Feedback WG BG Meetings 4/9 Verwarrend: Users Group 21/9/2017 David Zenner
Implementation Network Codes: status update 2
Network Code Status Best guess(!) for entry into force Market codes: Status NC adoption Summary = changes since last plenary Users Group meeting Capacity Allocation and Congestion Management (CACM) Entered into force 14/08/2015 Forward Capacity Allocation (FCA) Entered into force 16/10/2016 Electricity balancing (EB) Approved in Comitology (16/03/2017) Q4 2017 Connection codes: Requirements for generators (RfG) Entered into force 17/05/2016 Demand Connection Code (DCC) Entered into force 07/09/2016 HVDC (HVDC) Entered into force 28/09/2016 Operational codes: Operational Security (OS) Merged in one guideline Operational Planning & Scheduling (OPS) Published in the Official Journal of the EU (25/08/2017) 14/09/2017 Load Frequency Control & Reserve (LFCR) Emergency & Restoration (E&R) Approved in Comitology (24/10/2016) November 2017 3
Indicative planning and agenda workshops with focus on Federal Grid Code and general requirements Task Force Implementation Network Codes has ended. 4 dedicated workshops for discussing: Federal Grid Code impact and amendment proposals Progress on general requirements All interested parties are welcome. All workshop material distributed prior to the workshop allowing preparation by all parties + everything will be published on elia.be Workshop 1 22/9/2017 Workshop 2 23/11/2017 Workshop 4 7/2/2018 Public consultation limits ABCD 19/5/2017 20/6/2017 Workshop 3 18/12/2017 Public consultation FTR and Gen Req. 3/2018 4/2018 mei jul sep nov 2018 mrt mei 2018 19/6/2017 WG BG 04/9/2017 WG BG 07/11/2017 WG BG Normal WG BG meetings Normal WG Bal meetings Normal WG EMD/SO meetings 17/5/2018 Submission: FTR proposal general req. ABCD proposal The normal UG Working Groups can work in support of the FTR workshops, e.g. for discussing topics for which it is too early to discuss concrete amendment proposals (e.g. non-nc wish-list ). 4
Network Code content on Elia website Publications Public consultation Public consultation webpage relating to the proposal for maximum capacity thresholds for types B, C and D powergenerating modules containing: Consultation document (consultation ran from 19 May till 20 June) Consultation report Original stakeholder feedback received EU NC publications Publication of all terms and conditions or proposals, established (partly) by Elia as part of the EU network codes An overview of the documents that will be published in the future (including estimated publication date), will be added soon The publication of these documents is a NC requirement WG Belgian Grid Task Force Implementation NC Presentations, minutes and documentation of the Task Force that started in 2015 and continued till the end of Q1 2017 Structured per topic (e.g. Significant Grid Users) Overview of all Task Force sessions that have taken place Workshops 'Federal Grid Code and General Requirements' Presentations, minutes and documentation of the stakeholder workshops that will soon take place (cfr. previous slide) Implementation EU Network Code General information on the EU Network Codes Status on the adoption and description of the content of each Network Code Information on the Task Force Implementation NC and on the stakeholder workshops In addition, ENTSO-E launched a new Network Codes webpage with all information about codes, timelines, implementation projects, upcoming consultations, latest news, etc. ENTSO-E link 5
Elia Publications Public Consultation Archive Proposal for maximum capacity thresholds 6
Elia Publications Public Consultation Archive Proposal for maximum capacity thresholds 7
Elia Publications EU Network Codes 8
Elia Publications EU Network Codes 9
Users Group WG Belgian Grid Task Force Implementation NC No more Agenda 10
Users Group WG Belgian Grid Task Force Implementation NC No more agenda but, per topic, list of the meetings occured 11
Users Group WG Belgian Grid Task Force Implementation NC Topics : the place to find the whole set of documentation on a topic 12
Users Group WG Belgian Grid Workshops Federal Grod Code and General Requirements New page 13
Users Group Implementation EU Network Codes 14
European Network Codes Implementation of Topic Modernization Presented on WG BG 04/09/2017 Requirements for Generators: Modernisation based on power and functional blocks Demand: Modernisation based on power put at disposal and functional blocks For the global presentation : Substantial modernisation : Presentation Next steps: RfG: present case by case examples DCC: Prepare new proposal no use of notion PPAD FTR: * Insert concept of modernization in the current existing process for connection => to be presented in Workshop n 3 * Incorporate general philosophy and way to handle cases (potentially including thresholds) * Define notion of full/partial compliance 15
European Network Codes Implementation of Topic Compliance simulation and testing Presented on BG 04/09/2017 Requirements for Generators: Simulations: Process currently already implemented, finetuning necessary Testing: To develop Demand: Simulations: Testing: currently not applicable, incorporate in existing process. To develop For the global presentation : Compliance - Testing : Presentation Next steps: RfG + DCC: elaborate on the proposed process summarize demanded tests and simulations FTR:insert required element for compliance and testing in the current existing process for connection => to be presented in Workshop n 3 16
To set a framework for the federal CDS Approval of the Position Paper «Aanbevelingen betreffende de vast te stellen regels voor de gesloten distributienetten in het Technisch Federaal Reglement» 17
Objective of the Position Paper To have a common understanding within Users Group of the necessary rules constituting a federal framework for CDS To guide drafting work for modifications in federal grid code regarding CDS: Not yet detailed rules (see next steps) Guidelines for developing a coherent set of rules at federal level, taken into account fact that CDS grids are mostly mix (they are situated at F & R levels) New title for CDS in the Federal Grid Code, based on existing rules (PVNTR, Appendix 14 of Elia access contract, current practices of existing CDS) Not covering the (connection) NCs elements related to the CDS Position Paper CDS Users Group 21/9//2017 18
The Proposal of Position Paper in a nutshet Description of current situation and gap analysis of the reglementation => general proposal of the UG How to develop a coherent set of rules at federal level, taken into account fact that CDS grids are at F & R levels Proposal for differentiated application of the rules (3 steps): CDS is considered as a grid user if no TPA /flexibility activation New set of rules to be added in federal grid code: list of topics to be covered Heart of the Position Paper Proposal to integrate all rules spread in TRPVN in one unique chapter Specific rules for the Tractienet spoor Position Paper CDS Users Group 21/9//2017 19
Next steps for implementing the federal CDS rules 21/9: validation of final version Position Paper CDS at plenary meeting Users Group 7/11: presentation of a global proposal for new Title CDS in WG BG 9/11: send track-changes regarding the proposal to Users Group (2 weeks before the 2 nd Workshop on Federal Grid Code) 23/11: 2 nd Workshop on Federal Grid Code : discussion & feedback on proposal for Title CDS 7/2/2018: 4rd Workshop on Federal Grid Code : finalisation of the proposal for Title CDS Position Paper CDS Users Group 21/9//2017 20