Disturbance Monitoring and

Similar documents
Unofficial Comment Form Project Disturbance Monitoring

Reliability Standard Audit Worksheet 1

Mapping of Requirements from PRC (ii) to PRC Project System Protection Coordination

Standard Development Timeline

PRC Coordination of Protection Systems for Performance During Faults

Project Consideration of Commission Directives in Order No. 693

Standard Development Timeline

Standard: PRC System Protection Coordination Requirement in Approved Standard Translation to New Standard or Other Action

FRCC Disturbance Monitoring Equipment Outage Reporting

Supplemental Information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1

Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project )

Implementation Plan for COM-001-2

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010

Transmission Interconnection Handbook, Appendix F. System protection, generation interconnection, substation test, and telecommunication personnel

Reliability Standard Audit Worksheet 1

DRAFT Reliability Standard Audit Worksheet 1

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

Information Document PRC-001-AB3-1.1(ii) Protection System Coordination ID # RS

Reliability Standard Audit Worksheet 1

Southwest Power Pool AQ IMPROVEMENT TASK FORCE MEETING June 5, 2013, 9-11am Net Conference MINUTES

i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection

About Georgia Transmission Corporation (GTC)

Network Configuration Document Selection for New Substations Framework

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013

PG&E Transmission Interconnection Handbook

Offshore BMU Configuration

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

PRC System Protection Coordination Supplementary Reference

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Standard EOP Disturbance Reporting

COM Communications and Coordination

A. Introduction. B. Requirements and Measures

Date adopted/approved 02/08/2013 Custodian (entity responsible for maintenance and upkeep) Data Exchange Work Group. Web URL: Previous name/number

PG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug.

PRC 001 R6 & R7.3 TFO s Notification Requirement

Facility Connection Requirements. LST-FAC-001-PRO-Facility_Connection_Requirements

Project Protection System Misoperations

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015

Québec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan Annual Implementation Plan

NERC Request for Data or Information: Protection System Misoperation Data Collection August 14, 2014

Generation, Transmission, and End User Facilities

WHAT IS A BUS? FUNDAMENTALS OF BUS PROTECTION. Kevin Wright Senior Protection Engineer Sacramento Municipal Utility District

Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1

Studies Overview and Data Requirements. Robert Pan

Unofficial Comment Form Project Protection System Maintenance and Testing Phase 3 (Sudden Pressure Relays)

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company

BULK POWER SYSTEM FACILITY AND END USER INTERCONNECTION REQUIREMENTS TO THE LIPA TRANSMISSION SYSTEM

SIRIUS Overload Relays. SIRIUS 3RB24 Solid-State Overload Relays with Complete Starter Functionality via IO-Link

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018

Revision 6.0. Transmission Interconnection Guide

136 FERC 61,187 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Parts and 40. [Docket No. RM ]

GE Multilin technical note

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

Reliability Standard Audit Worksheet 1

Consideration of Issues and Directives Project Modeling Data (MOD B) October 7, 2013

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

Power System Protection Training

Bulk Electric System Definition Changes and Reporting

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Transmission Register PTO Admin User Manual. Version 1.0

SIRIUS 3RB24 Solid-State Overload Relays with Complete Starter Functionality via IO-Link

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

BCM ULP Breaker Communication Module

Unofficial Comment Form

String monitoring with CMS - Circuit monitoring system Increased productivity and improved maintenance of PV systems

WON Security Guideline

REAL-TIME MONITORING DATA SPECIFICATION

Disturbance Monitoring Standard Drafting Team August 7, p.m. 5 p.m. August 8, a.m. 5 p.m. August 9, a.m. noon

Multilin P30 Phasor Data Concentrator

HPC-9DJ

OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER

INTERCONNECTION FACILITIES STUDY REPORT

State of Reliability Report 2013

TOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements. FRCC Spring RE Workshop April 17-18, 2018

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

Project Modifications to BAL Frequency Response and Frequency Bias Setting. Industry Webinar December 18, 2018

Electric Transmission Reliability

NERC and Regional Coordination Update

NPCC Regional Reliability Reference Directory # 4 Bulk Power System Protection Criteria

SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM

Facility Connection Requirements

Common Departures Interconnecting Facilities Requirements

Verification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation

Miniature Circuit Breakers for Railway Applications

JEA. Facility Connection Requirements

Blackstart Hardware-in-the-loop Relay Testing Platform

Commission Testing Methods for Protection Systems

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

Transcription:

PRC-002-2 R1 Notification Disturbance Monitoring and Reporting Requirements Compliance Spring Workshop May 10, 2017

Objectives This presentation will discuss: Requirement R1 Part 1.2 notifications Definition of Element Application of Bulk Electric System (BES) bus from Attachment 1 Notification requirements for transmission lines owned by an adjacent Transmission Owner (ATO) 2

PRC-002-2 Disturbance Monitoring and Reporting Requirements Purpose: To have adequate data available to facilitate analysis of Bulk Electric System (BES) Disturbances. Effective Date: July 1, 2016 for R1 3

Requirement R1 R1. Each Transmission Owner (TO) shall: 1.1. Identify BES buses for which sequence of events recording (SER) and fault recording (FR) data is required by using the methodology in PRC-002-2, Attachment 1. 4

Requirement R1 (continued) R1. Each Transmission Owner (TO) shall: 1.2. Notify other owners of BES Elements connected to those BES buses, if any, within 90-calendar days of completion of Part 1.1, that those BES Elements require SER data and/or FR data. 5

Requirement R1 (continued) R1. Each Transmission Owner (TO) shall: 1.3. Re-evaluate all BES buses at least once every five calendar years in accordance with Part 1.1 and notify other owners, if any, in accordance with Part 1.2, and implement the re-evaluated list of BES buses as per the Implementation Plan. 6

Definition of Element Glossary of Terms Used in NERC Reliability Standards: Element Any electrical device with terminals that may be connected to other electrical devices such as a generator, transformer, circuit breaker, bus section, or transmission line. An Element may be comprised of one or more components. 7

Application of BES bus Attachment 1, Step 1: BES bus For the purposes of this standard, a single BES bus includes physical buses with breakers connected at the same voltage level within the same physical location sharing a common ground grid. These buses may be modeled or represented by a single node in fault studies. For example, ring bus or breaker-and-a-half bus configurations are considered to be a single bus. 8

Application Question? Is notification to the ATO required under R1 Part 1.2 for the situation described below: The TO identifies a BES bus for which SER and FR data is required under Part 1.1 of R1 The BES bus is a ring bus (or breaker-and-a-half) with multiple transmission lines, and one of the transmission lines is owned by an ATO The ATO owns the line conductor, which connects to a disconnect switch, owned by the TO The disconnect switch is connected to a bus section of the BES bus, and is connected in series with the transmission line 9

One Line Diagram Ring Bus Point of interconnection 10

Notification Requirement In this example: The ATO owns part of the transmission line The transmission line is a BES Element The transmission line is connected to the BES bus R1 Part 1.2 1.2. Notify other owners of BES Elements connected to those BES buses, if any, within 90-calendar days of completion of Part 1.1, that those BES Elements require SER data and/or FR data. 11

Notification Requirement (continued) Therefore, the TO must notify the ATO within 90-calendar of identifying the BES bus in Part 1.1. Agreed to by all eight regions and NERC 12

Highlights A transmission line is an Element For PRC-002-2, ring bus and breaker-and-a-half bus configurations are considered to be a single BES bus Notification to ATOs is required, even if they only own the transmission line conductor 13

Questions? Scott Knewasser sknewasser@frcc.com (813) 464-0169