PRESENTATION OVERVIEW SECTION 1: - Speaker overview SECTION 2: - Company overview SECTION 3: - Objective & Scope overview SECTION 4: - Service Concept overview SECTION 5: - Strategic Consideration and Future Plan overview SECTION 6: - Open discussion and conclusion
PRESENTATION OVERVIEW SECTION 1: Speaker
SPEAKER OVERVIEW - Telecommunication Engineer specialized in the GNSS domain - CPD Course in Space Mission Analysis and Design Glasgow Univeristy Job Experience - Vitrociset Belgium S.p.r.l. ESA IAP ARTES 20 Project SSMART System for Safety in Multimodal Assisted Remotely Transports EC FP7 Project COSMEMOS Cooperative Satellite navigation for Meteo-marine Modelling and Services - Vitrociset S.p.A. EX FP7 Project REWARD Real time Wide Area RaDiation Survelliance System ESA IAP ARTES 20 Project SAPI&NS Satellite Portable & LocalizatioN System ESA G2G Program MEOLUT Medium Earth Orbit Local User Terminal (Ongoing)
PRESENTATION OVERVIEW SECTION 2: Company
COMPANY OVERVIEW - 1 Vitrociset for over 40 years, designs, builds and operates technologically advanced and complex systems, safety-of-life and mission critical applications, guaranteeing the highest standards of quality, security and availability Organization Model: Strategy & Innovation Department International Sales Department 4 Business Unit Technologies & Quality Engineering Department Civil Infrastructure Engineering Department Civil & ICT Infrastructure Engineering Department
COMPANY OVERVIEW - 2 VITROCISET SpA ESTABLISHMENTS ITALY Rome (HQ) Villaputzu (Sardinia) Naples Venice GERMANY Darmstadt Munich SUBSIDIARIES VITROCISET BELGIUM Sprl Transinne VITROCISET FRANCE Sarl Kourou (French Guiana) JADWALEAN VITROCISET (JV) VITROCISET KSA Riyadh THE NETHERLANDS Noordwijk KENYA Malindi REPRESENTATIVE OFFICES INDONESIA Jakarta TURKEY Ankara
PRESENTATION OVERVIEW SECTION 3: Objective & Scope
OBJECTIVE & SCOPE - 1 The goal of SAPI&NS Satellite Portable & LocalizatioN System Feasibility Study aimed at investigating the technical feasibility and economic viability of a dual use service solution for Search & Rescue (S&R) mission, to improve: The Safety of operation by management of significant data (biomedical, position, ); The efficiency of the operation by the provision of dual service, to facilitate cooperation. SAPI&NS service methodology design: Interview & User Needs Scenario Service System Requirements Architecture
OBJECTIVE & SCOPE - 2 S&R operations are characterized by a similar set of constraints, the operational environments are unfriendly and time is critical: any delay can results in dramatic consequences, such as the human losses. No Images acquisition No Tracking of vehicles No Tracking of rescuers No Monitoring of the health status parameters of the victim No Cooperation between different entities No Monitoring of the Healt Status Parameters of the rescuers S&R without SAPI&NS No Centralized monitoring of the mission evolution
OBJECTIVE & SCOPE - 3 The goal of the feasibility study was to build up a concept of sustainable service solution that helps to overcame the current difficulties of S&R mission, often unpredictable in their nature and demands. Images acquisition Tracking of vehicles Tracking of rescuers Monitoring of the health status parameters of the victim Cooperation between different entities Monitoring of the Healt Status Parameters of the rescuers S&R with SAPI&NS Centralized monitoring of the mission evolution
PRESENTATION OVERVIEW SECTION 4: Service Concept
SERVICE CONCEPT - 1 The overall SAPI&NS service and system infrastructure can be summarized as follow: USER B User A User B User C GSM SAT SENSOR CAMERA GNSS Remote Users Remote Terminal Remote Segment GSM SATELLITE GNSS Satellite Navigation System Terrestrial Telecommunication Network Satellite Telecommunication Network VCS INTERNET Ground Segment User A GSP User B GSP User C GSP
SERVICE CONCEPT - 2 The Ground Service Provider is a server implementing the INTERNET following functionalities: GSP #1 GSP #2 Real Time Acquisition Storage Map Server External shared RAID storage Monitor,keyboard, mouse The Ground Service Provider is interfaced with different Ground Control Station dedicated to: LAN1 LAN2 KVM switch LAN1 LAN2 2D/3D Cartoghraphic Presentation Message Exchange Biomedical Data Parameters Hub switch LAN1 LAN1 LAN2 Hub switch LAN2 Ground Control Station #1 Ground Control Stationl #2
SERVICE CONCEPT - 3 The Remote Terminal is composed by a Smartphone equipped with a Thuraya Satsleeve, plus external wearable sensors. SAPI&NS Smart Mobile App: GNSS Data Acquisition Report Transmission Short Text Message Event Management Local Storage Setting Configuration parameters Security through user identification and data encryption Sensor data acquisition
SERVICE CONCEPT - 4 CASE A CASE B CASE C Data Health Parameters Position... SAT COM Provider Satellite Telecommunication SAT COM Provider Satellite Telecommunication SAT COM Provider Satellite Telecommunication Integration Data Fusion Compression Report GSM COM Provider GSM COM Provider GSM COM Provider Tx Images Delivery Terrestrial Telecommunication Delivery Terrestrial Telecommunication Delivery Terrestrial Telecommunication Storage Data Transmission Data Size (Kbit) Average Delay (Second) Average Rate(Kbps) Report 40* 15 2.7 Image 800 150 5.3 Images and Report (simultaneous transmission) 2000 150 13.3 Report and Text messages (fixed size 1200 bits) 2400 150 16
SERVICE CONCEPT - 5 Data Acquisition Data Processing Remote Terminal SW Programmer SW Programmer Images Images Management HW RT Provider Sales Manager Smartphone Provider Sales Manager Biomedical Data Biometric Data Management Data Integration and Data Fusion Delivery of Satsleeve Delivery of Smartphone GIS Data GIS Data Management Hardware Sensors Provider Sales Manager Data Telecommunications Provider SAT COM Provider GSM COM Provider Final Service Delivery of Biometric Sensors Sales Manager Sales Manager GIS Data Provider Delivery of Satellite Telecommunication Delivery of Terrestrial Telecommunication Sales Manager Software Delivery of Geographic Information System (Map) Data SW Programmer Ground Service Provider SW Programmer Vitrociset Service Provider Data Management Data Integration and Data Fusion Monitoring And Data Backup Servers and Database Hardware & Software Maintenance GIS Data GIS Data Management IT & Technical Support Expert Data Acquisition Data Processing
SERVICE CONCEPT - 6 As part of the feasibility study, a SAPI&NS Proof of Concept (PoC) has been developed in order to verify and demonstrate that the potential product/service can be successful introduced in the operative use during Search and Rescue mission, in addition to identify and validate critical technical and logistical issues that might interfere with the success of the mission. Video wall 3D Remote Terminal Simulator Flight Simulator Ground Control Station Simulator Ground Service Provider Simulator
SERVICE CONCEPT - 7
PRESENTATION OVERVIEW SECTION 5: Strategic Consideration & Plan Ahead
STRATEGIC CONSIDERATION & PLAN HAEAD - 1 The result of the Viability Analysis has been estimated, through Internal Rate of Return (IRR) and Net Present Value (NPV) that confirmed the business sustainability and profitability, with the actual potential End Users. Required Partnership (ESA Service Providers) IPR and Legal Arrangements (Patents, Copyright, Trademarks, ) Future Development (HW and SW) International Sales (B2G market) Dissemination Activities (Workshop, Webpage, Exhibition, )
STRATEGIC CONSIDERATION & PLAN HAEAD - 2 At this phase, the SAPI&NS project has reached the final part of the Feasibility Study and the next step is to analyze the possibility to go into the Demonstration Phase. Feasibility Study 1 Year Demonstration Phase 1 Year Pre-Operational Phase 6 Months Operational Phase
PRESENTATION OVERVIEW SECTION 6: Open Discussion
CONCLUSION