IEC Engineering Process and Multi-Vendor System Configuration Tools Reduce Engineering Costs of Substation Automation Projects

Similar documents
Copyright 2017 SUBNET Solutions Inc.

The synergy of SCADA with energy control

Integrating IEC & IEEE 1815 (DNP3)

InFusion SOFTWARE Product Specifications

How smart can the grid really be?

Trends, Lessons and Benchmarks

Make your life safer and simpler

Engineering Approach for the End User in IEC applications

Power quality enhancements for IEC 61850

Let reliability and flexibility be your drive. Linergy. Distribution and connection systems from 0.5 A to 4000 A

Boost your productivity. by upgrading your Modicon Compact 984

Designing a new IEC substation architecture

Pushing the limits. ABB product development based on the IEC standard

Smart Grids, Telecontrol and the New Standards. Reliable and secure communication with zenon Process Gateway

Overview and Application

MiCOM P122C Time-Overcurrent Protection

This application note describes configuring automatic bus transfer (ABT) logic with two V57 relays.

Standards Are Not Enough! Challenges of Interoperability. A. ESHPETER SUBNET Solutions Inc. Canada

SCL Manager An Engineering & Configuration tool based on IEC

PAC World Conference IEC A to Z Implementation in a Nutshell

Substation Configuration Language. Summary August 2006

Communication Interface

Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO!

INTELLIGENT ELECTRONIC DEVICE DATA EXTRACTION AT HYDRO ONE. Sheng Hsu Senior Protection & Control Engineer Hydro One

Easergy Studio V8.0.0 Release Notes

MiCOM Px3x Series. Self Monitoring. Supplementary Functional Description

Impact of IEC communication protocol on substation automation systems

System Engineer Configures IEC Gateway to DNP3 Substation

MiCOM P111. Three phase and earth fault overcurrent relays

ICT standards for smart grids: IEC 61850, CIM and their implementation in the ERIGrid project

Digital substations. Introduction, benefits, offerings

Industrial Communication. Ethernet as a Distributed I/O Network

IEC Test Equipment Requirements

Rethink the future of metering

IEC Overview. Grant Gilchrist. Principal Consultant, Smart Grid Engineering November 2009

Substation to substation (ss2ss) GOOSE exchange for critical relay operations

The Impact of the coming Standard IEC61850 on the Life-cycle of Open Communication Systems in Substations

IEC SCL - MORE THAN INTEROPERABLE DATA EXCHANGE BETWEEN ENGINEERING TOOLS

* Make the most of your energy

Leverage substation gateway hardware to host a substation HMI and reduce costs

COMMUNICATION NETWORKS. FOX615/612 TEGO1 IEC GOOSE Proxy Gateway interface module.

MiCOM P521. Fast feeder differential protection

ProField-GW Description

Effective energy management services for all your needs

Development of an Intelligent Station HMI in IEC Based Substation

Yukon Visual T&D HMI/SCADA

Utilization of IEC GOOSE messaging in protection applications in distribution network

Grow your business, expertise, & profitability by partnering with Schneider Electric. Note: Requires Adobe Reader for full interactive experience

Station Automation based on IEC 61850

C I R E D 22 nd International Conference on Electricity Distribution Stockholm, June 2013

Digitizing copper Defining key elements to ensure a successful integration from concept to maintenance

RELEASE NOTE. Integrated Engineering Tool IET600 Ver. 5.3 Feature Pack 3

CASE STUDY. Wind Farm in Mexico Completes First Successful IEC Application With Multivendor Interoperability

Amsterdam 27 September 2017 David MacDonald

ABB Automation & Power World: April 18-21, 2011 IEC connectivity, networking and state-of-the-art Relion protection/control technologies

Abstract. Randy Kimura GE Digital Energy

The move to IEC61850 what and when will it be delivered?

Schneider Electric Alliance

When two become one. JOHAN HANSSON, STEFAN BOLLMEYER The successful. ABB review special report

MiCOM P124. Self and Dual Powered Overcurrent Relays. Protection Relays

ABB Group April 19, 2011 Slide 1

PowerLogic communication devices. EGX100 Ethernet gateway EGX300 Integrated gateway-server. Technical data sheet

MiCOM P521. Fast Feeder Differential Protection

PAP13 - Harmonization of IEEE C with IEC and Precision Time Synchronization

IEEE 1588v2 Time Synchronization in Energy Automation Applications Case Studies from China

SDG&E s EPIC Demonstration Projects on Emerging Communication Standards. IEC Europe 2017 Conference. Frank Goodman, SDG&E EPIC Program Manager

Jehanpour Ranjkesh, Integrator Partner Seminar 2012 Station level product news Automation Controller COM600

SDG&E EPIC Program Overview

ECE Supervisory Control & Critical Infrastructure Systems IEC Presented by Jake Groat Slides by Rick Liposchak, P.E.

MiCOM P721 & P723. Numerical High Impedance Differential Relay. Protection Relays. Customer Benefits

IEC 61850: From Paper to Operation

Ethernet Network Redundancy in SCADA and real-time Automation Platforms.

More Than Communication the Engineering Approach of IEC 61850

RELEASE NOTE. Integrated Engineering Tool IET600 Ver. 5.3 Feature Pack 4

Electrical network management. Schneider Electric. EM4200 Technical Datasheet

Learn IEC Configuration In 30 Minutes

Application of IEC61850 in smart grid visualization, simulation and diagnosis

AMA ServerSim-G Server-Simulator for IEC Data Sheet

IEC conference Amsterdam 2017

Smart Grid Architecture Committee (SGAC) Standard Review IEC Suite of Standards White Paper November 2011

Analysis of an IEC based Electric Substation Communication Architecture: A Simulation and Experimentation based Hybrid Approach

GEORGE J. ANDERS, Ph.D., P.Eng., Fellow IEEE

IEC Comprehensive & Independent Hands-on Training

Importance of Interoperability in High Speed Seamless Redundancy (HSR) Communication Networks

Lessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc.

Introduction and Overview of IEC Communications. Schweitzer Engineering Laboratories, Inc.

IEC standard update

Substation Automation Systems

Send documentation feedback to Supported Functionalities - Switches and IEDs

Synchronous switching of distribution sub networks

Verified and validated

OsiSense for your hoisting applications

The State-of-the-art HMI that adapts to your needs

THE ANATOMY OF A CENTRALIZED REMEDIAL ACTION SYSTEM: WHAT CAN BE DONE IN 50 MILLISECONDS?

IMPACT OF IEC ON SYSTEM ENGINEERING, TOOLS, PEOPLE- WARE, AND THE ROLE OF THE SYSTEM INTEGRATOR

/ Charlie Hsu, Sales, PSAC, Power System Division, TWABB, June.2013 IEC The Approach and the Standard. ABB Group July 1, 2013 Slide 1

IEC61850 TaskForce - Punch List*

Power Products. Protection and Control IED Manager PCM600 Product Guide

PowerLogic power-monitoring units. iem3000 Series. Technical data sheet

Electrical engineering. data management. A practical foundation for a true mechatronic data model

Transcription:

IEC 61850 Engineering Process and Multi-Vendor System Configuration Tools Reduce Engineering Costs of Substation Automation Projects Adam Gauci, P.Eng. Schneider Electric North America

Summary Abstract... 1 Introduction... 2 IEC 61850: More than a communications protocol... 3 Engineering substation communications systems... 5 Conclusion... 8 White paper on substation automation engineering cost reduction

Abstract This paper discusses the various costs associated with the substation automation engineering process such as change management, software configuration training, and human error. It then compares the object-oriented engineering approach as defined in the IEC 61850 standard versus traditional methods using hardwire and DNP3. A case is then made for multivendor system configuration tools by discussing the benefits and cost savings associated with following a standard engineering process. Finally, the paper describes one such tool. White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 1

Introduction As substation automation is moving towards software based IEC 61850 environments, the engineering process is becoming more complex. Consequently a greater portion of the CAPEX budget is used to develop new (or upgrade existing) substations especially in interoperable, multi-vendor environments. This can be attributed to the increasingly complex automation schemes which are now possible, and the learning curve associated with having to learn a multitude of different configuration tools currently required during the engineering process of a substation automation system. One problem today is that many vendors of substation systems have tried to adapt proprietary methodologies into their native tools for configuring IEC 61850 communications within a substation. This leads to incompatibilities between devices and configuration tools from different vendors. It also increases the potential for incorporating human error into the process as engineers have to use multiple tools to configure a substation automation system. White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 2

IEC 61850: More than a communication protocol Data with Context Preparing a tabulation of functions for monitoring and control of a substation by a central SCADA system can be a complex task. With the multitude of new intelligent electronic devices (IEDs) with communications capabilities such as protection relays, controllers, remote terminal units (RTUs) and gateways, a lot of different players are now involved in the process. These players usually have very different roles and priorities. For example, a protection engineer may be involved with the data mapping of a protection relay, but their primary function is to configure the protection settings of the relay. As dataflow progresses up the hierarchy from device to SCADA, data must be passed through many different systems, and through teams with different competencies, which makes it difficult to ensure the data context stays intact. With traditional SCADA protocols such as DNP3, many engineers would use spreadsheets and other forms of documentation to pass the context of the data from level to level. An alarm at a protection IED would be mapped to a DNP3 index; this index could be mapped to data concentrators by a controls engineer, and finally mapped to a SCADA front-end processor. As the data is mapped from index to index, it is easy to lose the context of the data through human error when compiling such mapping tables. With IEC 61850, data is mapped to logical nodes with pre-defined, meaningful names in the context of an electrical substation. This standardisation between different devices and players ensures that the data never loses its context at different stages of the substation engineering process. Peer-to-Peer Messaging With new technologies, protection schemes are becoming more complex. Inputs and outputs are traditionally hardwired between different IEDs. During the engineering process, a small change in the protection scheme logic could require a substantial amount of effort to implement, especially during later stages of the engineering process. This change could require updating engineering drawings, making modifications to, or adding new wiring between devices. These changes can be time consuming and labour intensive, requiring different trades to accomplish what could be considered a trivial change to some digital logic. IEC 61850 Generic Object-Oriented Substation Event (GOOSE) messages are highspeed messages optimised to be multicast over an Ethernet network. These messages allow for digital representations of hardwire I/O to be published on the network and received by the subscribers within a 4 ms timeframe. The major benefit of using GOOSE messaging for I/O is that adding new logic variables and virtual inputs and outputs is simplified, requiring the engineer to only modify the device configurations. The potential now exists for much more complex, distributed protection schemes. Removal of physical I/O limitations of protection relays allows for hundreds of virtual input and output signals internal to a relay and not typically used in today s schemes to be shared between multiple devices. White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 3

Substation Configuration Language Based on extensible Markup Language (XML), IEC 61850 provides a configuration language that can be used to describe the functional specification of the substation switchyard equipment, and how it relates to communication systems and IEDs. This information is stored in various types of files with different subsets of data, described in Table 1. These files allow for data transfer between different engineering tools and devices, independent of the manufacturer. This eliminates some of the intermediate steps that are required when using current methods for typical substation engineering projects, and helps to maintain data coherency. SCL DESCRIPTION FILE TYPES SCL File File extension Description IED Capability Description ICD The ICD contains a description of the functional capabilities of a specific IED type. It acts as a template to be configured by the engineer in a system or IED configuration tool. Instantiated IED Description System Specification Description Substation Configuration Description Configured IED Description System Exchange Description Table 1 IID SSD SCD CID SED The IID contains a pre-configured instance for a single IED for a specific project. It may already have some components already configured such as project addresses or datasets. This data can be imported to a system configuration tool. The SSD describes the single line diagram of the substation, the required substation switchyard equipment, their functions, and the required IEC 61850 Logical Nodes. The SCD contains the complete system configuration including the substation specification, all configured IED instances, and the communications configuration. The CID file is meant to be sent directly to the IED for configuration. It contains information related to configuring the communications for a specific IED. The SED describes interfaces for data that needs to be exchanged between different projects. White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 4

Engineering substation communication systems Engineering Challenges Distributed, Multi-vendor Environments With the progression of Ethernet based networks inside the substation, functions are increasingly being distributed amongst many different devices. Since open standards are not restricting designers into a vendor proprietary solution, designers are free to choose the best solution for their application. This can lead to multi-vendor environments. To configure the communications between the different devices inside a substation, system engineers must learn to configure multiple devices from different vendors. These vendors can take vastly different approaches to their configuration methodology. This can lead to increased costs in terms of additional training time for engineers. Manual Engineering With the multitude of different configuration tools available for the different devices in a substation system, creating links between diverse devices can be a manual process. This can lead to the introduction of human error into the system. Change Management Implementation One common consideration to make when deciding whether to permit a change during the substation system engineering process is the amount of effort the change will take to implement. It is often difficult to completely plan for all contingencies during the design phase of the system. Realistically, new requirements and problems can arise during the implementation phase of a project. The change can require updates to engineering drawings, modifications to already implemented wiring, and many device configuration updates. This can be costly in terms of the time to implement the change and the effort of personnel with different roles and competencies. Another consideration has to do with how the desired outcome of the change is evaluated. If the outcome of the desired change does not have the intended results, it can be difficult and costly to undo or modify this change. White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 5

The IEC 61850 Engineering Process The IEC 61850 standard defines a methodology for engineering a substation automation system in an object-oriented, multi-vendor environment. The data flow for this process is shown in Figure 1. Most organizations have a process to choose the standard IEDs used in their substations, based on their specific protection and control philosophies, and the required logical nodes for their power system. Native vendor IED configuration tools contain a mechanism to export ICD files, which act as a template for a specific IED containing the device s supported logical nodes and capabilities. In some cases, an organization may have standardised configuration parameters such as network addresses or preconfigured datasets. In this case an IID file can be used. The IID file would contain the same data as the ICD file, and contain additional parameters regarding the configuration for a specific IED. In parallel, substation engineers define the substation specification based on their operating methodologies. This includes defining the primary switchyard equipment, their functions, the single line diagram and choosing the necessary logical nodes. This data can be contained in the substation section of the project SSD file. Once the group of IEDs and the system specification has been defined, they can be imported into a system configuration tool. Within the system configuration tool the engineer can define specific instances from the different IED templates and link them to the electrical process. The engineer can then define project-specific addressing and configure the data model by defining the datasets and GOOSE publishing/subscribing amongst the various IEDs. The complete substation description, all IEDs and communications configuration can then be exported to a SCD file. The SCD file can then be imported to various IED native vendor configuration tools to complete the protection, control, and device-specific configuration. The IED configuration tool is fully aware of the data available to it from the system, and can make use of this data in the protection logic. After the IED specific configuration is completed, the configuration can be placed on the IED through proprietary means, or by transferring a CID file to the IED. If changes are made to the communications configuration or the IED instance in an IED configuration tool, they can be reintegrated into the system by importing the IID file back into the system configuration tool. Vendor IED Configuration Tools IID ICD IID IED Configuration Tool 1 Approved IED Templates Partially Configured IED Templates CID IID ICD SSD System Engineering Tool SCD HMI Configuration Tool System Specification Tool IED Configuration Tool 2 IED IED HMI IED IED Fig. 1 - Data and information flow in the IEC 61850 engineering process CID IID White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 6

System Configuration Tool Example An example of one such system configuration tool allows designers to start developing their substation automation system, by importing a copy of their single line diagram schematic from sources such as a CAD drawing. Through automatic recognition of the substation primary equipment, the common logical nodes associated with the detected equipment are added to the project. The associated voltage levels and bays can then be defined for the substation based on the single line diagram layout and the utility s standard substation philosophies. Fig. 3 - System configuration tool: Overview of the network architecture and defining device addressing Fig. 2 - System configuration tool: Defining the primary equipment, voltage levels, bays, and associating IEDs Each selected IED used in the project should have the supported logical nodes defined in an ICD file, which is imported into a database of approved IEDs. These IEDs can then be selected, instantiated, and placed into the appropriate bay on the single line diagram. Additional logical nodes can be added at any level of the hierarchy for enhanced customisation. The System View allows the system designer to visualise the network architecture. It includes all network devices, such as Ethernet switches and printers. The designer can then set all of the specific network addressing for each device, such as the IP address and subnet. This view can help the designer to develop complex network topologies potentially spanning multiple networks. Switching to the logical view allows the designer to view the IEC 61850 dataflow between the functional elements of the different devices. Based on the logical nodes available from each IED, the data sets for reporting can be defined for each IEC 61850 server and HMI, concentrator and gateway clients. Data sets can also be defined for publishing and subscribing of GOOSE messages for peer-to-peer messaging between IEDs. The view can easily be rearranged to view only the dataflow associated with a specific device, making troubleshooting much simpler. Once configuration of the system has been completed the data model can then be exported as an SCD file, which will contain a system specification of the primary equipment, as well as an instantiated data model of each IED used in the project. This SCD file will contain all of the addressing and configured data sets required for the project. The next step is to import the SCD file into the vendor-specific IED configuration tool and complete the device-specific configuration and logic for each IED, such as protection settings for protection relays or legacy protocol configuration for protocol convertors. The last step would be to send the complete device configuration to each device. Fig. 4 - System configuration tool: Overview of the network architecture and defining device addressing White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 7

Conclusion Cost savings associated with IEC 61850 Apart from the traditional cost savings of adopting IEC 61850, such as reductions in physical copper wiring used for I/O, there are significant cost savings to be found in the engineering process, due to the efficiencies that can now be realised. 1) Reduction in the amount of time needed to configure a substation automation system System configuration tools have the capability of significantly reducing the amount of time required to configure a system. These tools can reduce configuration time by automating as much of the addressing as possible within the system, and eliminating the need to individually configure the communications/data flow for each individual IED within the native vendor IED tool. One such study testing the configuration of a system of 7 protection relays engaged in a GOOSE-based protection scheme found that there was a time savings of 72% using a system configuration tool versus configuring each protection relay individually using the native vendor tool alone. For this test only one brand of protection relay was used, and of the two engineers selected for the test, the less experienced was selected to work with the system configuration tool. 2) Increased virtualisation The substation data model can be developed and tested before the implementation phase of the project. A stronger initial design allows for a reduction in modifications later, when they could be more costly. Virtualisation also allows the engineer to focus on designing for the functional requirements of the substation automation system project and selecting the functional elements that are necessary for its realisation. Conversely, using current design methods, significant effort is spent on integrating the physical devices from different vendors and trying to make them fit into an eventual solution. Virtualisation allows utilities to define the outcome without defining the means of the solution. This allows for the development of more innovative and cost-effective system solutions without sacrificing functionality. 3) Reduced reaction to design modifications Changes to the design that require modifications to the system during the implementation phase can be made through software, minimizing physical reconfiguration. This means the system design is solely in the hands of the engineer and that it is simple to quickly revert back to previous versions of the configuration if the change does not have the desired results. 4) Increased standardisation and object oriented engineering The object-oriented approach to substation design enabled by the IEC 61850 standard allows designers to develop standard bay configurations for elements of their power system. This means that the building blocks of a project do not have to be re-engineered from scratch every time a substation automation system engineering project comes along. Standardisation also allows for a high level of reusability and efficient repeatability. Future uses outside of the substation A comprehensive data model can be produced for each substation in the system which can be exported to a number of other systems. Harmonization of the IEC 61850 model with the IEC Common Interface Model (CIM) standards (IEC 61968/61970) will allow for communication and integration of the substation data model with any number of enterprise applications. From automatic configuration of local human machine interfaces (HMI), to enterprise level applications such as distribution management systems (DMS), the opportunity to develop innovative integrated solutions are boundless. White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 8

References [1] Communication networks and systems for power utility automation Part 6: Configuration description language for communication in electrical substations related to IEDs, IEC Standard 61850-6, 2009. [2] Substation Engineering Tools: A New Generation, L. Hossenlopp, Lattes, France, 2003. [3] Engineering Perspectives on IEC 61850, L. Hossenlopp, IEEE Power and Energy Magazine, pp. 45-50, Jun. 2007. [4] VLPGO Statement on the IEC 61850 Standard, The Very Large Power Grid Operators,VLPGO Secretariat, Lansdale, PC, USA, May 2012. [5] Engineering savings example, M. Jardim, Lattes, France, April, 12, 2012. Adam F. Gauci was born in Toronto, Ontario, Canada and received a Bachelors of Science in computer engineering from Queen s University at Kingston, Ontario. His previous work experience includes Hydro One Networks as a Protection and Control Engineer and Cooper Power Systems as a Field Application Engineer. Currently he is working with Smart Grid Solutions at the Schneider Electric North American Energy Automation Center in Toronto, Ontario. Mr. Gauci is currently a member of the IEEE Power and Energy Society, and a registered professional engineer in the province of Ontario. White paper on substation automation engineering cost reduction 998-1197420_GMA-GB 9

Schneider Electric Industries SAS 35, rue Joseph Monier CS 30323 92506 Rueil Malmaison Cedex France RCS Nanterre 954 503 439 Capital social 896 313 776 www.schneider-electric.com 998-1197420_GMA-GB This document has been printed on ecological paper 04-2013 2013 Schneider Electric. All Rights Reserved.