G20 DEVELOPMENT WORKING GROUP INFRASTRUCTURE

Similar documents
Resolution adopted by the General Assembly. [without reference to a Main Committee (A/62/L.30 and Add.1)]

Recommendations for Small and Medium Enterprises. Event Date Location

Global Infrastructure Connectivity Alliance Initiative

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/64/417)]

Resolution adopted by the General Assembly on 14 December [without reference to a Main Committee (A/61/L.44 and Add.1)]

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/60/488/Add.3)]

Background Note on Possible arrangements for a Technology Facilitation Mechanism and other science, technology and innovation issues

UAE National Space Policy Agenda Item 11; LSC April By: Space Policy and Regulations Directory

Caribbean Private Sector Network meeting 24 August 2017, Ministry of Trade, Port-of-Spain, Trinidad and Tobago

The UNISDR Private Sector Alliance for Disaster Resilient Societies

Joint Meeting of the Executive Boards of UNDP/UNFPA/UNOPS, UNICEF, UN-Women and WFP 4 February 2013 New York

The United Republic of Tanzania. Domestication of Sustainable Development Goals. Progress Report. March, 2017

ISSUE OBJECTIVES FOR THE 2002 G8 KANANASKIS SUMMIT - DIGITAL OPPORTUNITIES TASK FORCE (DOT FORCE) -

SE4All Nexus Initiative TAPSIC SE4All Nexus Workshop: Vienna, 22 February, 2016

Preparatory process of the second High-level United Nations Conference on South-South Cooperation

2009/7 Assessment of the progress made in the implementation of and follow-up to the outcomes of the World Summit on the Information Society

Building Resilience to Disasters for Sustainable Development: Visakhapatnam Declaration and Plan of Action

Infrastructure connectivity : The contribution of the G20 Hangzhou summit. ZHANG HAIBING Shanghai Institutes for International Studies

Brussels, 19 May 2011 COUNCIL THE EUROPEAN UNION 10299/11 TELECOM 71 DATAPROTECT 55 JAI 332 PROCIV 66. NOTE From : COREPER

THE WHITE HOUSE. Office of the Press Secretary. For Immediate Release September 23, 2014 EXECUTIVE ORDER

J.Enhancing energy security and improving access to energy services through development of public-private renewable energy partnerships

Promoting accountability and transparency of multistakeholder partnerships for the implementation of the 2030 Agenda

Promoting Trade, Inclusiveness and Connectivity for Sustainable Development

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4802 Project Name. ECOWAS Broadband Connectivity Program Region

Private sector s engagement in the implementation of the Sendai Framework

Global Infrastructure Hub Update. G20 Infrastructure Working Group, January 2019

8 th APEC Transportation Ministerial Meeting Tokyo, Japan SEPTEMBER 5, 2013 Ministerial Joint Statement

GUIDING PRINCIPLES I. BACKGROUND. 1 P a g e

EGM, 9-10 December A World that Counts: Mobilising the Data Revolution for Sustainable Development. 9 December 2014 BACKGROUND

Transport and ICT Global Practice Smart Connections for All Sandra Sargent, Senior Operations Officer, Transport & ICT GP, The World Bank

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/65/433)]

Business Model for Global Platform for Big Data for Official Statistics in support of the 2030 Agenda for Sustainable Development

European Union Financing Mechanisms for ICT in Latin American context

Featured event 1: Disaster Risk Resilient Infrastructure for Sustainable Development

TERMS OF REFERENCE URBAN RAILWAY DEVELOPMENT GUIDEBOOK SUPPORT TO DEVELOP CHAPTER 15 CLIMATE AND NATURAL DISASTER RESILIENCE IN URBAN RAIL PROJECTS

A BUSINESS PERSPECTIVE ON INTERNATIONAL CLIMATE CHANGE POLICY

DISASTER RISK REDUCTION AND RESILIENCE A Regional Approach

From Hyogo to Sendai. Anoja Seneviratne Disaster Management Centre

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho

Elements of FIP Investment Criteria and Financing Modalities

TERMS OF REFERENCE Scaling-up Renewable Energy Program in Ghana Scoping Mission

South-South Cooperation:

Principles for a National Space Industry Policy

UAE Space Policy Efforts Towards Long Term Sustainability of Space Activities Agenda Item 4; COPUOS June 2017 By: Space Policy and

Domestic Private Sector Provider Initiative

Master Plan on ASEAN Connectivity 2025: A Blueprint for a Stronger ASEAN

Assessment of the progress made in the implementation of and follow-up to the outcomes of the World Summit on the Information Society

Joint Declaration by G7 ICT Ministers

Innovative Climate Finance Mechanisms for Financial Institutions in Fiji, Pakistan, Indonesia and Sri Lanka

ASEAN COOPERATION ON DISASTER MANAGEMENT. Disaster Management & Humanitarian Assistance Division, ASEAN Secretariat

Promoting Energy Efficiency Finance: Examples of Tools and Best Practices. 30 November 2017

UNEP Finance Initiative Regional Roundtable in Latin America 5-6 th September, 2017, Buenos Aires. Benoit Lebot, IPEEC

Financing resilience at the subnational 22 JUNE 2014 STANDING COMMITTEE ON FINANCE FORUM, MONTEGO BAY, JAMAICA

UPU UNIVERSAL POSTAL UNION. CA C 4 SDPG AHG DRM Doc 3. Original: English COUNCIL OF ADMINISTRATION. Committee 4 Development Cooperation

BACKGROUND PAPER. Sub-Regional Platform on Disaster Risk Reduction

OPEN Networks - Future Worlds Consultation

Common Framework for Preparedness

Common Framework for Preparedness

2017 Aid for Trade - Partner Country Questionnaire SurveyMonkey

The Hyogo Framework for Action: an instrument to reduce the impact of disasters

Background Document for Agenda Item 3: Briefing from the Secretariat on launch of the Green Coalition on the Belt and Road Initiative

STRATEGY ATIONAL. National Strategy. for Critical Infrastructure. Government

Endpoint Security for Wholesale Payments

A framework for community safety and resilience

Enhancing synergies towards climate action and sustainable development on the ground

The Smart Campaign: Introducing Certification

Agenda for the French G20 Summit: Global Architecture for Green Growth and Climate Change Negotiations

Commonwealth Cyber Declaration

New International Framework for Disaster Risk Reduction

December 10, Statement of the Securities Industry and Financial Markets Association. Senate Committee on Banking, Housing, and Urban Development

Executive summary. Natural disasters including bushfires, floods, storms and cyclones have destructive and devastating consequences for Australia

Commonwealth Telecommunications Organisation Proposal for IGF Open Forum 2017

Closing the Infrastructure Gap

The Science and Technology Roadmap to Support the Implementation of the Sendai Framework for Disaster Risk Reduction

JOINT STATEMENT BY THE MINISTRY OF ENERGY OF THE RUSSIAN FEDERATION AND THE INTERNATIONAL ENERGY AGENCY

GLOBAL FINANCING FACILITY IN SUPPORT OF EVERY WOMAN EVERY CHILD

ehealth Ministerial Conference 2013 Dublin May 2013 Irish Presidency Declaration

First Session of the Asia Pacific Information Superhighway Steering Committee, 1 2 November 2017, Dhaka, Bangladesh.

Promoting Quality Infrastructure Investment

Private Sector Engagement in DRR in Jordan

World Telecommunication Development Conference (WTDC- 14) Dubai, 30 March 10 April 2014

Mohinder Gulati Chief Operating Officer Sustainable Energy for All (SE4All)

Sector(s) Public administration- Information and communications (50%), General public administration sector (50%)

U.S. Japan Internet Economy Industry Forum Joint Statement October 2013 Keidanren The American Chamber of Commerce in Japan

UNDAF ACTION PLAN GUIDANCE NOTE. January 2010

RESOLUTION 140 (REV. BUSAN, 2014)

SAINT PETERSBURG DECLARATION Building Confidence and Security in the Use of ICT to Promote Economic Growth and Prosperity


United Nations Environment Programme en.lighten initiative Financing for an Efficient Lighting NAMA

General Assembly Resolution 64/222 of 21 December 2009: The General Assembly,

Clean energy for NDCs: scaling up private financing

Resolution adopted by the General Assembly on 21 December [on the report of the Second Committee (A/64/422/Add.3)]

EU policy on Network and Information Security & Critical Information Infrastructures Protection

Capacity Building Breakout Group

Post Disaster Needs Assessment Guide and

how to manage risks in those rare cases where existing mitigation mechanisms are insufficient or impractical.

Beijing Call for Action

DISCUSSION PAPER. Recommendations for a common UN System wide agenda on NCDs

THE WORLD BANK GROUP AND THE UNITED NATIONS. Working Together for Development

COUNCIL OF THE EUROPEAN UNION. Brussels, 26 November /10

Transcription:

G20 DEVELOPMENT WORKING GROUP INFRASTRUCTURE REPORT ON INFRASTRUCTURE AGENDA AND RESPONSE TO THE ASSESSMENTS OF PROJECT PREPARATION FACILITIES IN ASIA AND AFRICA

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 1 G20 Development Working Group: report on infrastructure agenda and response to the assessments of project preparation facilities in Asia and Africa OVERVIEW This paper summarises the main outcomes of the Group of Twenty (G20) Development Working Group (DWG) program of work for 2014 and proposed multi-year infrastructure agenda for 2015. This includes: the DWG response to the Assessment of Project Preparation Facilities in Asia which lays the basis for commitments in 2014 and a multi-year agenda; and possible new work arising out of a DWG-commissioned report Misperception of Risk and Return in Low Income Countries (2012). This year the DWG has commissioned and delivered an Assessment of Project Preparation Facilities in Asia; this was framed to build on a similar assessment of project preparation facilities (PPFs) in Africa. These two assessments provide a substantial evidence base on: features of effective project preparation facilities; suggestions for multilateral development banks (MDBs) and donors on the organisation and funding of PPFs; and, for developing countries, on aspects of the enabling environment and improving all project preparation. In addition, the DWG has reviewed reports produced for the G20 finance track; analysed implications for low income countries (LICs), and then provided advice to the G20 Investment and Infrastructure Working Group (IIWG) on aspects of its work program relevant to LICs and other developing countries. In addition, the DWG has re-examined key reports commissioned by the DWG, including on Misperception of Risk and Return in Low Income Countries (2012), to inform possible future actions. The DWG can play an important role in ensuring challenges are addressed from an inclusive and povertyreduction perspective. This entails promoting sustainable, economic, social and environmental development. The DWG forward work program is focused on progressing work to strengthen the demand side of infrastructure investment in LICs and other developing countries. This includes a particular focus on aspects of the enabling environment, including upstream work in relation to project preparation. A new action on addressing misperceptions in the risk of investing in infrastructure in LICs has also been identified. Other new actions are based on the combined analysis of the assessment of PPFs in Asia, and the previous assessment of PPFs in Africa (Infrastructure Consortium of Africa report, 2012). The following sections provide an overview of key components, outcomes and commitments arising from the 2014 work program. This work lays the basis for a multi-year infrastructure agenda, commencing in 2015. RESPONSE TO ASSESSMENTS OF PROJECT PREPARATION FACILITIES The 2013 G20 leaders declaration recognised the importance of improving the prioritisation, planning, and funding of investment projects. It also emphasised the need to make better use of PPFs. In support of this, the 2013 St Petersburg Development Outlook specifically requested the DWG to: Assess the effectiveness of PPFs in regions in addition to Africa in promoting long-term investment financing for infrastructure, increase understanding of the obstacles to implementation, disseminate this knowledge through a common platform, and consider the creation of a global network of regional PPFs.

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 2 In December 2013, the DWG agreed that Australia, in consultation with infrastructure co-facilitators (India and the Republic of Korea), would lead the development of terms of reference (TORs) for the assessment of PPFs in Asia. The TORs were agreed out-of-session in March 2014. The objective of the Asia assessment was to: Evaluate the effectiveness of PPFs in Asia in promoting long-term investment financing for infrastructure. The assessments of PPFs in Africa and Asia found that there was a need to significantly increase the resources devoted to project preparation to improve its quality and to facilitate increased infrastructure development. In Africa, there was a particular problem with developing large scale regional projects, whereas in Asia these types of projects had been successfully developed in the past. Both assessments advocate: greater transparency in the operation of PPFs; consideration by donors of the financial viability of smaller PPFs; and greater movement towards cost recovery for project preparation to increase the ownership by government of projects and improve the financial sustainability of PPFs. In addition, both assessments strongly advocate an approach to project preparation that supports thirdparty financing and syndication of funds between PPFs. In Africa, a recent step towards greater cooperation between PPFs has been the establishment of a PPF Network, which met for the first time in June 2014. The lessons from the assessments of PPFs in Asia and Africa provide G20 members with the opportunity to support new approaches to project preparation that are aimed at preparing high quality infrastructure projects. This is important for attracting finance from a range of sources that can bolster resources already committed to fund infrastructure through domestic and other traditional sources of finance. Without additional financing for infrastructure investment in LICs and other developing countries, infrastructure needs will not be met, and both growth and development prospects will be negatively affected. The recommended actions fall into two broad categories and are consistent with the agreed DWG focus on the demand side of infrastructure investment and project preparation. They include actions to strengthen the upstream capacity for project preparation and those aimed at maximising the effectiveness of PPFs to prepare quality projects for financing from a range of sources, including through public private partnerships (PPPs). This recognises that greater engagement of the private sector in infrastructure can benefit developing countries through providing access to technology, markets, experience and increased efficiency in infrastructure operations. Strengthening the upstream environment for infrastructure project preparation The World Bank Group (WBG) estimates that between 2014 and 2020 up to US$1.3 trillion per annum may be required to meet infrastructure demands in LICs and other developing countries. The Organisation for Economic Co-operation and Development (OECD) estimates that approximately US$ 800 900 billion is currently being spent on infrastructure per year in these countries. The vast majority of financing for infrastructure investment in developing countries is from domestic sources, including the public sector (55 75 per cent), and approximately 20 30 per cent is financed by the private sector. Official development finance accounts for only 5 8 per cent of infrastructure financing (OECD, 2014). While domestic resources and official flows will remain vital contributors to infrastructure investment in developing countries, increasing private sector finance could help fill the investment financing gap and drive an expansion in infrastructure investment that could stimulate growth, and address key development issues such as food insecurity, access to energy and other key services.

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 3 The DWG recognises that LICs and other developing countries face major constraints in meeting their infrastructure needs. The DWG has identified that demand-side factors may need to be addressed and that the DWG can play an important role in ensuring that challenges are addressed from an inclusive and poverty- reduction perspective. LICs may have insufficient and poor quality data on infrastructure gaps and requirements, low capacity to prioritise infrastructure needs, identify and prepare projects, and a lack of technical expertise to create the right domestic settings to attract private investors. These demand-side factors are often referred to as upstream activities for project preparation. While developing-country governments must take the lead in building an enabling environment for infrastructure, G20 members can provide support through identifying aspects of the enabling environment that are critical to increasing both public and private infrastructure investment. This may include specific support for aspects of the enabling environment that relate to the financing and funding of infrastructure from domestic and other sources. The proposed Action 1 (below) seeks to draw on the experience of key international organisations, such as the OECD Investment Policy Reviews, and work of MDBs, to identify a range of indicators that could be used on a voluntary basis by developing countries to help in identifying and prioritising reforms to their enabling environment for infrastructure investment, and to identify areas that may require capacity building or technical assistance. G20 members could commit to support critical reforms identified by governments such as: improvements to the policy, legal, institutional, operational investment climate and financial environment. Support could be provided by the provision of technical assistance, through MDB advisory services and via MDB-based PPFs that include a focus on upstream support for PPPs and other forms of private sector participation in infrastructure. Support that strengthens the enabling environment for private sector investment in infrastructure, for example through addressing regulatory reforms or strengthening government capacity to prioritise projects, will also lead to more efficient and targeted public investment in infrastructure. As countries develop, and there is greater interest in pursuing PPPs, the complexity and cost of project preparation for infrastructure rises. This is due to increasing standards of project preparation and the complexity of structuring projects for multiple financiers. Social factors must also be considered to help ensure its sustainability. Moreover, green and climate resilient infrastructure also present specific design, regulatory and financing challenges, as they require access to specialist expertise and are less familiar to investors. In this context, governments, MDBs, donors and PPFs need to have realistic expectations in relation to the difficulties and cost of project preparation and be prepared to provide adequate funding. G20 members could also commit to increasing transparency in relation to the cost of project preparation financed through official development assistance (ODA). This would be a first step towards increasing appreciation of the real cost of preparing projects that follow good design practice and that maximise the economic, social and environmental returns for the government. Increased appreciation of the cost of project preparation should lead to an allocation of more funds for the preparation of public financed infrastructure and PPPs. Together with improved capacity for upstream activities and project preparation, increased funding for quality project preparation should increase the number of projects being prepared that are successful in attracting finance and being implemented. The DWG s responses to recommendations 1 and 5 of the Assessment of PPFs in Asia report (at Annex 1) address aspects of supporting the enabling environment for infrastructure. Maximising the effectiveness of project preparation facilities to leverage greater co-financing arrangements, including through public-private partnerships Increasing the number and quality of infrastructure projects ready for financing in developing countries will require close coordination between a number of stakeholders including; international finance institutions, G20 member countries and national level governments and institutions. Dedicated PPFs currently

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 4 undertake the minority of preparation for infrastructure projects. There is an opportunity to scale up delivery of infrastructure by fostering the engagement of catalytic, specialist PPFs to prepare projects that can attract finance from a range of sources, including the private sector. There are a range of approaches being considered by MDBs to leverage their funds, country and technical expertise, access to de-risking and leveraging operations and their reputations to work with the private sector to meet the infrastructure challenges facing developing countries. These initiatives directly respond to the G20 High Level Panel report that asks that MDBs make their capital work harder and smarter to crowd in private sector support. They also address calls for MDBs to transition from a lending culture to an enabling culture. Improving the capacity of MDB-based PPFs to work together would significantly enhance the overall capacity to engage with the private sector and move towards establishing infrastructure as an asset class for a broad range of national and international long term investors. Infrastructure investment is long term and has particular risks associated with it at different times in project implementation. To some extent these risks are magnified in developing countries. MDB-based PPFs are well placed to help manage the risks of infrastructure investment in developing countries, including through providing potential investors with access to country and sector level knowledge and expertise. MDB-based PPFs are also well placed to work with developing country governments to make information accessible that can be utilised by the private sector in their investment decisions. The importance of such information being available was highlighted in the G20 High Level Panel (HLP) on infrastructure report (2011), which noted that the private sector will not invest in the dark. In order to fulfil their potential role in attracting greater private sector involvement in infrastructure investment in developing countries, MDBbased PPFs must be able to work collaboratively on project preparation, development and in some cases, financing for specific infrastructure projects. Given this, G20 members could call on new MDB-based PPFs with a focus on increasing private sector financing of infrastructure to maximise their capacity to collaborate with each other, with country financed PPFs, the private sector and governments. Specifically, the G20 members could call on MDB-based PPFs to: move towards approaches to country specific sector diagnostics and project prioritisation the outcomes of which can be utilised by other MDBs (elaborated on in proposed Action 2 below); and prepare projects so as to maximise financing options including through having an open access approach to possible sources of funds. In this context, the G20 DWG notes the continued development of the Global Infrastructure Facility (GIF) and welcomes additional information on it when available. The Assessment of PPFs in Asia has identified a need for a regional based approach in Asia that will focus on preparing infrastructure PPPs, with a particular focus on assisting countries where there is insufficient scale or capacity to support national level PPFs. The proposed Asian Development Bank PPF in Asia (the AP3F) will be a standalone facility that will focus on PPPs in which the private sector will provide the majority of financing for projects. The AP3F design has incorporated recommendations from the Assessment of PPFs in Asia in its design. These include recommendations that the AP3F includes capacity for targeted support for upstream activities in relation to project preparation, is open to consideration of project concepts from partner governments, multilateral and bilateral donors, other MDBs and private consortia, and that it prepares projects that can be financed by a range of investors. The G20 DWG welcomes the continued development of AP3F, and notes its design is intended to respond to recommendations of the Assessment of PPFs in Asia. The G20 DWG welcomes the incorporation of Africa 50, which responds to a conclusion of the Assessment of PPFs in Africa for a dedicated facility that has African ownership and the ability to crowd in non-

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 5 traditional sources of finance, especially from the private sector. Africa 50 will work closely with other project preparation facilities and is designed to incorporate a high degree of collaboration with other institutions. Although not the subject of the assessments commissioned by the G20, existing PPFs in Latin America and the Caribbean, managed by the Inter-American Development Bank (IDB), have helped to successfully prepare both national and regional infrastructure projects. Going forward, the IDB s experience can provide useful lessons that can contribute to the knowledge sharing in the design and implementation of new MDBbased PPFs. To ensure that the benefits of MDB-based PPFs are sustained and flow to all project preparation, including for domestic financed projects, MDB-based PPFs must be well integrated with MDB loan operations, advisory services and government project preparation efforts. To this end, the DWG could welcome the capacity to provide upstream support which has been integrated into the designs of the GIF and the AP3F. The DWG will work with the IIWG on ensuring that links between new MDB facilities and broader MDB activities in infrastructure in developing countries are maximised. For example, the World Bank Group has produced a set of principles for the prioritisation of infrastructure to maximise development impact as part of an ongoing work program in the IIWG on a range of leading practices and principles. The DWG could draw on this work and that of other MDBs when taking forward its future Action 2 (ii) (below) requesting MDB-based PPFs focused on PPPs for infrastructure to move towards government approved lists of prioritised projects. At the same time, where support is provided for small PPFs and other project preparation, G20 members may individually consider whether national project preparation systems can be strengthened to achieve required scale, or if needs would be better served by consolidating funds in a regional or global facility such as those mentioned above. To increase the sustainability of PPFs which focus on PPPs for infrastructure, the DWG could call on MDBs and development assistance agencies to consider moving towards partial or full cost recovery as countries develop and their project preparation capabilities improve. Potential DWG responses to recommendations 2, 3, 4 and 6 of the Assessment of PPFs in Asia report (at Annex 1) address different aspects of maximising the effectiveness of PPFs to leverage increased private sector investment and to strengthen all project preparation, irrespective of the funding source. CROSS-CUTTING ISSUES Analysis of reports from the G20 s finance track on a range of issues affecting investment in infrastructure confirmed that some developing countries face difficulties in accessing capital for investment in infrastructure. Many developing countries face limitations in their capacity to raise finance in their own capital markets, which may lack depth and breadth. LICs, in particular, can find international capital markets difficult to access due to poor sovereign risk ratings. The HLP report noted that the actual risk involved in infrastructure investment in LICs may be lower than the perceived risk. Some of the difference in actual versus perceived risk may be related to a lack of access to reliable information on the investment environment in LICs. In cases where there are legitimate factors related to the enabling environment for infrastructure that contribute to higher sovereign risk, the expertise may not exist in the country to either diagnose the problem or to address it. Access to good quality technical assistance is therefore particularly important for LICs and other developing countries who wish to create an attractive environment for investment.

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 6 The May 2014 DWG meeting endorsed the value in follow up work on the issue of the real versus the perceived risk of investing in infrastructure in LICs. Australia and DWG infrastructure co-facilitators have explored the potential for follow up work in this area, including by assessing the specific recommendations of the DWG commissioned report on Misperceptions of Risk and Return in Low Income Countries (2012). Potential work has been identified that would involve drawing on the collective experience of MDB-based and other donor funded organisations that focus on increasing investment in infrastructure in LICs to identify pragmatic ways of assessing and managing risk throughout the investment cycle. Potential work in this area could include efforts to address the lack of risk ratings on infrastructure projects in LICs, and analysis of different insurance and credit enhancement products available to manage risk. The option of opening a dialogue with private sector investors, including commercial banks and equity houses could also be explored. It is anticipated that as Action 3 the G20 DWG will, in coordination with the IIWG, initiate a dialogue on factors affecting risk perception in LICs, with a view to better informing risk management and mitigation approaches. As a first step, the DWG will explore the possibility of facilitating engagement between international investors and other potential stakeholders. NEW ACTIONS: A MULTI-YEAR INFRASTRUCTURE AGENDA Increasing investment in infrastructure in developing countries is a long term agenda that requires efforts to: establish a good enabling environment; address issues related to the risk associated with infrastructure investment; increase the supply of projects ready for financing; and attract increased finance. The following proposed multi-year agenda for DWG infrastructure work is consistent with the agreed DWG focus on the demand side of infrastructure investment and project preparation, and builds on the foundation of the assessments of PPFs in Asia and Africa. The summary of the DWG response to specific recommendations of the Assessment of PPFs in Asia report is at Annex 1. Based on the DWG response and further analysis completed, the DWG commits to three new actions for 2015, outlined below. NEW ACTION 1: STRENGTHENING THE UPSTREAM ENVIRONMENT FOR INFRASTRUCTURE PROJECT PREPARATION The G20 requests key international organisations to consult with and share information with developing countries on policy indicators that can be used on a voluntary basis to identify the most essential reforms in the enabling environment for infrastructure investment. G20 members and MDBs could be encouraged to provide capacity building support in response to reform priorities identified by governments. NEW ACTION 2: MAXIMISING THE EFFECTIVENESS OF PROJECT PREPARATION FACILITIES TO LEVERAGE GREATER PRIVATE SECTOR INVESTMENT Take concrete, practical steps over several years to ensure that MDB-based PPFs collaborate to support governments develop prioritised lists of infrastructure projects. These steps recognise that for substantive collaboration to take place, it should build on the cooperation that already exists, and be paced to allow for agreed approaches to be evaluated by the relevant institutions. (i) The G20 requests MDB-based PPFs that are focused on PPPs for infrastructure to report on the key elements of their current approach to country-specific sector diagnostics, as a first step in moving towards sector diagnostics that can be exchanged with other MDBs.

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 7 (ii) The G20 requests MDB-based PPFs that are focused on PPPs for infrastructure to report on current approaches to project prioritisation as a first step to moving towards government approved lists of prioritised projects. NEW ACTION 3: PROMOTING BETTER UNDERSTANDING OF RISK AND RETURN IN INFRASTRUCTURE INVESTMENT IN LICS The DWG will, in coordination with the IIWG, initiate a dialogue on factors affecting risk perception in LICs, with a view to better informing risk management and mitigation approaches. As a first step, the DWG will explore the possibility of facilitating engagement between institutional investors and other potential stakeholders.

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 8 Annex 1: G20 Development Working Group response to specific recommendations of the Assessment of Project Preparation Facilities in Asia Recommendations of Assessment of Project Preparation Facilities in Asia (numbers 1 6 from Executive Summary) 1. Priority should be given to strengthening developing country governments capacity for upstream activities leading to the identification of prioritised investment programs. G20 DWG response Agree Comment The experience of international organisations could be drawn on to identify a range of indicators that could be used on a voluntary basis by developing countries to identify and prioritise reforms to their enabling environment for infrastructure investment, and to identify areas that may require capacity building or technical assistance. Action 1: The G20 requests key international organisations to consult with and share information with developing countries on policy indicators that can be used on a voluntary basis to identify the most essential reforms in the enabling environment for infrastructure investment. G20 members and MDBs could be encouraged to provide capacity building support in response to reform priorities identified by governments. 2. The common practice of selecting the financing modality for a project prior to feasibility study should ideally be reversed otherwise it necessitates better upstream project investigation and flexibility during project preparation. Agree in principle The G20 recognises that it may not always be possible to follow the ideal project preparation approach with respect to when the financing modality for a project is selected. Given this, MDBs and donor funded technical assistance can build capacity for governments to take the necessary decisions regarding the appropriate financing approach for a particular investment at the right time.

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 9 3. The scale of project preparation needs to be ramped up to support enhanced infrastructure development. 4. Funding for project preparation should be rationalized and increased. 5. There should be a clear path for countries to transition from receiving grant support for project preparation to eventually being willing to finance it themselves as their economies develop. Agree Agree in principle Agree in principle There is a case for greater transparency in relation to the cost of project preparation, particularly where it is financed through government resources and grant aid. An appreciation of the real cost of preparing projects that follow good design practice and that maximise the economic, social and environmental returns for the government may lead to an allocation of more funds for preparation. This, in turn, should lead to more and better infrastructure projects being financed and implemented. G20 members could commit to increasing transparency in relation to the cost of project preparation funded through official development assistance sources. Both the Africa and Asia assessments question the sustainability of some PPFs, and raise issues about the scale of operation necessary for a standalone PPF focused on infrastructure. In the case of Asia, support should be provided at a regional level to project preparation in infrastructure, particularly in countries where a stand-alone facility would be unlikely to have sufficient scale to prepare large and complex projects for public private partnerships (PPPs). Such support could be delivered through a facility developed by a regional development bank, such as the proposed Asian Development Bank regional PPF (the AP3F), or via a regional presence of a global facility, such as the proposed Global Infrastructure Facility. The G20 recognises that as countries develop, the complexity of their project preparation may increase and yet their capacity for project preparation may remain under-developed. This issue must be taken into account when considering the path for transitioning from grant support for project preparation to it eventually being financed through government resources. PPFs with a focus on preparing infrastructure projects to attract private financing, may help in the transition through seeking partial or full cost recovery for projects prepared. Moving towards more cost recovery will also improve the sustainability of PPFs, and ensure that more projects are prepared ready for finance from a range of sources.

G20 DWG report on infrastructure agenda and response to the assessments of project preparation facilities 10 6. Improved efforts are needed to make better use of the private sector in infrastructure design, funding, delivery and long-term operation and to leverage the overall benefits of private sector participation. Agree To maximise the capacity of MDB-based PPFs to work closely with the private sector and leverage greater private sector funding into infrastructure in developing countries, PPFs must be encouraged to collaborate with each other. Ideally, governments and all PPFs working in a country would work from the same sector diagnostics and list of prioritised projects. This would improve the environment for all public and private sector involvement in infrastructure and it would send a positive signal to investors. Action 2 (i): The G20 requests MDB-based PPFs that are focused on PPPs for infrastructure to report on the key elements of their current approach to countryspecific sector diagnostics, as a first step in moving towards sector diagnostics which can be exchanged with other MDBs Action 2 (ii): The G20 requests MDB-based PPFs that are focused on PPPs for infrastructure to report on current approaches to project prioritisation as a first step to moving towards government approved lists of prioritised projects.