been posted. Identified Affected system CAISO will notify Interconnection Customer of their Identified Affected Systems Adjacent Interconnection Customer to affirmatively contact the Identified Affected System operators and make reasonable efforts to address system impacts system Impacts Resolved Impacts must be resolved no later than six months prior to the generating unit s Initial Synchronization Date Page 22

Upcoming Affected System Outreach Cluster 11 The CAISO will reach out to Potentially Affected Systems after projects post Initial Financial Security (May 2019) Adjacent Potentially Affected Systems must identify themselves as Identified system Affected Systems within 60 days of CAISO notification CAISO will notify Interconnection Customers of their Identified Affected Systems (August 2019) Page 23

Modifications to Interconnection Requests Before Phase II Results Meeting Minutes are published Certain changes are allowed without a Material Modification Assessment (MMA) between Phase I and Phase II Modification requests are processed by your Interconnection Specialist After Phase II Results Meeting Minutes are published Any modifications require MMA Modification requests are processed by QueueManagement@caiso.com Page 24

Modification Review Process Two very similar processes for modification requests Material Modification Assessment process (MMA) The modification review process For projects prior to declaring COD Post-COD projects Material if it has an impact on the cost or timing of any other Interconnection Request Unacceptable if modification is a substantial change to the capacity or electrical characteristics of the project* * 2018 IPE Update Page 25

Modification Review Process contd. 45 Calendar Days Interconnection Customer submits request, deposit, and complete technical data CAISO and Participating TO engineers perform an assessment to identify any material impacts CAISO responds to the request in writing Agreement is amended, deposit is reconciled with invoices, and actual cost is paid Submit request with justification in writing to QueueManagement@caiso.com Modifications requiring technical data take more time for technical data validation The deposit amount is $10,000 Interconnection Customer will be charged actual costs incurred by the CAISO and Participating TO, and remaining deposit, if any, is returned Page 26

Modifications Subject to Commercial Viability Projects requesting to extend their Commercial Operation Date (COD) beyond 7 years or modifications to projects that have already exceeded the 7 years are subject to Commercial Viability Criteria* Criteria includes permitting, power purchase agreement status, site exclusivity, and GIA status Failure to meet criteria results in conversion to Energy Only deliverability status Limited exemption for no power purchase agreement One year delay for conversion to Energy Only * 2018 IPE Update Page 27

Modifications Subject to Commercial Viability contd. Criteria can no longer be met with balance sheet financing* Power purchase agreement must reflect the point of interconnection, capacity, fuel type, technology, and site location of project* Energy Only conversion will result in a reduction to cost responsibility only if assigned upgrades are eliminated* Fuel type modifications after the 7 year timeline are prohibited* Modifications to add storage are not considered fuel-type modifications * 2018 IPE Update Page 28

Modifications to Add Energy Storage Projects may request to add energy storage to their Interconnection Request or operating Generating Facility Energy storage addition does not alter the approved Net-to-Grid MW capacity If a project is wholly replaced or increasing the Net-to-Grid MW then a new Interconnection Request is required If an energy storage modification request is denied, the CAISO will work with the Interconnection Customer to identify how much energy storage might be acceptable If an existing Generating Facility that has added energy storage is retiring, an assessment will determine if the energy storage can continue to operate* * 2018 IPE Update Page 29

Modifications to Add Energy Storage contd. Energy storage may request deliverability if energy storage can meet the resource adequacy requirements Project must retain the maximum deliverability associated with the maximum on-peak exceedance level used in the most recent Deliverability Assessment Example: 100 MW Solar project proposes to replace 20 MW with energy storage, resulting in 80 MW solar and 20 MW energy storage The exceedance value for Solar is 90% and has 90 MW of associated Deliverability Options for splitting deliverability: Solar (90% exceedance value) Energy Storage (100% exceedance value) Option 1: 70 MW & PCDS 20 MW & FCDS Option 2: 72 MW & PCDS 18 MW & PCDS Page 30

Technical Bulletin for Hybrid Energy Storage On October 19, 2016, the CAISO posted a technical bulletin for Implementation of Hybrid Energy Storage Generating Facilities Covers master file modelling, metering and telemetry, interconnection and resource ID selection https://www.caiso.com/documents/technicalbulletin- ImplementationofHybridEnergyStorageGeneratingFaciliti es.pdf Page 31

Suspension LGIAs include suspension rights for a period of up to 3 years Suspension notifications should be sent to QueueManagement@caiso.com and the PTO Notifications should include the effective date of the suspension and good faith estimate of how long a suspension will last* A material modification assessment will be required if milestone dates are changing* If material impacts can be mitigated the suspension can be approved Suspension does not apply to shared upgrades * 2018 IPE Update Page 32

Repowering Requests Repowering is for existing generating facilities, including QFs, that wish to make changes that are not substantial Facilities who propose substantial changes must enter Generation Interconnection and Deliverability Allocation Procedures (GIDAP) Substantiality is determined based on impact of changed electrical characteristics as outlined in the Generator Management BPM Must utilize the same fuel source and point of interconnection Energy storage can be considered the same fuel source May require a facilities study with the Participating TO Affidavit to QueueManagement@caiso.com initiates the request Information provided in the affidavit is subject to audit by the CAISO Study deposit is $50,000* * 2018 IPE Update Page 33

Queue Management GIA Milestone tracking Interconnection Customers must meet the project milestones in their GIA to be in good standing Deliverability may not be reserved for projects not in good standing Interconnection Customers provide quarterly project progress reports to Queue Management after the GIA is effective Page 34

Queue Management cont. Prior to Initial Synchronization and COD Queue Management verifies contract obligations have been met Upgrades Inverters Affected Systems Asynchronous Obligations MW values in GIA, PGA, and Master File WECC Path Rating and Progress Report Policies and Procedures Upon verification, Queue Management provides approval in the New Resource Implementation (NRI) process Page 35

Queue Management cont. All reliability network upgrades and pre-cursor transmission projects must be in-service prior to initial synchronization date Limited Operation Studies Can be used to evaluate if system can support early, energy-only interconnection before network upgrades and interconnection facilities are complete The study is paid for by the Interconnection Customer Only within 5 months of Initial Synchronization Submit request to QueueManagement@caiso.com Results of the study determine the operating capability of the project Page 36

Commercial Operation for Markets (COM) Block implementation in advance of COD of the project CAISO acknowledges wind and solar block construction and ability to energize Portion of project is allowed to bid into CAISO markets while remaining portion is testing or under construction Resource adequacy eligibility requirements Qualifying capacity must be obtained from the CA Public Utilities Commission Obligated to meet all tariff and resource adequacy requirements (bid, penalty, etc.) Reliability network upgrades must be completed Page 37

COM versus Phasing COM Phasing Requested in the NRI Process Identified in GIA Allows participation in the market prior to COD of the entire project Allows portions of the project to have various COD dates Page 38

Resources Contracts and agreements http://www.caiso.com/rules/pages/contractsagreements/default.aspx 2018 IPE Stakeholder Initiative http://www.caiso.com/informed/pages/stakeholderprocesses/interconnectionprocessenhancements.aspx QF Affidavit Template https://www.caiso.com/documents/affidavittemplate.doc Potentially Affected System Contact List http://www.caiso.com/documents/generatorinterconnectionprocedures_affectedsystemscontactlist.xls Repowering Affidavit Template http://www.caiso.com/documents/repoweringaffidavittemplate_20141002.doc Technical Bulletin: Implementation of Hybrid Energy Storage Generating Facilities http://www.caiso.com/market/pages/reportsbulletins/default.aspx Quarterly Status Report Template http://www.caiso.com/documents/queuemanagementquarterlystatusreporttemplate.docx Page 39

Thank you! If you have any further questions on the content in this presentation, please send them to RegulatoryContracts@caiso.com or QueueManagement@caiso.com Page 40

Questions? Page 41