Feedback WG BG Meetings 4/9

Similar documents
WG Belgian Grid. WG Belgian Grid 19/06/2017

An Introduction to Network Codes & The Links Between Codes

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

Grid Code Planner EU Code Modifications GC0100/101/102/104

Network Code on Operational Security. User s Group System Operations 06/11/2013

Implementation Network Codes. WG Belgian Grid 26 October 2016

European Network Codes: RfG GB Grid Code Application Options

Annual Industry Consultation

Connection & Compliance processes

WORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

Task Force icaros. Integrated Coordination of Assets for Redispatching and Operational Security. Meeting 5 November 21, Elia

European Developments

European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

Much more than Rules need to be in place by 2014

ANNUAL WORK PROGRAMME 2018 VERSION FOR PUBLIC CONSULTATION

ENTSO-E working to fulfill the 3 rd Package

National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010

SESAR Deployment and upcoming CEF Transport Calls ANS Consultative Board. Helsinki, 12 October 2015

All-island European Stakeholder Forum. 22 September 2016 Dublin

ENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper

Data Exchange & Switching

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14

MISO PJM Joint and Common Market Cross Border Transmission Planning

Protocol Governance Committee Meeting #19 28/06/ h00 Summary Minutes

Deliverable No. 6.3 E-newsletter 2

Joint European Stakeholder Group

ENTSO-E WORK PROGRAMME

GC0104:EU Connection Codes GB Implementation Demand Connection Code

SME License Order Working Group Update - Webinar #3 Call in number:

BCI Principles & Criteria: Revision

The EU OPEN meter project

Plan Management Stakeholder Committee April 6, 2017

Network Codes, Governance and Regulatory issues for the Transition towards up to 100% RES

ENISA S WORK ON ICS AND SMART GRID SECURITY

Privacy Code of Conduct on mhealth apps the role of soft-law in enhancing trust ehealth Week 2016

Joint European Standing Group (JESG)

Standards of Practice Committee (SoPC) Guidelines

The latest update of power market in Latvia

The Road to Paris. Towards the 2015 Climate Agreement

ENTSO-E Requirements for Generators Network Code: GB Stakeholder s Key Issues. Feedback to JESG Garth Graham (SSE) 16 August

The European Single Electronic Format (ESEF)

Stakeholder consultation process and online consultation platform

INSPIRE status report

D3.1 Validation workshops Workplan v.0

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017

New Concept for Article 36 Networking and Management of the List

Joint European Standing Group (JESG)

PSUR Repository Implementation Plan

Overview of OGC Document Types

Agenda and General Information

Important information about the transition phase between the 3 BG model and the 1 BG model and use of the customer portal for balance groups:

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM

ENISA s Position on the NIS Directive

ESMA REGULAR USE. 30 May The European Single Electronic Format (ESEF) XBRL Europe Day. Anna Sciortino

Executive Committee Meeting

BEREC Public debriefing

Welcome Membership Update Sub-group / Initiatives update Investigator TMF Clarifications Sub-artifacts Observational Studies Exchange Mechanism

European Transport Policy: ITS in action ITS Action Plan Directive 2010/40/EU

CORE Voluntary Certification: Certification from the Testing Vendor s Perspective. February 18, :00 3:00pm ET

ARISE + IPR. Ignacio de Medrano Caballero HIPOC meeting Tokyo, 19-20/02/2018

Smart Metering Forum: The DCC Roadmap. Chris Rowell 30 November 2011

Business Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS)

SLHC-PP DELIVERABLE REPORT EU DELIVERABLE: Document identifier: SLHC-PP-D v1.1. End of Month 03 (June 2008) 30/06/2008

FP7 Information & Communication Technologies. Rules of the Programme

Client Services Procedure Manual

National Smart Metering Program Testing Framework Work Stream Actions Log

Embracing Competition Stakeholder Engagement Workshop no May 2018

Submission. to the. Australian Communications and Media Authority. on the. Planning for mobile broadband within the 1.

APACMed Workshop Update on UDI Implementation & ASPAC Regional Trend. Victoria Qu Sept. 22 nd, 2017

Improving the sampling standard and guidelines

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit

Welcome to today s Webcast. Thank you so much for joining us today!

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017

2008 E-customs progress report

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

Agenda and General Information

Status update on REMIT implementation

RTP Media Congestion Avoidance Techniques (rmcat)

Report from UN-GGIM: Europe A year in review

Terms of Reference (ToR) for ICAT support to MRV in the Energy Sector in Kenya

Standardization mandate addressed to CEN, CENELEC and ETSI in the field of Information Society Standardization

Key Items: - Customer Premises Cabling - 1 ISO/IEC SC25/WG3 Meeting Singapore: January 2017

Agenda and General Information

ENTSOG update and view on Germany

Test Strategy for the June 11 BSC Systems Release

Design and Implementation of Modern Programming Languages (Seminar)

IGO/INGO Identifiers Protection Policy Implementation. Meeting with the IRT 9 March 2016

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

The Agency s Work Programme Outline for 2016

13543/17 PhL/at 1 DG G 3 B

European Single Electronic Format (ESEF) Eurofiling workshop 8 June 2017

IEEE Liaison report (Oct ) T v000 Tom Palkert, Macom

Proposal for an IEEE 802 EC Privacy Recommendation Study Group. 18 th of July 2014

The Research Data Alliance (RDA): building global data connections CC BY-SA 4.0

e-submission Quick Reference Guide for Economic Operators

Registration closed circuit

Transcription:

Feedback WG BG Meetings 4/9 Verwarrend: Users Group 21/9/2017 David Zenner

Implementation Network Codes: status update 2

Network Code Status Best guess(!) for entry into force Market codes: Status NC adoption Summary = changes since last plenary Users Group meeting Capacity Allocation and Congestion Management (CACM) Entered into force 14/08/2015 Forward Capacity Allocation (FCA) Entered into force 16/10/2016 Electricity balancing (EB) Approved in Comitology (16/03/2017) Q4 2017 Connection codes: Requirements for generators (RfG) Entered into force 17/05/2016 Demand Connection Code (DCC) Entered into force 07/09/2016 HVDC (HVDC) Entered into force 28/09/2016 Operational codes: Operational Security (OS) Merged in one guideline Operational Planning & Scheduling (OPS) Published in the Official Journal of the EU (25/08/2017) 14/09/2017 Load Frequency Control & Reserve (LFCR) Emergency & Restoration (E&R) Approved in Comitology (24/10/2016) November 2017 3

Indicative planning and agenda workshops with focus on Federal Grid Code and general requirements Task Force Implementation Network Codes has ended. 4 dedicated workshops for discussing: Federal Grid Code impact and amendment proposals Progress on general requirements All interested parties are welcome. All workshop material distributed prior to the workshop allowing preparation by all parties + everything will be published on elia.be Workshop 1 22/9/2017 Workshop 2 23/11/2017 Workshop 4 7/2/2018 Public consultation limits ABCD 19/5/2017 20/6/2017 Workshop 3 18/12/2017 Public consultation FTR and Gen Req. 3/2018 4/2018 mei jul sep nov 2018 mrt mei 2018 19/6/2017 WG BG 04/9/2017 WG BG 07/11/2017 WG BG Normal WG BG meetings Normal WG Bal meetings Normal WG EMD/SO meetings 17/5/2018 Submission: FTR proposal general req. ABCD proposal The normal UG Working Groups can work in support of the FTR workshops, e.g. for discussing topics for which it is too early to discuss concrete amendment proposals (e.g. non-nc wish-list ). 4

Network Code content on Elia website Publications Public consultation Public consultation webpage relating to the proposal for maximum capacity thresholds for types B, C and D powergenerating modules containing: Consultation document (consultation ran from 19 May till 20 June) Consultation report Original stakeholder feedback received EU NC publications Publication of all terms and conditions or proposals, established (partly) by Elia as part of the EU network codes An overview of the documents that will be published in the future (including estimated publication date), will be added soon The publication of these documents is a NC requirement WG Belgian Grid Task Force Implementation NC Presentations, minutes and documentation of the Task Force that started in 2015 and continued till the end of Q1 2017 Structured per topic (e.g. Significant Grid Users) Overview of all Task Force sessions that have taken place Workshops 'Federal Grid Code and General Requirements' Presentations, minutes and documentation of the stakeholder workshops that will soon take place (cfr. previous slide) Implementation EU Network Code General information on the EU Network Codes Status on the adoption and description of the content of each Network Code Information on the Task Force Implementation NC and on the stakeholder workshops In addition, ENTSO-E launched a new Network Codes webpage with all information about codes, timelines, implementation projects, upcoming consultations, latest news, etc. ENTSO-E link 5

Elia Publications Public Consultation Archive Proposal for maximum capacity thresholds 6

Elia Publications Public Consultation Archive Proposal for maximum capacity thresholds 7

Elia Publications EU Network Codes 8

Elia Publications EU Network Codes 9

Users Group WG Belgian Grid Task Force Implementation NC No more Agenda 10

Users Group WG Belgian Grid Task Force Implementation NC No more agenda but, per topic, list of the meetings occured 11

Users Group WG Belgian Grid Task Force Implementation NC Topics : the place to find the whole set of documentation on a topic 12

Users Group WG Belgian Grid Workshops Federal Grod Code and General Requirements New page 13

Users Group Implementation EU Network Codes 14

European Network Codes Implementation of Topic Modernization Presented on WG BG 04/09/2017 Requirements for Generators: Modernisation based on power and functional blocks Demand: Modernisation based on power put at disposal and functional blocks For the global presentation : Substantial modernisation : Presentation Next steps: RfG: present case by case examples DCC: Prepare new proposal no use of notion PPAD FTR: * Insert concept of modernization in the current existing process for connection => to be presented in Workshop n 3 * Incorporate general philosophy and way to handle cases (potentially including thresholds) * Define notion of full/partial compliance 15

European Network Codes Implementation of Topic Compliance simulation and testing Presented on BG 04/09/2017 Requirements for Generators: Simulations: Process currently already implemented, finetuning necessary Testing: To develop Demand: Simulations: Testing: currently not applicable, incorporate in existing process. To develop For the global presentation : Compliance - Testing : Presentation Next steps: RfG + DCC: elaborate on the proposed process summarize demanded tests and simulations FTR:insert required element for compliance and testing in the current existing process for connection => to be presented in Workshop n 3 16

To set a framework for the federal CDS Approval of the Position Paper «Aanbevelingen betreffende de vast te stellen regels voor de gesloten distributienetten in het Technisch Federaal Reglement» 17

Objective of the Position Paper To have a common understanding within Users Group of the necessary rules constituting a federal framework for CDS To guide drafting work for modifications in federal grid code regarding CDS: Not yet detailed rules (see next steps) Guidelines for developing a coherent set of rules at federal level, taken into account fact that CDS grids are mostly mix (they are situated at F & R levels) New title for CDS in the Federal Grid Code, based on existing rules (PVNTR, Appendix 14 of Elia access contract, current practices of existing CDS) Not covering the (connection) NCs elements related to the CDS Position Paper CDS Users Group 21/9//2017 18

The Proposal of Position Paper in a nutshet Description of current situation and gap analysis of the reglementation => general proposal of the UG How to develop a coherent set of rules at federal level, taken into account fact that CDS grids are at F & R levels Proposal for differentiated application of the rules (3 steps): CDS is considered as a grid user if no TPA /flexibility activation New set of rules to be added in federal grid code: list of topics to be covered Heart of the Position Paper Proposal to integrate all rules spread in TRPVN in one unique chapter Specific rules for the Tractienet spoor Position Paper CDS Users Group 21/9//2017 19

Next steps for implementing the federal CDS rules 21/9: validation of final version Position Paper CDS at plenary meeting Users Group 7/11: presentation of a global proposal for new Title CDS in WG BG 9/11: send track-changes regarding the proposal to Users Group (2 weeks before the 2 nd Workshop on Federal Grid Code) 23/11: 2 nd Workshop on Federal Grid Code : discussion & feedback on proposal for Title CDS 7/2/2018: 4rd Workshop on Federal Grid Code : finalisation of the proposal for Title CDS Position Paper CDS Users Group 21/9//2017 20