Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

Similar documents
WORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS

European Standardization

New Concept for Article 36 Networking and Management of the List

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

e-sens Nordic & Baltic Area Meeting Stockholm April 23rd 2013

EUTurbines comments to. ENTSO-E Public consultation on Connection Codes Implementation Guidance Documents (Overview of questions answered)

Network Code on Operational Security. User s Group System Operations 06/11/2013

Stakeholder consultation process and online consultation platform

European Developments

BEST PRACTICE GUIDE ON THE USE OF THE ELECTRONIC COMMON TECHNICAL DOCUMENT

ENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down.

Implementation Network Codes. WG Belgian Grid 26 October 2016

The latest update of power market in Latvia

SME License Order Working Group Update - Webinar #3 Call in number:

Continual Improvement of Data Centre Energy Performance

Much more than Rules need to be in place by 2014

Mandate to CEN, CENELEC and ETSI for Standardisation in the field of electric motors

EUROCONTROL SWIM Standards Evolution Workshop

EUROCONTROL SWIM Specifications. NM B2B Tech Forum June 2018

Contacts. CEDEC Marc Malbrancke, Coordinator CEDEC WG Network Code

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

POTRAZ ZIMBABWE. ITU Workshop on Performance, QoS and QoE for Multimedia Services Johannesburg, South Africa, July 2017

HPE Security Data Security. HPE SecureData. Product Lifecycle Status. End of Support Dates. Date: April 20, 2017 Version:

This report is based on sampled data. Jun 1 Jul 6 Aug 10 Sep 14 Oct 19 Nov 23 Dec 28 Feb 1 Mar 8 Apr 12 May 17 Ju

BANGLADESH UNIVERSITY OF PROFESSIONALS ACADEMIC CALENDAR FOR MPhil AND PHD PROGRAM 2014 (4 TH BATCH) PART I (COURSE WORK)

Conformity assessment Requirements for bodies providing audit and certification of management systems. Part 6:

INAB Mandatory and Guidance Documents Policy and Index

An Introduction to Network Codes & The Links Between Codes

ICT PROFESSIONAL MICROSOFT OFFICE SCHEDULE MIDRAND

ENTSO-E working to fulfill the 3 rd Package

European Network Codes: RfG GB Grid Code Application Options

Grid Code Planner EU Code Modifications GC0100/101/102/104

Technical guidelines implementing eidas

COMMON REGULATORY OBJECTIVES FOR GSM EQUIPMENT PART 2 SPECIFIC ASPECTS OF GSM EQUIPMENT

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Criticality control in SFP. Radwaste and Decommissioning

COURSE LISTING. Courses Listed. with SAP Hybris Marketing Cloud. 24 January 2018 (23:53 GMT) HY760 - SAP Hybris Marketing Cloud

Network Codes, Governance and Regulatory issues for the Transition towards up to 100% RES

ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service

IANA Update ICANN Meetings, Marrakech Kim Davies Internet Assigned Numbers Authority

Customer Forum. Access to Data. Author, Department. 26 April 2018

New CEN-CENELEC Technical Committees for Infosec and Data Protection Standardization (TC8) Brussels - 19 September 2017 Alessandro GUARINO Chair,

INAB Mandatory and Guidance Documents Policy and Index

List of EA Publications. Documents

software.sci.utah.edu (Select Visitors)

4. ENCOUNTER DATA PROCESSING PROCEDURES A. General Information

News in Download services in the Czech Republic. Petr Souček Czech Office for Surveying, Mapping and Cadastre Prague, Czech Republic

ISO/IEC INTERNATIONAL STANDARD. General requirements for the competence of testing and calibration laboratories

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

Markets Gateway Roadmap

SD3-60 AIRCRAFT MAINTENANCE MANUAL REF. No 360/MM

Sector Vision for the Future of Reference Standards

MISO PJM Joint and Common Market Cross Border Transmission Planning

EA-01/01 List of EA Publications

Annex A to the DVD-R Disc and DVD-RW Disc Patent License Agreement Essential Sony Patents relevant to DVD-RW Disc

Connection & Compliance processes

European Standards & Community Specifications

IMPLEMENTATION GUIDELINE FOR NETWORK CODE Demand Connection

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

Countermeasures against Mobile spam

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

GRID MODERNIZATION INITIATIVE PEER REVIEW

ENTSO-E Requirements for Generators Network Code: GB Stakeholder s Key Issues. Feedback to JESG Garth Graham (SSE) 16 August

Transition Implementation Status Reporting. 31 March 2016

Substance, Product, Organisation and Referential (SPOR) communication update

CIMA Asia. Interactive Timetable Live Online

List of EA Publications. And International. Documents

North American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Working Session January 16 th, 2018

Getting in Gear with the Service Catalog

IAF Mandatory Document KNOWLEDGE REQUIREMENTS FOR ACCREDITATION BODY PERSONNEL FOR INFORMATION SECURITY MANAGEMENT SYSTEMS (ISO/IEC 27001)

10th Maintenance Cost Conference Chairman s Report Athens Sept 10& Tiymor Kalimat Manager Technical Procurement Royal Jordanian Airlines

RPS Work Item: Beta Testing of Message Standard

National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010

Revision of the EPB Overarching Standard EN15603 (future EN-ISO ) Annex A-B approach and expected time schedule

MISO PJM Joint and Common Market Cross Border Transmission Planning

Standardization and Regulations in the EU/EFTA

IGO/INGO Identifiers Protection Policy Implementation. Meeting with the IRT 9 March 2016

CEN and CENELEC Position Paper on the draft regulation ''Cybersecurity Act''

Yield Reduction Due to Shading:

Decision Making Information from Your Mobile Device with Today's Rockwell Software

Section 1.2: What is a Function? y = 4x

Consolidation Team INSPIRE Annex I data specifications testing Call for Participation

Undergraduate Admission File

Access Control and Physical Security Management. Contents are subject to change. For the latest updates visit

ISO/IEC TS Conformity assessment Guidelines for determining the duration of management system certification audits

Communication networks and systems for power utility automation Part 80-3: Mapping to web protocols Requirements and technical choices

ISO/IEC INTERNATIONAL STANDARD. Software engineering Software measurement process. Ingénierie du logiciel Méthode de mesure des logiciels

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

Freedom of Information Act 2000 reference number RFI

BS EN :2017. Electronic Invoicing and associated PDs (TSs and TRs) Copyright 2017 BSI. All rights reserved 06/10/2017

CEN & ETSI standards & eidas Compliance

CIMA Asia. Interactive Timetable Live Online

Questions for national reference groups

MIGRATION PROCESS FROM UCTE DEF TO CGMES SECOND EDITION

CENELEC NWIs (New Work Items) and EWIs (European Work Items)

WORKPACKAGES Month

List of EA Publications. And International. Documents

WHERE THE DIGITAL TRANSFORMATION OF THE EUROPEAN ELECTRICITY SYSTEM STARTS:

The Accreditation and Verification Regulation - Verification report

INSPIRE status report

Transcription:

Work to establish standard EN50549-1 EN50549-2 EN50549-10 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 1

SOMMAIRE Summary Key points TC8X / WG31 01 Schedule1 TC8X / approach1 02 03 Next steps 04 Others considerations1 05

Key points TC8X / WG3 2013 2014 2015 2016 Publication of (EU)2016/631 today Publication new Edition EN50438 Decision to start work for drafting technical specification on compliance to requirements for the connection of generating plants in parallel with LV or MV distribution network Publication first edition TS50549-1 & TS50549-2 Publication IS EN50438 Starting drafting CLC/prTS50XXX Starting drafting inside TC8X-WG3 of future series of Ens to be used to provide conformity to RfG Draft EN50549-1 Draft EN50549-2 EN 50438 EN 50549 EN50549 LV connected micro-generating plants Requirements for generators to be connected to distribution networks - Part 1 connection to a LV distribution network Generating plants of Type B and smaller Requirements for generators to be connected to distribution networks Part 2 connection to a MV distribution network Generating plants of Type B and smaller 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 3

Schedule EN50549-1 & 2 a very constrained timetable WG3 Official Schedule NWI request to TC8X Publication NWI request on Collaboration platform BT Decision Preparation WG Draft -1-1 and -2 combined-adapt to NC RfG-Merge with EN 50438 WG comments on WG Draft -1-1 and -2 Dealing with WG comments on Draft -1-1 and -2 combined Deliver splitted draft for Enquiry to CCMC CCMC editing (3 months) - optional Enquiry (3 months) Dealing with comments from NC's Deliver draft for voting to CCMC CCMC editing Voting by NC's Final editorial review by CCMC RfG regulatory Schedule (maximum) RfG issued (April 27) and enter into force (Art. 72, May 17) ENTSO guidelines (Art. 58), 6 m after f and each 2 years Agengy' list of information for ENTSO monitoring (Art. 59) TSOs requirements proposals (Art. 7, 2y) Agreement from third parties (Art. 7, 6m) Decision on requirements. RfG shall apply 2019 April 27 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 4

TC8X / WG3 approach A single understanding of vocabulary and definitions and requirements A wider scope than RfG scope including RfG requirements and their national implementation Including requirements of DSOs A reference for Members States without existing technical guidelines A reference for manufacturer to facilitate design and manufacture of mass generating units (class A&B) 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 5

TC8X / WG3 approach A single understanding of vocabulary, definitions and requirements Some definitions should be clarified for a common understanding in all members states translated languages What is the definition of: Unit Module Plant Facility 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 6

TC8X / WG3 approach A single understanding of vocabulary, definitions and requirements CENELEC asked questions to European stakeholder committee regarding requirements Active power Set-points during LSFM-O When LFSM-O is active, the LFSM-O set-point will prevail over any other active power set-points which would result in an increase of power above the LFSM-O set-point. Is this in line with RfG art 13(2)? Response time to LFSM-O Based on CENELEC survey to include all technologies a response time between15s and 30s shall be considered. To be confirmed if this is feasible according to RfG Active Power Output for falling frequency We need confirmation of the understanding that power reduction logic shall take into account technical capabilities of PGU along all frequency range and can foresee higher power reduction than the specified curve LSFM-O logic with Hysteresis We would like to know if such characteristics are in line with the RfG requirements, since the characteristics serve well reducing the power. Minimum Requirements or We need to understand how to consider the RfG requirements to properly align the text of the standards under drafts. The aim of the standards under draft is documents that can be useful for an extended audience. Therefore clarification is needed if more stringent requirements shall be considered and/or additional requirements can be introduced 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 7

TC8X / WG3 approach A wider scope than RfG scope -including RfG requirements and their national implementation -including requirements of DSOs New Annexes List of national requirements applicable for Generating plants To provide information for the user which further documents are relevant for grid connection This list is informative only and might not be complete. It is the responsibility of the producer to ensure that all applicable requirements are complied with 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 8

TC8X / WG3 approach A wider scope than RfG scope -including RfG requirements and their national implementation -including requirements of DSOs New Annexes Relationship between this European standard and the COMISSION REGULATION (EU)2016/631 To provide information which articles of 2016/631 are covered by which clause of EN50549 Generating plants compliant with the clauses of this European Standard are considered to be compliant with the relevant Article of COMISSION REGULATION (EU)2016/631, provided, that all settings as provided by the DSO are complied with. 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 9

TC8X / WG3 approach A wider scope than RfG scope -including RfG requirements and their national implementation -including requirements of DSOs New Annexes Parameter Table Table for all defined parameters might be used by DSOs to provide parameter settings to customers 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 10

Next steps 2016-11-23 TC8X decided to distribute the draft of technical Specification (CLC/prTS50XXX) on compliance test and start debate inside WG3 of the structure of the future series of Ens to be used to provide conformity to the network code RfG. 2017-03-22 Start of work on EN50549-10 Compliance test specification 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 11

Others considerations CENELEC wrote of European stakeholder committee to drawn the attention on an essential point Establish An effective Harmonization or as a minimum coordinated values for non exhaustive parameters regarding frequency requirement on the same synchronous area To avoid A specific range of product developed for each member state with consequences on generation cost An unfair sharing of efforts to ensure system stability 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 12

Others considerations Drafting of EN50549-10 is starting. It should be use to provide conformity with RfG Simultaneously national implementation are progressing and future national technical guidelines are to be established. Should EN5049-10 be taken as basis to specify a methodology for testing and assessing RfG exhaustive and non exhaustive requirements to be used for mass generating units 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 13