Peak V&R R-T Voltage Security Assessment (VSA) Tool Validation 9/9/2014, JSIS. Hongming Zhang EMS Applications Manager, PEAK RC

Similar documents
HAA Tools Roadmap. October 26, 2016 PHAAUG Face to Face Meeting. April Freeman Reliability Services Engineer

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Software Technologies

SDG&E s Accomplishments and Future Plans

Power System Network Simulator (PSNsim)

BC HYDRO REAL TIME OPERATIONS SYSTEM OPERATING ORDER 7T - 50

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

PowerWorld s Experience Using Real-Time Power System Models

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

IJETST- Volume 01 Issue 09 Pages November ISSN

Karl Iliev, San Diego Gas & Electric Company

Solutions for transmission network management

Re-Dispatching Generation to Increase Power System Security Margin and Support Low Voltage Bus

Power System Studies. The Power of Trust. The Future of Energy.

On-line Estimation of Power System Security Limits

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO

Optimal Placement and Sizing of SVC for Improving Voltage Profile of Power System

Voltage Stability assessment by SVC Device Via CPF

Grid Operations - Program 39

Grid Modernization at SDG&E

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10,

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision

Achieving Smarter Grid Operation With On-Line DSA Technology

Installation Guide and Users Manual

Effect of Topology Control on System Reliability: TVA Test Case

ISO New England Data Modeling Requirements

MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPALLI EE-2401 POWER SYSTEM OPERATION AND CONTROL UNIT-III REACTIVE POWER VOLTAGE CONTROL

Using WECC Composite Load Model and PowerWorld Time Step Simulation Tool. Eleanor Ewry

Dispatcher Training Simulator (DTS) JOB AIDE

Modeling and Simulation of Static VAR Compensator Controller for Improvement of Voltage Level in Transmission Lines

requirements in a NERC or Regional Reliability Standard.

Transmission Distribution Microgrid - DER

Standard CIP Cyber Security Critical Cyber As s et Identification

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281

G. Larry Clark Principal Engineer Power Delivery Alabama Power Company, A Southern Company

N-1-1 Reactive Upgrades

Demonstration Test Bed for Advanced Control Systems

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document

DRAFT Risks and Mitigations for Losing EMS Functions

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center

Simulation and Analysis of Static Var Compensator with Matlab

Project Consideration of Commission Directives in Order No. 693

UNITROL 1000 Compact Automatic Voltage Regulator for small synchronous machines UNITROL

Feasibility Study on Load Flow and Short Circuit Project

University of California, Santa Cruz Baskin Engineering School Electrical Engineering Department

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor

Standard CIP Cyber Security Critical Cyber As s et Identification

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Transient Stability Improvement of Long Transmission Line System by Using SVC

OPTIMAL LOCATION OF SVC USING BENEFIT FACTORS TO IMPROVE THE VOLTAGE PROFILE IN POWER SYSTEMS

Static Var Compensator: Effect of Fuzzy Controller and Changing Membership Functions in its operation

ipcgrid 2015 March 26, 2015 David Roop Director Electric Transmission Operations Dominion Virginia Power

Peak Reliability Coordination Services in the West March 30, 2018

IMPLEMENTATION ISSUES FOR HIERARCHICAL, DISTRIBUTED STATE ESTIMATORS

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models

Corporate Profile. Bring Power to Innovation! Bigwood Systems, Inc.

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

Original Contribution EFFECTS OF PARALLEL FACTS CONTROLLERS ON STAEDY STATE VOLTAGE STABILITY MARGIN M. A. Kamarposhti 1 *, H.

149 FERC 61,157 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING STIPULATION AND CONSENT AGREEMENT

edart Quick Reference Guide

Empowering Operations with the PI System

SM40: Measuring Maturity and Preparedness

RTDMS CAISO TRAINING SESSION

GridEye FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID

Performance Testing: Respect the Difference

Copyright 2013 OSIsoft, LLC. 1

Using PMU Data to Increase Situational Awareness

Smart Grid Demonstration Project

Perry. Lakeshore. Avon. Eastlake

DRAFT Agenda Synchronized Measurement Subcommittee (SMS) Meeting

ABB static var compensator stabilizes Namibian grid voltage

Node-Breaker Modeling Representation

Outage Coordination External Workshop. Jason Ausmus Manager, Operations Planning

Optimize Your Databases Using Foglight for Oracle s Performance Investigator

Meeting the Demands of Power Hungry China through a Real-time Data Driven Enterprise Platform

Reliability Coordinator Procedure

Information Processing and Synthesis Tool (IPAST) Abstract

Quality Assurance and IT Risk Management

Hosting Capacity for Distributed Energy Resources on Distribution Feeders A Case Study

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

Dispatch Training Simulator Worksheet

Simulating Active Distribution Systems. Roger C. Dugan Sr. Technical Executive EPRI, USA. OpenDSS

CHAPTER-5 APPLICATION OF SYMBIOTIC ORGANISMS SEARCH ALGORITHM

Unofficial Comment Form Project Disturbance Monitoring

Tutorials. Tutorial: Creating a New Case Page 1 of 13

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

OPTIMUM CAPACITY ALLOCATION OF DISTRIBUTED GENERATION UNITS USING PARALLEL PSO USING MESSAGE PASSING INTERFACE

Standard Development Timeline

2012 Grid Assessment Results CAISO Stakeholder Meeting September 26-27, 2012

FUZZY LOGIC TECHNIQUE FOR CONGESTION LINE IDENTIFICATION IN POWER SYSTEM

Using Threat Analytics to Protect Privileged Access and Prevent Breaches

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals

Geomagnetic Disturbances and High-Altitude Electromagnetic Pulse Research

Reliability Standard Audit Worksheet 1

NEW PROTECTION COORDINATION SYSTEM ACCORDING TO ESS AND RENEWABLE ENERGY EXPANSION

Transcription:

Peak V&R R-T Voltage Security Assessment (VSA) Tool Validation 9/9/2014, JSIS Hongming Zhang EMS Applications Manager, PEAK RC

Agenda Peak-ROSE project deliverables. ROSE VSA scenarios validation strategy. Testing, observations and investigations. RAS modeling work by VB scripts. Next steps. 2

ROSE Project Deliverables in 2014 Peak Reliability is implementing real-time assessment and monitoring for two identified IROLs i.e. San Diego Gas & Electric (SDGE) import and Northwest Washington (NW-Wash) transfer. These IROLs are voltage stability constrained. Monitoring the IROLs by real-time ROSE VSA tool is a critical task to be accomplished by end of 2014. 3

ROSE VSA Limits Validation Strategy Among 18 scenarios defined in ROSE, Peak team now focus on validating IROL related scenarios: For SDGE Import IROLs, Peak collaborate with CISO to validate ROSE results against Bigwood s. o ROSE VSA results are to be stored in PI For NW-Wash IROL, Peak rely on third-party tools i.e. VSAT and PowerWord for off-line validation. 4

Validation Workflow Primary and backup POM servers are configured differently for real-time VSA Limits validation: o Both servers receive identical SE snapshots o Cap switching is set differently on two POM servers o RAS are not enabled for testing Use offline POM to reproduce problematic VSA Limits and report the issues to V&R. Work with V&R for software fix and solution tuning. 5

PI Trend of VSA Limits (SDGE_SUM_IM) (24 hours starting Sept 8 5:00 PM) SDGE Summer Import VSA Limit SDGE Summer Import VSA Limit Margin 6 SDGE Summer Import Actual Flow

Observations of Real-time VSA Limits SDGE VSA Limits are expanded by 15% or higher for SDGE import while Cap switching is enabled. NW-Wash VSA Limits vary while Cap switching is enabled for (N-1) CTG, compared to no Cap switching or Cap switching for (N-0) CTG. o What causes the big change of VSA limits? VSA Limits solve higher when a smaller step size is applied to solve NW-Wash scenario. 7

VSA Limits (with vs. w/o Cap Switching) 8

What NW-Wash P-V Curves Indicate? (N-1) Cap switching incurs numerical instability? P-V curves depends on whether constant P/Q load characteristics holds once P-V curves reach 0.8 p.u bus voltage. Auto switch to voltage dependent load model at 0.8 p.u. reduces the loads and interface flows, as well as re-shapes P-V curves sharply on a heavily shunt compensated network such as NW-Wash. 9

Case 1: Cap Switching Disabled 10

Case 2: (N-1) Cap Switching Allowed 11

Case 3: (N-0) Cap Switching Allowed 12

Cause, Effect and Resolution Excessive Cap switching under (N-1) is observed at a collapse approximation point i.e. 16 shunts switching and 38 generators reaching their reactive power limit (Qmax) at the last transfer step. Unlikely switch in so many Caps once by operators. How to solve (N-1) mode massive Cap switching? o POM Solution parameters tuning (work around) o Smart logic & robust logic against numerical instability 13

Cause, Effect and Resolution (Cont) Allowing (N-1) Cap switching is a common practice in industry i.e. assuming system operators shall switch in shunts manually as needed. Cap switching in basecase will typically result in a higher transfer capability However, as approaching the nose of the PV curve, each transfer step starts to cause large changes in voltage, which in turn cause Caps to switch in excessively. Thereby dynamic step size is desired. 14

Case 4: (N-0) Cap Switching & Smaller Step Size Applied 15

Impact of Shunt AVR Flag Setting Enabling AVR regulation of small shunt banks @ a sensitive location/station could raise VSA limits considerably. For example, o Massachu Cap banks (~30 Mvar in total) is set AVR off: NW-WASH VSA limit = 4631 (MW) o Massachu Cap banks (35 Mvar in total) is set AVR on: NW-WASH VSA limit = 4811 (MW) (N-0 Cap switching) Which Cap banks shall be set AVR flag on under pre-contingency, and /or post-contingency? 16

Efficient Scripting for ROSE-RAS Model RAS in ROSE is model by VB scripts separately, Not imported from WSM-RTCA RAS database Using VB scripts for RAS modeling offers additional flexibility: 17 o However, without GUI support, it requires RAS operation expertise and VB coding skill to add or update RAS correctly in ROSE, sort of challenging for engineer. One RAS is likely modeled for multi-vsa scenarios. It s desired to separate specific RAS scripts from individual scenarios for less maintenance & coding efficiency.

[Continued] 18

Next Steps Keep validating ROSE VSA Limits and sign off test. Model all RAS related to IROLs scenarios and validate their impact to VSA Limits. Deliver user guide and training modules to SOEs. Work with V&R to develop smart logic against numerical instability. 19

Hongming Zhang, hzhang@peakrc.com