Stakeholder Joint Working Session 2016 TRANS AUSTRIA GASLEITUNG GmbH NEP 2017-2026 Vienna, 29.06.2016
Overview TAG GmbH as company The TAG pipeline system Capacity products Highlights 2016 Market survey for CNDP 2017-2026 TAG capacity outlook 2017-2026 Projects 2
TAG GmbH as company TAG GmbH is the Transmission System Operator of the TAG Pipeline System in compliance with 170 (21) of the Austrian Natural Gas Act (GWG 2011) and has been granted ITO certification in July 2014. TAG GmbH is the exclusive holder of the transportation rights as well as of the property of the TAG pipeline system. The shareholders of TAG GmbH are SNAM S.p.A. (84,47%) and Gas Connect Austria GmbH (15,53%). 3
The TAG pipeline system Entry-Exit System: Relevant Points Entry Point Baumgarten (FZK, UK) Exit Point Baumgarten (UK) Exit Point Arnoldstein (FZK, UK) Entry Point Arnoldstein (DZK, UK) CS MS Baumgarten SK Three pipelines with 380 km each, 5 compressor stations St. Pölten Salzburg A WIEN CS Eggendorf Eisenstadt Graz CS Grafendorf CS MS Weitendorf H Klagenfurt SOL I MS Arnoldstein CS Ruden SLO 4
Capacity products Founding member and shareholder of the PRISMA European Capacity Platform founded in Leipzig on December 4 th, 2012. Exclusive marketing of transport capacities via PRISMA online auction platform since 1 st April 2013 Offered capacity products according to CAM Network Code Yearly products Quarterly products Monthly products Day-Ahead products Within-Day products Implemented CMP measures : UIOLI Capacity Surrender PRISMA Secondary Platform since 2014 5
Highlights 2016 Offer of Within Day capacity products on PRISMA at the relevant points Offer of interruptible capacity (UK) at Exit Baumgarten Bundling of capacities at the relevant points Installation of ultra sonic flow meter (USFM) measurement in the cross-border MS Arnoldstein and MS Baumgarten replacing existing orifice fitting metering 6
Market survey for CNDP 2017-2026 TAG GmbH conducted a non-binding market survey Published on TAG website PRISMA newsletter In cooperation with Gas Connect Austria and the Market Area Manager Projects and capacity demands can be submitted further on No demand for increased capacity at the relevant points of TAG GmbH as per due date 01.04.2016 An extension of the existing technical capacities at the relevant points of the TAG Pipeline System is not required for the period 2017-2026 7
Entry point Baumgarten in MWh/h 8
Exit point Arnoldstein in MWh/h 9
Entry point Arnoldstein MWh/h 10
Project TAG 2015/01 TAG 2015/01 Messstrecken Baumgarten TAG Einbindung Physical connection between the GCA subsystem WAG-MS4 and the TAG system No capacity increase at the relevant points Increase of physical interconnection capacity between the GCA/TAG transmission systems in the area of Baumgarten Planned finalization Q3/2016 Corresponding GCA project: GCA 2015/09 11
Project TAG 2015/02 TAG 2015/02 AZ1 Baumgarten Reverse Flow Physical connection capacity in Baumgarten between the TAG transmission system and the GCA subsystem PVS-AZ1 in Reverse Flow Enables the creation of FZK entry capacity at Murfeld (Slovenian/Austrian border) Upgrades Arnoldstein entry capacity from DZK to FZK Planned finalization: Q3/2018 Corresponding GCA projects: GCA 2015/08 + GCA2015/10 + GCA 2016/03 12
Project TAG 2016/01 TAG 2016/01 TAG Reverse Flow Weitendorf/Eggendorf Guarantee the transport of at least 1.6 Mio. Nm³/h (at least 1,000,000 Nm³/h from Entry Point Arnoldstein and 600,000 Nm³/h from Entry Point Murfeld) to Baumgarten Planned finalization: Q4/2018 Corresponding GCA projects: GCA 2015/08, GCA 2015/10, GCA 2016/03 13
Project TAG 2016/02 TAG 2016/02 AZ1 additional entry and connection with BOP13 Additional physical capacity from AZ1 entry point to the TAG System Connection of BOP13 to AZ1 low pressure pipeline Eliminates logistical problems that occured in winter 2014/15 Planned finalization: Q3/2018 Corresponding GCA project: GCA 2015/7b 14
Project TAG 2016/03 TAG 2016/03 Reverse Flow Baumgarten MT station (MS2) Physical Reverse Flow of the TAG System in direction of the Slovakian network Security of Supply measure 15
TAG Baumgarten interconnection capacity Creation of interconnection capacity in Baumgarten TAG 2016/04 TAG Baumgarten interconnection capacity (Mosonmagyaróvár) Corresponding GCA Projekt: GCA 2015/05 TAG 2016/05 TAG Baumgarten interconnection capacity (BACI) Corresponding GCA Projekt: GCA 2015/01a TAG 2016/06 TAG Baumgarten interconnection capacity (BBI) Corresponding GCA Projekt: GCA 2016/01 16
17 Thanks for your attention!