UNIVERSITI TEKNOLOGI MALAYSIA

Similar documents
DEVELOPMENT OF DATABASE MANAGEMENT SYSTEM (DBMS) BASED ON ELEMENTAL COST ANALYSIS (ECA) METHODOLOGY SITI KHAIRIZAN BINTI IBRAHIM

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS

DEVELOPMENT OF VENDING MACHINE WITH PREPAID PAYMENT METHOD AMAR SAFUAN BIN ALYUSI

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

DESIGN ANALYSIS OF EXTERIOR CAR BODY PART BASTIAN WIBAR BIN MOMANG

PREDICTION OF SURFACE ROUGHNESS IN TURNING OPERATION OF LOW CARBON STEEL AISI 1018 FAKHRUR RAZI BIN BAHRIN UNIVERSITI MALAYSIA PAHANG

TUITION CENTRE MANAGEMENT SYSTEM (TCMS) ZARIFAH BINTI MOHD PAHMI UNIVERSITI TEKNIKAL MALAYSIA MELAKA

VIDEO DISTORTION MEASUREMENT USING PSNR IN WAVELET DOMAIN MOK YUNG LENG

BORANG PENGESAHAN STATUS TESIS

THE DEVELOPMENT OF MODULAR PRODUCT DESIGN: FOLDABLE CHAIR

SYSTEM MANAGEMENT AQIQAH AND QURBAN ONLINE (SMAQO)

WEB-BASED DEVICE CONTROL AND COMMUNICATION VIA PARALLEL PORT MOHD RASHDAN BIN ABD RAHMAN UNIVERSITI TEKNIKAL MALAYSIA MELAKA

BORANG PENGESAHAN STATUS TESIS* TERHAD (Mengandungi maklumat TERHAD yang telah ditentukan oleh organisasi/badan di mana penyelidikan dijalankan)

BORANG PENGESAHAN STATUS TESIS*

HOME APPLIANCE CONTROL SYSTEM TAN WEI SYE

Performance of Real Time Traffic In The Ethernet And WLAN Using TCP And UDP Protocols. Punitha Subbramaniam

Study of Distributed Coordination Function (DCF) and Enhanced DCF (EDCF) in IEEE MAC Protocols for Multimedia Applications.

COORDINATION PROTECTION SYSTEM IN INDUSTRIAL PLANTS AHMAD TARMIZI BIN MD NOR

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

REMOVING AL-QURAN ILLUMINATION AMIRUL RAMZANI BIN RADZID UNIVERSITI TEKNIKAL MALAYSIA MELAKA

BORANG PENGESAHAN STATUS TESIS JUDUL: TAILOR SYSTEM (TailorSys) (HURUF BESAR)

BORANG PENGESAHAN STATUS TESIS*

SMART BODY MONITORING SYSTEM MOHAMAD KASYFUL AZIM BIN AHMAD

PERFORMANCE ANALYSIS OF VIDEO TRANSMISSION OVER IEEE ARCHITECTURE NOOR HURUL-AIN BINTI MOHAMAD

SMART PARKING SYSTEM USING LABVIEW MUHAMMAD NAZIR BIN MAT ISA

PROTOTYPE OF POWER LINE INTERFACE SOCKET USING EMBEDDED CONTROLLER FOR DATA ACQUISITION AND CONTROL. LAI CHING HUAT

PERPUSTAKAAN UTHM *

COMPARATIVE STUDY BETWEEN FEATURE EXTRACTION METHODS FOR FACE RECOGNITION

FORCE ANALYSIS ON ROBOTIC DEBURRING PROCESS

EDUCATION PATH SYSTEM MOHD ZULHAFIZ BIN HUSSIN

ZIGBEE-BASED SMART HOME SYSTEM NURUL ILMI BINTI OMAR

SESSION BASED ACTIVITY MONITORING APPLICATION FOR ANDROID TAN LEIK HO

UPGRADE FMS200: SHAFT SUPPLY MODULE THOUGH HUMAN MACHINE INTERFACE LEE HO CHUNG

NUR ZURAIN BT ZUBAIDI B

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA OPTIMIZATION OF MEASUREMENT PARAMETERS IN NON- CONTACT MEASURING SYSTEM

AN ANDROID-BASED SMART SECURITY TOURING SYSTEM FOR REAL-TIME DATA RECORDING USING NFC, GPS AND GSM TECHNOLOGY.

HOME APPLIANCES MONITORING AND CONTROL USING SMARTPHONE APPLICATION AHMAD DANIAL BIN AHMAD NAZRI

PERFORMANCE EVALUATION OF LEACH PROTOCOL FOR WIRELESS SENSOR NETWORKS USING NS2 MUHAMAD FAIZ BIN RAMDZAN

IMPLEMENTATION OF DIAMOND SEARCH (DS) ALGORITHM FOR MOTION ESTIMATION USING MATLAB SITI HAJAR BINTI AHMAD

BORANG PANGESAHAII STATUS TESIS

BORANG PENGESAHAN STATUS TESIS ν

THE APPLICATION OF DIFFERETIAL BOX-COUNTING METHOD FOR IRIS RECOGNITION AHMAD AZFAR BIN MAHMAMI

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

FINITE ELEMENT ANALYSIS OF SEEPAGE FLOW UNDER A SHEET PILE LOH LING PING

AUTO SILENT MODE FOR ANDROID SMARTPHONES MUHAMMAD AZLAN SHAHARIMAN BIN AHMAD

DEVELOPMENT OF HOME ENERGY MANAGEMENT SYSTEM (HEMS) CHEA MENG HUAT UNIVERSITI TEKNIKAL MALAYSIA MELAKA

ELECTROMAGNETIC MODELLING OF ARTIFICIAL PACEMAKER. Emelia Anak Gunggu

PROJECT TITLE JARIPAH BINTI ADZHAR

LOW COST MP3 PLAYER USING SD CARD KHAIRIL AMRI BIN MUHAMAD UNIVERSITI TEKNIKAL MALAYSIA MELAKA

DEVELOPMENT OF TIMETABLING PROGRAM FONG WOON KEAT

KOLEJ UNIVERSITI TEKNOLOGI TUN HUSSEIN ONN

DESIGN OF ENERGY SAVING AIR CONDITIONING CONTROL SYSTEM MOHD KHUZAIRIE BIN MOHD TAUFIK

2D CUT-OUT ANIMATION "MAT TUNANGKU"

NUR FARAH DIYANA BINTI SABARUDIN

LOGICAL OPERATORS AND ITS APPLICATION IN DETERMINING VULNERABLE WEBSITES CAUSED BY SQL INJECTION AMONG UTM FACULTY WEBSITES NURUL FARIHA BINTI MOKHTER

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

7 I I, BORANG PENGESAHAN STATUS TESIS* SESI PENGAnAN: 2012 I Saya MOHD FARID BIN MOHD YUSOF (B )

SIT1 NURI-IAZA BINTI MOHD RAMLI

HOME APPLIANCES AND SECURITY CONTROLLED VIA GSM SYSTEM NUR SYAFIQAH BINTI YUSOP

90(111H7. AND 1800i1H7. MOBILE PHONE SI1Il'LATION WITH HVNIAN HEAD ANI) HAND 11ODEl.

PLC APPLICATION FOR FLOOD DETECTION AND PROTECTION VIA COMMUNICATION SYSTEM MOHD AKMAL BIN ZAINAL ABIDIN

KARAOKE MACHINE TOOL MOHD AIEZATT DANIAL B RAMIZAN

AN IMPROVED PACKET FORWARDING APPROACH FOR SOURCE LOCATION PRIVACY IN WIRELESS SENSORS NETWORK MOHAMMAD ALI NASSIRI ABRISHAMCHI

BLOCK-BASED NEURAL NETWORK MAPPING ON GRAPHICS PROCESSOR UNIT ONG CHIN TONG UNIVERSITI TEKNOLOGI MALAYSIA

THE COMPARISON OF IMAGE MANIFOLD METHOD AND VOLUME ESTIMATION METHOD IN CONSTRUCTING 3D BRAIN TUMOR IMAGE

INFORMATION TECHNOLOGY EQUIPMENT MANAGEMENT SYSTEM (ITEMS) MOHD NOR IRMAN BIN SULAIh4AN UNIVERSITI TEKNCKAL MALAYSIA MELAKA

HOME MAILBOX NOTIFICATION MOHD HAZWAN BIN MOHAMED HARITH

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

PERPUSTAKAAN KUi TTHO 3 OOOO

INTEGRATION OF CUBIC MOTION AND VEHICLE DYNAMIC FOR YAW TRAJECTORY MOHD FIRDAUS BIN MAT GHANI

PROBLEMS ASSOCIATED WITH EVALUATION OF EXTENSION OF TIME (EOT) CLAIM IN GOVERNMENT PROJECTS

MULTICHANNEL ORTHOGONAL FREQUENCY DIVISION MULTIPLEXING -ROF FOR WIRELESS ACCESS NETWORK MOHD JIMMY BIN ISMAIL

SEMANTICS ORIENTED APPROACH FOR IMAGE RETRIEVAL IN LOW COMPLEX SCENES WANG HUI HUI

IMPLEMENTATION OF UNMANNED AERIAL VEHICLE MOVING OBJECT DETECTION ALGORITHM ON INTEL ATOM EMBEDDED SYSTEM

DEVELOPMENT OF MOBILE ROBOT CONTROLLER BASED ON BLUETOOTH COMMUNICATION SYSTEM MUHAMAD ROZAIMI BIN MUHAMAD SABRI B

CLOUD COMPUTING ADOPTION IN BANKING SYSTEM (UTM) IN TERMS OF CUSTOMERS PERSPECTIVES SHAHLA ASADI

ENHANCING TIME-STAMPING TECHNIQUE BY IMPLEMENTING MEDIA ACCESS CONTROL ADDRESS PACU PUTRA SUARLI


INTELLIGENT FINGERPRINT RECOGNITION SYSTEM SY MOHD SYATHIR BIN SY ALI ZAINOL ABIDIN UNIVERSITI MALAYSIA PAHANG

HARDWARE/SOFTWARE SYSTEM-ON-CHIP CO-VERIFICATION PLATFORM BASED ON LOGIC-BASED ENVIRONMENT FOR APPLICATION PROGRAMMING INTERFACING TEO HONG YAP

PERFORMANCE ANALYSIS OF SMARTPHONE BASED REAL-TIME DRIVER ASSIST SYSTEM OVER IEEE WIRELESS NETWORKS WONG CHEE YIN

DETECTION OF WORMHOLE ATTACK IN MOBILE AD-HOC NETWORKS MOJTABA GHANAATPISHEH SANAEI

A TRUST MODEL FOR BUSINESS TO CUSTOMER CLOUD E-COMMERCE HOSSEIN POURTAHERI

Signature :.~... Name of supervisor :.. ~NA.lf... l.?.~mk.. :... 4./qD F. Universiti Teknikal Malaysia Melaka

PERPUSTAKAAN UTHM 'I "-: -, * '

HARDWARE-ACCELERATED LOCALIZATION FOR AUTOMATED LICENSE PLATE RECOGNITION SYSTEM CHIN TECK LOONG UNIVERSITI TEKNOLOGI MALAYSIA

BORANG PENCALONAN HADIAH UNIVERSITI NOMINATION FORM FOR UNIVERSITY AWARD

ISOGEOMETRIC ANALYSIS OF PLANE STRESS STRUCTURE CHUM ZHI XIAN

ENHANCEMENT OF UML-BASED WEB ENGINEERING FOR METAMODELS: HOMEPAGE DEVELOPMENT CASESTUDY KARZAN WAKIL SAID

AUTOMATIC APPLICATION PROGRAMMING INTERFACE FOR MULTI HOP WIRELESS FIDELITY WIRELESS SENSOR NETWORK

DYNAMIC TIMESLOT ALLOCATION TECHNIQUE FOR WIRELESS SENSOR NETWORK OON ERIXNO

SUPERVISED MACHINE LEARNING APPROACH FOR DETECTION OF MALICIOUS EXECUTABLES YAHYE ABUKAR AHMED

GARIS PANDUAN PERMOHONAN IMBUHAN PENERBITAN JURNAL / PROSIDING / SITASI BERINDEKS SCOPUS

SECURE-SPIN WITH HASHING TO SUPPORT MOBILITY AND SECURITY IN WIRELESS SENSOR NETWORK MOHAMMAD HOSSEIN AMRI UNIVERSITI TEKNOLOGI MALAYSIA

SYSTEMATIC SECURE DESIGN GUIDELINE TO IMPROVE INTEGRITY AND AVAILABILITY OF SYSTEM SECURITY ASHVINI DEVI A/P KRISHNAN

Transcription:

PSZ 19:16 (Pind. 1/97) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL: DEVELOPMENT OF DATABASE MANAGEMENT SYSTEM (DBMS) BASED ON ELEMENTAL COST ANALYSIS (ECA) METHODOLOGY Saya SESI PENGAJIAN: 2005/2006 SITI KHAIRIZAN BINTI BERAHIM @ IBRAHIM (HURUF BESAR) mengaku membenarkan tesis (PSM/Sarjana/Doktor Falsafah)* ini disimpan di Perpustakaan Universiti Teknologi Malaysia dengan syarat-syarat kegunaan seperti berikut : 1. Tesis adalah hakmilik Universiti Teknologi Malaysia. 2. Perpustakaan Universiti Teknologi Malaysia dibenarkan membuat salinan untuk tujuan pengajian sahaja. 3. Perpustakaan dibenarkan membuat salinan tesis ini sebagai bahan pertukaran antara institusi pengajian tinggi. 4. ** Sila tandakan ( ) SULIT TERHAD (Mengandungi maklumat yang berdarjah keselamatan atau kepentingan Malaysia seperti yang termaktub di dalam AKTA RAHSIA RASMI 1972) (Mengandungi maklumat TERHAD yang telah ditentukan oleh organisasi/badan di mana penyelidikan dijalankan) TIDAK TERHAD Disahkan oleh (TANDATANGAN PENULIS) (TANDATANGAN PENYELIA) Alamat Tetap: 2053 Taman Sari, PM Dr. Mohamad Ibrahim Mohamad Jalan Hospital, Nama Penyelia 15200 Kota Bharu, Kel. Tarikh: 15 MAY 2005 Tarikh: 15 MAY 2005 Catatan * Potong yang tidak berkenaan. ** Jika tesis ini SULIT atu TERHAD, sila lampirkan surat daripada pihak berkuasa / organisasi berkenaan dengan menyakan sekali tempoh tesis ini perlu dikelaskan sebagai SULIT atau TERHAD. Tesis dimaksudkan sebagai tesis bagi ijazah Doktor Falsafah dan Sarjana secara penyelidikan, atas disertasi bagi pengajian secara kerja kursus dan penyelidikan, atau Laporan Projek Sarjana Muda (PSM)

I hereby declare that I have read this project report and in my opinion this report is sufficient in terms of scope and quality for the award of the degree of Master of Science, (Construction Management) Signature :. Name of Supervisor : PM Dr. Mohamad Ibrahim Mohamad Date : 15 th May 2006

DEVELOPMENT OF DATABASE MANAGEMENT SYSTEM (DBMS) BASED ON ELEMENTAL COST ANALYSIS (ECA) METHODOLOGY SITI KHAIRIZAN BINTI BERAHIM @ IBRAHIM A project report submitted in partial fulfillment of the requirements for the award of the degree of Master of Science (Construction Management) Faculty of Civil Engineering University of Technology, Malaysia May, 2006

I declare that this project report entitled Development of Database Management System (DBMS) Based on Elemental Cost Analysis (ECA) Methodology is the result of my own research except as cited in the references. The report has not been accepted for any degree and is not concurrently submitted in candidature of any other degree. Signature : Name : Siti Khairizan Binti Berahim @ Ibrahim Date : 15 th May 2006

ACKNOWLEDGEMENT I wish to express my sincere appreciation to my project supervisor PM Dr. Mohamad Ibrahim Mohamad for his effort, encouragement and guidance. In preparing this project report, I was in contact with many industry practitioners. They have given me tips and useful information in order for me to complete the data sourcing. I am very thankful to them. Last but not least, I am grateful to my beloved, Nasabandi, all my family members and friends for their everlasting support and encouragement to complete the course of studies.

ABSTRACT For 30 years, major Quantity Surveying (QS) consultants from the developed country have started to produce the Database Management System (DBMS) for estimating process. Development and installation of the software required high expenses. These conditions encourage the development of estimating software in the market. Currently, there are few estimating software in the market. These systems are difficult to use because they are not developed by the practicing QS themselves and not comprehensive enough. Therefore, this study aims to develop a software based estimating system using Elemental Cost Analysis (ECA) method. Extensive study was performed at the initial stage of this study using various methodologies such as interviews, questionnaire survey, and case studies in order to identify the viability of the developed system. This study found that the developed systems which integrate the application of DBMS system and ECA method increases efficiency and speed of estimating system. The developed system has been tested on real project and verified by a panel of experts. The results of the validation process encourage the recommendation of the developed system for practical implementation in the industry.

ABSTRAK Sejak 30 tahun yang lalu, kebanyakan Perunding Ukur Bahan daripada negara membangun telah mula menghasilkan Pengurusan Sistem Pengkalan Data untuk proses penganggaran. Pembangunan dan pemasangan perisian memerlukan perbelanjaan yang besar. Keadaan ini telah menggalakkan kepada pembangunan perisian penganggaran di dalam pasaran. Pada masa sekarang, terdapat beberapa sistem penganggaran di dalam pasaran. Sistem tersebut sukar untuk digunakan kerana pembinaan sistem tersebut adalah bukan oleh Juruukur Bahan dan tidak berapa lengkap. Oleh sebab itu, kajian ini telah dijalankan untuk membina perisian berdasarkan sistem penganggaran menggunakan kaedah Analisis Kos Elemen. Kajian dilaksanakan pada peringkat awal dengan menggunakan pelbagai kaedah seperti temubual, borang soal selidik, dan kajian kes untuk mengenal pasti keperluan dan keberkesanan sistem yang dibangunkan ini. Kajian ini telah membuktikan bahawa sistem yang telah dibangunkan yang berintegrasikan kepada aplikasi Pengurusan Sistem Pengkalan Data dan kaedah Analisis Kos Elemen telah meningkatkan kecekapan dan kepantasan sistem penganggaran. Sistem yang telah dibangunkan ini diuji dengan projek sebenar dan telah disahkan oleh panel-panel yang pakar. Proses pengesahan keputusan ini menggalakkan kepada cadangan untuk mengguna pakai sistem ini di dalam industri.

CONTENTS CHAPTER TITLE PAGE TITLE DECLARATION DEDICATION ACKNOWLEDEGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENT LIST OF TABLE LIST OF FIGURES LIST OF APPENDICES ii iii iv v vi vii viii xiii xiv xvi 1 INTRODUCTION 1.1 Introduction 1.2 Problem Statement 1.3 Aim and Objective 1.4 Scope of Study 1.5 Brief Methodology 1.6 Report Outline 1 1 3 3 4 6 2 REVIEW OF THE CURRENT PRACTICE IN PREPARATION OF ESTIMATING PROCESS 2.1 Introduction 2.2 Current Estimating Methods 7 7

2.2.1 Unit Method 2.2.2 Cube Method 2.2.3 Superficial of Floor Area Method 2.2.4 Storey-Enclosure Method 2.2.4.1 Objective 2.2.4.2 Rules of Measurement 2.2.4.3 Comparison with other Single Price-Rate Method 2.2.5 Approximate Estimate 2.2.6 Elemental Cost Analysis (ECA) 2.2.6.1 Benefits of Elemental Cost Analysis (ECA) 2.3 Basic Rules of Measurement/Taking-Off and Build Up Rate (BUR) 9 10 12 13 13 14 15 16 17 17 19 3 DEVELOPMENT OF DATABASE MANAGEMENT SYSTEM (DBMS) FOR ELEMENTAL COST ANALYSIS (ECA) METHODOLOGY 3.1 Introduction 3.2 Conceptual of Database Design 3.3 Development of Database Management System 3.3.1 Active Server Pages (ASP) 3.3.1.1 ASP Language Application 3.3.1.2 Accessing Data with ASP Components 3.3.1.2.1 RDO and DAO: Earlier Data Access Techniques 3.3.1.2.2 Universal Data Access 3.3.1.3 Re-architecting the application around ASP Web Service 3.3.2 Structured Query Language (SQL) 3.3.2.1 Introduction 3.3.2.2 SQL Activity Application 3.3.3 ActiveX Data Objects (ADO) 22 22 23 23 24 25 25 26 27 28 28 29 31

3.3.3.1 Introduction 3.3.3.2 ADO Connection Application 3.3.3.2.1 Data Providers 3.3.3.2.2 DataSets 3.4 Conceptual Model 3.5 Up-grade the Database Management System (DBMS) 31 32 33 33 34 36 4 RESEARCH METHODOLOGY 4.1 Introduction 4.2 Literature Review 4.3 Questionnaire 4.3.1 Preparation of Questionnaire 4.3.2 Response of Questionnaire Survey 4.3.3 Relative Index (RI) 4.4 Interview 37 37 38 38 39 39 40 5 DATA COLLECTION AND ANALYSIS 5.1 Introduction 5.2 Respondent Background 5.3 Current Practice in Preparation of Estimating Process Using the Existing Method 5.4 Development of Database Management System (DBMS) 41 41 44 48 6 DATA COLLECTION AND ANALYSIS 6.1 Introduction 6.2 Results and Discussion 6.2.1 Review of the Current Method of Existing Process 6.2.2 Need of the Standardize Database Management System (DBMS) in Preparation of Estimate 6.3 Case Study Construction and completion of three (3) and four (4) storey shop/office (KP87) at Parcel C2, Danga Bay, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim for 53 53 53 55

Messrs Danga Bay Sdn Bhd 6.3.1 Project Brief 6.3.2 Project Specification 6.3.3 Measurement/Taking-Off Elements and Items 6.3.4 Methods/Technique of Working 6.3.4.1 Main page to ECA 6.3.4.2 Main page to List of Projects 6.3.4.3 Main page to Standard Item & Description List 6.3.4.4 Determine the Sub or Sub-sub for Item Type (to create the ID) 6.3.4.5 Adding the number of Sub or Sub-sub for Item Type (create the ID code) 6.3.4.6 Adding the code of Sub or Sub-sub for Item Type (create the ID code) 6.3.4.7 Adding the code, description and the unit for Sub or Sub-sub for Item Type (create the ID code, description and the unit) 6.3.4.8 Adding the project title, number of preliminary estimate & cost plan, location/specific level and date 6.3.4.9 Summary page of ECA 6.3.4.10 Details page of ECA 6.3.4.11 Measurement page of ECA 6.3.4.12 Build Up Rate (BUR) page of ECA 6.3.4.13 Gross Floor Area (GFA) page of ECA 6.3.4.14 Completed Summary Page of ECA 6.3.5 Evaluation 57 57 57 59 59 59 60 60 61 62 63 63 65 65 66 67 68 69 70 72 7 CONCLUSION AND RECOMMENDATION 7.1 Introduction 7.2 Conclusions 73 73

7.2.1 Review the Current Methods in Preparation of Estimates 7.2.2 Development of Database Management System (DBMS) 7.3 Recommendation 7.3.1 Taking off System 7.3.2 BOQ Scanning System 7.3.3 BOQ Production System 7.3.4 Analysis System 7.3.5 Tender Evaluations 7.3.6 Valuation and Interim Payments 7.3.7 Digitisers 7.3.8 Up-grading of ECA DBMS Estimating System 73 74 75 75 75 76 76 77 78 78 78 REFERENCES 79 APPENDICES 81

LIST 0F TABLE TABLE NO. TITLE PAGE 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 5.12 6.1 6.2 Gathered data for year experience of the respondents Registered respondents with Institution of Surveyor Malaysia (ISM) Appointment of the Quantity Surveyor Preference of current methods in preparation of estimate Range of accuracy percentage in preparation of preliminary estimate Preference of suitability to apply preliminary estimate in the form of ECA based on different type of building construction Causes ECA not prepared after project completed Comparison between the companies using the DBMS against the company without the DBMS Reason why they not using DBMS in company Problems/Effectiveness occurred to the company without DBMS Types of DBMS Advantages/Effectiveness by using the DBMS Project Specification Completed summary page of ECA 42 43 44 45 46 47 47 49 50 51 51 52 57 71

LIST 0F FIGURES FIGURE NO. TITLE PAGE 1.1 3.1 3.2 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 6.1 6.2 6.3 6.4 Study of flow chart ASP application with the server Conceptual Model Percentage breakdown of respondents base on years of practice Percentage breakdown of registered respondents with Institution of Surveyor Malaysia (ISM) Percentage breakdown appointment of the Quantity Surveyor Percentage breakdown of range of accuracy Percentage breakdown of causes ECA not prepared after project completed Percentage breakdown of companies using the DBMS against the company without the DBMS Percentage breakdown of the reason for not using DBMS in company Percentage breakdown types of DBMS used Main page to ECA Main page to List of Projects Main page to Standard Item & Description List Determine the Sub or Sub-sub for Item Type (to create the ID) 6 28 35 42 43 44 46 48 49 50 52 59 60 61 62

6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 6.13 Adding the number of Sub or Sub-sub for Item Type (create the ID code) Adding the code of Sub or Sub-sub for Item Type (create the ID code) Adding the code, description and the unit for Sub or Subsub for Item Type (create the ID code, description and the unit) Adding the project title, number of preliminary estimate & cost plan, location/specific level and date Summary page of ECA Details page of ECA Measurement page of ECA Build Up Rate (BUR) page of ECA Gross Floor Area (GFA) page of ECA 62 63 64 65 66 67 68 69 70

LIST 0F APPENDICES APPENDIX TITLE PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Questionnaire Survey Site Layout Measurement/taking-off lists Architectural Drawing : Pelan Tingkat Bawah Aras 7.500m Architectural Drawing : Pelan Tingkat Bawah Aras 10.800m Architectural Drawing : Pelan Tingkat Satu Architectural Drawing : Pelan Tingkat Dua Architectural Drawing : Pelan Tingkat Bumbung Architectural Drawing : Pandangan 1 & 2 Architectural Drawing : Pandangan 3 & 4 Architectural Drawing : Keratan A-A & B-B Structural Drawing : Foundation Layout Plan Structural Drawing : Lower Ground Floor Plan Structural Drawing : Ground Floor Plan Structural Drawing : First Floor Plan Structural Drawing : 2 nd Floor Plan Structural Drawing : Roof Plan Structural Drawing : Upper Roof Plan 81 88 89 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109

CHAPTER 1 INTRODUCTION 1.1 Introduction This chapter will present an overview of the study in respect of its background; determining its aims, specifying the problems in the problem statement, mapping the study process, selection of the correct methodology, setting the report outline and identify the limitation of the study scope. 1.2 Problem Statement Anyone with an interest on cost advice will be aware that the subject can involve the use of a number of mathematical formulae. At the heart of nearly all building evaluation programmes of any size is a database, which is an organised pool of shareable data usually consisting of regularly updated files. These files are related and permit direct retrieval of information for a wide range of purpose. The function of approximate or preliminary estimate is to produce forecast of the cost of any future project before it is designed in details. This preliminary estimate will inform the client about their commitments (as the project owner) before the design works is undertaken. The choice of method employed will be

2 influenced by the information and time available, the experience of the Surveyor and the amount and form of the cost data available to him. The entry of Quantity Surveyor with adequate technique into the estimating field was of considerable significance in the early development of professional role. To extent this role into that, the building economics required the development of understandings and techniques of a kind that deal. Not just with the items which go into the accountancy of a particular building, but with the economic and other forces, which have determined the nature and relationship of those quantities and costs, and which determine the trends they show. Indeed, economics is the study of all the forces which determine the present functioning and probable future trends of a whole industrial or financial system. The Quantity Surveyor performs an extremely important role in cost assessment, giving advices as to the probable cost of a particular design proposal and variation to it. However, be emphasized at the outset that no approximately estimate can be any better than the information on which it is based. Indeed, realistic approximately estimating can be achieve only when there is full cooperation and communication between all the consultants to gather the information. The information also can be taken from the supplier, contractors and also from the past project. The estimate which based on inadequate information cannot be precise, and in such a situation he would be well advised to give a range of prices, as an indication of the lack of precision that is obtainable. Here the important of the Database Management System (DBMS) for estimating process in collecting the information. Using computer based tools to generate an estimate will only take few minutes. However, the Quantity Surveyor needs better techniques, parametric models, and tools in case of changes during the design development process. The greatest challenge for the Quantity Surveyor is deciding where to start when faced with a blank sheet of paper to start the first preliminary estimate or to up-grade the existing or previous preliminary estimate if changes are happen. For example, during a proposal Quantity Surveyor must quickly gain an understanding of the

3 building s requirements, the structure of the solution, and the process needed to design, build, and deliver that solution in computer base. Hence, the development of Database Management System (DBMS) in respect of Elemental Cost Analysis (ECA) form should become the best solution to make sure the information gathered are in systematic ways and easy to understand. Therefore, the needs of computer generated in preparation of estimating process are a must to produce accurate, fast and lower overhead cost to enhance the clients need in order to achieve clients target such as total construction cost, duration of construction period, and forecast their profit or loss. 1.3 Aim and Objective The aim of this study is to identify how to improve the efficiency in preliminary estimate through the use of computers to cope with increasing challenges of tight budgets, strict deadline and limitation of staff (resources) in preparing the approximate quantity. These will include modelling and utilizing of construction information database to support estimating operations. To achieve the above aims, the following objectives are set: a) To review the current practice in preparation of estimating process b) To develop a new computer generated approach in DBMS to support the estimating process based on ECA methodology c) To evaluate the implementation of the ECA DBMS estimating system using real life project. 1.4 Scope of Study The scope of study will be focusing on current practice of Quantity Surveying Firms in preparation of estimating process. After the interview with

4 senior quantity surveyor and also through the early literature review, the current estimating process can be classified into six (6) types as follows: a) Unit Method b) Cube Method c) Superficial of Floor Area Method d) Storey-Enclosure Method e) Approximate Estimate f) Elemental Cost Analysis (ECA). The study will also focus on the development of a new computer generated approach in Database Management System (DBMS) to support the estimating process base in Elemental Cost Analysis (ECA) methodology. Evaluation of this computer generated approach on the Elemental Cost Analysis (ECA) Database Management System (DBMS) estimating system will be using real project setting as follows: - Construction and completion of three (3) and for (4) storey shop/office lot (KP87) at Parcel C2, Danga Bay, Mukim Bandaran, Daerah Johor Bahru, Johor Darul Takzim for Messrs Danga Bay Sdn. Bhd. 1.5 Brief Methodology The study was conducted mainly through three (3) methods, namely: i) A literature review was conducted in all the various way which are relevant such as books, articles, journals, magazines, reports, and examination paper for the Professional Practice by Institution of Surveyor Malaysia (ISM).

5 ii) iii) Questionnaire was passed to the qualified Quantity Surveyor (registered with Board of Quantity Surveyor Malaysia - BQSM, Institution of Surveyor Malaysia (ISM) or both). The questionnaire are divided into three (3) section and structured as follow: - Section A : Respondents background - Section B : Current estimating method - Section C : Usage of Database Management System (DBMS) Interview was conducted with the same qualified quantity surveyors (respondent in (ii)). The respondents give a very good feed back from the face-to-face interview because they can refer to the questionnaire as guidance in answering the interview.

6 The study can be summarized by the flow chart shown in Figure 1.1 Preliminary Stage Identify Problems Establish the aim and objective Information Gathering Stage Information Gathering Literature Review Questionnaire Interview Analysis and Development System Stage Development of ECA DBMS System Writing Stage Summary, Conclusion, Suggestion and Documentation Figure 1.1 : Study of flow chart 1.6 Report Outline The report can be divided into seven (7) main chapters. The first chapter introduced the report aims and objectives, scope of study, and selected method used in conducting the study.

7 The second chapter is a review on the current estimating methods (Unit Method, Cube Method, Superficial of Floor Area Method, Storey-Enclosure Method, Approximate Estimate, and Elemental Cost Analysis (ECA)). This chapter will also describe how to do the measurement/taking-off in order of Standard Method of Measurement (SMM), and rate the element by Build Up Rate (BUR). Chapter three will discuss the development of the Database Management System (DBMS). The implementation of Active Server Pages (ASP), Structured Query Language (SQL), and ActiveX Data Objects (ADO) are shown on the connection, language and communication between these three (3) elements to develop the estimating system. Chapter four described the selected methodology used in this study together with the structure and description on the questionnaire. Chapter five showed the collected data from the questionnaire survey in form of tables, figures and also the analysis of these data. Chapter six focus on the results and the findings of the studies. The last chapter which is chapter seven will present the conclusion and recommendation for further study.