ASSET RISK MANAGEMENT Criticality Framework

Similar documents
Network Configuration Document Selection for New Substations Framework

Asset Criticality Framework

SP Energy Networks Business Plan

RCP2 Portfolio Overview Document

System Operations Division. PR-OC-213_Conduct Peer Review of a Manual Security Constraint

OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER

GUIDELINES FOR SHARED TRANSMISSION CONNECTIONS IN VICTORIA

System Operations Division. PR-OC-229 Update Registers, Notifications, CANs, Update Transpower Website

ASSET MANAGEMENT PRACTICES

Dynamic Maintenance Based on Criticality in Electricity Network

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Optimizing wind farms

PLANNING FOR THE TRANSMISSION NETWORK

NIA Progress Report. Programme Summary. 31 July Electricity North West/NIA Programme Summary/31 July 2016 Page 1 of 10

Infrastructure Resilience in Northland. Northland Lifelines Group October 2008

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

System Operations Division. PR-OC-204 Security Constraints Process

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Equipment Strategy For High Voltage Circuit Breakers

Leading Locally, Expanding Globally

Equipment Strategy for Voltage Transformers Strategy

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Final Determination: Criteria for Assessing Material Inter- Network Impact of Transmission Augmentations

EU DONOR FUNDED SMART GRID PROGRAMME

Cost and performance implications of infrastructure investment options in the Eskom Distribution network

October 2017 INVESTING FOR THE FUTURE. NIE Networks summary business plans

What You Should Know About Communication Systems: Business Strategies and Options

Portable Power Solutions

PRC Coordination of Protection Systems for Performance During Faults

Description of the Application Process for Small Embedded Generators

NETS SQSS Review of Requirement of Onshore Connection Facilities for Offshore Wind Farm Connections (GSR014) Working Group Report

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

POWER SYSTEM DATA COMMUNICATION STANDARD

Smart Distribution Technology

UNDERGROUND HV SUBSTATION DESIGN

Air-insulated medium-voltage secondary distribution switchgear

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region

String monitoring with CMS - Circuit monitoring system Increased productivity and improved maintenance of PV systems

ICM Project Station Infrastructure and Equipment

ABB Data Center Forum 2017

Ministry for the Environment PO Box Auckland City Sent via to:

1. Project Description

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality,

Capital Contribution Policy for New Load and Network Extensions Marlborough Lines

Solution Renewables. tgood.com

Substation SCADA Monitoring

The need for a fundamental review of electricity networks reliability standards SMARTGRIDS SECURITY AND RESILIENCE TASK FORCE - WHITE PAPER 2016

Benefits, offering and references

INTERCONNECTION FACILITIES STUDY REPORT

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 13(2015)

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

Company Directive STANDARD TECHNIQUE : NC2D/2. Relating to Specification of Connection Assets

Testing of Real Time Power System Control Software

Geomagnetic Induced Current (GIC) Mitigation System Summary for the White Paper

Engineering Recommendation G87 Issue

ENMAX Power Corporation

SIMEAS SAFIR The network quality system: Know your network quality avoid faults minimize downtime

Lessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc.

151 FERC 61,066 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. (Issued April 23, 2015)

ABB AG - EPDS. Gas-insulated switchgear Type ZX2

Capital Contribution Policy for New Load and Network Extensions Marlborough Lines

ELECTRICAL DESIGN PRACTICE NOTE ELECTRICAL SYSTEM REQUIREMENTS

MAJOR AUGMENTATION PROPOSAL

Underground HV Cable Research- Health Index for HV solid cables

Digital substations. Introduction, benefits, offerings

Standard Development Timeline

APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION. PT. TÜV NORD Indonesia PS - TNI 001 Rev.05

ABB Medium Voltage Days 2016 Asset service innovation Solutions along the lifecycle

Grid Solutions. SERVICES Optimizing Asset Reliability, Up-Time and Performance

Switching Process and Rules Systems Operations Framework. Document Number:

ABB Process Automation, September 2014

The standard base asset life used in the renewal programme and asset valuation for facility assets (major components) are shown in the table below:

Power System Operating Incident Report Trip of Calvale No.2 275kV busbar and Calvale-Halys 8810 and 8811 transmission lines on 30 March 2014

Substation automation products. MicroSCADA Pro for substation automation

Measuring the resilience of transport infrastructure

INTERNATIONAL STANDARD

CPS VS UPS FOR POWERING DATA CENTERS

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

System Engineering, IT/OT Integration and the Smart Grid. Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa

Guidelines for Traffic Counting. May 2013

Bus Protection Application Challenges

ABB AG Calor Emag Medium Voltage Products Gas-insulated switchgear Type ZX2. ABB Gas-insulated switchgear type ZX2 1

High and Medium Voltage Substation Design, Testing and Maintenance. KSA, Jeddah, Holiday Inn Jeddah Gateway Hotel.

Electrical Integration with Smart Communication

Solution Utility. tgood.com

Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations

Notes to expenditure information provided by WE in support of the CPP earthquake readiness expenditure. Commissioned Assets

Landsnet-Icegrid. Requirements for protection and control systems. Principles for the Icelandic power transmission network.

GUIDELINES FOR THE CLASSIFICATION OF GRID DISTURBANCES ABOVE 100 kv

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals

CYBER SECURITY TAILORED FOR BUSINESS SUCCESS

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application

ELECTRICAL SUPPORT SERVICES

New Zealand Telecommunications Forum. Code for Vulnerable End Users of Telecommunication Services. ( Vulnerable End User Code )

Your experts for coal assets

Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines

THE WHITE HOUSE. Office of the Press Secretary. For Immediate Release September 23, 2014 EXECUTIVE ORDER

Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS

Feasibility Study on Load Flow and Short Circuit Project

Transcription:

ASSET RISK MANAGEMENT Criticality Framework 15 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D Preface This document has been prepared to outline the state of development and application of a Criticality Framework for the Grid assets, as at the date of the RCP2 submission in December 2013. Transpower New Zealand Limited 2013. All rights reserved.

C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D This document is protected by copyright vested in Transpower New Zealand Limited ( Transpower ). No part of the document may be reproduced or transmitted in any form by any means including, without limitation, electronic, photocopying, recording or otherwise, without the prior written permission of Transpower. No information embodied in the documents which is not already in the public domain shall be communicated in any manner whatsoever to any third party without the prior written consent of Transpower. Any breach of the above obligations may be restrained by legal proceedings seeking remedies including injunctions, damages and costs. Transpower New Zealand Limited 2013. All rights reserved.

Table of Contents ASSET RISK MANAGEMENT... 1 CRITICALITY FRAMEWORK... 1 1 INTRODUCTION... 1 1.1 Purpose... 1 1.2 Risk Management... 1 2 CRITICALITY... 1 3 APPLICATIONS... 2 4 CRITICALITY FRAMEWORK... 2 4.1 Impact on Customers... 3 5 FUTURE IMPROVEMENTS... 4 5.1 Safety... 4 5.2 Environmental... 4 5.3 Financial... 4 APPENDICES... 5 APPENDIX A: CRITICALITY APPROACH... 6 Transpower New Zealand Limited 2013. All rights reserved.

Decreasing Asset Health BR03 1 INTRODUCTION 1.1 Purpose This document explains the development and application of a criticality framework as part of our overall asset risk management approach. It includes an overview of criticality and describes the different categories of criticality, how we use criticality, and future improvements. Details of our current criticality approach are set out in Appendix A. 1.2 Risk Management Risk management is an important foundation for asset management. Its overall purpose is to understand the cause, effect and likelihood of adverse events and to optimally manage associated risks to an acceptable level. We do not yet have a fully quantified risk assessment framework that can be applied to the management of our assets. As an interim measure, we have sought to reflect the two main determinants (likelihood and consequence) of risk through an integrated framework by using asset health and asset criticality as simplified proxies. 1 We use a combination of asset health and criticality to reflect asset-related risk. This is used to support prioritisation within our planning processes. Our asset health and criticality frameworks have been designed to be used together. An illustration of the concept is shown below. Increasing Criticality Figure 1: Asset Risk Proxy: Asset Health and Criticality 2 CRITICALITY Criticality is a concept that recognises that assets have differing importance (value), or represent different vulnerabilities to an organisation. Criticality in a network based utility will generally include consequences of asset failure or non-performance. Understanding the criticality of assets is relevant to system planning, design standards, asset operation, maintenance scheduling, fault response and prioritising investments. We have developed a framework for criticality that we can systematically apply and implement in our systems and processes. 1 Criticality is used with asset health indices, which is a proxy for the likelihood of asset failure (refer BR02 Asset Risk Management Asset Health Framework ). Transpower New Zealand Limited 2013. All rights reserved. Page 1

3 APPLICATIONS To date, we have primarily used criticality in the following areas: Performance Monitoring: we are using criticality to monitor and set targets for our service performance measures. We have set different targets for the number and duration of unplanned interruptions based on point of service criticalities. Further information on our service performance targets can be found in BR04 Service Performance Measures. Asset Management Strategies: we are integrating criticality into our business processes to inform our asset management strategies. For example, we take criticality into account in our maintenance and planning decisions. Investment prioritisation: we have used criticality in conjunction with asset health to prioritise investments during RCP2 by identifying individual assets that may have high failure risk. The extent to which we applied criticality and asset health in the prioritisation process varies by asset fleet, depending on the maturity of the approach, its applicability to the fleet, and the availability of information. Additional applications include: supporting differentiated design standards supporting differentiated approaches to interventions in the manufacture, installation and commissioning of assets specifying a differentiated approach to the operation and maintenance of assets Our future development of criticality will begin to incorporate these latter applications. 4 CRITICALITY FRAMEWORK The impact of asset failure will be different depending on the type of consequence considered. For example, the failure of an oil interceptor at a substation may have a very high impact on the environment, but no impact on service received by customers. Likewise, the failure of a transmission line in a built-up area may have a very high impact on safety, but less of an impact on service performance (particularly if there is redundancy in the system). So far, we have focused on the impact on customers in terms of service performance (that is, interruptions to supply). Other categories that we will consider in the future include: safety environment financial. Each of the above may have different methods for determining the criticality of an asset. These are discussed further in Section 5. Transpower New Zealand Limited 2013. All rights reserved. Page 2

4.1 Impact on Customers Our method for determining the impact of asset failure on the service received by customers has three elements: Point of service criticality: reflects the type and scale of load or generation that is connected to the Grid at a point of service. Bus and circuit criticality: reflects the impact that an outage of a network component (transmission circuit, transformer circuit or busbar) has on a point of service. Asset criticality: reflects the impacts of individual asset outages on the point of service (similar to bus and circuit criticality) but at the level of an individual asset, such as, a circuit breaker or current transformer. Point of service, bus and circuit, and asset criticality are linked. We discuss the point of service approach below, bus and circuit and asset criticality are described in Appendix A. Point of Service criticality Customer expectations of service quality vary as there are differing needs and expectations as the impact of interruptions can vary significantly. To reflect this, we considered a number of options for categorising points of service. At one extreme, each individual customer could have a different criticality based on their value of unserved energy. We reviewed how distributors categorised their customers and proposed and consulted on an approach that could be easily understood and readily translated into our business objectives. Our aim in designing point of service criticality was for a pragmatic and straightforward categorisation of the point of service, taking account of the economic impacts that interruptions cause. We have defined the following categories: high priority, important; and standard. 2 The figure below illustrates the three categories and the criteria used to assign them to points of service. High priority Important Standard Load of national significance OR Meets 2 or more criteria Meets 1 criteria All remaining offtake points of service Criteria Main city Key load > 25,000ICPs Examples are provided in Appendix A showing how we used the above criteria to assign criticality to actual points of service. 2 Generator POS are aligned with the standard load criticality. Transpower New Zealand Limited 2013. All rights reserved. Page 3

5 FUTURE IMPROVEMENTS At present, our criticality approach considers groups of assets at a high level. These groups are busbars, transmission circuits and transformer circuits. The next stage of work will target the individual asset level, where we will be able to assign a specific criticality to an asset position such as a circuit breaker or disconnector. At the time of writing, most of our work has focussed on service performance criticality. The remaining elements of our Criticality framework are still in the conceptual or early development stages. Further work will also be undertaken to develop criticality assignment methods for other categories such as: safety environment financial. We will also consider how the different criticalities assigned to an asset under each category could be combined or rolled-up to provide an overall criticality rating for each asset. 5.1 Safety Our method for determining the impact of asset failure on safety must reflect the potential consequences of asset failure on people, including the general public, neighbours, service providers and employees. Ranking the potential safety consequences is important to managing our safety risks. This consequence ranking will need to be defined. For example, lines over roads or public places, and substations in residential areas pose a greater risk to the community than they do in more remote areas. We are developing a safety criticality assessment method to provide for a more systematic approach towards safety-based prioritisation of asset management activities. We already have data about the land use and occupancy under each transmission line span, and this will form the basis of the safety criticality assessment method for transmission lines. 5.2 Environmental Our method for determining the impact of asset failure on the environment must reflect the direct consequences on the environment and our environmental obligations. We have previous experience with ranking sites based on the consequences of an oil spill to the external environment. 5.3 Financial Financial criticality is intended to recognise the impact of failures in terms of direct costs we incur. This includes direct repair or replacement costs, equipment purchases, inventory or spares disbursements, loss of consumables due to, for example, an oil spill or gas release, and labour. It also includes direct costs that are consequences of failure, such as penalties or liquidated damages, or missed performance targets linked to revenue. Transpower New Zealand Limited 2013. All rights reserved. Page 4

Appendices Transpower New Zealand Limited 2013. All rights reserved. Page 5

APPENDIX A: CRITICALITY APPROACH We have three types of service performance criticality: Point of service criticality bus and circuit criticality asset criticality. These are outlined in the following sections. Point of Service Criticality Examples Our aim in designing POS criticality was for a pragmatic and straightforward categorisation of the POS, taking account of the economic impacts that interruptions cause. The figure below illustrates the three categories we use and the criteria used to assign the categories. High priority Important Standard Load of national significance OR Meets 2 or more criteria Meets 1 criteria All remaining offtake points of service Criteria Main city Key load > 25,000ICPs The table below provides examples of how we have used the above criteria to assign criticality to actual points of service. Description Load of national significance Large City Key load >25,000ICPs Criticality Addington 66 kv Christchurch CBD Yes High Priority Bream Bay Refinery Refinery High Priority Invercargill Dairy Yes High Priority Cambridge Dairy Important Kaiwharawhara Wellington Important Kawerau (A) Pulp and Paper Important Rotorua 33 kv Standard Transpower New Zealand Limited 2013. All rights reserved. Page 6

Bus and circuit criticality The transmission network can be thought of as a system of circuits and busbars. A forced or fault outage of any asset in this system typically removes the entire circuit or busbar from service, and in some cases it affects more than one circuit or busbar. The grouping of assets into circuits and busbars is illustrated in Figure 2. Load Busbar Transformer circuit 33kV bus A 33kV bus B Transformer A Transformer B 220kV bus A 220kV bus B Circuit A Circuit B Grid 220kV bus C Transmission circuit Circuit C 220kV bus D 220kV bus E Grid Figure 2: Illustration of how assets are grouped into busbars and circuits The impact that an outage of a circuit or busbar has on a POS, determines the criticality of that group of assets. Three types of circuit or busbar criticality have been developed for these groups of assets, based on the impact of an outage on POS: high impact, medium impact, and low impact. High impact An outage of the busbar or circuit: causes a loss of connection to one or more high priority POS, or Transpower New Zealand Limited 2013. All rights reserved. Page 7

causes a loss of connection to more than 200 MW of load, or places two or more POS, including at least one high priority, on single circuit security or places more than 200 MW of load on single circuit security. Medium impact An outage of the busbar or circuit: causes a loss of connection to one or more important, standard or generator POS, or places either at least one important point, or at least two standard or generator POS, on single circuit security. Low impact An outage of a busbar or circuit does not usually cause loss of connection and places only one standard or generator POS at most on N-security. Summary A summary of the criticality rules for busbars or circuits may be represented as shown below. Consequence of an outage Effects Criticality Places more than one of the following on single circuit security Includes High priority POS Standard or Important POS High Medium Places one of the following on single circuit security >200 MW of load High High priority POS High Important POS Low Standard POS Low >200 MW of load High Causes a loss of supply at one of the following High priority POS Important POS Standard POS High Medium Medium No effect Busbar or circuit criticality assignment rules Low Transpower New Zealand Limited 2013. All rights reserved. Page 8

The following illustration provides an example showing how we assign bus and circuit criticality. Example: Assigning bus and circuit criticality PoS category = Important Total load = 150 MW 33kV bus A 33kV bus B Transformer A Transformer B 110kV bus A 110kV bus B Circuit A Circuit B Busbar or circuit 33 kv bus A & B Transformer A & B POS interruption if out of service? Yes. 75 MW of important load lost No 110 kv bus A & B No Circuit A & B No POS security reduced if out of service? Not applicable Yes. 150 MW of Important load on single circuit security Yes. 150 MW of Important load on single circuit security Yes. 150 MW of Important load on single circuit security Criticality Medium The criticality of the 33 kv busbars A and B are assigned medium because an outage of either of them will result in an interruption to an Important POS. All of the remaining groups of assets are assigned low criticalities because even though their outage will cause the POS to be placed on single circuit security, there is no interruption. Four issues in assigning bus and circuit criticality are: busbars at a point of service, load considerations, changing Grid configuration, and the inter-island HVDC link. Busbars at a POS Many POS comprise two or more busbars, each connecting part of the customer s load or generation. The impact of a busbar outage may therefore be a partial loss of service to a customer; Low Low Low Transpower New Zealand Limited 2013. All rights reserved. Page 9

for example, only half the feeders may be interrupted. For the purposes of assigning criticality to the busbar, this partial loss of service is regarded as an interruption to the POS. Load considerations Historic peak load is used when determining the impact of an outage on a POS. This applies to considerations of the amount of load placed on single circuit security, and whether the remaining assets have the capacity to meet the load following an outage. Changing Grid configuration The criticality of busbars and circuits will change over time. For example, the commissioning of the two North Island Grid Upgrade (NIGUP) circuits has reduced the criticality of all 220 kv circuits supplying Auckland and Northland. Prior to the NIGUP circuits being commissioned, the outage of a single 220 kv circuit would place Auckland load (a large part of which is high-priority load) on N- security. These circuits would be defined as high impact. Following the commissioning of the two NIGUP circuits, N-1 security to the Auckland and Northland load is still maintained when one of the original 220 kv circuits is removed from service. These 220 kv circuits are therefore now less critical (medium impact rather than high impact). Inter-island HVDC link The HVDC link is initially treated the same as any other element of the transmission system for the purposes of assigning criticality. The entire link from end to end is regarded as a transmission circuit. However, as outlined in the HVDC Fleet Strategy, we intend to develop a customised application of the Criticality Framework for assets and groups of assets in the HVDC system. Asset criticality Asset criticality considers how the failure of an asset impacts on the circuit or bus section of which that asset is a part. This includes primary power transmission equipment, its measurement and control devices, and other associated equipment such as voltage support devices or power electronics. Each circuit or bus section comprises assets. The diagram in Figure 5 shows the assets that make up a typical transformer circuit. Transpower New Zealand Limited 2013. All rights reserved. Page 10

Network circuits and buses are made of many different assets. These assets contribute to performance of the branch in different ways. As an example, assets in a transformer circuit include: droppers disconnectors earth switches circuit breakers cables power transformers earthing transformers surge arrestors current transformers voltage transformers protection systems. Figure 3: Assets comprising a transformer circuit Our methodology for determining the criticality of individual assets is yet to be fully developed. In the meantime, we have assigned the bus or circuit criticality to the assets that make up the bus or circuit. Our intention is to develop a strong risk-based link between asset criticality and the potential consequences of failure for the point of service. Transpower New Zealand Limited 2013. All rights reserved. Page 11