DECK All-In-One Enclosure. Quick Installation Guide for Field Installers

Similar documents
Quick Installation Guide for Field Installers

DON T WASTE INSTALL TIME!

EnerSure Installation Guide

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.

SolarVu Installation Guide for Sungrow SG60KU-M Inverter

PM Series Power Meter

AcquiSuite Ally 12 & 48 Advanced Multi-Circuit Meter

Site Preparation. for AE250 Inverter Installation Guide. SolarVu

Wiring & Configuration for AE Solaron Inverters

BLUE 3 INSTALLATION GUIDE

Multi-instrument Communication, MIC-2 MKII DIN Quick Start Guide

Version 1.0c May 6, 2010 ATK3

Ethernet Network Card Installation and Operation Manual

DRAFT. Application Note: Modbus/RS485 Wiring for Conext Core XC Series Inverters. 1.0 Introduction DANGER. 1.1 Related Documents

IIM Warwick Court. Williamsburg VA REV 5

SolarVu Installation Guide For CSI-KTL-GS Three Phase Inverters

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

INVERTER COMMISSIONING CHECKLIST

Rev CH Breaker Gateway Installation and Operation Manual

POWERWISE INDAC SETUP MANUAL

BCM2 Series Branch Circuit Monitors Quick Setup Guide

isma-b-mg-ip User Manual Global Control 5 Sp. z o.o. Poland, Warsaw

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER!

LGate 120 Installation Guide - Appendix

M250 (M LL) Safety

MYRIAD QLC 4-CHANNEL MONITOR/CONTROLLER INSTRUCTION MANUAL

SolarEdge 10000A-US Inverter SolarVu Installation Guide

Enercept H8035/H8036 Modbus Energy Meter Networked kw/kwh Transducers

SolarVu Installation Guide For Fronius SYMO Inverters

Multi-instrument Communication, MIC-2 MKII DIN Quick Start Guide

6222 Two Door Module Technical Operations Manual

SCR100 User Manual. Version:1.1 Date:Dec 2009

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB-1960, PMMC-1000 PM Series Power Meter

M215 (M215-60) Safety

SolarVu Installation Guide for Sungrow SG30KU Inverters

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Product Overview. Raritan DANGER!

Model HU-224/225. Technical Information TI.224/ Humidity Transduce r FOR ADDITIONAL INFORMATION SEE HU-224/225 DATA SHEET

installation Operation ADDRESS product diagram H8030/8031 INSTALLATION GUIDE

for Fronius IG Plus V Inverters

RGM180 Display Series

M215 Safety (M LL-S22-IG / S23-IG / S24-IG)

8380 RPC Return Path Combiner. User s Guide

ABB Drives. User s Manual RS-485 Adapter Board FRSA-00

Power Xpert Meter 2000 Gateway Card Kit

Power Xpert Meter 2000 Gateway Card Kit

DTS 310. DIN Rail Mounted, Indoor Rated Revenue Grade Electrical Sub-meter. Page 1. Measurlogic MQ A

M215-Z Safety Information (M LL-IG-ZC)

B60 Domestic Voltage Optimisation Unit

AcquiSuite Ally 48 Advanced Branch Circuit Monitor

Xcel Energy Telemetry Requirements for Distributed Energy Resource Interconnections: Revision 3.1

M GE825. SolarVu CL CL25000 Inverter Installation Guide

*****CAUTION/ATTENTION***** Before You Start...

700 Series 200 Amp Clamp Meters

Digital Lighting Systems, Inc.

IntesisBox Modbus Server KNX

epad 5.0 Mobile Keypad

PV Rapid Shutdown device

ENERCEPT H8035/H8036 DANGER NOTICE CAUTION. Networked Power Transducer (Modbus RTU) INSTALLATION GUIDE QUICK INSTALL TABLE OF CONTENTS

egauge Model EG4xxx Owner s Manual Version 1.0

ControlKeeper 4. General Information. Connecting Relay Loads. Installation Sheet. Getting Started. Power Supply Wiring. Mounting the Cabinet

SECTION SWITCHBOARDS

NEW ERA METER. Installation & Operation Guide NE METER

Instruction Manual. Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

SEM3 - Embedded Micro Metering Module

for AE 500NX Inverters Installation Guide COMMUNICATION SETTINGS (DEFAULT) SERIAL COMMS ADDRESS 22 8 RJ45 plug Viewed from pin side ORA-W ORA

MYRIAD LC1 LEVEL CONTROLLER INSTRUCTION MANUAL

ABB Drives. User s Manual Modbus Adapter Module FMBA-01

BMS: Installation Manual v2.x - Documentation

INTRINSICALLY SAFE DUPLEXER PROTECTION. ELECTRONICS, INC Vulcan Road Apopka, Florida MOTOR INSTRUCTION MANUAL

F-3100 FLOW METER NETWORK INTERFACE Installation and Operation Guide

EG4xxx Owner s Manual Version 1.0. Onset Computer Corp 470 MacArthur Blvd Bourne, MA

Installation Quick Reference Guide. BACnet Alarm v1.0

Power Xpert Meter 2000 Gateway Card Kit

NCOM SERIAL DEVICE SERVER 1XX SERIES USER S MANUAL

MID PRELIMINARY DATA SHEET. RI-D Series. Single Phase Multifunction Energy Meter (MID Certified) MID

Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation

Flex Gateway Card. Installation and Operation Manual. For CPS 50kW/60kW 3-Phase String Inverters

- +-+ Fig 1 Internet Connection. SolarVu Server. Fig 2 K135 to Sunergy inverters serial connections

Quick Guide Flex Gateway G2

Product startup: G-30 + DIGIWARE C31 - U30-3xI35

INSTALLATION INSTRUCTIONS

Metaphase DDC-3. Technologies USER MANUAL. Version 7.X August metaphase-tech.com. pg. 1

NCOM SERIAL DEVICE SERVER 4XX SERIES USER S MANUAL

Installation and Maintenance Manual IM

INSTALLATION INSTRUCTIONS

Installation and Maintenance Manual IM Replacement Intelligent Equipment Gateway

3710 ACM 3750 PDC 3800 RTU. ISOCOM Communications Card Retrofit Instructions

1/32-DIN TEMPERATURE CONTROLLER INSTALLATION, WIRING AND OPERATION MANUAL FORM 3882

ABB Drives. User s Manual. Modbus Adapter Module RMBA-01

Galaxy Rectifier Shelf Field Replacement

EX-RC1 Remote I/O Adapter

Nevco Message Center Installation Manual Retain this manual in your permanent file. 08/27/ Rev. C

Lab - Configure Wireless Router in Windows

Installing the Enphase Envoy-S Metered

Installation, Operation, and Service Manual SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET

Welcome to the safety functions configuration training module for ACS880 Cabinet-built industrial drives.

Lab - Connect to a Router for the First Time

Commercial 1000VDC String Inverter XGI Installation and Operation Guide Models: XGI XGI

INSTALLATION DKM-409 NETWORK ANALYSER WITH HARMONIC MEASUREMENT AND SCOPEMETER. Before installation:

Interface WI-FI CODE: INTW. v.1.0. Edition: 2 from Supersedes the: 1 from edition

Transcription:

DECK All-In-One Enclosure Quick Installation Guide for Field Installers

1 Contents Legal Statement... 2 Preliminary Considerations... 2 Required Installation Tools and Materials... 2 Networking Information... 2 Modbus Communication and Wiring Specification... 3 Cable Termination... 4 AC Wiring... 5 Providing AIO Box Control Power... 5 Meter Setup... 6 Supplying Reference Voltage... 6 Attaching your CTs... 6 Verifying proper CT installation... 7 External Modbus Devices... 8 AcquiSuite Configuration... 9 Configuring an IP Address... 9 Logging into the Acquisuite... 9 Verifying and Naming Modbus devices... 10 Sending Data to DECK... 10 Figures Figure 1 Control power input area... 5 Figure 2 Voltage reference input area... 6 Figure 3 CT input area... 7 Figure 4 - Auxiliary 24VDC power output area... 8 Figure 5 - Modbus device input area... 8

2 Legal Statement DECK Monitoring is not responsible for the installation of the monitoring system, which must be installed by a licensed electrician. In no event will DECK be liable for any damages, including personal injury, arising out of or related to any of the following: The installation of the monitoring system The security of Customer s network or the devices placed on the Customer s network (including the AcquiSuite) Any failure of the Hardware Unauthorized use of or access to the software service Internet connectivity For a full description of DECK s Terms and Conditions, including the warranty provisions, please visit this web page: www.deckmonitoring.com/terms.pdf. Preliminary Considerations Please read this guide fully for a comprehensive understanding of the installation procedures. Required Installation Tools and Materials Installer should bring the following materials to assist in the installation process: Laptop computer Digital multimeter Belden 3106A Modbus communication cable for monitoring additional devices AC wire and conduit necessary for installation Small (#0) slotted and Phillips-head screwdrivers A 5/16 slotted screwdriver Ethernet patch cable A small Ethernet router, switch or hub (as example: Netgear ProSafe 5-Port 10/100 Desktop switch or similar item) Networking Information Installers will need the following information before starting the configuration process: Valid IP address for your network Subnet Mask Gateway IP address Domain Name Service IP address

3 If you need assistance gathering the above information, contact your local network Administrator. Modbus Communication and Wiring Specification DECK Monitoring s Engineering Department has identified approved cables and network wiring methods in an attempt to provide a stable communications bus given that environmental noise has been and will continue to be an issue in the field. Belden 3106A has been identified as a desirable cable for Modbus communication networks. 3106A carries a 300V dielectric rating and as such must be provided with additional insulation as required when conductors carrying higher voltages are present, as required by the NEC and jurisdictions having authority. Modbus Network and Layout Requirements Devices shall be networked as a single bus Network shall originate from a single Bus Master device, here the Acquisuite Network shall be include termination per Modbus protocol specifications Network wiring shall be executed with an approved cable per DECK Monitoring Engineering Devices identified by DECK Monitoring Engineering as inducing noise into the Modbus network shall each require one (1) approved RS-485 Optical Isolator

4 Cable Termination The Modbus Standard for Serial Communication states that line termination resistors must be placed near each end of the bus. Modbus specifies that a network not requiring line bias shall use a 150Ω ½W resistor between the differential pair. This resistor value should be selected in accord with the impedance of the cable selected. Recommended cables typically require a 120Ω resistor. Some devices provide integral termination resistors. Before installing termination the installer should verify the absence of integral termination in the devices at each end of the Modbus network. Networks in a high RF environment may require the use of Line Bias to stabilize communications. The use of line bias requires a change to the termination resistor arrangement. Modbus specifies that a 1nF 10V capacitor shall be used in series with a 120Ω ½W resistor.

5 When the RS485 network is not being actively driven by a device the differential pair is more susceptible to interference and noise. Correct termination of the shield drain to a dedicated ground terminal or chassis should provide noise rejection. In environments where excessive interference and noise still compromises network stability line biasing, the use of pull-up/pull-down resistors on the differential pair is required. Individual equipment manufacturers may or may not provide facilities to bias the network. As such DECK Monitoring Engineering directs installers and technicians to reference the applicable installation documents for the equipment in these environments. In the event that none of the devices on the network provide the requisite bias facilities an approved optical isolator may be used. AC Wiring Providing AIO Box Control Power Control power terminals are two breaker-fused terminal blocks and a ground terminal (Figure 1 Control power input area). The DECK All-In-One enclosure provided (30BD) is powered using 90 Volts up to 304 Volts between the L1 and L2/N breakers. If control power is lost to the equipment, i.e. if it is powered from inverter output that is temporarily lost, data will not be recorded from the time of power outage to restoration. Please select the most reliable available source to power the equipment. Figure 1 Control power input area

6 Meter Setup Supplying Reference Voltage For a standard 480V 3-phase system each of the three hot conductors must be tapped to supply reference voltage to the meter with the appropriately sized conductors. If a neutral conductor is present at the point being metered, a neutral tap is required as well. Split-phase systems require the two hot conductors and neutral tapped to A, B, and N. Single-phase system require L-L or L-N tapped to A and B or to A and N, respectively. For more details, See the Veris meter manual at: http://www.veris.com/docs/installs/e51cx_full_i0b2.pdf For the DECK All-In-One enclosure provided with two DSP 30-24/277A power supplies, fused terminals under Monitored Voltage labeled VA, VB, VC, and N supply meter terminals A, B, C, and N, respectively (Figure 2 Voltage reference input area). Attaching the CTs Figure 2 Voltage reference input area Each CT should be placed on a load carrying conductor and wired to the corresponding CT input terminal on termination block inside the DECK All-In-One enclosure. Be sure that the CTs are mounted to the correct side of the switchgear, bus bar, etc. For PV generation metering, the CTs will be on the inverter side of the disconnect; for net metering, the CTs will be on the grid side; for building energy metering, the CTs will be on the load side. The CTs provided are labeled identifying their orientation to Source. Please face this side of the CT towards the inverter, the AC combiner, or the power source. If monitoring PV or other generation, the Source Side points towards the inverter(s). If monitoring demand, Source

7 Side points away from the load and towards the load s incoming energy source. If monitoring net grid energy used (net metering), Source Side points towards the grid. The white CT leads go to the A+, B+, and C+ CTs terminals (2.1, 2.3, and 2.5) and the black CT leads go to the A-, B-, C- terminals (2.2, 2.4, and 2.6) (Figure 3 CT input area). Verifying proper CT installation Figure 3 CT input area Verify that there is no wrench symbol in the top left corner of the meter's LCD screen. This wrench symbol is a warning of a phase sequencing error that would need to be corrected by verifying that the order of the wiring of the voltage taps to the terminal block matches the order of the wiring of the CT that are measuring the corresponding AC conductor. Next verify positive power readings by using the down button to navigate to the 3PHAS menu, and then the right arrow button to 3 KW. Finally, using the up button will then scroll through each of the phases power readings. If you find any of the phase(s) showing negative power values, flip the corresponding CT lead wires at the termination block.

8 External Modbus Devices Fused DC power at 24V and 1.25 Amps is available via terminals labeled DC 24V (11 and 12) that are just to the right of the neutral tap (Figure 4 - Auxiliary 24VDC power output area). These are designed to power weather stations, add-on meters requiring 24V, etc. Figure 4 - Auxiliary 24VDC power output area External Modbus devices are connected to the communications loop via standard Modbus daisychaining (Figure 5 - Modbus device input area). Connect the outgoing +, -, and common RS485 wiring to the DATA MOD/RTU terminals. Connect the other end of the wiring to the RS485 terminals on the next device in the chain. Double-land an outgoing RS485 wire set on the device along with the incoming wires for further devices in the chain as needed. Continue to the last device on the chain, where a terminative resistor is included between the + and terminals) if the final devices does not contain internal termination. See Communication and Wiring for termination information. Figure 5 - Modbus device input area Note that the Acquisuite gateway will be preconfigured to communicate with most external Modbus devices at Modbus IDs specified on the Bill of Materials provided on the 1-Line drawing generated by DECK.

9 AcquiSuite Configuration Configuring an IP Address Although the Acquisuite can obtain an IP address automatically via DHCP (and is set to DHCP by default), DECK Monitoring strongly recommends that the Acquisuite be configured with a static IP address, which provides a more stable and consistent network connection to the Acquisuite. In order to configure for a static IP address you will need to obtain the following information from the IT department responsible for the site: IP Address, Subnet Mask, Gateway Address, DNS 1 Address, and DNS 2 Address. To set the unit for a static IP address: Power on your Acquisuite. Acquisuite Ready, along with an IP address will appear on the built-in LCD screen. Locate the Menu and Select buttons on the top right hand side of the Acquisuite. Press the Menu button once to get to the TCP/IP Configuration Menu. Press the Select button once to get to the IP Configuration Menu. Press the Select button again to get to the IP address. At this point, the cursor on the display will be blinking on the first number in the IP address on the second line. Your IT department should have provided you with a static IP address to assign to the Acquisuite. To change the number currently displaying on the Acquisuite to the one given to you, press the menu button and the display will cycle through the digits 0-9 as well as a decimal option (. ). Once the correct digit is displayed, press the select button to advance to the next digit. Repeat the process until all the digits are correct. Set the Subnet Mask, Gateway, and DNS Servers, by pressing the Menu button to arrive at the appropriate menu, the Select button to enter that menu, and repeating the steps above to enter the appropriate IP address. Logging into the Acquisuite The Acquisuite's active IP address is displayed on its embedded LCD screen. From any computer connected to the same network as the AcquiSuite, type the displayed address into the Internet browser s URL bar on your computer. The AcquiSuite-Data Acquisition Server page will appear. (If you are unable to have your laptop connected to the same network, you can directly connect your laptop to the AcquiSuite with a network cable. Both the AcquiSuite and the laptop need to be set with a static IP address to do this. Refer to p. 10 of the Laptop/Computer Setup section of the AcquiSuite manual for detailed instructions.) Click on the link titled 'Click here for System Configuration. You will be prompted for your username and password to access the AcquiSuite s settings.

10 The user name is admin and the password is deckxxxx, where the XXXX is the last 4 characters of your AcquiSuite s serial number, which can be found on a label inside the bottom right of the DECK All-In-One enclosure. Verifying and Naming Modbus devices After logging in, you will be redirected the Welcome page. Choose the Device List menu option on the left menu tree under Modbus to view the communication status of the Modbus devices connected to the gateway. You can rename any of the devices by clicking the Rename All Devices link at the bottom of the Name and Purpose column of the Modbus Device List. Sending Data to DECK Once the Acquisuite detects an active Internet connection, it will begin uploading data to DECK. Visit the Status menu under Log File Data to view the current upload status and verify that data has been uploaded to DECK. As a final step, please call DECK Technical Support at (503) 224-5546 to verify the uploading of data to DECK.