Network Integration Transmission Service. Implementation of NITS on OASIS

Similar documents
NITS on websmartoasis. February 1, 2017

Designation and Termination of Network Resources

Business Practice. Non-Firm Transmission Service Request Processing

Open Access Transmission Tariff of Southern Companies

NorthWestern Energy (NWMT)

Transmission Service Reference Manual. May 08, 2017

Business Practice. 1.2 Resources must meet certain FERC specified requirements in order to qualify as Designated Network Resources.

REDIRECT OF A TRANSMISSION RESERVATION

OPUC Transmission Workshop 2 FERC Pro Forma Transmission

NETWORK INTEGRATION TRANSMISSION SERVICE. Preamble

Western Area Power Administration Right of First Refusal Business Practice

Midwest ISO. Module B- Network Integration Transmission Service Overview. Vikram Godbole Lead, Transmission Service Planning October 20, 2010

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures

Tri-State Generation & Transmission Association, Inc.

Member Impacting Project Overview. Order 676-H NITS Modifications to weboasis. version 2.0

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

ARR Registration User Manual

Feasibility Study on Load Flow and Short Circuit Project

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)

The NYISO shall assign a Queue Position based upon the date and time of receipt of the

Tri-State Generation & Transmission Association, Inc.

SoCalGas ENVOY. Backbone Transportation Service User Guide

I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)

Open Access Transmission Tariff Business Practices Manual Chapter K: Designation of Resource as a Network Resource

SoCalGas ENVOY. Buy Rights Ledger Backbone Transportation Service

Scheduling Jobs. Activating Bulk Provisioning Service CHAPTER

EIM Entity Readiness Criteria May 6, 2015

Stakeholder Comments Template

System Impact Study for Power Supply 400 MW Import on the EAL BCHA Path

bcuc British Columbia Utilities Commission

State Report Using the edmr. Denise Seman City of Youngstown

How to Interact with the Natural and Non-prescription Health Products Directorate Electronically. Guidance Document

WECC Board of Directors. Approved Regional Criteria

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process

ELECTRONIC FILING INSTRUCTIONS

NORTH COAST GAS TRANSMISSION. Electronic Bulletin Board. Shipper User Manual

Oracle Managed Cloud Services for Software as a Service - Service Descriptions. February 2018

ELECTRONIC FILING INSTRUCTIONS

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

Scheduling Jobs. Activating Bulk Provisioning Service CHAPTER

Electronic Filing Instructions In re Weatherford International Securities Litigation

Online Banking Wire Transfer Enrollment

MOD Transmission Reliability Margin Implementation Document

Electronic Filing Instructions In re Bristol Myers Squibb Co. Securities Litigation

North American Energy Standards Board

Scheduling and E mailing Reports

Online Banking Guide Commercial Banking Business Banking Government Banking

Chapter Nine: Organization Non-Filing Information

Electronic Filing Instructions Pfizer Securities Litigation Settlement

Reliability Coordinator Procedure

Agreements and Queue Management

Alerts Webster Web-Link Descriptions

Electronic Filing Instructions SEC v. A.C.L.N., Ltd.

Mathematical Algorithms for Calculation of Firm and Non-Firm ATC

MEMORANDUM. Robert Kreszswick, Director, Membership Services Department. Web CRD Electronic Procedures for Forms U4 and U5

Business ebanking Mail and Alerts

Coordinate Interchange

Coordinate Interchange

ONLINE BANKING MANUAL FOR BUSINESS MASTER USERS

Electronic Filing Instructions JP Morgan RMBS Settlement

FF Flex Mobile App. Easily manage your healthcare benefit account from your mobile phone!

TCR RELEASE 3.1 Job Aid for Structured Testing

FAQ- Alert Service for CPF Users

Generator Interconnection Process. Wholesale Transmission Overview

In re Allergan, Inc. Proxy Violation Securities Litigation

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service

Instructions for Non-Profit License Renewals. e-file

Direct Remittance User manual

CDKN Invitation to Tender Q&A - Project Name KMGL-0047b

INFRACON OPERATION PROCEDURE

ELECTIVE INTERCONNECTION FACILITIES

COCHRANE TELECOM SERVICES CRTC TELEPHONE SYSTEM Revision 1 GENERAL TARIFF Section 630 CARRIER ACCESS TARIFF

Morningstar Add-In (Microsoft Excel ) Release Notes

Instructions for Manufacturer's Agent New Registration. e-file

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

IACA Business Process Design and the High Volume Filer, Best Practices

PJM Daylight Saving Scheduling Guide for Spring and Fall 2018

Service Level Agreement

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Apple Bank s Mobile Remote Deposit Service

Southwest Power Pool AQ IMPROVEMENT TASK FORCE MEETING June 5, 2013, 9-11am Net Conference MINUTES

Electronic Filing Instructions Manulife Financial Corporation Securities Class Actions

Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 3.4 Last Updated: February 2015

Member Impacting Project Overview Data Push

Attachment C Service Level Agreement for WAN and Internet

SHORT TERM OPERATING RESERVE E-TENDER GUIDANCE DOCUMENT

Electronic Filing Instructions New York State Teachers Retirement System v. General Motors Company

ATTACHMENT I: Generator Interconnection Procedures (GIP)

GETTING STARTED ONLINE

Electronic Filing Instructions In re Barrick Gold Securities Litigation

WIRE TRANSFER ENROLLMENT QUICK REFERENCE GUIDE

Electronic Filing Instructions Manulife Financial Corporation Securities Class Actions

Onboarding Guide to the Microsoft Azure Enterprise Portal (Indirect Enrollment)

MSCS BridgeNet. Enter a Transfer In-Kind Request

Internet Banking. Member User Guide

Supplier Instructions for Completing NAFTA Certificate of Origin in Trade Automation (TA)

Fault Current Margin Queuing Position Process for Parallel Synchronous Distributed Generation. Consolidated Edison Company of New York, Inc.

Workshop on PJM ARR and FTR Market 2012/2013

Checklist for Submission to Utility

Transcription:

Network Integration Transmission Service Implementation of NITS on OASIS

Key Items Revisited Queue Processing and Preemption/Competition Automation of Hourly & Daily Strict Enforcement of Timing Requirements Curtailments Reservation v. Schedule Methodology Network Service Short Term TSR-Based Methods Long Term NITS Functionality

Network Service Benefits of new NITS process Short Term TSR-Based Methods Embedded attestation Daily designations processed automatically Long Term NITS Functionality Credits to ATC upon undesignation

Network Integration Transmission Service (NITS) SHORT-TERM DESIGNATION REQUESTS CHANGES

Monthly, Weekly, or Daily Firm Network CURRENT CURRENT Transmission Customer ( TC ) submits new OASIS reservation ( TSR ) for designation NID App document for attestation available on OASIS TC submits NID App via e-mail On-System Resource information (e.g. MVAR lead/lag) Off-System Resource information (e.g. Source BAA, POR Interface) Attestation of Network Resource meeting requirements of Section 29.2 in Southern Companies OATT Once TP verifies NID App is received and valid, then the TSR can be manually processed in the queue

Current NID app CURRENT

Monthly, Weekly, or Daily Firm Network TC creates new OASIS reservation for designation Before submission, TC must attest and provide appropriate Designated Network Resource ( DNR ) data on new embedded Attestation form Once the form is completed, then TC can submit the TSR for processing

Create TSR and Attest

Short-Term Firm Attestation

Close up of Attestation Link on TSR

Short-Term Firm Network Changes Summary NID app will no longer be needed embedded attestation Daily Firm designation requests will be processed automatically Currently, no template access for attestation form TC must use GUI Also, please note that a TSR cannot be undesignated If undesignation is anticipated to be needed, then the request must be created in the NITS Module More details about NITS module later

Network Integration Transmission Service (NITS) YEARLY DESIGNATION REQUESTS CHANGES

Requests for new Yearly Network Service CURRENT CURRENT Yearly requests for NITS are submitted TC electronically and/or by mail Application and spreadsheet templates available on OASIS Application contains the following information: Customer name and eligibility under Tariff Description of Network Load(s) 10 year forecasts Identification of any applicable interruptible load(s) Description of Network Resource(s) 10 year forecasts Description of customer s transmission system Service Commencement Date Attestation statement of the Network Resource(s) Create Yearly TSR representing the Designated Network Resource(s)

Yearly Network Service Request Timeline CURRENT Complete Network Service Application received Executed Study Agreement returned Facilities Study Agreement tendered Facilities Study completed and report provided 30 45 105 135 150 210? Days System Impact Study Agreement tendered System Impact Study completed and report provided Executed Facilities Study Agreement returned Network Service Agreement executed & filed

Modifications to existing Network Service CURRENT Requests to modify existing NITS are submitted by TC electronically or by mail Application requirements and study timelines are same as with new service request For new DNR, TC submits new TSR To terminate existing DNR, indefinitely or temporarily, TC submits Network Resource Termination request on OASIS Currently, does not credit back to ATC To add or terminate load(s) only requires amendment to NITS agreement ( NITSA )

Data Migration to NITS Module Confirmed Yearly Firm Network TSR data from current OASIS node has already been transferred into the new NITS module TC can preview all NITS data on OATI Demo node: http://demo.oasis.oati.com/soco/ All pending status Yearly TSR will be transferred before 10/1/2013 RECEIVED, QUEUED, STUDY, and ACCEPTED

Yearly Firm Network Service NITS Module TC creates new Network Load record with 10 year forecast TC creates new Network Resource record with 10 year forecast If not PPA resource type, then TC must create a Network Generation record containing required operating information TC must link each Network Resource to a Network Generation (except PPA ) Finally, TC creates new NITS application and selects designation for Network Load and Network Resource(s) with attestation Transmission Provider ( TP ) reviews application and marks Complete >>> Study process begins

Yearly Network Service Request Timeline Complete Network Service Application received 30 Executed Study Agreement returned 45 105 Facilities Study Agreement tendered 135 150 Facilities Study completed and report provided 210? Days System Impact Study Agreement tendered System Impact Study completed and report provided Executed Facilities Study Agreement returned Network Service Agreement executed & filed

Requests for new Yearly Network Service Define Network Load (10 year forecast) Define Network Generation (Operating Info.) Define Network Resource (10 year forecast) S T A T E S Designate Network Load(s) and Resource(s) New NITS Application NS123 PENDING to QUEUED by Customer RECEIVED by Provider Application deemed COMPLETED or DEFICIENT by Provider STUDY to ACCEPTED by Provider CONFIRMED by Customer

New NITS Module link

Network Service Summary

Requests for new Yearly Network Service Define Network Load (10 year forecast) Define Network Generation (Operating Info.) Define Network Resource (10 year forecast) S T A T E S Designate Network Load(s) and Resource(s) New NITS Application NS123 PENDING to QUEUED by Customer RECEIVED by Provider Application deemed COMPLETED or DEFICIENT by Provider STUDY to ACCEPTED by Provider CONFIRMED by Customer

Network Load

Step 1: Define Network Load On-System and Off-System Load definition requirements are same TP: SOCO Customer Name (e.g. [CUST] NETWORK LOAD ) Description (delivery points) Load Type: Off-System or On-System Balancing Authority Sink Point of Delivery (POD) Substation/Voltage ( Various if needed) Interruptible? Customer Transmission System [upload] 10-year Load Projection

Requests for new Yearly Network Service Define Network Load (10 year forecast) Define Network Generation (Operating Info.) Define Network Resource (10 year forecast) S T A T E S Designate Network Load(s) and Resource(s) New NITS Application NS123 PENDING to QUEUED by Customer RECEIVED by Provider Application deemed COMPLETED or DEFICIENT by Provider STUDY to ACCEPTED by Provider CONFIRMED by Customer

Network Generation

Step 2: Define Network Generation Identify operating characteristics On-System Type Off-System Type

Requests for new Yearly Network Service Define Network Load (10 year forecast) Define Network Generation (Operating Info.) Define Network Resource (10 year forecast) S T A T E S Designate Network Load(s) and Resource(s) New NITS Application NS123 PENDING to QUEUED by Customer RECEIVED by Provider Application deemed COMPLETED or DEFICIENT by Provider STUDY to ACCEPTED by Provider CONFIRMED by Customer

Network Resource

Step 3: Define Network Resource 3 Resources Types: On-System, Off- System, and PPA On-System and Off-System Resource Types must be linked to a Network Generation record TP: SOCO Customer Resource Name Description Location Resource Type: On-System Balancing Authority Source Point of Receipt (POR) External Transmission Arrangements [upload] 10-year Resource Projection

Step 3a: Link Resource to Generation

Requests for new Yearly Network Service Define Network Load (10 year forecast) Define Network Generation (Operating Info.) Define Network Resource (10 year forecast) S T A T E S Designate Network Load(s) and Resource(s) New NITS Application NS123 PENDING to QUEUED by Customer RECEIVED by Provider Application deemed COMPLETED or DEFICIENT by Provider STUDY to ACCEPTED by Provider CONFIRMED by Customer

NITS Application

Step 4: Create New NITS Application

Requests for new Yearly Network Service Define Network Load (10 year forecast) Define Network Generation (Operating Info.) Define Network Resource (10 year forecast) S T A T E S Designate Network Load(s) and Resource(s) New NITS Application NS123 PENDING to QUEUED by Customer RECEIVED by Provider Application deemed COMPLETED or DEFICIENT by Provider STUDY to ACCEPTED by Provider CONFIRMED by Customer

Yearly Network Changes Summary NITS module will contain all yearly designations of load and resources Long-term DNR will be represented by NITS Master Agreement ( NS123 ) No traditional TSR will be needed Requests for NITSA modifications will be facilitated via NITS module Aggregated 10-year forecasts will be maintained in NITS module Detailed 10-year forecasts in spreadsheets will still be needed by TP for planning purposes current process will continue Termination of Network Resources temporary or indefinite will be available in NITS module ATC will be credited upon termination for requested period

Network Integration Transmission Service (NITS) TERMINATION OF NETWORK RESOURCE NITS MODULE

Network Service Summary

Terminate Designated Network Resource

Terminate Designated Network Resource

The End QUESTIONS?