July 1, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Similar documents
December 10, 2012 Advice Letter 2797-E

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

December 5, 2012 Advice Letter 2441-E

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

December 9, 2011 Advice Letter 2613-E

March 1, 2013 Advice Letter 2840-E

November 14, 2008 Advice Letter 2265-E

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )

Advice Letters 4350-E

Subject: Joint Filing PG&E, SDG&E, SoCalGas, & SCE - Low Income Customer Data Sharing With Water Utilities

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PREHEARING CONFERENCE STATEMENT OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E)

Liberty Utilities (CalPeco Electric) LLC (U-933 E) Notification of the Creation of New Affiliates

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY'S (U 338-E) NOTICE OF COMMUNICATION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) )

June 12, Advice 4648-E (Pacific Gas and Electric Company ID U39 E) Public Utilities Commission of the State of California

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA NOTICE OF EX PARTE COMMUNICATION OF SOUTHERN CALIFORNIA EDISON COMPANY (U338-E)

CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL)

Updates and Modifications to Report

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Updates and Modifications to Report

Memorandum. This memorandum requires Committee action.

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL)

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

ARLINGTON COUNTY, VIRGINIA

CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL)

Updates and Modifications to Report

Los Anseles W Department of 5* Water & Power

CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL)

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. REPLY BRIEF OF SOUTHERN CALIFORNIA EDISON COMPANY (March 19, 2009)

CALIFORNIA PUBLIC UTILITIES COMMISSION Advice Letter Filing Summary Sheet (PAL)

TSR A & B - FACILITIES STUDY REPORT

{(. }.) Ordinance Fact Sheet 'P..o... ~~

Alberta Electric System Operator Secord 2005S Substation Needs Identification Document

ENMAX Power Corporation

August 10, Sacramento County Planning and Community Development 827-7th Street Sacramento, CA Tricia Stevens, Principal Planner

RE: Response to the U.S. Army Corps of Engineers s Questions Related to the Proposed Haymarket Transmission Line

APPENDIX E: DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION COMMENT LETTERS AND RESPONSES

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) NOTICE OF EX PARTE COMMUNICATION

Electric Sample Form No Agreement for Unmetered Low Wattage Equipment Connected to Customer-Owned Street Light Facilities

Valley-Ivyglen and Alberhill Transmission Line Projects

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:

ORDINANCE NO APPROVING A MAILBOX ORDINANCE FOR SHAWANO COUNTY

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

Pu6Gic Service Commission Of West Virginia

From: Laura Manz, Vice President of Market & Infrastructure Development

Content Copy Of Original

NOTICE OF APPLICATION AND HEARING FOR AN ELECTRICITY DISTRIBUTION RATE CHANGE Hydro One Remote Communities Inc.

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning

SOUTHERN CALIFORNIA EDISON COMPANY

2015 General Rate Case

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Appendix I: LOAD OPERATING AGREEMENT

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Document C0. Use for:

CALIFORNIA PUBLIC UTILITIES COMMISSION DIVISION OF WATER AND AUDITS Advice Letter Cover Sheet

B-1-1. Janet L. Fraser Director, Regulatory Affairs Phone: Fax:

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ERRATA TO SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) REPLY TO PROTESTS

June 17, SR-NASD Policy to Conduct Fingerprint-based Background Checks of NASD Employees and Independent Contractors

Application for Water and/or Sewer Connections


BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

We are filing herewith, for effect November 1, 2003, tariff material consisting of: Revision of

Application and Instructions for Firms

Funding California Investor Owned Utilities Smart Grid Technologies & Deployments

Arkansas Public Service Commission 1000 Center Little Rock, Arkansas RE: Docket No U. Dear Commissioners:

ARLINGTON COUNTY, VIRGINIA

SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Exhibit 25.A. June 2, [First Name] [Last Name] [Suffix] [Address_1] [Address_2] [City], [State] [Zip]


CC Docket Notice of Detariffing of Common Carrier Wireline Broadband Internet Access Transmission Service

AGENCY APPLICATION AND PARTICIPATION AGREEMENT MISSOURI POLICE CHIEFS CHARITABLE FOUNDATION CERTIFICATION PROGRAM

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

Commission de l énergie de l Ontario NOTICE OF APPLICATION

City of Sacramento City Council 915 I Street, Sacramento, CA,

WORKPAPERS TO PREPARED DIRECT TESTIMONY OF DAVID BUCZKOWSKI ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY BEFORE THE PUBLIC UTILITIES

Certain terms used generally throughout this tariff for the Access Services of this Company are defined below.

Information Technology Services UNMANAGED CO-LOCATION S E R V I C E L E V E L A G R E E M E N T

North Gila-Imperial Valley #2 Transmission Project

17. Microwave Collocation 17.1 General

ANRC II. Eligibility requirements Authority Requirements for accreditation Review of application...

STATE OF NORTH CAROLINA OFFICE OF THE STATE AUDITOR BETH A. WOOD, CPA FAYETTEVILLE STATE UNIVERSITY

MATERIAL TRANSFER AGREEMENT

1.2 Participant means a third party who interacts with the Services as a result of that party s relationship with or connection to you.

COUNCIL COMMUNICATION

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

WELCOME PACKAGE PARKWOOD ONTARIO HOMEOWNER S ASSOCIATION

Consolidated Privacy Notice

City of Ames Street Banner Policy

'ie BOARD OF AIRPORT COMMISSIONERS REPORT TO THE. aili.,2 T, Q,,,Q (2

Transcription:

Donald A. Fellows, Jr. Manager of Revenue and Tariffs July 1, 1999 (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Notice of Proposed Construction of Facilities Pursuant to General Order 131-D, 66kV Power Line and Substation Project in the City of El Segundo Southern California Edison Company (SCE), hereby submits notice pursuant to General Order 131-D (GO 131-D), Section XI, Subsection B.4 of the construction of facilities that are exempt from a Permit to Construct. GO 131-D was adopted by the California Public Utilities Commission (Commission) in Decision No. 94-06-014 and modified by Decision No. 95-08-038. PURPOSE This advice filing provides a copy of the Notice of Proposed Construction (Attachment A) and the Notice Distribution List (Attachment B) which comply with the noticing requirements found in GO 131-D, Section XI, subsections B and C. BACKGROUND SCE proposes to construct two double circuit 66kV overhead line taps on private property in the City of El Segundo (City), and to construct a new 66/13.2kV substation on private property at 324 El Segundo Boulevard in the City. The double circuit 66kV line taps and substation will serve the Chevron Refinery Steam Naphtha Reformer (SNR) Furnace Replacement Project. Each of the proposed line taps will be 150 foot double circuit 66kV lines, located on existing easements. The proposed 66kV line taps will be constructed using overhead 954 Stranded Aluminum Conductor (SAC). SCE will install one 65 foot tall wood pole, two 75 foot tall wood poles with 1200 amp pole mounted switches, and one 70 foot tall tubular steel pole. In addition, two existing 75 foot tall wood poles will be reframed to allow P.O. Box 800 2244 Walnut Grove Ave. Rosemead, California 91770 (626) 302-8175 Fax (626) 302-4829

(U 338-E) - 2 - July 1, 1999 the installation of two 1200 amp pole mounted switches. One of the two proposed lines will tap an existing 66kV line on the north side of an existing substation on Chevron property. This line tap will travel east for approximately 100 feet. At this point the line will turn south for approximately 50 feet to the proposed substation. The second proposed line will tap another existing 66kV line 50 feet north of the proposed new substation and will travel west for approximately 100 feet. At this point, the new line will turn south for approximately 50 feet to an existing substation. The proposed new substation will be a 44.8 MVA, 66/13.2kV substation. The substation will occupy a 112 foot by 80 foot area located on Chevron's property. The substation will be equipped with three 66kV circuit breakers and two transformer banks. The tallest structure in the substation will be 30 feet high. The substation will be enclosed by an eight foot tall chain link fence topped with barbed wire and with a 20 foot wide gate on one side. The proposed construction period is August 30, 1999 through November 1, 1999. This project qualifies as exempt from Permit to Construct filing requirements pursuant to GO 131-D, Section III, Subsection B.1.f, which exempt, power lines or substations to be relocated or constructed which have undergone environmental review pursuant to CEQA as part of a larger project, and for which the final CEQA document (Environmental Impact Report (EIR) or Negative Declaration) finds no significant unavoidable environmental impacts caused by the proposed line or substation. GO 131-D, Section XI, Subsection B.4 requires that this advice filing be made not less than 30 days before the date such construction is intended to begin. SCE intends to begin construction no sooner than August 30, 1999. No cost information is required for this advice filing. This advice filing will not increase any rate of charge, cause withdrawal of service, or conflict with any other rate schedule or rule. EFFECTIVE DATE Because this advice filing is being made in accordance with the noticing requirements described in Subsection B.4 of Section XI of GO 131-D, it is requested that this advice filing become effective on the 40 th calendar day after the date filed, which is August 10, 1999. No resolution is required for this advice filing; therefore, approval of this advice filing is not subject to the review and comment provisions of Senate Bill 779.

(U 338-E) - 3 - July 1, 1999 NOTICE Anyone wishing to protest this advice filing may do so by sending a letter no later than 20 days after the date of this advice filing. Protests should be mailed to: IMC Program Manager Energy Division California Public Utilities Commission 505 Van Ness Avenue, Room 4002 San Francisco, California 94102 Facsimile: (415) 703-2200 Copies should also be mailed to the attention of the Director, Energy Division, Room 4004 (same address above), and Donald A. Fellows, Manager of Revenue and Tariffs, Southern California Edison Company, 2244 Walnut Grove Avenue, Rosemead, California 91770, Facsimile (626) 302-4829. There are no restrictions on who may file a protest, but the protest shall set forth specifically the grounds upon which it is based and shall be submitted expeditiously. In accordance with Section III, Paragraph G, of General Order No. 96-A, SCE is mailing copies of this advice filing to the interested parties shown on the attached service list. Address change requests should be directed to Emelyn Lawler at (626) 302-3985. Further, in accordance with Public Utilities Code Section 491, notice to the public is hereby given by filing and keeping the advice filing open for public inspection at SCE s corporate headquarters. Southern California Edison Company DAF:eml:1389e.doc Enclosures /s/ Donald A. Fellows, Jr. cc: CPUC, SF - Attn: Elena Schmid, ORA GO 96-A Service List

ATTACHMENT A NOTICE OF PROPOSED CONSTRUCTION 66kV Power Lines and Substation Project in El Segundo Proposed Project: Southern California Edison Company (SCE) proposes to construct two double circuit 66kV overhead line taps on private property in the City of El Segundo (City), and to construct a new 66/13.2kV substation on private property at 324 El Segundo Boulevard in the City. The double circuit 66kV line taps and substation will serve the Chevron Refinery Steam Naphtha Reformer (SNR) Furnace Replacement Project. Each of the proposed line taps will be 150 foot double circuit 66kV lines, located on existing easements. The proposed 66kV line taps will be constructed using overhead 954 Stranded Aluminum Conductor (SAC). SCE will install one 65 foot tall wood pole, two 75 foot tall wood poles with 1200 amp pole mounted switches, and one 70 foot tall tubular steel pole. In addition, two existing 75 foot tall wood poles will be reframed to allow the installation of two 1200 amp pole mounted switches. One of the two proposed lines will tap an existing 66kV line on the north side of an existing substation on Chevron property. This line tap will travel east for approximately 100 feet. At this point the line will turn south for approximately 50 feet to the proposed substation. The second proposed line will tap another existing 66kV line 50 feet north of the proposed new substation and will travel west for approximately 100 feet. At this point, the new line will turn south for approximately 50 feet to an existing substation. The proposed new substation will be a 44.8 MVA, 66/13.2kV substation. The substation will occupy a 112 foot by 80 foot area located on Chevron's property. The substation will be equipped with three 66kV circuit breakers and two transformer banks. The tallest structure in the substation will be 30 feet high. The substation will be enclosed by an eight foot tall chain link fence topped with barbed wire and with a 20 foot wide gate on one side. The proposed construction period is August 30, 1999 through November 1, 1999. EMF Compliance: The California Public Utilities Commission (CPUC) requires utilities to employ no cost and low cost measures to reduce public exposure to electric and magnetic fields (EMF). In accordance with SCE's EMF Design Guidelines for New Electrical Facilities: Transmission Substation and Distribution, filed with the CPUC in compliance with CPUC Decision 93-11-013, SCE will implement the following measure(s) for this project: 1. Where possible, the proposed project will use taller poles. 2. The proposed line will be phased to minimize EMF. 3. The 66kV switchrack, 22.4 MVA transformers and 13.2kV service rack will be located near the center of the substation to minimize magnetic fields outside the substation. Exemption from CPUC Authority: Pursuant to CPUC General Order 131-D, Section III.B.1, projects meeting specific conditions are exempt from the CPUC s requirement to file for an application requesting authority to construct. This project qualifies for the following exemption: "Power lines or substations to be relocated or constructed which have undergone environmental review pursuant to CEQA as part of a larger project, and for which the final CEQA document (Environmental Impact Report (EIR) or Negative Declaration) finds no significant unavoidable environmental impacts caused by the proposed line or substation". Resolution No. 2433, by the City Planning Commission, approved Environmental Assessment No. EA-443 for the Chevron Refinery SNR Furnace Replacement and New Substation Project on November 12, 1998. Public Review Process: Persons or groups may protest the proposed construction if they believe that the utility has incorrectly applied for an exemption or believe there is reasonable possibility that the proposed project or cumulative effects or unusual circumstances associated with the project, may adversely impact the environment. Protests must be filed by July 21, 1999 and should include the following: 1. Your name, mailing address and day-time telephone number. 2. Reference to the CPUC Advice Letter Number and Project Name Identified. 3. A clear description of the reason for the protest. The letter should also indicate whether you believe that evidentiary hearings are necessary to resolve factual disputes. Protests for this project must be mailed within 20 calendar days to: California Public Utilities Commission Energy Division, Deputy Director 505 Van Ness Avenue, 4 th Floor San Francisco, CA 94102 AND Southern California Edison Company Law Department - Exception Mail 2244 Walnut Grove Avenue Rosemead, CA 91770 Attention: Ms. Y. Louie SCE must respond within five business days of receipt and serve copies of its response on each protestant and the CPUC. Within 30 days after SCE has submitted its response, the Executive Director of the CPUC will send you a copy of an Executive Resolution granting or denying the request and stating the reasons for the decision. Assistance in Filing a Protest: For assistance in filing a protest, contact the CPUC s Public Advisor in San Francisco at (415) 703-2074 or in Los Angeles at (213) 897-3544. Additional Project Information: To obtain further information on the proposed project, please contact: R. Haley, Public Affairs Regional Manager, Southern California Edison Company at (310) 783-9392.

ATTACHMENT B Notice Distribution List 66kV Power Lines and Substation Project in El Segundo Advice 1389-E Distribution List I) Agencies Mr. Bret Bernard Director of Building & Planning City of El Segundo 350 Main Street El Segundo, CA 90245 Kent Smith, Acting Executive Director California Energy Commission 1516 9 th Street, MS-39 Sacramento, CA 95814-5512 II) Newspaper El Segundo Herald 312 E. Imperial Avenue El Segundo, CA 90245