Power System Operating Incident Report Trip of Calvale No.2 275kV busbar and Calvale-Halys 8810 and 8811 transmission lines on 30 March 2014

Similar documents
TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015

METERING SERVICE PROVIDER REGISTRATION PROCEDURE (PART1)

GUIDELINES FOR SHARED TRANSMISSION CONNECTIONS IN VICTORIA

Description of the Application Process for Small Embedded Generators

THE NATIONAL GAS MARKET BULLETIN BOARD - PARTICIPANT REGISTRATION KIT

METERING SERVICE PROVIDER APPLICATION FORM (PART 2)

Network Configuration Document Selection for New Substations Framework

WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES

AEMO S RESPONSE TO MARKET AUDITOR S REPORTS FOR AUDIT PERIOD 1 AUGUST 2015 TO 30 JUNE 2016

MMS DATA MODEL GUI INSTALLER GUIDE

POWER SYSTEM DATA COMMUNICATION STANDARD

B2B PROCEDURE ONE WAY NOTIFICATION PROCESS

1. Project Description

Guide to Contract Reference Selections 1.00 Final March 2019

GUIDE TO GAS SUPPLY HUB CSV FILE TRANSACTIONS

GBB (WA) 1.11 (BUILD 345) RELEASE NOTES

AAPT Business Dark Fibre. Service Schedule

SRAS GUIDELINES FOR SYSTEM RESTART ANCILLARY SERVICES INCORPORATING: SRAS DESCRIPTION SRAS ASSESSMENT GUIDELINES SRAS QUANTITY GUIDELINES

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

AAPT Business Dark Fibre. Service Schedule

OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER

Data Interchange Framework and Glossary 1.01 Final September 2018

Standard EOP Disturbance Reporting

VAR DISPATCH WEB INTERFACE USER GUIDE VERSION 0.3

ALLOCATION OF EMBEDDED NETWORK CODES

GBB (WA) 1.8 (BUILD 316) RELEASE NOTES

SPECIFIC TERMS METRO ETHERNET SERVICE

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

2018 Summary Report into the cyber security preparedness of the National and WA Wholesale Electricity Markets. AEMO report to market participants

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP)

MSATS USER INTERFACE GUIDE

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Final Determination: Criteria for Assessing Material Inter- Network Impact of Transmission Augmentations

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

WEBSITE TERMS OF USE

A Guide to the Input Data and Model of the 2018 National Electricity Market Electricity Statement of Opportunities

MSATS PROCEDURES CATS PROCEDURE PRINCIPLES AND OBLIGATIONS. PREPARED BY: Retail Markets and Metering VERSION: 4.5 EFFECTIVE DATE: 1 December 2017

Specific Terms And Conditions for hi!share International Prepaid Airtime Top- Up Value Added Service ( hi!share International Terms )

GUIDE TO B2B VALIDATION MODULE SOFTWARE COVERS THE SET-UP AND USE OF THE B2B VALIDATION MODULE SOFTWARE

Building Information Modeling and Digital Data Exhibit

ELECTRIC RULE NO. 25 Sheet 1 RELEASE OF CUSTOMER DATA TO THIRD PARTIES

MSATS PROCEDURES: CATS PROCEDURE PRINCIPLES AND OBLIGATIONS

Terms and Conditions of Website Use

GUIDE TO DATA SUBSCRIPTION PROVIDES INSTRUCTIONS FOR USING THE DATA SUBSCRIPTION WEB INTERFACE IN THE EMMS MARKETS PORTAL. Version: 3.

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

TERMS & CONDITIONS. Complied with GDPR rules and regulation CONDITIONS OF USE PROPRIETARY RIGHTS AND ACCEPTABLE USE OF CONTENT

Terms and Conditions for External accounts Service

Supplemental Information

B2B MAPPING TO ASEXML

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)

SEC Appendix AG. Deleted: 0. Draft Version AG 1.1. Appendix AG. Incident Management Policy

Entrust WAP Server Certificate Relying Party Agreement

BCDC 2E, 2012 (On-line Bidding Document for Stipulated Price Bidding)

Schedule Identity Services

Encoo CONNECTIVITY SERVICE LEVEL AGREEMENT. Ground Floor, 15 Queen St, Melbourne, VIC, 3000 Tel: (03) FAX: (03)

IP WAN SERVICE SCHEDULE

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TERMS AND CONDITIONS

ABOUT THIS SECTION...

Uncontrolled document when printed. Large Customer Connection Manual

Installing Your Microsoft Access Database (Manual Installation Instructions)

HUTCHISON GLOBAL COMMUNICATIONS LIMITED IBIZCLOUD SERVICE SERVICE LEVEL AGREEMENT (SLA)

MMS DATA SUBSCRIPTION SERVICES USER INTERFACE GUIDE

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281

PRC Coordination of Protection Systems for Performance During Faults

OCTOSHAPE SDK AND CLIENT LICENSE AGREEMENT (SCLA)

CALSTRS ONLINE AGREEMENT TERMS AND CONDITIONS

Guideline for the Connection of Micro Embedded Generators to the TasNetworks Distribution Network

Standard Development Timeline

Terms Of Use AGREEMENT BETWEEN USER AND DRAKE MODIFICATION OF THESE TERMS OF USE LINKS TO THIRD PARTY WEB SITES USE OF COOKIES

Birmingham Midshires - Terms and Conditions Mortgage Intermediaries On-line Terms of Use (June 2017)

Service Schedule BT Web Starter

Declaration. [To be made by organizations seeking from APNIC a change of registration details or a new maintainer object password]

Entrust SSL Web Server Certificate Subscription Agreement

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

WSAA PRODUCT APPRAISAL CERTIFICATE

NEM 12&13 FILE FORMAT CLARIFICATIONS

CHAPTER 11 HOW TO ENHANCE THE RELIABILITY & POWER QUALITY OF ELECTRICITY SUPPLY

Therapy Provider Portal. User Guide

"PPS" is Private Practice Software as developed and produced by Rushcliff Ltd.

GDPR Processor Security Controls. GDPR Toolkit Version 1 Datagator Ltd

User Terms of Service

Terms and Conditions 01 January 2016

Appendix I: LOAD OPERATING AGREEMENT

First Federal Savings Bank of Mascoutah, IL Agreement and Disclosures

TERMS & CONDITIONS PLEASE READ THESE TERMS AND CONDITIONS CAREFULLY BEFORE USING THE SITE

OCR Interchange Service Agreement

Support Policy and Service Level Commitment

Release Information. Revision History. Version: build 018 Release Date: 23 rd November 2011

Schedule document N4MDM. PUBLIC Node4 limited 31/11/2018. Node4 Limited Millennium Way Pride Park Derby DE24 8HZ

SCHEDULE DOCUMENT N4MDM PUBLIC NODE4 LIMITED 13/07/2017. Node4 Limited Millennium Way Pride Park Derby DE24 8HZ

Submission to the International Integrated Reporting Council regarding the Consultation Draft of the International Integrated Reporting Framework

SSL Certificates Certificate Policy (CP)

Non Profit. For Profitt. Other: Address: Administrative $500 $700 $ 1,000. Technology

SCHEDULE DOCUMENT MANAGED FIREWALL SERVICES PUBLIC NODE4 LIMITED 17/07/2017

Nexgen Australia. Service Level Agreement

Terms and Conditions for MPF e-statement/e-advice Service ( Terms and Conditions )

Historical Reliability Data for IEEE 3006 Standards: Power Systems Reliability

TERMS AND CONDITIONS

Transcription:

Power System Operating Incident Report Trip of Calvale No.2 275kV busbar and Calvale-Halys 8810 and 8811 transmission lines on 30 March 2014 PREPARED BY: Systems Capability DATE: 6 June 2014 STATUS: FINAL

Version Release History VERSION DATE BY CHANGES CHECKED BY AUTHORISED BY 1 6 June 2014 Alanah Makin FINAL S Darnell P Biddle Incident Classifications Time and date and of incident 2136 hrs Sunday 30 March 2014 Region of incident Queensland Affected regions Queensland Event type TT Loss of multiple transmission elements Primary cause TE Transmission Equipment Failure Impact Nil Associated reports N/A Abbreviations Abbreviation AEMO CB CT kv Line 8810 Line 8811 MW NER No. 2 Busbar Term Australian Energy Market Operator Circuit Breaker Current Transformer Kilovolt Calvale - Halys 8810 275 kv transmission line Calvale - Halys 8811 275 kv transmission line Megawatt National Electricity Rules Calvale No.2 275kV Busbar Disclaimer Purpose This report has been prepared by the Australian Energy Market Operator Limited (AEMO) for the sole purpose of meeting obligations in accordance with clause 4.8.15 (c) of the National Electricity Rules (NER). No reliance or warranty This report contains data provided by third parties and might contain conclusions or forecasts and the like that rely on that data. This data might not be free from errors or omissions. While AEMO has used due care and skill, AEMO does not warrant or represent that the data, conclusions, forecasts or other information in this report are accurate, reliable, complete or current or that they are suitable for particular purposes. You should verify and check the accuracy, completeness, reliability and suitability of this report for any use to which you intend to put it, and seek independent expert advice before using it, or any information contained in it. Limitation of liability To the extent permitted by law, AEMO and its advisers, consultants and other contributors to this report (or their respective associated companies, businesses, partners, directors, officers or employees) shall not be liable for any errors, omissions, defects or misrepresentations in the information contained in this report, or for any loss or damage suffered by persons who use or rely on such information (including by reason of negligence, negligent misstatement or otherwise). If any law prohibits the exclusion of such liability, AEMO's liability is limited, at AEMO's option, to the resupply of the information, provided that this limitation is permitted by law and is fair and reasonable. 2014 Australian Energy Market Operator Ltd. All rights reserved 6 June 2014 Page 2 of 7

CONTENTS 1 Introduction... 4 2 The Incident... 4 3 Powerlink Investigation... 4 4 System Diagram... 4 5 Immediate Response... 5 6 Follow-up Response... 6 7 Power System Security... 6 8 Conclusions... 6 9 Pending Actions... 6 10 Recommendations... 6 Appendix 1 Incident Event Log... 7 6 June 2014 Page 3 of 7

1 Introduction This report reviews a power system operating incident that occurred on Sunday 30 March 2014 at Calvale Substation in Queensland. AEMO is required to review this incident as it is classified as a non-credible contingency that satisfies the requirements of a reviewable operating incident under the National Electricity Rules 1. The purpose of this incident review is to assess power system security over the course of the incident. The NER requires AEMO to assess the adequacy of the provision and response of facilities and services and the appropriateness of actions taken to restore or maintain power system security 2. This report is based upon information provided by Powerlink 3 and AEMO. National Electricity Market time (Australian Eastern Standard Time) is used in this report. 2 The Incident On Sunday 30 March 2014, at 2136 hrs, the Calvale No.2 275kV Busbar (No.2 Busbar) tripped due to a fault on a 275 kv current transformer (CT). As a result of the CT fault, the Calvale - Halys 8810 and 8811 275 kv transmission lines also tripped (Line 8810 and Line 8811). During this power system disturbance there was no loss of load or generation. The reason for investigating this incident is that a transmission busbar tripped and two transmission lines tripped at both ends. Generally for a power system fault, just the power system element bearing the fault should trip. Other power system elements should remain connected to the power system. 3 Powerlink Investigation Powerlink investigated this incident and found that an internal high voltage fault on CT at Calvale Substation caused the No. 2 Busbar to trip. The No.2 Busbar and Line 8811 tripped immediately as a result of the failed CT. These trips were expected for this type of event. The failed CT was associated with the 275kV CB 88112 at Calvale substation. The CT supplied the protection systems for both the No.2 Busbar and the Line 8811. Line 8810 tripped three seconds after the CT fault. The trip was due to a high voltage fault on Line 8810 caused by ionised air particles as a result of the CT failure. Powerlink found that protection systems for No.2 busbar and Lines 8810 and 8811 operated correctly, and in accordance with the NER, for this type of event. Powerlink removed the failed CT from the power system, and by 2323 hrs on the same day had returned Lines 8810 and 8811 to service. Powerlink has yet to identify the cause of the CT failure. The investigation is expected to be complete by the end of July 2014. The investigation is necessary to identify if this type of CT has a systemic problem. If the CT has a systemic problem, then remedial work on similar CTs may be required to maintain power system security. 4 System Diagram Figure 1 shows the status of the power system at Calvale substation after the incident. The diagram shows the circuit breakers (CBs) that opened as a result of the incident. 1 NER Clause 4.8.15(a)(1)(i) and AEMC Reliability Panel Guidelines for Identifying Reviewable Operating Incidents. 2 NER Clause 4.8.15 (b) 3 Powerlink is the Transmission Network Service Provider in Queensland region 6 June 2014 Page 4 of 7

Figure 1 - Status of the power system immediately after the incident Stanwell 855 Stanwell 8873 Stanwell 8874 Callide B PS 851 Callide B PS 852 Callide C PS 853 Callide C PS 854 Line deloaded prior to incident 1 8552 88732 88742 8512 8522 8532 8542 CALVALE 5012 5022 5032 5042 5052 5062 5072 5412 5422 8712 88102 88112 Failed CT 2 88102/1 88112/1 2T Wurdong 871 Callide A T022 8810 8811 CB Reclosed Closed CB Open CB 88102 88112 275 kv Busbar, line HALYS (Part) 5072 5062 Busbar, line out of service 88712 88702 275 / 132 kv Transformer Reactor Tarong 8871 Tarong 8870 5 Immediate Response This section assess the immediate response to the incident. Immediately after the incident the power system was in a secure state 4. To maintain an ongoing secure state AEMO invoked constraint set Q-HACL 5 approximately 9 minutes after the CT fault. This constraint set alone however was not sufficient to ensure power system security whilst both 8810 and 8811 lines were out of service. Constraint set Q-HACL is designed for a single line outage. If the power system had progressed to an insecure state then AEMO would have invoked additional constraints. Once Line 8810 had returned to service (11 minutes after the CT fault) constraint set Q_HACL was sufficient to ensure the power system was in a secure state. No further immediate actions were required. 4 AEMO is required to return the power system to a secure state within thirty minutes following a contingency event - NER Clause 4.2.6 (b) 5 Constraint set Q-HACL constrains the power system for an outage of either Line 8810 or Line 8811 6 June 2014 Page 5 of 7

6 Follow-up Response This section assess the follow-up response to resolve the incident. AEMO issued Market Notice 45480 at 2201 hrs approximately 25 minutes after the incident to notify the market of the non-credible contingency event. This notification was within two hours of the event in which AEMO is required to notify the market of a non-credible contingency event 6. Powerlink isolated the failed CT and then returned No. 2 Busbar and Lines 8810 and 8811 to service. This was complete by 2323 hrs on the same day. The isolation of the failed CT does not impact other protection systems whilst CB 88112 is open. CB 88112 will remain open until the failed CT is replaced. AEMO issued Market Notice 45483 at 2329 hrs to notify the market that the incident would not be reclassified as a credible contingency 7. AEMO considered that the root cause of the incident had been identified and isolated, and that the incident was unlikely to reoccur. 7 Power System Security This section assesses how power system security was managed over the course of the incident 8. See Appendix 1 for a chronological log of events comprising the incident. The power system was in a secure state over the course of the incident - power system frequency, and voltage remained within limits - and the fault was cleared within required timeframes. AEMO issued appropriate notifications, and correctly assessed the incident by not reclassifying the incident as a credible contingency. Over the course of the incident the provision and response of facilities and services were adequate to maintain power system security. 8 Conclusions 1. No. 2 Busbar and Line 8811 tripped due to a high voltage fault in a CT. 2. Line 8810 tripped due to ionised air particles as a result of the CT fault. 3. Power system security was maintained over the course of the incident. 9 Pending Actions Powerlink to complete an investigation into the cause of the CT fault. The investigation is expected to be complete by the end of July 2014. Powerlink will provide results of the investigation to AEMO. 10 Recommendations There are no recommendations arising from this review 6 AEMO is required to notify the Market of a non-credible contingency event within two hours of the event - AEMO, Power System Security Guidelines, Section 10.3. 7 For a non-credible contingency event AEMO is required to assess whether or not to reclassify a non-credible contingency event as a credible contingency (NER Clause 4.2.3A (c)) and to report how re-classification criteria were applied NER Clause 4.8.15 (ca). AEMO has to determine if the condition that caused the non-credible contingency event has been resolved. 8 AEMO is responsible for power system security in the NEM and is required to operate the power system in a secure operating state (NER Clause 4.2.4 (a)). AEMO must thereby ensure that the power system is maintained in, or returned to, a secure operating state following a contingency event. 6 June 2014 Page 6 of 7

Appendix 1 Incident Event Log The sequence of events comprising the incident are itemised in Table 1. Table 1 Event Log Time and Date Event 2136 hrs 30 March 2014 No.2 Busbar and Line 8811tripped. Line 8810 tripped 3 seconds later. 2136 hrs 30 March 2014 Line 8811 auto-reclosed and tripped again to lockout. 2136 hrs 30 March 2014 Line 8810 successfully auto-reclosed at Halys end only. 2145 hrs 30 March 2014 AEMO invoked Constraint set Q-HACL. 2147 hrs 30 March 2014 Line 8810 returned to service. CB 5062 manually closed at Calvale substation. 2201 hrs 30 March 2014 AEMO issued Market Notice 45480. Notification of the non-credible event and that Line 8810 had been returned to service. 2208 hrs 30 March 2014 AEMO issued Market Notice 45481. Notification that constraint set Q-HACL has been invoked. 2212 hrs 30 March 2014 AEMO issued Market Notice 45482. Notification that Line 8811 remains out of service. 2212 hrs 30 March 2014 Powerlink isolated the failed CT from the power system. 2319 hrs 30 March 2014 Powerlink returned Line 8811 to service. 2323 hrs 30 March 2014 Powerlink returned No.2 Busbar returned to service. 2325 hrs 30 March 2014 AEMO revoked constraint set Q-HACL. 2329 hrs 30 March 2014 AEMO issued Market Notice 45483. Notification that No.2 busbar, Line 8810 and Line 8811 have been returned to service, and that AEMO did not reclassify this event as a credible contingency. 2350 hrs 30 March 2014 AEMO issued Market Notice 45484. Notification of the likely cause of the non-credible contingency. At this time AEMO thought lightning was the cause of the incident. 9 1542 hrs 31 March 2014 AEMO issued Market Notice 45486. Notification that the trip of Lines 8810 and 8811 were not simultaneous and that the trips were caused by equipment damage at Calvale substation. 9 At the time of issuing Market Notice 45484 AEMO believed that the cause of the incident was a lightning strike. Later Powerlink identified that the trip of the busbar and lines were related to a CT fault. 6 June 2014 Page 7 of 7