Guilin, China September 9, GPP2 TSG-SX. Meeting Summary #2 Miami, Florida

Similar documents
Miami, Florida June 3, GPP2 TSG-SX. Meeting Summary #1 Busan, Korea

3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington

TSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Meeting Summary Orlando, FL USA

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA

3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Meeting Summary Wailea, HI

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China

July 2004 TSG-X Meeting Summary

Abstract: This document is a summary of the 3GPP2 TSG-S meetings that were held during the period of 6-9 February 2012.

Title: Source: Abstract: Recommendation: Notice: Page 1. APPROVED SUMMARY OF 3GPP2 TSG-C MEETINGS for 5 October 2004 Interim Plenary Conference Call

APPROVED SUMMARY OF TSG-S MEETING for September 2006 in Xi an, China

APPROVED SUMMARY OF TSG-S MEETING for February 2006 in Jeju, Korea

3GPP2 Access Network Interfaces TSG (TSG-A) #39 Draft Meeting minutes

APPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call

APPROVED SUMMARY OF 3GPP2 TSG-C MEETING for 28 December 2001 conference call.

3GPP2 Access Network Interfaces TSG (TSG-A) #69 Meeting Summary

TSG-S Meeting Summary: July Seoul, Korea Page 1. APPROVED SUMMARY OF TSG-S MEETING for the period of July 2001 in Seoul, Korea.

Summary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China

3GPP2 Access Network Interfaces TSG (TSG-A) #24 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #30 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #25 Draft Meeting minutes

3GPP2 From Geneva to San Francisco. Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee

3GPP Work Item Description. Title: Study on Licensed-Assisted Access using LTE

DRAFT SUMMARY OF 3GPP2 TSG-C MEETINGS for 8-12 July 2002 in San Diego, CA (USA)

DEVICE TESTING AND CERTIFICATION LIFE CYCLE

3GPP Work Item Description. Title: Study on Indoor Positioning Enhancements for UTRA and LTE

Partnership. Organizational Partners (SDOs) Market Representative Partners. Regional standards organizations:

ESN Migration to MEID - Milestones & Timeline

Big Data for Smart Cities Connected Vehicles in the Wireless World

3GPP2 Overview. Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom

Mar 3,2005 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE

5G Standards and Progress

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

3GPP Contribution Analysis Who Leads the Mobile Infrastructure Race?

November 2013 IEEE 802.3

Towards 5G NR Commercialization

Proposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC

ISO/IEC JTC1/SC7 /N3945

IEEE Working Group Opening Plenary 9 th July 2018

ETSI TS V9.0.0 ( ) Technical Specification

cdma2000 Technology Initiative

System Release 4 Standardized Services and Features

802.1 Activities & status

UMTS. Quality of Service

Progress report on 3GPP. 3GPP UE IMS CC Conformance Testing and TTCN3. Shicheng Hu. 31 May 2 June 2006 Berlin Germany T3UC#3

Nomor 3GPP Newsletter March 2008 Major decisions within 3GPP RAN

IEEE 802 EC 5G / IMT-2020 standing committee

ETSI/TC/SMG#16 Tdoc List

IEEE 802 EC ITU standing committee

UNITED STATES PATENT AND TRADEMARK OFFICE BEFORE THE PATENT TRIAL AND APPEAL BOARD

Second Global 5G Event 3GPP s flexible 5G system architecture

Approved by General Counsel. TR-34.1 Meeting Report Date(s): 04/01/ /01/2010 Location: TIA Headquarters Approved: 04/04/2013

3GPP activities around Virtual Reality

ATIS Wireless Technologies and Systems Committee (WTSC) IMT-2020 Evaluation Group

Access to Broadband Spectrum

IEEE YANG Data Model(s) Study Group Closing Report

Approved by General Counsel. TR-41.3 Meeting Report Date(s): 11/20/ /20/2014 Location: Tuscon, AZ Approved: 12/05/2014

Dusseldorf, Germany Agenda item: th -20 th June, Status Report of SMG11 at SMG#32

ETSI Workshop on. Machine to Machine (M2M)

TO: Dino Flore, 3GPP TSG RAN Chair, 3GPP TSG WG RAN1, Chairman Satoshi Nagata,

ETSI TC INT IMS Network Testing Group. Giulio Maggiore TC INT Chair

Standards for C-ITS ESF GmbH, Dr. Hans-Joachim Fischer Fichtenweg 9, D Blaubeuren, Germany

Editor: David Crowe Phone Vol. 10, No. 1 January, The Development of cdma2000 Standards

LTE GLOBAL PHONE Version: 0.1 Apr. 2016

Christoph Voigt, Chairman 5GAA GAA

CTO MEETING GENEVA COMMUNIQUÉ

3GPP2 TSG-P Wireless Packet Data Networking TITLE: SOURCE: ABSTRACT: RECOMMENDATION:

4G, LTE and the Road to 5G

5G Commercial realization: From standards to deployments

Emergency Communications Preparedness Center (ECPC) Research and Development (R&D) Focus Group (FG)

IEEE 802 EC ITU standing committee

Overview of 5GMF Current Activities Kohei Satoh Secretary General of 5GMF

ETSI standards are enabling a global M2M solution. Enrico Scarrone, ETSI TC M2M Chairman, Telecom Italia 3 ETSI M2M workshop, Mandelieu, France, EU

System Release Guide for the (R4) Release of the cdma2000 System Specifications

Nomor 3GPP Newsletter October 2007 News in 3GPP RAN standardization Authors: Eiko Seidel, Lauritz Hamm

ISO/IEC JTC1/SC7 /N3647

ISO/IEC JTC 1 Update. April 2018 Phil Wennblom, Chair

NB-IoT: The next phase. Tony Sammut Vodafone Group Research & Development

Test Plan for CDMA Mobile Stations

ETSI TS V3.1.0 ( )

IEEE Liaison report (Oct ) T v000 Tom Palkert, Macom

Wireless Network Infrastructure Market (2G, 3G, LTE, WiMAX, WiFi):

ETSI TS V ( )

Maxime Flament, CTO 5GAA GAA

ETSI TR V5.0.0 ( )

Security Standardization

Mobile-enabled THe 5G future

SMG#27 Temporary document List

3GPP TS V9.5.0 ( )

TITLE: Final Linked Agenda for the 31st JTC 1 Plenary Meeting, 7-11 November 2016 in Lillehammer, Norway

Global Mobile LTE RAN Virtualization Forecast, : Benefit of the BTS Hotel. Market Study Third Quarter, 2013

Impact of SEP conflicts on ICT innovation in Europe European Commission: Joint Research Center, Sevilla 27 October 2014

ETSI TS V ( )

onem2m - A Common Service Layer for IoT Basic principles and architecture overview

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

3GPP LTE & 3GPP2 LTE STANDARDIZATION

SIGNALING CONFORMANCE TEST SPECIFICATION FOR INTERWORKING OF CDMA2000 1X AND HIGH RATE PACKET DATA SYSTEMS REVISION A

Transcription:

DATE: June 3, 2013 3GPP2 TSG-SX Meeting Summary #2 Miami, Florida LOCATION: CHAIR: VICE CHAIR: SECRETARY: Miami, Florida Dr. Xiaowu (Frankle) Zhao, ZTE Yuezhen Wang, China Telecom Mike Dolan, Alcatel-Lucent Eileen McGrath Doohan, representing 3GPP2 OPENING PLENARY 1. TSG-SX Opening Remarks by TSG-SX Chair The TSG-SX Chair conducted TSG-SX plenary meeting sessions as follows (times are in local time): Opening plenary 8:55 AM 10:15 AM, Monday, June 3, 2013. Interim Plenary 3:00 3:15PM, Monday June 3, 2013. Closing plenary 8:05 9:20AM, Friday, June 7, 2013. 2. Introduction and Attendance Registration Ms. Doohan conducted a roll call of member companies. During the Plenary sessions in the week, 10 of 16 quorum members responded as present, for 63% quorum. Refer to the quorum list in Section 14. Adjournment for details. Attendance was recorded as follows: Company Name E-mail Alcatel-Lucent Terry Jacobson Terry.jacomson@alcatel-lucent.com Alcatel-Lucent Mike Dolan Mike.dolan@alcatel-lucent.com Applied Communication Sciences Achilles Kogiantis akogiantis@appcomsci.com China Telecom Yuezhen Wang wangyzh@gsta.com China Telecom Ye Zhao zhaoye@dhinatelecom.com.cn Huawei Jixing Liu liujixing@huawei.com NEC Hirofumi Okata h-okata@cq.jp.nec.com Nokia Siemens Networks Victor Coello Victor.coello@nsn.com Qualcomm Roozbeh Atarius ratarius@qti.qualcomm.com Qualcomm Alex Gogic agogic@qti.qualcomm.com Qualcomm Jack Nasielski jackn@qti.qualcomm.com Qualcomm Anand Palanigounder apq@qti.qualcomm.com Qualcomm Jun Wang jwang@qti.qualcomm.com Sprint Nextel Bonnie Chen BonnieChen@sprint.com US Cellular Sebastian Thalanany Sebastian.thalanay@uscellular.com ZTE Xiaowu Zhao Zhao.xiaowu@zte.com.cn 3GPP2 Eileen McGrath Doohan eileen.m.mcgrath@mac.com 3. Numbering of Contributions The following SX00-20130603-xxx documents were numbered and assigned to the listed agenda items, as follows: 000 Document Register 001 Agenda TSG-SX R0 approved, updated to R8. 1

002 TSG-SX Summary Meeting Report, March 2013, with Action List TSG-SX R2 approved for posting to server 003/A/B TSG-SX Projects Work Plan Secretariat, TSG-SX Remanded to 004 Reserved N/A N/A 005 Agenda 006 WG2 Agenda WG2 007 WG3 Agenda WG3 008 WG4 Agenda WG4 009 3GPP2 Work Plan folder Secretariat, 3GPP2 Remanded to 010/A TSG-SX Correspondence Templates, with new SC Chair exploder Secretariat 011/A Incoming LS to 3GPP2 Director re: TR-45.8 Workplan updates TIA TR-45.8 Remanded to 012 Courtesy Copy of LS to TIA TR-45.4 re: HRPD IOS Publication TSG-AC 013 Courtesy Copy of LS to ETSI SCP re: Coding Value Request TSG-AC 014 Courtesy Copy of LS to ETSI SCP re: MO SMS Control TSG-AC 015 Courtesy Copy of LS to ETSI SCP re: REFRESH TSG-AC 016 Courtesy Copy of LS to PMT Coordinator re: Workplan TSG-AC 017 Outgoing Correspondence to TR-45.5 on NIST wireless characteristics matrix TSG-SX 017A Wireless Characteristics matrix TSG-SX 018 3GPP2 TSG-SX WG4 Work Plan TSG-SX WG4 Remanded to Editor to incorporate into 003 Liaison Statement dated 17 February 1 March 019 2013 re: Request for Information on ITU-T SG13 Remanded to WG2 Recommendation Q.1742.10, TD 39 Correspondence to External Organizations dated 020 18 March 2013 re: 3GPP2 Structure and SC Leadership 021 Incoming Correspondence to TSGs re: Work Item Review Director, 3GPP2 Remanded to 021A WI 3GPP2-00323: Update to C.S0017-010-A Data Service Options for Spread Spectrum Systems to Remanded to support 1xRevF 021B WI 3GPP2-00324: Defining the CDMA2000 radio Environment for Smartphone Battery Life Remanded to measurement 021C WI 3GPP2-00325: LTE ehrpd Interworking Alignment with 3GPP Release 11 Remanded to 022 Incoming Liaison dated April 22, 2013 re: Interaction of onem2m with Underlying Networks onem2m Remanded to WG2 & WG3 (lead) 023 Standards Update for Small Cells World Summit Secretariat & Small Cell Forum 024 Proposed Work Item for S.X0057-B v2.0 R1 remanded to 025 LS on information of progress in the SI on LTE- HRPD SON 3GPP RAN3 026 Work Item 3GPP2-00224 Cancelled Director, 3GPP2 027 5 Work Item Worksheets Approved Director, 3GPP2 028 Incoming Correspondence from TR-45.8 re: Remanded to, Action #2 Workplan updates and questions for clarification TIA TR-45.8 remanded to 003 Editor regarding the joint workplan 2

029 Incoming Correspondence re: TR-45.8 re: reballot comments on TSB-4977 TIA TR-45.8 Remanded to 029A Ballot Comments Table TIA TR-45.8 Remanded to 030 Summary Report 031 Proposed Outgoing Correspondence to PMT re: Work Item Review, New Work Item Proposal, Approved for Distribution Open Work plan Questions 031A New Work Item Worksheet X.S0057-B v2.0 Bug Approved for Distribution 031B Open Work Plan Questions, updated Approved for Distribution 032 Incoming email dated June 3, 2013 re: Work Director, 3GPP2 Items for TSG Review 106 032A Work Item 3GPP2-00326 Corrections and new test cases for Mobile Equipment Conformance 106A Testing with R-UIM 032B Work Item 3GPP2-00327 Administration of Parameter Value Assignments 106B 032C Work Item 3GPP2-00328 X.S0057-B v2.0 Bug 106C 100 Document Status Table. 101 Closing Plenary reporting folder A: workplan, B: approved for distribution, C: approved for publication 04, D: attach to B, E: approve title change 102:, A: approved for 102 WG2 Closing Plenary reporting folder WG2 distribution re: V&V 02, B: approved for distribution re: publication 03 103 WG3 Closing Plenary reporting folder WG3 Ar1:, Br1: for workplan, Cr1:, Dr2: approved for distribution re V&V 05, Er1: approved for distribution 06, F: approved for RnF, G: with F, H: approved for V&V, I: with H, J: with H 104 WG4 Closing Plenary reporting folder WG4 104:, 104A: 105 Proposed Outgoing Correspondence dated June 7, 2913 to TIA TR-45.8 re: Cancelled Projects WG3 Approved for distribution 07 106 Incoming email dated June 3, 2013 re: Work Items for TSG Review Director, 3GPP2 Remanded to 106A Work Item 3GPP2-00326 Corrections and new test cases for Mobile Equipment Conformance Remanded to Testing with R-UIM 106B Work Item 3GPP2-00327 Administration of Parameter Value Assignments Remanded to 106C Work Item 3GPP2-00328 X.S0057-B v2.0 Bug Remanded to 107 Incoming LS dated 17 18 April 2013 re: reply LS to Request for coding value in ETSI TS 102 223 for ehrpd (in SCP(13)000058/TSG-AC to ETSI ETSI TC SCP SCP re CodingValueRequest) SCP(13)000099r1, SCP(13)000096 108 Incoming LS dated 21 24 May 2013 re: Reply LS to MO Short Message Control Support in 3GPP2 (C6-130160) C6-130165 3GPP TSG CT6 3

109 Incoming LS dated 17 18 April 2013 re: Reply LS to MO Short Message Control Support in 3GPP2 (in SCP(13)000059/TSG-AC to ETSI SCP ETSI TC SCP re MO SMS Control) SCP(13) 000098r1, SCP(13)000097 110 Incoming LS dated May 24 2013 re: Work for Revision of Recommendation ITU-R F.1763, Interface standards for broadband wireless access systems in the fixed service operating ITU-R WP5A below 66 GHz (Extract from Annex 2 to Document 5A/306) 111 Incoming LS dated May 30 2013 re: Technologies for Public Protection and Disaster Relief Communications associated with work on WRC- ITU-R WP5A 15 Agenda Item 1.3 (Extract from Annex 2 to Document 5A/306) 112 Incoming LS dated May 24, 2013 re: Revision of Recommendation ITU-R M.1450-4, Characteristics of broadband radio local area networks (Extract from Annex 2 to Document 5A/306) ITU-R WP5A 4. Agenda Review & Approval SX00-20130603-001: R0 was approved as noted in Section 3. During the meeting, the agenda was updated to R8. 5. Meeting Summaries Review and Approval 6. Correspondence and Liaisons SX00-20130603-002: the TSG-SX previous Meeting Summary was approved as presented. A PDF will be posted. The following correspondence and liaisons were discussed at the meeting: SX00-20130603-003, 004, 009, 010/A, 011/A, 012, 013, 014, 015, 016, 017/A, 019, 020, 021/A/B/C, 022, 023, 024, 025, 026, 027A, 028/A, 029, 031/A/B, 105, 106/A/B/C, 107, 108, 109, 110, 111, 112. The following correspondence and documents were approved for transmission: List of Outgoing Correspondenc e 1 SX-201306-01 SX-201306-01A SX-201306-01B Plenary Contribution Number 031 031A 031B Description Source Status Proposed Outgoing Correspondence to PMT re: Work Item Review, New Work Item Proposal, Open Work plan Questions New Work Item Worksheet X.S0057-B v2.0 Bug Open Work Plan Questions, updated SX-201306-02 102aR1 Proposed Outgoing Correspondence to TR-45.8 re: X.P0042 V&V SX-201306-03 102bR1 Proposed Outgoing Correspondence to TIA TR-45.8 re: X.S0008 MEID publication SX-201306-04 101B Proposed Outgoing Correspondence to TIA TR-45.8 re: S.P0151-0 v1.0 ehrpd EUTRAN IW Matrix V&V Comment Disposition WG2 WG2 4

SX-201306-04A 101C S.P0151-0 v1.0, Publication Text, Word version SX-201306-04A1 101CA S.P0151-0 v1.0, Publication Text, PDF version SX-201306-04B 101D X.P0151-0 v1.0 Comment Disposition Record SX-201306-05r1 103Dr3 X.P0062-A v0.9 PCC for cdma2000 1x and HRPD networks, (revision marked) WG3 SX-201306-06 103 Er1 Proposed Outgoing Correspondence to onem2m on interface support WG3 SX-201306-07 105 Proposed Outgoing Correspondence to TR-45.8 re: Cancellation of X.P0047-0 v2.0 and X.P0058-0 v3.0 Note 1: This identifier is used for cross-tsg correspondence tracking. Refer to Section 3 for additional actions/decisions. Posted 7. Working Group Business 7A. : 7B. WG2: 7C. WG3: 7D. WG4: SX00-20130603-005, 030: Remanded to. SX00-20130603-101: report, as noted in Section 3. SX00-20130603-006: Remanded to WG2. SX00-20130603-102: WG2 report, as noted in Section 3. SX00-20130603-007: Remanded to WG3. SX00-20130603-103: WG3 report, as noted in Section 3. SX00-201300603-008, 018: Remanded to WG4. SX00-20130603-104: WG4 report, as noted in Section 3. 8. Unfinished Business: as per Working Group Business 9. New Business: as per Working Group Business 10. Assignments: N/A 11. Next Meetings Schedule: 12. Open Discussion: N/A 14. Adjournment SX00-20130603-100: The meeting agenda for Guilin China was presented for review. Meeting Location: Sheraton Guilin Hotel 15 BIN JIANG ROAD Guilin, Guangxi541001 China Phone: (86 773) 282 5588 The TSG-SX Closing Plenary was adjourned at 9:20AM local time on Friday, June 7, 2013. At the closing of TSG-SX meeting #1, there were 10 quorum members present from the quorum list of 16 companies, listed as follows: Company Name 1 Attended 2013/03/11 Attended 2013/06/03 1. Alcatel-Lucent 1 1 5

2. Applied Communication 1 1 Sciences 3. China Telecom 1 1 4. Ericsson 1 5. Dept of Homeland 1 Security (DHC, prev NCS) 6. Hitachi 7. Huawei Technologies 1 1 8. KDDI 9. Kyocera 1 10. Motorola Mobility 11. NEC 1 1 12. Nokia Siemens Networks 1 1 13. Qualcomm 1 1 14. RITT 1 15. Sprint/Nextel 1 1 16. ZTE Corporation 1 1 Quorum Total 12 10 17. US Cellular 1 Note 1: Companies in bold were quorum members as of this meeting. As per articles 25a & 25b of the Working Procedures Document, version 12, a member is added to the next meeting's quorum list after attendance of two consecutive meetings. A company missing three consecutive meetings will be dropped from that group s quorum list. Voting rights are established upon attendance at the 2 nd consecutive meeting. Individual members that miss three consecutive meetings of the TSG are dropped from the TSG voting list at the close of the 3 rd meeting. 6