Mechanical Installation Recommended Tools for MP200 Unit Installation: #2 Phillips screwdriver; 1/4-inch (0.250 ) nut driver, socket, box, or open-end wrench; wire cutters. OTE: The MP200 unit is designed to withstand harsh environmental conditions; however it is recommended you install it in a dry location, free from dirt and corrosive substances. 7.60in 3.03in 193.1mm 76.9mm 0.19in 4.8mm 0.80in 20.4mm 4.50in 114.3mm 0.12in centered 2.9mm 10.98in 278.9mm centered 11.28in 286.5mm 0.28in 7.2mm 1. Mount the unit against any firm, flat surface. 2. Use a #8 screw in each of the four slots on the flange to ensure that the MP200 unit is installed securely. IMPORTAT! For safety reasons, mount the MP200 unit in an enclosed and protected environment, such as in a switchgear cabinet. Connect an earth ground to the post on the side of the MP200 unit, using an AWG 12 wire. Install a switch or circuit breaker nearby; label it clearly as the MP200 unit s disconnecting mechanism. 0.81in 20.5mm 3.18in 80.6mm 7.62in 193.5mm 4.36in 110.6mm Doc# E166705 V.1.02 QS - 1
Electrical Installation: WARIGS! For Electrical Installation: All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid contact with any current-carrying surfaces. The current inputs are only to be connected to external current transfomers (CTs). SERVICES: WYE, 4 WIRE. COECTIO TYPE: Direct Voltage, CTs 3 1 2 LIE V3 V2 V1 CT Shorting Block EI# SB-6CT I1-LO I1-HI I2-LO I2-HI I3-LO I3-HI Only one 3 phase circuit is shown. Duplicate for additional circuits. V3 FUSES 3 x 0.1A V2 V1 FUSE 3A L(+) (-) Power Supply Connection LOAD Service: Three Phase, 4-Wire WYE Service Direct Voltage and 3 CT Connection for Metering 8 Three Phase Loads: MP200-Y IMPORTAT! All CTs must have one side grounded to reduce shock hazard. EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com. Doc# E166705 V.1.02 QS - 2
SERVICES: WYE, 4 WIRE. 3 COECTIO TYPE: 3PTs, CTs 1 2 LIE V3 V2 V1 CT Shorting Block EI# SB-6CT I1-LO I1-HI I2-LO I2-HI I3-LO I3-HI Only one 3 phase circuit is shown. Duplicate for additional circuits. V3 FUSES 3 x 0.1A V2 V1 FUSE 3A L(+) (-) Power Supply Connection LOAD Service: Three Phase, 4-Wire WYE Service with 3 PT Voltage and 3 CT Connection for Metering 8 Three Phase Loads - MP200-Y IMPORTAT! All CTs must have one side grounded to reduce shock hazard. EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com. Doc# E166705 V.1.02 QS - 3
SERVICES: SIGLE PHASE, 2-WIRE COECTIO TYPE: Direct Voltage, CTs 1 LIE VL CT Shorting Block EI# SB-6CT I1-LO I1-HI I2-LO I2-HI I3-LO I3-HI Only three circuits are shown. Duplicate for additional circuits. VL Short Voltage inputs together FUSE 3A L(+) (-) Power Supply Connection LOADS Single Phase, 2-Wire Service with Direct Voltage and 1 CT Connection for Metering 24 Single Phase Loads: MP200-S IMPORTAT! All CTs must have one side grounded to reduce shock hazard. EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com. Doc# E166705 V.1.02 QS - 4
SERVICE: SIGLE PHASE, 3-WIRE COECTIO TYPE: Direct Voltage, CTs To monitor 24 individual loads. See accuracy table for limiting factors. 2 1 LIE VL1 VL2 CT Shorting Block EI# SB-6CT Run lines VL1 and VL2 through the CT in opposite directions Set PT ratio to half in the meter. VL2 VL1 I1-LO I1-HI I2-LO I2-HI I3-LO I3-HI Only one circuit is shown. Duplicate for additional circuits. VL1 FUSES 2 x 0.1A Short Voltage inputs together FUSE 3A VL2 L(+) (-) Power Supply Connection LOADS Service: Single Phase, 3-Wire Service with Direct Voltage and 1 CT Connection for Metering 24 Single Phase Loads - MP200-S IMPORTAT! All CTs must have one side grounded to reduce shock hazard. EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com. Doc# E166705 V.1.02 QS - 5
MP200 Metering System Configuration: 1. Connect to the MP200 unit through its USB port: Use a USB Type A to B plug to connect from your PC s USB port to the MP200 unit s USB port. If your PC doesn t automatically find the USB driver, download it from the product CD that came with the MP200 unit (see Appendix A in the MP200 USB Port Metering System Installation and Operation Manual on the CD). OTE: This Quickstart shows connection using the USB port. For Ethernet/Wifi or RS485 connection, see the MP200 Metering System Installation and Operation Manual. 2. Open Communicator EXT TM software (download from product CD). 3. Click Connect on the tool bar. You will see the Connect screen, shown on the right. Make sure the Address, Baud Rate, and Protocol settings match the ones here. 4. Click Connect - the Device Status screen confirms the connection; then click OK - the Communicator EXT TM application s main screen opens. Configuration Steps: 6. Click the Profile button on the tool bar. The Device Profile screen opens. The Tree menu on the left side of the screen lets you choose setting screens. 7. Click System Settings to open one of the screens shown below. Use this screen to name the MP200 unit (CPU) and to label the circuits (individual meters). You must give the MP200 CPU an individual, unique name to properly download data to the database. Doc# E166705 V.1.02 QS - 6
8. Click Communications (see instructions below). 9. Click CT, PT Ratios and System Hookup (see instructions below). Communications Settings: COM 1: RS485/ Ethernet/WIFI (optional) Address: 1-247; Baud Rate: 57600; Protocol: Modbus RTU/Modbus ASCII; Response Delay: 0-750ms; Parity: Odd, Even or one COM 2: USB port OTE: The USB port settings are fixed. COM 3: RS485 Address: 1-247; Protocol: Modbus RTU/ASCII Baud Rate: 9600, 19200, 38400, 57600 Response Delay: 0-750ms OTE: Click the (1)Default to Ethernet or (2)Default to Display button to set either the (1)Ethernet settings for COM1 or (2)Display settings for COM3, to their default values. CT, PT Ratios and System Hookup: ote that the settings you see on the screen depend on your MP200 unit s circuit configuration. The top screen is for an MP200 unit with the single phase circuit configuration (MP200-S). The bottom screen is for an MP200 unit with the three phase circuit configuration (MP200-Y). For PT settings, see the MP200 Metering System Installation and Operation manual, on the enclosed CD. The CT settings are: CT Ratios CT umerator (Primary): 1-65535 CT Denominator (Secondary): 5 or 1 Amp, depending on the MP200 unit s ordered option (this field is display only). Update Device: 10. When changes are complete, click the Update button to send a new profile to the MP200 unit. 11. Click Cancel to Exit the screen. OTE: For further details and additional programming screens, refer to the Communicator EXT TM 3.0 Software User Manual on the enclosed CD (access the software manual by clicking Help>Contents from the Communicator EXT TM application s Title bar). Communicator EXT is a trademark of. Doc# E166705 V.1.02 QS - 7