KM-4800w. Installation Guide

Similar documents
VJ-1614 INSTALLATION MANUAL

VJ-1604 INSTALLATION MANUAL

VJ-1618 INSTALLATION MANUAL

Hardware Operation Guide

Removal and Installation8

Installation Manual for B8300 and Its Peripheral Devices

Installation Manual. 65 Interactive LED/LCD. Model: HILF65101 (64.56 )

Changing the Size of the Paper in the Paper Tray For Local Printing For Network Printing (WorkCentre PE120i only)...1.

Océ CS9060. User s Guide. Eco Solvent

Epson SureColor F6070 Setup Guide

Assembly and Setup Manual

Installation Manual. Model: HILU Ultra HD Interactive Flat Panel Display

X940e, X945e. Maintenance Guide

VJ-1624 INSTALLATION MANUAL

VJ-1304 INSTALLATION MANUAL

MUTOH EUROPE N.V. Tel.:32-(0) Fax:32-(0)

At 5% print coverage (A4 or Letter size). The actual number of printed pages will vary depending on the average type of print job and paper.

Assembly and Setup Manual

EPSON ActionLaser Read This First. eepa POLLUTION PREVENTER

Setup Guide. Confirming the Installation Space. Installation space (W x D x H) 70.5 x 66.3 x 61.5 inches (1790 x 1684 x 1560 mm) 23.

Exterior...12 Inside...14 Control Panel...15

System Storage EXP3000 Rack Installation Instructions

K Service Source. StyleWriter

XEROX PHASER 5500 TONER & DRUM CARTRIDGE REMANUFACTURING INSTRUCTIONS

Lexmark X203n and X204n Series. Maintenance Guide

Nov. 07, 2013 p. 5 - changed the B axis unit value to from Changed by Randy per Frank s request.

7" Touch Screen Display

USER MANUAL INCLUDED IN THE BOX

User s Guide. Mobile Rack Device Mounting Kit for Echo Express III-R and xmac Pro Server. Quick Start Guide Video Available Online!

Replacing the Encoder Strip

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

Model No. ET-JPF200BE

Xi4 Quick Reference Guide

TDM To MiniMech conversion ProceDure

The Nureva Span ideation system. Installation guide. Single panoramic system

6 Removal and replacement

Start Here. All-in-One Printer. Print Copy Scan

Unpacking and Installing the Flora 2512 UV Printer. Steps 1: Unscrew the 10mm bolts holding the top. Then remove the top and put in a safe place.

MONARCH 9416 XL QUICK REFERENCE

Cone Beam Volumetric Tomography and Panoramic Dental Imaging System

C935 Series. Maintenance Guide

Rack Installation Instructions

CARTRIDGE REMANUFACTURING INSTRUCTIONS TONER CARTRIDGE DRUM CARTRIDGE

Important! Save the box and shipping materials for transporting the MultiPASS in the future.

Installing the Server into a Rack

Trademarks...3 Safety Information...4 Positions of RWARNING and RCAUTION labels...8 ENERGY STAR Program...10 How to Read This Manual...

Assembly Instructions for #5630 Medication PalWOW

1 Press the cover release button and then open the front cover of the printer. 2 Take out the drum unit assembly (drum unit with toner cartridge).

User Safety. Electrical Safety. Phaser 4500 Laser Printer

CHASSIS INSTALLATION GUIDE

icore Kiosk system Installation Guide

INSTALLATION MANUAL. I. Outline of installation procedures. d-color MF201. Applied Machine: d-color MF201 PC-105. Machine DF-612

OnePlus 5 Screen and Digitizer Assembly Replacement

imac Intel 21.5" EMC 2389 Stand Replacement

LBP-810 Laser Printer

User s Guide. for RackMac Pro 4U Rack Enclosure for New Mac Pro

3M Indoor Protected Building Entrance Terminal 4588V-QCS Series

imac Intel 27" EMC 2429 SSD Dual Drive

B&W RearView Camera Installation & Operation

X500n, X502n. Maintenance Guide

Xerox Corporation 701 S. Aviation Boulevard El Segundo, CA by Xerox Corporation. All rights reserved Copyright protection claimed includes

Included Items Not Shown:

Thanks for shopping with Improvements! Lighted Canterbury Christmas Greenery Doorway Arch Item #548443

9-pin dot matrix printer

Moving your printer 1. Remove cables. Printing Moving the printer. Using color. Paper handling. 1 Turn the printer off. Maintenance.

Rack Installation Instructions

Zebra XiII-Series Printer Quick Reference Guide

Fuser Assembly Removal

Installation Instructions

X925. Maintenance Guide

200 lb (90.7 kg) 2 People Required. 250 lb (113.4 kg)

THE XEROX PHASER 7400 TONER & DRUM CARTRIDGES

Main Menu. Menu II. UNPACKING AND SETUP II-5. RADF MR-3021/3022

Fuser. Figure Remove the fuser assembly (1 of 2) 184 Chapter 5 Removal and replacement ENWW

Unpacking and Setup Guide

AstroJet TM M2 Quick Start Guide

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

Océ User manual. Océ CS2024. Quick Start Guide

User s Manual (Model A) isappos 9/12 Stand

G12/G12x USER S MANUAL

To connect the AC adapter:

Tabletop Paper Collator FC-10

Gateway Profile 4 service guide

Encore XT Manual Gun Upgrade Kit

Full HD IP Vandal Dome Camera

CLEANING THE DRUM UNIT

BPL SERIES INSTALLATION INSTRUCTIONS THIS SHEET CONTAINS IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS.

ES1624 MFP Setup and Installation Guide

User s Guide. for xmac mini Server 2H Thunderbolt -to-pcie Expansion System and 1U Rack Enclosure for Mac mini With Thunderbolt Port

Clearing paper jams. Identifying paper jam areas. Printing. Using color. Paper handling. Maintenance. Troubleshooting. Administration.

EVO-TM2A EVO-TM2B Touch Screen Monitor

Addendum to the Actalyst Interactive Digital Signage Installation and User s Guide

FUSION RX1600RAID. Rackmount 16-Drive SATA Storage System with Internal SAS Expanders. Drive Enclosure User s Guide

Chapter 4 Replacement Procedures

DIGITAL OBSERVATION GUARD LOW PROFILE PAN TILT KIT USER MANUAL

Keysight Technologies N9020B MXA Signal Analyzer

OPERATING INSTRUCTIONS:

4.1 General. 4 Replacement Procedures

5.6 Color Rear View Safety System Installation & Operation. RV56 (Includes MO56 monitor & CA56 camera)

Transcription:

KM-4800w Installation Guide

TABLE OF CONTENTS page 1 Installation Requirements 2 2 Unpacking 3 2. 1 Unpacking 3 2. 2 Confirmation of Accessories 5 3 Leveling the Machine 7 4 Setup of the Roll Deck 9 5 Setup of the Machine 10 6 Installation of Accessories 20 7 Turning on the Machine 26 8 Initializing Scanner Unit 27 9 Installation of Optional Licenses 30 9.1 Scan System 2 (for Scan to File) 30 9.2 UG-32 (for PDF printing) 37 1

1 Installation Requirements The following conditions are required for the installation of the equipment. 1. Power source should be rated as: U.S.A: 120V +/-10%, 50/60Hz, 15A or higher Europe and Asia: 220-240V +6%/-10%, 50/60Hz, 10A or higher 2. The equipment must be on a dedicated circuit. 3. The outlet must be near the equipment and easily accessible. 1. Make sure to connect this equipment to a properly grounded outlet. 2. The outlet shall be installed near the equipment and shall be easily accessible. Site Environmental Conditions Temperature Range 10 C to 32 C 50 F to 89.6 F Humidity Range 15% to 80% RH. (NON CONDENSING) Keep the printer away from water sources, boilers, humidifiers or refrigerators. 1. The installation site must not have any open flames, dust or ammonia gases. 2. The equipment must not be exposed to the air vents from heating/cooling systems. 3. The equipment should not be exposed to the direct sunlight. Please draw curtains to block any sunlight. When you open the printer (Upper Half), do not expose the Photoconductive Drum to strong (intense) light as this will damage the Drum. Ozone will be generated while this equipment is in use, although the quantity generated is within all safe levels. (see certifications) Ventilate the room, if so required. Keep ample space around the equipment to ensure comfortable operation. (Refer to the following figure.) The floor must be level and the strength must be ample to sustain the weight of the equipment. 60cm or larger when the standard tray is installed 45cm or wider (Rear) 45cm or wider KM-4800w (Front) 70cm or wider (1 Roll) 90cm or wider (2 Rolls) 2

2 Unpacking 2. 1 Unpacking 1. Cut the bands (1) and remove the top board (2). 2 1 1 2. Remove 2 pads (3) and the outer cardboard pads (4). Please note that a Software Box will be included in the crate. The Software box has the Software CD and other important installation notes and documents 3 3 4 3. Remove the inner cardboard cases (5). 5 4. Open the front face (6) of the bottom board. Peel off the plastic bag (7). Remove the wrapped machine with a forklift, move it to the installation place. Unwrap the machine. 7 5. Put aside 1 accessory box (8). DO NOT DISCARD IT. Remove the scanner protection box (9) and the protection papers (10) around the machine. 6 8 9 10 3

6. Put aside one more accessory box (11) and the protection mat under the Roll Deck. DO NOT DISCARD IT. Remove the tapes (12) on Roll Deck. 11 12 7. Open the Scanner Unit. Remove the protection mat (13). Put aside Shading Sheet (14) for the scanner adjustment. DO NOT DISCARD THE SHEET. HANDLE WITH GREAT CARE. KEEP THE SHEET IN SAFE CUSTODY FOR AVOIDING DAMAGE. Remove the protection sheet (15) on the top rear of the machine. Close the Scanner Unit. 13 15 14 8. Remove Power Cord (16). NOTE Keep Drum Stand (17) in the safe custody for future service. 17 16 4

2. 2 Confirmation of Accessories Confirm the following parts are attached to the product. Item name Picture Number of article Item name Tray 4 Drum Stand Picture Number of article 2 Guide 3 2 Operation Panel Assembly 1 Tray 2 Assembly 2 Arm Assembly 1 Guide 4 2 Cover 3 1 Bind Screw (M3x8) 4 Power Cord 1 (M3x8 for Guide 4) Bind Screw (M4x6) (M4x6 for Cover 3) 1 Original Guide 1 & 2 1 1 Plate 2 2 5

Item name Picture Number of article Item name Picture Number of article Tray 1 Shading Sheet 1 Arm 2 Cap Assy 2 or 4 (2 for each roll) Arm 2 4 Developer Handle 1 Guide 5 Guide 6 1 1 Installation Guide 1 Guide Sheets 2 Quick Reference 1 Tooth Washer Screw (M4x6) 9 User CD 1 (3 for Operation Panel Assembly) (5 for Base Assembly) (1 for ground wire) Leaflet 1 Label (Operation Panel) 1 (Europe only) 6

3 Leveling the Machine 1. Pull up the Lever 2 (1) to open the Engine. 1 2. Remove the screws (2) at both sides. 2 2 3. Remove 4 screws (3) at the bottom of both sides. 3 3 4. Remove 6 screws (4) at the back on both sides. (3 pieces on each) 4 4 5. Remove the Cover 2 (5) and the Cover 3 (6). 5 6 7

6. Close the Engine Unit. 7. Rotate 4 Leveling Bolts (7) on the bottom of the machine with a wrench to bring up the machine from the floor. Keep 85mm of distance between the bottom plate and the floor. (It is about 80mm before the adjustment.) 85mm 7 NOTE Do not rotate the Levelling Bolts too much. If the distance between the bottom plate and the floor becomes wider than 95mm, the Adjuster Bolt may be removed. 8. Put a level (8) on the specified positions shown to check the level of the machine. If not leveled, adjust by rotating the Adjustment Bolts. Front Rear 8 8 Right Left 8 8 8

4 Setup of the Roll Deck NOTE This section is explained with using 2 roll model of KM-4800w. 1. Open the Roll Deck (1). 1 2. Remove the tapes (2) from Roll Deck. 2 2 2 3. Close the Roll Deck. 9

5 Setup of the Machine 1. Pull up on the Levers (1) to open the Engine. 1 2. Carefully remove the protection mat (2) under the Drum. 2 3. Open the Cover 4 (3). 3 3 4. Remove the screws (4) and flat washers (5) to release the Bands (6) at both sides. 6 6 4 5 10

5. Rotate up the Pins (7) and move them to the inside to pull them out from the holes. Remove the Cover 4 (3). 7 3 6. Open the Bypass Feeder (8). 8 7. Remove 4 pieces of screw (9). 9 9 11

8. Close the Bypass Feeder (8). Open the Developer Press Unit (10). 8 10 9. Disconnect the connector (11). 11 10. Remove 2 pieces of red screw (12) at both sides of the Developer Unit, which protect the Developer Unit from vibration during transportation. (They are no longer required.) 12 12 11. Holding both side plates firmly, slide the Developer Unit (13) out of the machine. 13 12

12. Disconnect the connector (14). 14 13. Remove 4 screws (15). 15 15 14. Remove the Hopper Assembly (16). 16 15. Remove the Separator (17). 17 17 16. Shake the Starting Toner Bottle (18) well, and add the toner to the Developer Unit. (Please even out the toner in the Developer unit.) 18 13

17. Along the guide on the side plates, gently place Separator (17) on the added toner. Do not push it in. 17 to be placed along the guide NOTE (1) Be careful of the direction of Separator (17). Do not install it in the wrong direction. 17 (2) Just put Separator (17) on the toner. It will be placed unseated. Do not push it completely at this time. Doing so may damage the plastic screwing sheets (19) on the 2 shafts. Unseated 17 19 19 18. Insert Developer Handle (20) to the shaft of Roller Developer, and gently turn Developer Handle (20). Separator will sink in the toner. Turn Developer Handle (20) until Separator sinks in position. 20 20 (continued on the next page) 14

NOTE (1) Slowly turn Developer Handle. Otherwise the toner may spill out. (2) Make sure that Separator (17) completely sinks in position by a 1/2 or more rotation of Developer Handle. If not in position, the plastic screwing sheets may be damaged at the next step. Unseated Seated 17 17 19. Replace the Hopper Assembly (16) and connect the connector (14). 16 14 20. Insert Developer Handle (20) to the shaft of Roller Developer, and rotate the Roller Developer several times so that its surface is covered with the toner. 20 NOTE Do not install the Developer Unit at this time, as it must be removed when you setup the Drum in the later procedure. 21. The process unit and toner cover should be open. The Photoconductive Drum is covered with a black sheet (21). Gently remove it pulling from the front. 21 21 15

22. Install the Developer Unit (13) to the machine. Connect the connector (11). 11 13 NOTE Both the Gear Helical 20T (22) on machine side and the Gear Helical 28T (23) on Developer Unit side must be in gear firmly with each other, but they may not be in gear with each other by just installing the Developer Unit to the machine. 22 23 After installing the Developer Unit to the machine, rotate Gear Helical 34T (24: instead of Gear Helical 20T) by hand from under the Engine Unit. Both gears will be in gear by this way. 24 23. Close and fix the Developer Press Unit (10), and put back the Cover 4 (3). 10 3 16

24. Close the Engine Unit. 25. Both the LED Head and the Image Corona are locked with the screws (25) being separated from the Drum, not to be damaged during the transportation. Loosen the screws (25) to unlock the Fixing Brackets (26) at both sides. Pressing down the Fixing Brackets (26) firmly, tighten the screws (25). Left side Right side 26 26 25 25 NOTE Please satisfy the following requirements before performing Step 25. (1) The black sheet has been removed from the Drum. (See the former procedure 21.) (2) The Engine Unit is closed firmly. (See the former procedure 24.) Otherwise a proper distance can not be kept between LED Head and Drum. 26. Prepare the Operation Panel Assembly (27) and Base Assembly (28) which are included in the accessory box. Insert 3 cables (29) of the Operation Panel into the hole of Base Assembly. 27 29 28 17

27. Fix the Operation Panel Assembly (27) to the Base Assembly (28) with 3 pieces of 4x6 Tooth Washer Screw (30) which are included in the accessory box. At this time fix the Operation Panel by either 45 degree or 60 degree making reference to the following NOTE. 28 30 27 30 NOTE 3 screw holes (31) of 6 on the bracket of Operation Panel Assembly are used when the Operation Panel is fixed by 45 degree, and other 3 of them (32) are used when it is fixed by 60 degree. 31 32 31 31 32 Put the screws (30) as the following photo when you fix the Operation Panel by 45 degree. 30 30 45 degree Put the screws (30) as the following photo when you fix the Operation Panel by 60 degree. 30 60 degree 30 18

28. Fix the Base Assembly (28) to the right side of machine with 5 pieces of 4x6 Tooth Washer Screws (33) which are included in the accessory box. Fix the grounding wire (34) with 1 piece of Tooth Washer Screws (35) which is included in the accessory box. 33 33 28 35 34 29. Connect each USB Cable (36), VGA Cable (37) and Power Supply cable (38) to the concerning connector. 36 37 38 30. Fix the Cover (39) to the Base Assembly with the 4x6 Bind Screw (40), which are included in the accessory box 39 40 31. Replace the Cover 2 (41) and Cover 3 (42). 42 41 19

6 Installation of Accessories 1. Fit 2 Guide 3 (1) to the notches on the Cover 10. 1 2. Fit the Guide 1 & 2 (2) to the Cover 4. 2 3. Loosen 4 screws (3), fit the Plate 2 (4) to the screws (3), and tighten the screws (3). 4 3 3 4 20

4. Install 2 pieces of Arm (5). 5 5 5. Install 4 pieces of Arm 2 (6), Guide 6 (7), Guide 5 (8). 6 6 7 NOTE 1. Insert all Arm2 (6), Guide 6 (7), Guide 5 (8) as the following photos. (Be careful of the direction of insertion.) 7 8 6 6 2. Remove the Arm 2 (6) if required according to the degree of curl of media. 21 8

6. Remove 2-4x6 Bind Screws (9). 9 7. Attach 2 Guide Sheets (10) with 4x6 Bind Screws (9) you have removed at step 6. 10 boss 10 NOTE Fit the positioning bosses on the Guide Sheet to the positioning holes on machine side at this time. 8. Fit 4 pieces of Tray (11) to the notches on the back of the machine. 11 9. Fit the Guides 4 (12) to the Tray 2 Assemblies (13). 13 12 NOTE Insert the tip plate (14) of the Guide 4 into the slit (15) of the Tray 2 Assembly. 14 15 22

10. Put each Tray 2 Assembly (13) onto the slide rails (16) on machine side. Fix Tray 2 Assembly with 2 Bind Screws (17: M3x8). 16 17 13 NOTE Insert Tray 2 Assembly and the plastic sheets together into the slit on the machine. slit plastic sheet Correct: plastic sheets inserted together Wrong: plastic sheets out of the slit 23

11. Remove 4 screws (18) to remove the plastic guides (19). 19 18 18 12. Fix Tray (20) and the plastic guides (19) together with the screws (18). 20 19 20 19 18 18 20 20 19 3 13. Open Cover 4 (21). 21 24

14. Shake Toner Cartridge (22) several times. 22 15. Pressing Lock Lever (23), locate the pin (24) on top of Toner Cartridge to the groove (25). Make sure that Lock Lever (23) correctly locks Toner Cartridge. 24 23 25 16. Turn Toner Cartridge body (26) in one revolution to the arrow direction to open the toner supply hole so that the tab (27) goes into the notch (28). 26 27 28 NOTE It is not necessary for the cartridge bottom to be locked by the lever (29). That will be done at the machine s power on. 29 17. Close Cover 4 (21). 21 25

7 Turning on the Machine 1. Plug the machine into a dedicated wall outlet. WARNING (1) Do not handle the Power Plug with wet hands, or you may receive an electrical shock. (2) Make sure to ground the machine for safety. (3) Do not plug the printer into a multi-wiring connector in which other devices are plugged. It may overheat the outlet and may result in a fire. (4) The outlet must satisfy the following conditions. In U.S.A. : 120V plus/minus 10%, 50/60Hz and 15A In Europe and Asia : 220-240V plus 6% or minus 10%, 50/60Hz and 10A 2. There is a Power Switch on the right side of the machine. Press it to the I side to turn on the machine. Power Switch Press side. 3. The Ready Indicator lights when the machine gets ready. 26

8 Initializing Scanner Unit After the setup, the Scanner Unit requires scanner adjustment for initialization. This provides a clearer and more accurate scan image. Initialize the Scanner Unit with using Shading Sheet. 1. Press Menu Key on Operation Panel to enter Menu Mode Screen. 2. Press R2 Key to enter Test Mode. 27

3. Press R1 Key to launch Shading Screen. 4. Set Shading Sheet in the accessory to the scanner noting the arrow direction. 28

5. Press Enter Key to start Shading. NOTE (1) It takes about 7 minutes to complete Shading. (2) One Shading Sheet scan calibrates R/G/B light sources at the same time. 6. When finished, the following message is displayed. Press Enter Key. 7. Scanner initialization is completed. 29

9 Installation of Optional Licenses 9. 1 Scan System 2 (for Scan to File) Install the optional license Scan System 2 to print a PDF file. 1. Remove 4 pieces of Tray (1). 1 2. Remove 4 pieces of 4x6 screw (2), loosen 4 pieces of 4x6 screw (3), and remove the Cover 15 (4). 2 4 3 30

3. Insert the USB Key (5) labelled with Scan System 2 into the specified USB socket (6). 5 6 Reference Cables and USB Keys are connected to the controller unit as follows. A: Operation Panel Cable (key) E: LAN Cable B: Controller Shut Down Cable F: KM-4800w USB Key C: Operation Panel Cable (Display) G: Option USB Key D: Scanner USB Cable E G A B C D F NOTE Temporarily remove LAN Cable (E) to install Scan System 2 USB Key to the connector (G). Be sure to replace LAN Cable in position after completion of Scan System 2 installation. 31

4. Replace Cover 15 (4) and Trays (1). 4 1 5. Press side of Power Switch (7) on the right side of the machine to turn it on. 7 Press this side. 6. Press the Menu key on the Operation Panel to indicate the Menu Screen. 32

7. Press the R4 Key, and input the password 10871087 to enter the Service Mode. Input 10871087. Press this. 33

8. Press the L4 Key to indicate the License Screen. Press this. 34

9. Confirm the license name Scan System 2 is displayed on the screen. Press the key beside Scan System 2. (L2 Key in this case.) Press the key beside Scan System 2. 10. The following message is displayed. Press the Enter Key to register the license. 35

11. The license name Scan System 2 is highlighted when it has been registered. 12. The following message is displayed when Scan System 2 has been registered. Turn off the machine, wait for 1 minute, and turn it on again to apply the license. 13. After the license registration, remove the USB Key of Scan System 2 from the controller unit. Keep it carefully. Replace LAN Cable in position. 36

9. 2 UG-32 (for PDF printing) Install the optional license UG-32 to print a PDF file. 1. Remove 4 pieces of Tray (1). 1 2. Remove 4 pieces of 4x6 screw (2), loosen 4 pieces of 4x6 screw (3), and remove the Cover 15 (4). 2 4 3 37

3. Insert the USB Key (5) labelled with UG-32 into the specified USB socket (6). 5 6 Reference Cables and USB Keys are connected to the controller unit as follows. A: Operation Panel Cable (key) E: LAN Cable B: Controller Shut Down Cable F: KM-4800w USB Key C: Operation Panel Cable (Display) G: Option USB Key D: Scanner USB Cable E G A B C D F NOTE Temporarily remove LAN Cable (E) to install UG-32 USB Key to the connector (G). Be sure to replace LAN Cable in position after completion of UG-32 installation. 38

4. Replace Cover 15 (4) and Trays (1). 4 1 5. Press side of Power Switch (7) on the right side of the machine to turn it on. 7 Press this side. 6. Press the Menu key on the Operation Panel to indicate the Menu Screen. 39

7. Press the R4 Key, and input the password 10871087 to enter the Service Mode. Input 10871087. Press this. 40

8. Press the L4 Key to indicate the License Screen. Press this. 41

9. Confirm the license name PDF is displayed on the screen. Press the key beside PDF. (L2 Key in this case.) Press the key beside PDF. 10. The following message is displayed. Press the Enter Key to register the license. 42

11. The license name PDF is highlighted when it has been registered. 12. The following message is displayed when UG-32 has been registered. Turn off the machine, wait for 1 minute, and turn it on again to apply the license. 13. After the license registration, remove the USB Key of UG-32 from the controller unit. Keep it carefully. Replace LAN Cable in position. 43

(blank)

(blank)

2008.9 305JG56721