BIPOLAR OPERATIONAL POWER SUPPLY

Similar documents
BOP QUICK START GUIDE 100W, 200W, 400W. KEPCO An ISO 9001 Company. BIPOLAR OPERATIONAL POWER SUPPLY I INTRODUCTION

BOP QUICK START GUIDE 100W, 200W, 400W. KEPCO An ISO 9001 Company. BIPOLAR OPERATIONAL POWER SUPPLY WARNINGS I INTRODUCTION II SAFETY.

ATE QUICK START GUIDE. KEPCO An ISO 9001 Company. VOLTAGE/CURRENT STABILIZED POWER SUPPLY I INTRODUCTION

ATE-DMG QUICK START GUIDE. KEPCO An ISO 9001 Company. VOLTAGE/CURRENT STABILIZED POWER SUPPLY WARNINGS I INTRODUCTION II SAFETY.

INSTRUCTION MANUAL RA 59 RACK ADAPTER. 1) This manual is valid for the following Model and associated serial numbers: MODEL SERIAL NO. REV. NO.

OPERATOR S MANUAL ATE 1/2 RACK POWER SUPPLY AUTOMATIC TEST EQUIPMENT MODEL

An ISO 9001 Company. KLP POWER SUPPLY

BOP 1KW-G POWER SUPPLY

INSTRUCTION MANUAL RA 55 RACK ADAPTER RACK ADAPTER FOR MST SERIES POWER MODULES

INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-6B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-5B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 60 SERIES RACK ADAPTER RA 60, RA 62, AND RA 63. 1) This manual is valid for the following Model and associated serial numbers:

OPERATION AND SERVICE MANUAL

INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY

from

INSTRUCTION MANUAL BOP 3/4 RACK POWER SUPPLY BIPOLAR

INSTRUCTION MANUAL ATE FULL RACK POWER SUPPLY AUTOMATIC TEST EQUIPMENT

INSTRUCTION MANUAL RA 19-4C RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF 300W, 600W, 1200W, 1500W SERIES POWER SUPPLIES

OPERATOR S MANUAL ATE 1/2 RACK POWER SUPPLY AUTOMATIC TEST EQUIPMENT MODEL

An ISO 9001 Company. BOP 1KW-MG FIRMWARE RETROFIT KIT

Power Supply and Fan Module Installation

KEPCO SINGLE OUTPUT, 1U SIZE, 100 WATT HOT SWAP PLUG-IN POWER SUPPLIES TABLE 1. OUTPUT RATINGS AND SPECIFICATIONS, HSF-1UR 100W SERIES

INSTRUCTION MANUAL RA 55 RACK ADAPTER RACK ADAPTER FOR MST SERIES POWER MODULES

OPERATOR MANUAL MAT 720W, 2/3-RACK POWER SUPPLY HIGH VOLTAGE MODELS: MAT 36-20, MAT 55-14, MAT 75-10, MAT , MAT

ATS-16 HV USER MANUAL. Automatic Transfer Switch 16A / 230Vac V090318

Laboratory Switch Mode Power Supply Series. Instruction Manual

BS 181 SINGLE CHANNEL POWER SUPPLY USER MANUAL

NI PXIe-1062Q Power Supply Shuttle

Junos WebApp Secure 5.0 Hardware Guide

SERVICE MANUAL MAT 1/3 RACK (EXCEPT 6-32) POWER SUPPLY

Rhino Buffer Module PSM24-BFM600S. Operating Instructions

Sorensen DLM 600 Series W V 2 75 A. Half Rack Programmable DC Power Supply

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

Installation, Operation and Maintenance Manual

Replacing the Power Supply

NI PXI-1042 POWER SUPPLY SHUTTLE USER GUIDE

User's Guide. Model W 3-in-1 Switching DC Power Supply

OPERATOR S MANUAL HSP SERIES 1000 AND 1500 WATT SWITCHING POWER SUPPLY VOLTAGE/CURRENT STABILIZED DC SOURCE

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

BOP 1KW-MG POWER SUPPLY

OPERATOR S MANUAL MST SERIES POWER MODULE DIGITALLY CONTROLLED POWER MODULE SYSTEM

Power Supply. Users Guide PRODUCT MANUAL. WESTELL.COM Westell Technologies MNL rd

MANUAL FOR THE UNIVERSAL MANUAL CONTROLLER UMC - 31

Power Supply (48Vdc, 2.5A)

OPERATING INSTRUCTIONS AND SYSTEM DESCRIPTION FOR THE HVA-100 HIGH VOLTAGE AMPLIFIER MODULE FOR EPMS SYSTEMS

Installing the Cisco MDS 9020 Fabric Switch

Power Supply Installation

200 VA bis VA 10 V bis 80 V 2 A bis 320 A. Source-Sink NL

Power Supply and Fan Module Installation

PFC Mini TM Power Factor Corrected AC-DC Switchers

INSTALLATION MANUAL SLI 50 INVERTER

Series 2200 Multichannel Programmable DC Power Supplies User Manual

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

Sorensen DLM 600 Series W V 2 75 A. Half Rack Programmable DC Power Supply

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

Rhino Redundancy Module PSM24-REM360S. Operating Instructions

Service Instructions. Conductor 420

Artisan Scientific is You~ Source for: Quality New and Certified-Used/Pre:-awned ECJuiflment

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

Installing the Cisco AS5400XM Universal Gateway

OPERATOR S MANUAL HSF 1200W/1500W POWER SUPPLY SINGLE OUTPUT POWER SUPPLIES SINGLE PHASE, POWER FACTOR CORRECTED UNIVERSAL AC INPUT, OPTIONAL METER

PumpDrive. Self -cooling, motor-independent frequency inverter. Brief Instructions

HPD Series Programmable DC Power Supply. Operation Manual

S-14 S-14. Compact Digital Multimeter. Compact Digital Multimeter

Innovative Circuit Technology Ltd.

PCM-7140 Pulsed Current Source Operation Manual

G5 PDU Installation Guide

OPERATOR S MANUAL KLN 750W PROGRAMMABLE D-C POWER SUPPLY 1U HALF RACK ORDER NO.

BRC SERIES 20kW High Voltage Power Supply

LDD M SERIES INSTRUCTION MANUAL LDD M SERIES

TRC-190 User s Manual

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

********SERVICE MANUAL******** MODELS:

Installation Job Aid for VSP 4850GTS

BS 287 DUAL CHANNEL POWER SUPPLY. User Manual. January 2017 V1.0

REGULATED DC POWER SUPPLIES.

7032 Digital-Analog Multimeter

Instruction Manual. G.R.A.S. 12AA 2-Channel Power Module with gain, filters and SysCheck generator. LI April 2015

OPERATING INSTRUCTIONS AND SYSTEM DESCRIPTION FOR THE PTC-20 PELTIER TEMPERATURE CONTROL SYSTEM

TRC-190 User s Manual

An ISO 9001 Company. BOP 1KW-MG FIRMWARE RETROFIT KIT

Follow the procedure below for unpacking the carton in which the device is shipped. DW-GTW-AC-E1060 Four anti-slide bumpers for desktop installation

OPERATING INSTRUCTIONS 7 SERIES STATIC GENERATORS

HCS-3600 / 3602 / 3604 Laboratory Grade & High RFI Immunity Switching Mode Power Supply with Rotary Encoder Control

OPERATING MANUAL FOR THE 30KV A.C. TEST SET P123. Bicotest High Voltage Products Ltd

OPERATING INSTRUCTION

TSP-BCM48, TSP-BCM48A. Operating Instruction Manual. Page 1 of 13

EFE300 / EFE400 EFE300M / EFE400M

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

MODEL 805 USER MANUAL

Model 7705 Control Module

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W.

LVN5200A-R2, rev. 1, Hardware Installation Guide

ADC7520 SERIES. 1600W Battery Chargers and Power Supplies

Applications Electronic Design/Development Battery Charging Launch Control Rackmount ATE Systems. DLM 600 Near Linear 600W DC Power Supply

Variable-switching Regulated DC Power Supplies PAS Series

Autoranging True RMS Multimeter User Manual

Transcription:

QUICK START GUIDE I INTRODUCTION KEPCO An ISO 9001 Company. BIPOLAR OPERATIONAL POWER SUPPLY 1.1. SCOPE OF MANUAL. This Quick Start Guide covers simple installation and local operation of the Kepco 100W, 200W and 400W Series of BOP Bipolar Operational Power Supplies. Full specifications, features and instructions are found in the BOP Operator Manual that can be downloaded free from the Kepco web site at: www.kepcopower.com/support/opmanls.htm#bop-op BOP 100W, 200W, 400W 1.3. OPTIONS. Standard models (M suffix) include analog voltage and current meters. Models with a D suffix include digital meters. Models optimized to operate in current mode with large inductive loads are identified by suffix L. Models optimized to operate in voltage mode with large capacitive loads are identified by suffix C. Models with digital control via GPIB or RS 232 are identified by suffix 4886. Models with digital control via ethernet/lan are identified by suffix 802E. 1.2. DESCRIPTION. Kepco s BOP are linear stabilizers with two bipolar control channels (voltage or current mode), selectable and individually controllable either by front panel controls, or by remote signals. These two principal control channels are each protected by bipolar limit circuits. The positive and negative current or voltage limit points can be manually set or remotely programmed simultaneously or Individually. Automatic crossover between each principal control channel and the limit channels is provided. Only one principle channel (voltage or current) can control the output at any one time. The BOP can operate in all four voltage-current quadrants; it can act as either a source (output voltage is the same direction as output current) or a sink (output voltage is opposite that of output current). An example is shown in Figure 1 where the BOP is programmed to deliver a sine wave output and the load produces a phase shift between the output voltage and current. See applicable BOP Operator Manual (PAR. 1.1) for limits on long-term operation in sink mode. Remote On-Off Feature. A new remote on-off feature is now included in BOP models. The front panel REMOTE indicator is a dual-function indicator labelled REMOTE (W/ DIG ON)/OUT ON (W/DIG OFF. When digital programming is ON, the indicator is on to show remote mode. When digital programming is OFF the indicator only goes on when the OUTPUT is ON. Isolated remote on-off control of the output and associated flag signal is configured at the PC 15 programming connector. Contact Kepco to retrofit older models. Units are shipped for 115V a-c operation (105V to 125V a-c), 57 to 63Hz. For operation at 104V a-c, 208V a-c or 230V a-c refer to the full Operator Manual (PAR 1.1). FIGURE 1. SINK OPERATION PRODUCED BY LOAD PHASE SHIFT 1.4. EQUIPMENT SUPPLIED. PC 15 programming connector (PC 12 wired for front panel control) MUST be installed at rear panel to enable local operation (see NOTE). 115V a-c Line Cord NOTE: The signal allocation of the rear panel programming connector is slightly altered from older models: - pin 21 was unused, changed to logic selection for isolated on-off. - pin 48 was shorted to pin 47, is now the return for isolated on-off control and flag (pin 47 unchanged). - pin 50 was shorted to pin 49, now used as isolated on off control (pin 49 unchanged). - pins 12, 14 were for class A/AB selection, now for external compensation of voltage mode loop, similar to pins 16 and 18 for current mode loop. 1.5. ACCESSORIES (NOT SUPPLIED) Slides (Full rack only) Rack adapter RA 24 or RA 37 (mount 3/4 rack unit in 19-inch rack) KEPCO, INC. 131-38 SANFORD AVENUE FLUSHING, NY. 11355 U.S.A. TEL (718) 461-7000 FAX (718) 767-1102 http://www.kepcopower.com email: hq@kepcopower.com 2016, KEPCO, INC 1 Data subject to change without notice 228-1841

II SAFETY. Exercise care in making all connections to and from the BOP terminals. WARNINGS 1. Remove a-c power from the BOP before making any connections. 2. Wires and/or cables, connected from the BOP terminals to external components or programming devices must be properly insulated and securely terminated on both sides to make accidental touch impossible. DO NOT USE BANANA PLUGS WITH EXPOSED SCREWS OR OTHER EXPOSED METAL PARTS AT THE FRONT PANEL OUTPUT TERMINALS! 3. The BOP chassis and cover must be safety-grounded to a reliable a-c source ground. A safety-ground may be established by using a grounded a-c power outlet or, if the latter is not available, by means of a separate wire, from the provided GROUND terminal to a reliable a-c source ground point. 4. THE COMMON OUTPUT TERMINAL OF THE BOP MAY EITHER FLOAT OR BE GROUNDED. Leave the output terminal floating when an external, grounded device is used at either the programming input or the output. For noise reduction ground a single return terminal on either the programming device, the BOP or the load configuration. See PAR 3.4 for the maximum allowable floating voltage for the COMMON output terminal. III INSTALLATION 3.1. UNPACKING. The power supply has been thoroughly inspected and tested prior to packing and is ready for operation. After careful unpacking, inspect for shipping damage before attempting to operate. Perform the Preliminary Checkout (PAR. 3.2). If any indication of damage is found, file an immediate claim with the responsible transport service 3.2. PRELIMINARY CHECKOUT. A simple operating check after unpacking and before permanent installation, is advisable to ascertain whether the BOP has suffered damage in shipment. 1. Install PC15 (supplied) at rear panel. This is required for local control of the unit. 2. Refer to Safety instructions (see Section II) and connect unit to 115V a-c source; see Operator Manual (PAR 1.1) for different source voltage. 3. Set the BOP front panel controls as follows a. Voltage/Current MODE select switch set to VOLT- AGE. b. Voltage Control ON/OFF switch to ON, Voltage Control to extreme counterclockwise position. c. A-C POWER circuit breaker/switch to ON. d. The E O Mode indicator will be on and the REMOTE (W/ DIG ON)/OUT ON (W/DIG OFF) indicator will also be on indicating the output is on. 4. Turn the Voltage Control clockwise through its range, while observing the front panel Voltmeter. The BOP output voltage should respond smoothly, from the maximum negative output voltage, through zero, to the maximum positive output voltage of the BOP. 5. Set Voltage Control ON/OFF switch to OFF. 6. Set A-C POWER circuit breaker/switch OFF. 7. Connect a short circuit between the OUTPUT and COMMON front panel output terminals. 8. Set the BOP front panel controls as follows: a. Voltage/Current MODE select switch set to CUR- RENT. b. Current Control ON/OFF switch to ON and Current Control to its maximum counterclockwise position. c. A-C POWER circuit breaker/switch to ON. d. The I O Mode indicator will be on. 9. Turn the Current Control clockwise through its range, while observing the front panel Ammeter. The BOP output current should respond smoothly, from the maximum positive output current, through zero, to the maximum negative output current of the BOP. 10.Apply voltage across pins 50 and 48 (return) of the PC 15 programming connector. Verify that front panel VOLTAGE and CURRENT meters show 0V and 0A, respectively, and OUT ON (W/ DIG OFF) indicator goes off. http://www.kepcopower.com email: hq@kepcopower.com 2 228-1841 112116

11. Set A-C POWER circuit breaker/switch OFF. Remove the short circuit from the output terminals. This concludes the preliminary check-out of the BOP. 3.3. INSTALLING THE POWER SUPPLY. 3/4 RACK MODELS. These models are shipped with four plastic feet installed for benchtop operation. The feet must be removed for rack mounting. Kepco s RA 24 or RA 37 can be used to install these models in a standard 19-inch rack (installation instructions supplied with rack adapter). Four plastic mounting inserts on the bottom of the chassis can be used to mount the unit on any flat surface. FULL RACK MODELS. These models are shipped with fixed angle brackets and chassis slide support bars installed and are ready for mounting in a 19-inch rack. 3.4. CONNECTIONS. Connections to the load can be made using either the front or rear panel terminations, but not both. LOAD CONNECTIONS. Connect the load between OUT- PUT and COMMON terminals. Connections may be made at either the front or rear panel. Sense connections are required; either local or remote must be used. Otherwise the unit will not operate. LOCAL SENSE CONNECTIONS. For local sensing the OUTPUT and COMMON terminals are connected to the adjacent SENSE terminals. The unit is shipped with local sensing links in place at the rear panel. If load connections are made at the front panel, remove the installed links from the rear panel. At the front panel install jumpers between COMMON and the adjacent SENSE terminal and between OUTPUT and the adjacent SENSE terminal. GROUNDING NETWORK. The unit is shipped with a link installed between terminals 5 and 6 at the rear panel to enable the Grounding Network. This network reduces noise/ripple that may be present at the output. INPUT A-C CONNECTIONS. Install the line cord (supplied) at the rear panel and connect to 115V a-c, 60Hz (105V to 125V a-c, 47 to 63Hz) mains. Refer to the full Operator Manual (see PAR. 1.1). For operation at 104V a- c, 208V a-c or 230V a-c refer to the full Operator Manual (PAR 1.1). A-C GROUND. The 3-wire line cord with 3-prong safety plug (supplied), in combination with a properly grounded a- c power outlet, automatically grounds the BOP case. If an adapter for a non-grounded outlet is used, the case must be grounded separately using a separate GROUND terminal at either the front or rear panel. The ground wire must be rated for at least the BOP input current (as noted on nameplate at rear of unit). D-C SIGNAL GROUND. Specified ripple and noise figures for BOP power supplies are valid only with the COMMON side of the output load circuit returned to a ground point. The BOP circuits, including output and programming terminals, have no d-c connection to the chassis. The COMMON terminal of the BOP can be floated up to 500 volts (d-c or peak) off chassis ground. The common mode current (leakage from output to ground) Is less than 50 A (rms) or 5 ma (p-p) at 115V a-c power input, 60 Hz. To avoid common mode current from affecting the BOP output, the system (including the programming device, if used, load, and BOP) must have a single connection to ground (earth ground). The d-c ground wire must be rated for the nominal output current of the BOP (e.g, for BOP 20-10M, use rating of 10A). Multiple signal grounds in the system may cause groundloop and instability problems, since noise signals develop across the impedances between the multiple ground points. The exact physical location of the best single ground point must be carefully selected for minimum ripple/ noise output and to avoid the possibility of output current flowing through the return path of an external programming signal. REMOTE SENSE CONNECTIONS. Remote sensing (connecting the corresponding SENSE terminals to the OUT- PUT and COMMON terminations at the load instead of at the BOP) can compensate for load wire losses up to 0.5V per wire (0.25V per wire on models with rated output less than 20V). Remote sensing is recommended for minimum load effect for a remote load. Use twisted pairs: #22 AWG for output sense lines and wires rated for the nominal output current of the power supply for power leads. See full Operator Manual (see PAR. 1.1) for remote sensing requirements. http://www.kepcopower.com email: hq@kepcopower.com 112116 228-1841 3

FIGURE 2. BOP FULL RACK, FRONT PANEL CONTROLS, INDICATORS AND TERMINATIONS FIGURE 3. BOP 3/4 RACK, FRONT PANEL CONTROLS, INDICATORS AND TERMINATIONS http://www.kepcopower.com email: hq@kepcopower.com 4 228-1841 112116

3.5. COOLING. The components in the BOP power supply rely on forced air cooling. SIDE PANEL OPENINGS AND THE TOP OF THE CASE MUST BE KEPT CLEAR FROM ALL OBSTRUCTIONS TO ENSURE AIR CIRCU- LATION. Periodic cleaning of the interior of the power supply is recommended. If the BOP is rack-mounted or installed into confined spaces, care must be taken that the ambient temperature (the temperature immediately surrounding the power supply) does not rise above 55 C (~131 F). FIGURE 4. BOP REAR PANEL TERMINATIONS, TYPICAL FOR 3/4 RACK AND FULL RACK MODELS http://www.kepcopower.com email: hq@kepcopower.com 112116 228-1841 5

IV OPERATION Turn the unit on using the front panel POWER switch/circuit breaker (see Figure 2 or 3). CAUTION: DO NOT repeatedly toggle the POWER on/off switch as this may cause unit to fault. If actuator does not lock when released, wait a few seconds before trying again. The circuit breaker is trip-free; if overload exists, contacts cannot be held closed by actuator. NOTE: PC 15 rear programming connector must be installed to enable local control of the unit. 4.1. VOLTAGE MODE OPERATION WITH CUR- RENT LIMITING. The BOP may be used as a stabilized (d-c) source of positive or negative voltage with output current limiting (for either polarity) when pre-selected for the application at hand. Always monitor the front panel meters while adjusting output voltage/current. 1. Determine the output voltage and current requirements of your load. Disconnect the load and set the BOP MODE switch to CURRENT and the CURRENT CON- TROL switch to ON. 2. Voltage limits are recommended to be greater than the maximum voltage required for the load by 10% of the rated voltage of the unit (e.g., for a 72V BOP and a load that requires 30V, set voltage limits to ±37.2V). If specific ± voltage limits are not needed, use a screwdriver to adjust the + V VOLTAGE LIMIT potentiometer to full clockwise position and V VOLTAGE LIMIT potentiometer to full counterclockwise position. If specific ± voltage limits are needed, proceed as follows. a. Turn CURRENT CONTROL fully counterclockwise. Use a screwdriver to adjust the V VOLTAGE LIMIT potentiometer as desired (recommended to be 10% greater than the maximum negative voltage required for the load), monitoring the VOLT- AGE meter for the correct limiting value. b. Turn CURRENT CONTROL fully clockwise. Use a screwdriver to adjust the + V VOLTAGE LIMIT potentiometer as desired, monitoring the VOLTAGE meter for the correct limiting value. 3. With the a-c POWER circuit breaker/switch set to OFF, connect a short circuit across the OUTPUT and COM- MON terminals. 4. Set the CURRENT CONTROL switch to OFF. Set the MODE switch to VOLTAGE and the VOLTAGE CON- TROL switch to ON, then set BOP POWER a-c circuit breaker/switch to ON. 5. Adjust the + I and I CURRENT LIMIT potentiometers for both polarities as required, monitoring the CURRENT meter for the correct limiting value. Proceed as follows: a. Turn VOLTAGE CONTROL fully counterclockwise. Use a screwdriver to adjust the I CURRENT LIMIT potentiometer as desired. b. Turn VOLTAGE CONTROL fully clockwise. Use a screwdriver to adjust the + I CURRENT LIMIT potentiometer as desired. c. Set a-c POWER circuit breaker/switch to OFF, then remove the short circuit from the output. d. Set a-c POWER circuit breaker/switch to ON and adjust the output voltage to zero using the VOLT- AGE CONTROL. e. Set a-c POWER circuit breaker/switch to OFF, then connect the load to the BOP output. 6. Set a-c POWER switch/circuit breaker to ON, and adjust the operating voltage by means of the VOLT- AGE CONTROL to the value required. NOTE: If the output current exceeds the pre-adjusted value at any time the VOLTAGE MODE indicator will go out and the CURRENT LIMIT indicator will go on. After the cause of the overcurrent is eliminated, the indicator lights will return to their initial status. 4.2. CURRENT MODE OPERATION WITH VOLT- AGE LIMITING. The BOP may be used as a stabilized d-c source of positive or negative current, with output voltage limiting (for either polarity), pre-selected for the application at hand. Always monitor the front panel meters while adjusting output voltage/current 1. Determine the output current and voltage requirement of your load. http://www.kepcopower.com email: hq@kepcopower.com 6 228-1841 112116

2. With the a-c POWER circuit breaker/switch set to OFF, disconnect the load and connect a short circuit across the OUTPUT and COMMON terminals. 3. Set the BOP MODE switch to VOLTAGE and the VOLT- AGE CONTROL switch to ON, then set a-c POWER circuit breaker/switch to ON. 4. Current limits are recommended to be greater than the maximum current required for the load by 10% of the rated current of the unit (e.g., for a 6A BOP and a load that requires 3A, set current limits to ±3.6A). If specific ± current limits are not needed, use a screwdriver to adjust the + I CURRENT LIMIT potentiometer to full clockwise position and - I CURRENT LIMIT potentiometer to full counterclockwise position. If specific ±current limits are needed, proceed as follows: a. Turn VOLTAGE CONTROL fully counterclockwise. Use a screwdriver to adjust the I CURRENT LIMIT potentiometer as desired (recommended to be 10% greater than the maximum negative current required for the load), monitoring the CURRENT meter for the correct limiting value. b. Turn VOLTAGE CONTROL fully clockwise. Use a screwdriver to adjust the + I CURRENT LIMIT potentiometer as desired (recommended to be 10% greater than the maximum positive current required for the load) monitoring the CURRENT meter for the correct limiting value. c. Set the VOLTAGE CONTROL switch to OFF. Set a-c POWER switch/circuit breaker to OFF, then remove the short circuit from the output but leave the load disconnected. 5. Set the BOP MODE switch to CURRENT, CURRENT CONTROL switch to ON and set a-c POWER switch/ circuit breaker to ON. b. Turn CURRENT CONTROL fully clockwise. Use a screwdriver to adjust the + V VOLTAGE LIMIT potentiometer as desired. c. Set a-c POWER switch/circuit breaker to OFF, then connect a short circuit across the OUTPUT and COMMON terminals. d. Set a-c POWER switch/circuit breaker to ON and use the CURRENT CONTRol to adjust the output current to zero. e. Set a-c POWER switch/circuit breaker to OFF and remove short across OUTPUT and COMMON terminals. 7. Connect the load to the BOP OUTPUT and COMMON terminals. 8. Set a-c POWER switch/circuit breaker to ON and use the CURRENT CONTROL to adjust output current through the load to the required value. 4.3. ADDITIONAL FEATURES. The following features of the BOP power supply are covered in the full Operator Manual (see PAR. 1.1). BOP Operation with Remote Control of the Voltage Control Channel BOP Operation with Remote Control of the Current Control Channel Using the BOP as an Amplifier Remote Control of the BOP Current Limit Remote Control of the BOP Voltage Limit Series and Parallel Connection of BOP Power Supplies Remote On-Off Control 6. Adjust the + V and V VOLTAGE LIMIT potentiometers to the required output (compliance) values. Proceed as follows: a. Turn CURRENT CONTROL fully counterclockwise. Use a screwdriver to adjust the V VOLTAGE LIMIT potentiometer as desired. http://www.kepcopower.com email: hq@kepcopower.com 112116 228-1841 7

http://www.kepcopower.com email: hq@kepcopower.com 8 228-1841 112116