Electric Transmission and Distribution Future R&D Needs

Similar documents
Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security

Phasor Technology Research Roadmap for the Grid of the Future

Wide-Area Reliability Monitoring and Visualization Tools

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

RTDMS CAISO TRAINING SESSION

Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum. December 9, 2010

MISO. Smart Grid Investment Grant Update. Kevin Frankeny NASPI Workgroup Meeting October 17-18, 2012

SDG&E s Accomplishments and Future Plans

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence.

North American SynchroPhasor Initiative (NASPI) Overview

Evolution of Control for the Power Grid

Visualization of. Power Systems and Components (S-18)

Introduction to the NYISO

2014 Reliability Leadership Summit

Dr. Yi Hu, Dr. Damir Novosel Quanta Technology LLC

PJM Interconnection Smart Grid Investment Grant Update

Perry. Lakeshore. Avon. Eastlake

NASPI and Synchrophasor Technology Progress. Alison Silverstein NASPI Project Manager NERC OC- PC Mee?ngs, December 2013

Achieving Smarter Grid Operation With On-Line DSA Technology

Transforming the Electric Grid

Dmitry Ishchenko/Reynaldo Nuqui/Steve Kunsman, September 21, 2016 Collaborative Defense of Transmission and Distribution Protection & Control Devices

GridEx IV Initial Lessons Learned and Resilience Initiatives

T&D Challenges and Opportunities

Synchrophasor Technology and Systems

Big Data Analytics: Research Needs. Ali Ghassemian

OVERVIEW: KEY APPLICATIONS

Software Technologies

Applications and Analysis Tools for Monitoring Dynamics on the Grid

Seams Management at the RTO level

Time Synchronization and Standards for the Smart Grid

History of NERC December 2012

Electric Sector Security & Privacy Plans for 2011

Synchrophasor Fact Sheet

PJM Interconnection Smart Grid Investment Grant Update

Wide Area Measurements & Control Systems

North American SynchroPhasor Initiative An Update of Progress

U.S. Department of Energy Cybersecurity for Energy Delivery Systems. Dr. Carol Hawk

Building a Topology Estimator for Large Inter-regional Networks

Interconnection and Transmission

Evolution of Control for the Power Grid

WAProtector Power System Wide Area Monitoring Protection and Control

Real-time visualization for detecting and solving power system challenges

SIGUARD System for Phasor Data Processing

Synchrophasors and Next Generation Energy Management Systems (EMS)

Smart Grid Demonstration Project

A High-Performance Platform for Real-Time Data Processing and Extreme-Scale Heterogeneous Data Management

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13

Multilin P30 Phasor Data Concentrator

Corporate Profile. Bring Power to Innovation! Bigwood Systems, Inc.

AC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland

ENERGY. JUDI GREENWALD Deputy Director for Climate, Environment and Efficiency U.S. Department of Energy

The Substation of the Future: A Feasibility Study

Wide Area Monitoring System Planning, Strategy and Implementation in Thailand s Power Grid

Minnesota Hosting Capacity Analysis

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013

Potential CIP decision tree for PMUs

Power Affiliates Program Highlights. Pete Sauer

History of NERC January 2018

Essential Reliability Services NERC Staff Report

Project CIP Modifications. Webinar on Revisions in Response to LERC Directive August 16, 2016

B O N N E V I L L E A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Sensing & Measurement Research Activities through DOE s Grid Modernization Initiative Tom King Sensing & Measurement Technical Area Lead

Future Grid Initiative Technology Challenges in Designing the Future Grid to Enable Sustainable Energy Systems

NYISO Selected Topics

Synchrophasor-Based Monitoring, Analysis, and Control

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program

2012 EMS User's Group. MISO Synchrophasor Project

Comments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference

Grid Modernization at the Department of Energy

Addressing Challenges Through Interconnection Wide

NASPI Reliability Coordinator Data Quality Survey Summary. Alison Silverstein NASPI Project Manager March 21, 2016

Optimal Power System Management with SIGUARD

Electric Program Investment Charge Joint IOU Stakeholder Webinar

History of NERC August 2013

Using PMU Data to Increase Situational Awareness

Implementation of Wide Area Monitoring System for interconnected power system in India

SCE WASAS Combined Disturbance Fault Recorder (DFR) and Phasor Measurement Unit (PMU) Specifications. Anthony Johnson

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused

Integrating Distributed Resources into Distribution Planning and Operations R&D Priorities

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

EPRI Research Overview IT/Security Focus. Power Delivery & Energy Utilization Sector From Generator Bus Bar to End Use

The Future of Real-Time Energy Management Systems For Transmission System Operations

Wide Area Situation Awareness (WASA) Demonstration System Utilizing the CIM in Japan

SCADA MASTER CONTROLLER STACKED SERVICES EMULATOR DATA COLLECTOR

ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE

Five Year Synchrophasor Plan NOVEMBER 2011

Québec Interconnection Approach to BES

Power System Stabilization Solutions in North America and Future Outlook

Q1 FY08 Highlights and Financial Guidance*

NWPP Members Market Assessment and Coordination Initiative Update with Regional Flow Forecast Tool presentation

NERC Overview and Compliance Update

Always an eye to security

SPP PMU. Project Overview for NASPI. Cody Parker Supervisor Operations Support

GO15 Reliable & Sustainable Power Grids

Cybersecurity for the Electric Grid

Power System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017

American Transmission Company U.P. Energy Summit

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Grid Operations and Reliability Monitoring/Analysis at American Transmission Company

Transcription:

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization The Center for Advanced Power Systems Florida State University, Tallahassee, Florida February 1, 2006 Presented by: Vikram Budhraja President, Electric Power Group Chair, Consortium for Electric Reliability Technology Solutions

Discussion Outline CERTS Introduction Research Drivers and Focus Changing Research Needs Transmission Grid Monitoring & Visualization Research Needs Evolving Research Needs Example of Phasor Technology Operational Consolidation and Wide-Area Reliability Visualization Solution for Reliability Coordinators -- Example Long Term Grid Research Framework Page 1

Consortium for Electric Reliability Technology Solutions (CERTS) CERTS was organized in 1999 as a partnership among universities, the private sector, and Department of Energy national labs. Consortium includes four labs (Lawrence Berkeley, Oak Ridge, Sandia, Pacific Northwest), Power Systems Engineering Research Center (consortium of 13 universities), and Electric Power Group. CERTS Industry Advisory Board includes ISOs, utilities, regulators, generators. CERTS research leverages public and private resources, including funding by the Department of Energy, Transmission Reliability Program, and the California Energy Commission Public Interest Energy Research Program. CERTS research is focused on addressing gaps in tools, technologies, systems, market rules, and management processes needed to manage the reliability of the electric grid and efficient market operations. Page 2

Research Drivers and Focus INDUSTRY STRUCTURE Disaggregation of Utility Functions Formation of ISOs/RTOs Formation of ERO RESEARCH FOCUS Local vs. Wide Area Models vs. Measurement Command and Control vs. Market Analog vs. Digital Low vs. High Resolution Data X-Ray vs. MRI TECHNOLOGY CHANGES Computers Communications Internet Visualization GPS Timing COMPETITIVE MARKETS Energy Ancillary Services Capacity LMP Reliability through Markets Page 3

Changing Research Needs Research Area PLANNING Deterministic Static Offline Engineering Data Probabilistic Dynamic Integrate Real Time Data OPERATIONS CONTROL/ PROTECTION VISUALIZATION SCADA Data State Estimation Economic Dispatch Local Central Mechanical Analog Local Area Line Diagrams Tabular Data Phasor Data State Measurement Market Dispatch Wide Area/RAS Distributed Electronic/Silicon Digital Wide Area Graphic, Geographic, Real Time: Monitor Track Analyze Alarm Notify Page 4

Transmission Grid Monitoring and Visualization Research Needs DATA METRICS MODELS VISUALIZATION APPLICATIONS Networking Quality Security Storage Access Archiving Retrieval Interconnection Performance Risk-Based Tracking Measured System State Wide-Area Voltage Assessment Probabilistic Risk Analysis Wide-Area Architecture Human Factors Display Design Monitor Track Analyze Alarm Wide-Area Monitoring Reliability, Security, Markets Standards Compliance Real-Time Wide- Area Control, Protection, and Alarming Notify Nomograms/RAS Situational Awareness Interconnection Dynamics Page 5

Evolving Research Needs Example of Phasor Technology Wide-Area Measurement Systems - WAMS Wide-Area Data Networking Wide Area Monitoring Phasor-Based Applications Visualization Monitoring Control/Protection Alarming Disturbance Analysis Forensic Analysis System Dynamics State Estimation 80 s 90 s-2000 2000-2010 2006 Page 6

EIPP Participants Utilities, RTOs, Transco s, Researchers, Vendors DOE and CERTS Initiated EIPP in 2002 August 2003 Blackout Highlighted Need BCH Manitoba Hydro BPA 50 PMUs and 7 PDCs in Place PG&E CAISO Initial Network SCE of 21 PMUs Operational TVA Data Host WAPA SRP Hydro Quebec NYISOISO-NE ATC HydroOne Keyspan NYPA ITC ConEd Exelon First Energy A PPL PJM MISO Cinergy E Trans Elect Grid America Ameren P Progress Duke TVA Southern Entergy FPL Page 7

Operational Consolidation and Changing Focus From Local to Wide-Area 2000-152 Operational Jurisdictions (Control Areas) 2003 17 Wide-Area Reliability Coordinators 2006 8 Wide-Area Reliability Regions Page 8

Visualization Solution for Reliability Coordinators -- Example Panel 2: 2D-Plot with BAAL Violation (Last 30-Minute of CPS1) for Control Areas of Selected Jurisdiction Panel 3: Bar-chart for last 30-Min of CPS1 with Thresholds for CPS1 and BAAL violations correlated with frequency Panel 1: Geographic View with Last Minute CPS1 for Control Areas in Selected Jurisdiction Panel 4: Dynamic Data Text Window with actual data displayed in tabular fashion for each selection criteria Page 9

Long Term Grid Research Framework High Investment Grid Upgrades New Grid Infrastructure Commercial Grid Management - Planning, Operations, Control/Protection, and Visualization Grid Technologies Research and Demonstration Long Term Page 10

Long Term Grid Research Framework High Investment Grid Upgrades Transformers Substations SVC s, DVAR, Statcom EMS, SCADA, Automation New Grid Infrastructure New Lines, Cables New ROW New Technologies Commercial CERTS RESEARCH FOCUS Grid Management - Planning, Operations, Control/Protection, and Visualization Wide-Area Monitoring EPACT 2005 Application of Phasors New Visualization Tools Fast Simulation Models State Estimation and Measurement Protection, Control, and Alarming Dynamics & Security Integration of Loads and Distributed Technologies Market Design and Performance Grid Technologies FACTS Technologies Power Electronics Composite Conductors Superconductors cables, fault current limiter, super VAR Storage Research and Demonstration Long Term Page 11