NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY

Similar documents
TEA, Inc. CORPORATE HEALTH AND SAFETY PROGRAM

Application for Utility Services

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE

Multiple Dwellings $.25/sq ft Building of Non-Residential Occupancy (New Building) $.30/sq ft

9500 Belmont Avenue ٠ Franklin Park, Illinois (847) , FAX # (847)

OFFICE OF STATE FIRE MARSHAL HAZARDOUS MATERIALS INFORMATION REQUEST --INFORMATION AVAILABLE--

TANK TRUCK CLEANING FACILITY AUDIT FORM

DEQ Guidance on Recordkeeping and Reporting

Setting up Residential Electrical Service with Cowlitz Public Utility District #I

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

Environmental Impact Questionnaire

CDOT Occupy Right-of-Way Permit

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 450 Columbus Blvd, Suite 901 Hartford, CT 06103

For in-house assistance: Switchboard , Melodi Deaver , Sherry Prince , or Kelly Galantis

RECERTIFICATION HANDBOOK

COUNTY OF NEVADA PROJECT INFORMATION QUESTIONNAIRE

Notice Basic Information Estimated Contract Value (USD) $400, (Not shown to suppliers) Reference Number Issuing Organization

NV17-79 Interactive Operator Round Table Discussion swmoa.org 2 20-Apr May-17 D I I D D I

CPCCCA2002B Matrix Map

Using SUE to reduce Delays and Disruptions on City of Toronto s Yonge Street Project

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 165 Capitol Avenue Hartford, CT 06106

Occupy Public Rightof-Way

Appendix C.6. Best Management Practices for Construction Activities

BGE Service Application Guidelines Residential Development Projects

UTILITY MARKING DEVICES. Naples City Council Workshop November 17, 2014 Presented by: Andrew Holland, P.E., Engineering Manager

ASBESTOS MATERIALS SURVEY

Application for Water and/or Sewer Connections

APPLICATION FOR SOIL AND LOT EVALUATION

Laboratory Safety Guideline Laboratory Safety Data Sheets (SDS) Management, Understanding, Preparation

ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL

Building: Residential Instructions

Collections Exam Need to Know Criteria

Prime Contractor DBE Solicitation Effort Help Guide

PUBLIC WORKS ORGANIZATIONAL CHART

CITY OF DRAPER PROPERTY & PUBLIC RIGHTS OF WAY ENCROACHMENT PERMIT APPLICATION & AGREEMENT

CITY OF CORINTH, TEXAS WIRELESS SERVICES (SMALL CELLS) DESIGN MANUAL

SUB-CONTRACTOR PRE-QUALIFICATION FORM

SPECIFICATIONS - DETAILED PROVISIONS Section Pre-Construction Audio Video Recording Above Ground Facilities C O N T E N T S

Hazard Communication 2013 Training for Chemical Users. The journey from the Right to Know to the Right to Understand 29 CFR 1910.

Tier IV Standards as Specified in the TIA 942 Document

Asbestos Notification Form

Operating Instructions

CarSense202 O P E R A T I N G I N S T R U C T I O N S V E HI C L E M O T I O N D E T E C T O R Johnston Parkway, Cleveland, Ohio 44128

Access Field Entrance Other Constructed Yes (Type)

ADDENDUM NO. 02 INVITATION NUMBER:

CONDITIONS OF SERVICE

Information Exchange of Underground Networks in. Tallinn, 16-17th September 2011 Drs. V.N. (Vanessa) Gosselink-van Dijk

UTILITY NOTIFICATION CENTER OF COLORADO CONVERSION TO TIER ONE MEMBERSHIP REGISTRATION

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

FACILITY COMPONENTS - MIDDLE SCHOOL

TOWN OF WAXHAW, NC FEE SCHEDULE Effective: December 20, 2016

PREMISES POLLUTION LIABILITY

Index: SUMMIT TITLES:

Granite Shoals, TX San Antonio, TX 78251

SPECIFICATIONS - DETAILED PROVISIONS Section Pre-Construction Audio Video Recording Pipelines and Roadways C O N T E N T S

City of Tyler, Texas Design Manual for the Installation of Network Nodes and Node Support Poles pursuant to Tex. Loc. Gov. Code, Chapter 284.

If you have any questions regarding this survey, please contact Marcell Reid at or Thank you for your support!

5-0 Mapping Best Practices

Keys To Disaster Preparedness

DISTRIBUTION OF QUANTITIES

MECHANICAL CONTRACTORS ASSOCIATION OF AMERICA, INC. CLEANROOM PIPING AND PROCEDURES BASIC CONSIDERATIONS

Office of Oil and Gas Management

ANNEX A APPENDIX 4-E CHAPTER 4 TO VOLUME VII JOINT FLEET MAINTENANCE MANUAL (JFMM)

CHAPTER WIRELESS TELECOMMUNICATION FACILITIES

"MATERIAL SAFETY DATA SHEETS: THE ANSI STANDARD"

Water Company Lay Application

Former DuPont Barksdale Works Project Update

The State of Missouri

1. Click Register for an Account at the top-right hand corner of the window.

TOWN OF FARMINGTON FEE SCHEDULE 2017

February 11, Mr. Michael Cox Arkansas Egg, LLC Mill Road Summers, AR Compliance Inspection AFIN: , Permit No.

WebPortal Ticket Entry

Lanier Environmental Consultants

Town North Sanitary Sewer Renewal PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru

CDOT Public Way Opening Permit

Terms of Agreement for Residential Fiber Optic Services

EXTRA TERRITORIAL ZONING COMMISSION CASE ANALYSIS

Environmental Management Procedure (EMP)

Version 10.0 Updated 12_16_09

Slide 1. Slide 2. Voisey s Bay Project Update

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY

TrackMyBackflow.com. Cross Connection Control (Backflow Prevention) Notification. Dear Backflow Preventer Tester, August 1, 2018

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan

Submitting your Hazardous Materials Business Plan using the Sacramento County Environmental Management Department s Portal

TRAINING GUIDE. Lucity Mobile In Depth

Introduction. We are excited about the possibility of bringing Google Fiber to your city and look forward to working with you.

Design Manual. for the Installation of Network Nodes and Node Support Poles pursuant to Tex. Loc. Gov. Code, Chapter 284.

1605 Lakes Parkway. Lawrenceville, Georgia Gwinnett County. 100,000 SF (Expandable) 17.7 Acres

Township of Leoni Medical Marihuana Facility License Application

Client Utility Package

ASSE PROFESSIONAL CERTIFICATION PROGRAMS PROCTOR GUIDE

WHAT IS MISSOURI ONE CALL SYSTEM?... 2 WHO SHOULD BECOME A UTILITY MEMBER?... 2 BILLING AND FEES... 3 BILLING DISPUTES... 3

Emergency Support Function (ESF) #14b: UTILITIES: Potable Water. ESF Activation Contact: Cornell Facilities Customer Service (607)

STREET EVENT PERMIT APPLICATION FORM LOW & HIGH IMPACT EVENTS

Mount Pleasant Waterworks. Cross-Connection Control Program Guidelines October 2010

Transcription:

NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY PROJECT INFORMATION Project Name Project Number Project Location City Legal Description: Plat # State Zip Code County Client Client Address Contact(s) Phone # Owner Owner Address Owner Representative Phone # Required Project Meetings include Dates and Times: Prestart Production Safety Description of Work to be Performed Is a SCOPE OF WORK included with the Project Survey? YES NO

PROJECT SURVEY Section #1 DESCRIPTION OF STRUCTURE(S) TO BE REMOVED OR ALTERED: (Include separate page for each structure) Name of Structure Date of Construction / / Location on Site Original Function Length of Structure Width Height Basement Depth Structural Framing Construction and Material _ Foundation Construction and Material Roof Construction and Material Wall Construction and Material Floor Construction and Material Floor loading Design-lb/sq. ft STRUCTURAL CONDITIONS Structural Alterations Yes No Locations Unusual Structural Conditions Yes No Locations Pre-Stressed Concrete Yes No Locations Post-Tensioned Concrete With Grouted Tendons Yes No Locations Without Grouted Tendons Yes No Locations KNOWN STRUCTURAL HAZARDS Physical Damage Yes No Locations Structural Failures Yes No Locations Fire Damage Yes No Locations ADJACENT STRUCTURES Describe Structure & Conditions Location on Project Describe Structure & Conditions Location on Project Describe Structure & Conditions Location on Project Describe Structure & Conditions Location on Project

ENGINEERING SURVEY STRUCTURES STRUCTURE, UTILITIES AND SITE CONDITIONS STRUCTURAL STABILIZATION Temporary Structural Stabilization Required Yes No Comments Structural Failure Prevention Plan Floors and Roof Shoring Plan Wall Shoring or Bracing Plan Overhead Protective Structures or Scaffold Locations Plan UTILITIES UTILITIES TO REMAIN INTACT AND PROTECTED Describe Utility Location on Project Describe Utility Location on Project Describe Utility Location on Project Describe Utility Location on Project Describe Utility Location on Project

UTILITIES TO BE RELOCATED Telephone/Cable Relocation Yes No subcontracted Yes No Natural gas relocation Yes No subcontracted Yes No Electrical relocation Yes No subcontracted Yes No Direct current relocation Yes No subcontracted Yes No Potable water relocation Yes No subcontracted Yes No Industrial water relocation Yes No subcontracted Yes No SITE CONDITIONS Roadways to be Maintained Yes No Locations Roadways to be Temporarily Relocated Yes No Locations Comments Pedestrian Traffic to be Maintained Yes No Locations Pedestrian Traffic to be Temporarily Relocated Yes No Locations Temporary Pedestrian Protection Canopy Yes No Locations Security Closure Yes No Locations Temporary Fencing Yes No Locations Silt Fencing Required Yes No Locations Comments

Storm Water Runoff Plan Needed Yes No Locations Storm Water Runoff Plan Completed Yes No Date / / Other Project Survey Completed By Reviewed By Reviewed By

PROJECT SURVEY Section # 2 SAFETY AND ENVIRONMENTAL SPECIAL SAFETY REGULATIONS PROJECT # WORK ZONE SAFETY Work Zone Traffic Control Plan Completed Yes No Date / / Temporary Traffic Control Barricades Yes No Locations Temporary Traffic Control Signage Yes No Locations UTILITY PROTECTION AND PRESERVATION Underground Piping Yes No Locations Underground Storage Tank Yes No Locations Underground Electrical Ducts Yes No Locations Water Lines Yes No Yes No Locations Oxygen Lines Yes No Yes No Locations Natural Gas Lines Yes No Yes No Locations Telephone and Communication Lines Yes No Yes No Locations Aerial Electrical Systems Yes No Yes No Locations

Electrical Conduits Yes No Yes No Locations Transformers Yes No Yes No Locations Manholes Yes No Yes No Locations Underground Vaults Yes No Yes No Locations SAFETY HAZARDS Common or Party Walls Yes No Location on Site Control Measures Energized Electrical Equipment Yes No Location on Site Control Measures Combustible Materials Yes No Location on Site Control Measures Flammable Materials Yes No Location on Site Control Measures Explosion Hazards Yes No Location on Site Control Measures Existing Openings & Fall Hazards Yes No Location on Site Control Measures Basements and Pits Yes No Location on Site Control Measures Trenches & Excavation Exposures Yes No Location on Site

Control Measures Confined Spaces Yes No Location on Site Control Measures Process Piping & Tanks Yes No Location on Site Control Measures Toxic Substances Yes No Location on Site Control Measures ENVIRONMENTAL HAZARDS Mercury Vapor Lamps: Location Quantity Sodium Vapor Lamps: Location Quantity Fluorescent Lamps: Location Quantity 2ft 4ft 8ft U Shape Ballasts: Location Total Weight Non PCB Suspected PCB

PCB Transformers: Location Total Gallons Total Weight Highest PCB Concentration Removal Methods Transport & Disposal PCB Capacitors: Location Removal Methods Transport & Disposal Switches, Thermostats and Relays: Location Removal Methods Transport and Disposal Emergency Exit Signs: Location Removal Methods Transport and Disposal Contained Oil: Quantity Location Contaminants Transport & Disposal

Spilled Oil: Quantity Location Contaminants Removal Methods Transport & Disposal Grease: Quantity Location Contaminants Removal Methods Transport & Disposal Other Lubricants: Quantity Location Contaminants Removal Methods Transport & Disposal Drums & Container: Contents Location Contaminants Removal Methods Transport & Disposal Tanks & Carboys: Contents Location Contaminants

Removal Methods Transport & Disposal Residual & Process Waste: Vessel or Tank: Contents Location Contaminants Removal Methods Transport & Disposal Brick or Refractory: Contents Location Contaminants Removal Methods Transport & Disposal KNOWN HAZARDOUS MATERIALS Reported Quantity of Asbestos Containing Material (ACM) ACM description Friable Quantity Location Non Friable Quantity Location ACM Gaskets & Seals: Location Quantity

MSDS Listing from Last Operator Yes No Hazardous MSDSs Describe Material Location Hazardous Constituents Control Measures Removal Methods Containment Measures MSDS Listing from Last Operator Yes No Hazardous MSDSs Describe Material Location Hazardous Constituents Control Measures Removal Methods Containment Measures Control Measures Site Safety Hazard Survey Completed By Reviewed By Reviewed By

PROJECT SURVEY UTILITY LOCATES and DISCONNECTS Section # 3 PUBLIC UTILITIES LOCATES PROJECT # DIG # Site Address: County: Cross Street: Contact: Scheduled Locate Date: / / Locate Good Until: / / PUBLIC UTILITIES DISCONNECT PROJECT # NATURAL GAS UTILITIES: PH: # Meter / Unit # Date of Notification / / Site Address: County: Cross Street: Person Notified: Scheduled Disconnect Time & Date / / Person Notified: Date: Person Notified: Date: Person Notified: Date: Person Notified: Date:

Person Notified: Date: Conformation # & Date Disconnect Completed # / / Verification Completed Disconnect: PUBLIC UTILITIES DISCONNECT PROJECT # ELECTRIC CO. UTILITIES: PH: # Meter / Unit # Date of Notification / / Site Address: County: Cross Street: Person Notified: Scheduled Disconnect Time & Date / / Person Notified: Date: Person Notified: Date: Person Notified: Date: Person Notified: Date: Person Notified: Date:

Person Notified: Date: Person Notified: Date: Person Notified: Date: Conformation # & Date Disconnect Completed # / / Verification Completed Disconnect: PUBLIC UTILITIES DISCONNECT PROJECT # TELEPHONE UTILITY: PHONE SERVICES PH: # Meter / Unit # Date of Notification / / Site Address: County: Cross Street: Person Notified: Scheduled Disconnect Time & Date / / Person Notified: Date: Person Notified: Date: Conformation # & Date Disconnect Completed # / / Verification Completed Disconnect:

PUBLIC UTILITIES DISCONNECT PROJECT # CABLE SERVICE COMPANY NAME: _ PH: # NAME: _ PH: # Meter / Unit # Date of Notification / / Site Address: County: Cross Street: Person Notified: Scheduled Disconnect Time & Date / / Person Notified: Date: Conformation # & Date Disconnect Completed # / / Verification Completed Disconnect: PUBLIC UTILITIES DISCONNECT PROJECT # WATER DEPARTMENT: PH: # Un-paid Water Cost: $ Disconnect Fee: $ Meter / Unit # Date of Notification / / Site Address: County: Cross Street: Person Notified: Scheduled Disconnect Time & Date / / Person Notified: Date:

PRIVATE UTILITIES DISCONNECT PRIVATE UTILITIES DISCONNECT PROJECT # WATER/WELL DISCONNECT Site Address: County: Cross Street: Date of Contact / / Scheduled Disconnect Date / / ESTIMATED COST: $ OTHER FEE: $ SUBCONTRACTOR: CONTACT: PH: # Person Notified: Date: Person Notified & Date Date: Conformation # & Date Disconnect Done # / / Verification Completed By PRIVATE UTILITIES DISCONNECT PROJECT # SEWER DISCONNECT Site Address: County: Cross Street: Date of Contact / / Scheduled Disconnect Date / / ESTIMATED COST: $ OTHER FEE: $ SUBCONTRACTOR CONTACT: PH: # Person Notified: Date: Conformation # & Date Disconnect Done # / / Verification Completed By

PRIVATE UTILITIES DISCONNECT PROJECT # SEPTIC DISCONNECT Site Address: County: Cross Street: Date of Contact / / Scheduled Disconnect Date / / ESTIMATED COST: $ OTHER FEE: $ SUBCONTRACTOR: CONTACT: PH: # Person Notified: Date: Conformation # & Date Disconnect Done # / / Verification Completed By Disconnect Form Completed By Reviewed By Reviewed By

PROJECT SURVEY Section # 4 LICENSING, PERMITTING, PROJECT # LICENSE CONTRACTOR LICENSE Licensing Agency Address of Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / License Number / / # Effective Date / Expiration Date / / Exp Date / / BONDS SURETY OR L&P BOND Bonding Agency Address of Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Bond Number / / # Bond Amount Effective Date / Expiration Date / / Exp Date / / Date Submitted / Fee Paid / / Fee $ Date Issued /Bond Number / / # Bond Number / Effective Date / Expiration Date / / Exp Date / /

PERMITTING COUNTY OR DISTRICT DEMOLITION / BUILDING PERMIT Permitting Agency Address of Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Bond Number / / # Effective Date / Expiration Date / / Exp Date / / CITY OR MUNICIPALITY DEMOLITION / BUILDING PERMIT Permitting Agency Address of Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Permit Number / / # Effective Date / Expiration Date / / Exp Date / / PUBLIC PLACE OBSTRUCTION PERMIT Permitting Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Permit Number / / # Effective Date / Expiration Date / / Exp Date / / Special Permit Conditions

PERMITTING STREET USE PERMIT Permitting Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Permit Number / / # Effective Date / Expiration Date / / Exp Date / / Special Permit Conditions ALLEY USE PERMIT Permitting Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Permit Number / / # Effective Date / Expiration Date / / Exp Date / / Special Permit Conditions WALKWAY / PARKWAY PERMIT Permitting Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Permit Number / / # Effective Date / Expiration Date / / Exp Date / / Special Permit Conditions

PERMITTING FIRE HYDRANT USE PERMIT Permitting Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Permit Number / / # Effective Date / Expiration Date / / Exp Date / / Special Permit Conditions MISCELLANEOUS PERMITS Permitting Agency Agency Contact Person Contact Telephone Number Ext # Application Submitted By Title Date Submitted / Fee Paid / / Fee $ Date Issued / Permit Number / / # Effective Date / Expiration Date / / Exp Date / / Special Permit Conditions Permit Form Completed By Reviewed By Reviewed By

PROJECT SURVEY Section #5 REQUIRED REGULATORY NOTIFICATION NOTIFICATIONS PROJECT # ENVIRONMENTAL FILING FED/STATE EPA NOTIFICATION: Name of Agency Address of Agency Time & Date Written Notifications / / Written Notifications Completed By Agency Contact Person & Telephone Ph: Target Start Date / Completion Date / / / / Amount of Fee Paid/Time & Date / / ENVIRONMENTAL FILING COUNTY EPA NOTIFICATION Name of Agency Address of Agency Time & Date Written Notifications / / Written Notifications Completed By Agency Contact Person & Telephone Ph: Target Start Date / Completion Date / / / / Amount of Fee Paid/Time & Date / / ENVIRONMENTAL FILING CITY EPA NOTIFICATION: Name of Agency Address of Agency Time & Date Written Notifications / / Written Notifications Completed By Agency Contact Person & Telephone Ph: Target Start Date / Completion Date / / / / Amount of Fee Paid/Time & Date / /

NON-ENVIRONMENTAL FILING Name of Agency Address of Agency Time & Date written notifications / / Written Notifications Completed By Agency Contact Person & Telephone Ph: Time & Date of Telephone Notification / / Telephone Notification Completed By UNDERGROUND TANK REMOVAL NOTIFICATION Target Start Date / Completion Date / / / / Amount of Fee Paid/Time & Date / / Permit/Authorization Secured By Permit Number Name of Agency Address of Agency Time & Date written notifications / / Written Notifications Completed By Agency Contact Person & Telephone Ph: Time & Date of Telephone Notification / / Telephone Notification Completed By Target Start Date / Completion Date / / / / Amount of Fee Paid/Time & Date / / Permit/Authorization Secured By OTHER REQUIRED NOTIFICATION Name of Agency Address of Agency Time & Date Written Notifications / / Written Notifications Completed By Agency Contact Person & Telephone Ph: Target Start Date / Completion Date / / / / Amount of Fee Paid/Time & Date / / Permit Number _

OTHER REQUIRED NOTIFICATION: Name of Agency Address of Agency Time & Date Written Notifications / / Written Notifications Completed By Agency Contact Person & Telephone Ph: Target Start Date / Completion Date / / / / Notifications Form Completed By Reviewed By Reviewed By