[ Quick Start Guide ]

Similar documents
[ Quick Start Guide ]

[ Quick Start Guide ]

[ Quick Start Guide ]

[ Quick Start Guide ]

[ Quick Start Guide ]

QLogic Series InfiniBand Switches and Directors

Installing and Managing the Switch

[ Quick Start Guide ]

SilverStorm Table of Contents

48-Port 10/100/1000Base-T with 4 Shared SFP. Managed Gigabit Switch WGSW Quick Installation Guide

Installing the Cisco SFS 3504 Server Switch

Management Security Switch SGSD-1022 / SGSD-1022P SGSW-2840 / SGSW-2840P. Quick Installation Guide

QLogic InfiniBand Cluster Planning Guide

Quick Install Guide. ibypass TM I2BP-4x Rev A 11/14

Installing the Cisco Unified Videoconferencing 3545 MCU

Hardware Installation Guide Installation (x3350)

24-Port 100/1000X SFP + 4-Port 10G SFP+ Managed. Metro Ethernet Switch MGSW-28240F. Quick Installation Guide

28-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch WGSW / WGSW-28040P. Quick Installation Guide

Industrial 8-Port 10/100/1000T 802.3af/at PoE + 2-Port 100/1000X SFP Managed Switch with Wide Operating Temperature

48-Port 10/100Mbps + 4 Gigabit TP / 2 SFP. Managed Switch WGSW Quick Installation Guide

Install your TPS 440T and 2200T security devices

DX Application Acceleration Platform Quick Start

24-Port Gigabit with 4 Optional 10G Slots. Layer 3 Managed Stackable Switch XGS Quick Installation Guide

Setting Up Your Cisco Unified Videoconferencing 3515 MCU

8-Port 10/100Mbps + 2G TP/SFP Combo. Managed Industrial Switch ISW-1022M / ISW-1022MT / ISW-1022MP / ISW-1022MPT / ISW-1033MT

Deploy the ExtraHop Trace 6150 Appliance

IFS NS3552-8P-2S and NS3550-2T-8S Quick Installation Guide

[ Quick Start Guide ]

Setting Up Your Cisco Unified Videoconferencing 3500 Gateway

Cajun P333R. Quick Start Guide. Unpack 1. Rack mount (optional) 2. Power up 3. Connect the cables 4. Configure 5. Run Web-based Manager (optional)

24-Port Gigabit with 4 Optional 10G Slots. Layer 3 Managed Stackable Switch XGS / XGS Quick Installation Guide

RS-232/422/485 to Copper or Fiber. Ethernet Converter. User s Manual

24-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch

16/24/48-Port 10/100/1000T + 2/4-Port 100/1000X SFP Managed Switch GS T2S/GS T2S/GS T4S. Quick Installation Guide

Deploy the ExtraHop Trace 6150 Appliance

16/24-Port 10/100/1000T 802.3at PoE + 2-Port 100/1000X SFP Managed Switch GS P2S GS P2S. Quick Installation Guide

SwitchBlade Switch Controller Quick Install Guide

XPress DR+W Quick Start Guide

Avaya P133G2. Quick Start Guide. Unpack. Rack mount (optional) Power up 3. Connect the cables 4. Configure 5. Run Web-based Manager (optional)

D Rev. B. SilverStorm 9000 CLI Reference Guide

DX 32xx and DX 36xx Quick Start

Quick Start Guide. 2-Port 10/100 Device Server RS-232/422/485 DB9 M. Access two serial RS-232 or RS-422/485 devices over a 10- or 100-Mbps network.

VTRAK E-Class/J-Class Quick Start Guide

EDS8/16/32PR Quick Start Guide

Deploy the ExtraHop Discover 3100, 6100, 8100, or 9100 Appliances

Industrial L2/L4 Managed Gigabit Switch. With 4-Port 802.3at PoE+ IGS P4T/IGS P4T2S. Quick Installation Guide

CHASSIS-1. Form number 7660

24-Port Gigabit + 4-Port 10G SFP+ Slot. Layer 3 Stackable Managed Switch XGS Quick Installation Guide

SCOPIA 100 MCU Quick Start

L2+ Managed Gigabit Switch WGSW series

Installation and Configuration Guide

IFS NS P/4S GE-DSSG-244 GE-DSSG-244-POE Quick Installation Guide

L2+ Managed Gigabit/10 Gigabit Ethernet Switch GS-5220 Series

Industrial 4G LTE Cellular Gateway ICG-2420-LTE

L2/L4 Managed Gigabit Ethernet Switch GS-4210 Ultra PoE Series

Quick Setup and Configuration

L2+ Managed PoE Switch GS-5220 PoE Series

Cisco SFS 3012 Multifabric Server Switch Quick Start Guide (Topspin 360 Quick Start Guide) Release 2.1.0

Industrial L2+ Multi-Port Full Gigabit. Managed Ethernet Switch IGS-10020MT / IGS-10020PT/HPT / IGS-10080MFT IGS-12040MT / IGS-20040MT / IGS-20160HPT

Securely manage data center and network equipment from anywhere in the world.

L2+ Multi-Port Full Gigabit Managed Ethernet Switch IGS-10020MT / IGS-10020PT / IGS-10020HPT / IGS-10080MFT / IGS-20040MT. Quick Installation Guide

L2+ Managed LCD Switch GS T2XV(R) / GS T4XV(R) Quick Installation Guide

6170 Shiloh Road Alpharetta, Georgia (770) FAX (770) Toll Free

Using the Web-Browser and CLI Interfaces

Industrial L2+ Multi-Port Full Gigabit. Managed Ethernet Switch IGS T2S/IGS UP1T2S IGS P2S/IGS P4S/IGS P2T2S

Industrial 24-Port 10/100/1000Mbps Managed Gigabit. Switch (-40~75 degrees C) with 4 Shared SFP Ports IGSW-24040T. Quick Installation Guide

Avid ISIS 1000 Quick Start

C2000 and C4000 Hardware Quick Start Guide

ProjectorNetTM Adapter Quick Start Guide

Cisco TelePresence Video Communication Server. Getting started

Quick Start Guide. 8-Port Value-Line Console Server QS Guide LES1508A

SPARC Enterprise T2000 Server Getting Started Guide

Securely manage data center and network equipment from anywhere in the world.

Multi-port Coax + 2-port 10/100/1000T + 2-port. 100/1000X SFP Long Reach PoE over Coaxial. Managed Switch LRP-822CS / LRP-1622CS

WiSpan Quick Start Guide

36 Port InfiniBand QDR Switch Platform Installation Guide

Manager Appliance Quick Start Guide

IBM Systems. Quick start guide for IBM System p5 505 ( )

Quick Start Guide. Remote Console Manager Quick Start Guide

Catalyst 2360 Switch Getting Started Guide

Deploy the ExtraHop Explore 5100 Appliance

ilo MP Utilities ilo MP

SPARC Enterprise T5220 Server Getting Started Guide (For Models That Run on DC Input Power)

Remote RMM-1400 Intelligent Remote Site Management Device. Installation Guide

Quick start guide for p5 520 ( )

Juniper Secure Analytics Quick Start Guide

WiBox 2100 Quick Start Guide

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables

Industrial Serial Device Server

Quick Start Guide. Remote Console Manager

L2+ Managed Metro Ethernet Switch MGSW / MGSD Series

CCN-to-Ethernet Converter Installation Instructions

GE-DSH-73/82 and 82-POE Managed Switch Installation Sheet

Rapier Series Switch Quick Install Guide

Pre-Installation Information--S8700 IP Connect

L2+ 16-/24-Port Gigabit PoE. + 2-/4-Port 10G SFP+ Managed Switch. with LCD Touch Screen GS P2XV(R)/GS UP2XV(R)

Cascade Sensor Installation Guide. Version 8.2 March 2009

About Chassis Manager

AI130 AIswitch Series 130 Chassis Installation Guide

Deploy the ExtraHop Discover EDA 6100, EDA 8100, or EDA 9100 Appliances

Transcription:

[ Quick Start Guide ] QUICK START GUIDE SILVERSTORM 9080 INSTALLATION z

Purchasers of OEM products should consult with the OEM for support. Support Headquarters QLogic Web Site Technical Support Web Site Technical Support Email Technical Training Email North American Region Email QLogic Corporation 4601 Dean Lakes Blvd Shakopee, MN 55379 www.qlogic.com support.qlogic.com support@qlogic.com tech.training@qlogic.com support@qlogic.com Phone +1 952-932-4040 Fax +1 952-932-4018 All other regions of the world QLogic Web Site www.qlogic.com

SilverStorm 9080 Quick Start Guide Pre-Installation Checklist Before beginning the actual installation, the Site Implementation Engineer must perform the following tasks: Step 1. Check the packing list to verify all ordered equipment has been received. The box should contain: A SilverStorm 9080 switch with the following pre-installed: Four (4) fan units Power supplies and blanks (6 total). InfiniBand (IB) leaf modules (up to 8 total) Spine modules and blanks (2 total) Virtual I/O hardware such as the SilverStorm FibreChannel Virtual I/O Card (FVIC) and the SilverStorm Ethernet Virtual I/O Card (EVIC) (up to 4 total) Any leaf/vio hardware blanks (up to 7 total). Additional parts: One (1) Hardware installation kit (mounting rails, etc.) One (1) Serial cable DB-9 female to RJ-11 connectors One (1) Category RJ-11 Serial cable Power cords (up to 2 total) NOTE: Be certain that the power cords are firmly seated into the SilverStorm 9080 power supplies AC power inlets. Step 2. Step 3. A CD ROM containing: Technical Documentation Software Release Notes. Unpack the equipment. Inspect the equipment for any shipping damage. NOTE: Any shipping damage should be reported to the shipping company. 3

Step 4. Verify that the equipment shipped matches the packing list. Tools and Equipment Required An ESD wrist strap A #2 Phillips screwdriver Pen (felt-tip) to mark the mounting holes on the rack 4

Installation Tasks NOTE: Before performing the installation tasks, take a few minutes to review the figures below. It is important to understand the slot numbering for the leaf modules and spine modules (and the corresponding spine RJ-45 ports). It is also important to understand the slot numbering for the fans and power supplies (and the corresponding AC power inlets for the power supplies). Figure 1. SilverStorm 9080 Chassis Front View Figure 2. SilverStorm 9080 Chassis Back View Leaf 7 Leaf 5 Leaf 3 Leaf 1 Leaf 8 Leaf 6 Leaf 4 Leaf 2 AC power inlet for power supplies 1 to 3 AC power inlet for power supplies 4 to 6 RJ-45 for Spine 1 RJ-45 for Spine 2 5

To perform the actual switch installation, the site implementation engineer must perform the following tasks, which are detailed in this section. Step 1. Check the installation site to verify the installation of cabinet power feeds, rails, and grounding. Step 2. Inspect the packaging and equipment for any shipping damage. Any shipping damage should be reported to the shipping company. Only unpack the equipment if there is no shipping damage. Step 3. Step 4. Record the equipment serial numbers. Physically install the switch in the rack. Step 5. Install InfiniBand (IB) or IB/Fiber Optic cables between the SilverStorm 9080 and network devices. Step 6. Step 7. Install intra-cabinet power and grounding cables for the switch. Power up the switch. Step 8. Change the default system IP address (192.168.100.9) and gateway IP address (255.255.255.0) for the master spine. Step 9. Add the equipment to the network. Changing the IP Address and Default Gateway Using the RS232 Serial Port Step 1. Connect null-modem/crossover serial cables to the RS-232 port of the switch spine module. If using a terminal emulation device, the settings should be: 8 data bits no parity bits 1 stop bit 56K baud Use VT100 emulation. 6

Step 2. Step 3. Flow control = XON/XOFF Power up the switch. To change the switch default IP address enter: setchassisipaddr -h ipaddress -m netmask where -h ipaddress is the new IP address in dotted decimal (i.e., xxx.xxx.xxx.xxx) format, and -m netmask is the new subnet mask in dotted decimal (i.e., xxx.xxx.xxx.xxx) format. Step 4. To change the switch default gateway IP address enter: setdefaultroute -h ipaddress where -h ipaddress is the new default gateway IP address in dotted decimal (i.e., xxx.xxx.xxx.xxx) format. Using Telnet or SSH Step 1. Power up the switch. Step 2. Connect a Category 5 or 6 (Cat 5/6) Ethernet cable to the RJ-45 connector on the switch. Connect the other end of the Cat 5/6 to a OOB LAN workstation. Step 3. Access the switch with the following command: telnet 192.168.100.9 Step 4. The system prompts for a user name. In order to change the IP address and default gateway, the user must be logged in as the administrator. At the prompt enter: admin Step 5. The system prompts for a password. At the prompt enter: adminpass The system responds with: Welcome to the SilverStorm 9080 CLI. Type 'list' for the list of commands. Step 6. To change the switch default IP address enter: setchassisipaddr -h ipaddress -m netmask 7

where -h ipaddress is the new IP address in dotted decimal (i.e., xxx.xxx.xxx.xxx) format, and -m netmask is the new subnet mask in dotted decimal (i.e., xxx.xxx.xxx.xxx) format. Step 7. To change the switch default gateway IP address enter: setdefaultroute -h ipaddress where -h ipaddress is the new default gateway IP address in dotted decimal (i.e., xxx.xxx.xxx.xxx) format. Step 8. To to exit the CLI enter: logout Using the Chassis Viewer Step 1. Power up the switch. Step 2. Connect a Category 5 or 6 (Cat 5/6) Ethernet cable to the RJ-45 connector on the switch. Connect the other end of the Cat 5/6 to a OOB LAN workstation. Step 3. To start Chassis Viewer, open a web browser and enter the IP of the switch. NOTE: The browser must be on a workstation connected to the same Ethernet LAN, and on the same TCP/IP subnet as the switch RJ-45 OOB LAN port. Step 4. From the main menu select OOB LAN IP then Set OOB LAN IP. The following screen is displayed: Figure 3. Set OOB LAN IP Window 8

Step 5. Step 6. Step 7. Type in the new switch IP address. Type in the new net mask. Click Apply. Step 8. To change the switch default gateway, from the main menu select OOB LAN IP then Set Default Gateway IP. The following screen is displayed: Figure 4. Set Default Gateway IP Window Step 9. Type in the correct switch default gateway IP address. Step 10. Click Apply. NOTE: A reboot is required to activate the new gateway IP address. 9

Subnet Manager License Key Activation If the user has purchased the InfiniBand Fabric Suite 2008 package, in order to activate the subnet manager the user must acquire a subnet manager (SM) license key from QLogic Technical Support. In order to do this, the user must first find the globally unique identifier (GUID) for the managed spine module to be used as the master SM. The GUID can be: Retrieved from the label on the spine. Retrieved via software using the Chassis Viewer GUI or the command line interface (CLI). GUID Formats NOTE: It is very important to enter the entire GUID correctly or the generated license key will not work. The SilverStorm GUID format is 16 characters hexadecimal. An example is displayed below: 00066x0006000xxx Hardware Retrieval Before powering up the switch, remove the applicable FRU and record the GUID from the label with the QLogic logo that is located on top of the unit. Software Retrieval: Command Line Lookup using Telnet or SSH To retrieve the FRU GUID using the CLI, do the following: Step 1. Access the switch with the following command: telnet <IP ADDRESS> Step 2. The system prompts for a user name. At the prompt enter: admin Step 3. The system prompts for a password. At the prompt enter: adminpass The system responds with: Welcome to the <SWITCH> CLI. Type 'list' for the list of commands. Step 4. To find the FRU GUID, enter the following: showibnodedesc The system responds with information similar to the following: IB Node (SMA) Description is = <SWITCH> GUID=0x00066a00da000100 Record the GUID number. 10

Software Retrieval: Chassis Viewer Lookup To retrieve the FRU GUID using the Chassis Viewer, do the following: Step 1. Open a web browser and enter the IP address of the switch. If user authentication is enabled, enter the user name admin and the password adminpass. The Chassis Viewer home page is displayed: Figure 5. 9080 Home Page Step 2. To display the spine module view, mouse over the spine to be used as the master SM. The edges of the module are highlighted green as shown below: Figure 6. Spine Module Mouseover Click the mouse. The spine module view is displayed: Figure 7. Spine Module View 11

Step 3. From the Master Spine Details Header, click the View FRU button. The FRU Information window is displayed: Figure 8. Spine FRU Information Step 4. Record the FRU GUID. Acquiring the Subnet Manager License Key Step 1. Step 2. Step 3. Center. Step 4. Go to the QLogic support web site at support.qlogic.com. From the left-hand menu, select Feature Activation/License Key. Under the Software column, select Subnet Manager Activation Select Activate License Keys and follow the instructions. Step 5. After acquiring a license key, refer to the SilverStorm 9000 Users Guide for instructions on activating the license key. Installing Documentation from a CD Installing Documentation on a Linux Host Step 1. Place the Documentation CD in the CD-ROM drive. 12

Step 2. Check that the CD has been mounted. Type ls /mnt/cdrom. The system returns a list of files on the CD. Step 3. reside. Create a subdirectory on the drive where the documentation will Step 4. Type cp /mnt/cdrom/<subdirectory NAME> /<SUBDIRECTORY NAME> to copy the documentation to the subdirectory created in Step 3. Step 5. file. Navigate to the Documentation directory and open the desired PDF 13

Declaration of Conformity QLogic Corporation. 26650 Aliso Viejo Parkway Aliso Viejo, CA 92656 Phone: 949.389.6000 www.qlogic.com QLogic Corporation declares the following product is in compliance with the following standards. Product identification: Name: 96 Port InfiniBand Switch Model/Type: SilverStorm 9080 Standards applied: FCC Part 15, Subpart B, Class A; ICES-003; EMC; EN55022, Class A, EN61000-3-2 and EN61000-3-3; VCCI, Class A and EN55024 Test House: Test report is issued by: Name: Underwriters Laboratories Inc. Address: 1285 Walt Whitman Road, Melville, NY 11747-3081 USA Test dates: 2004-10-27 to 11-05 File No: E231432 Project No: 04ME12243 Vladimir Tamarkin Director, Mechanical Engineering 14

2008 QLogic Corporation. QLogic, the QLogic logo, SANbox, and Enterprise Fabric Suite 2007 are registered trademarks or trademarks of QLogic Corporation. All other brands and product names are trademarks or registered trademarks of their respective owners. Information supplied by QLogic is believed to be accurate and reliable. QLogic Corporation assumes no responsibility for any errors in this brochure. QLogic Corporation reserves the right, without notice, to makes changes in product design or specifications.

JQLogic Corporation 26650 Aliso Viejo Parkway Aliso Viejo, CA 92656 949.389.6000 www.qlogic.com D000010-013