TRAFFIC CONCURRENCY INFORMATION

Similar documents
CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

Aamminalwar' Vivian G. Villaamil, J.D. Director! Facilities Planning

TEMPORARY USE PERMIT SUBMITTAL REQUIREMENTS

User Guide to Mesquite s Citizen Access Portal (CAP) Planning and Zoning Division New Application

MINOR DEVELOPMENT PERMIT CHECKLIST RESIDENTIAL DETACHED GARAGE 481 SQ. FT. 767 SQ. FT.

ORDINANCE NO Section 1. Section of the Rochester Code of Ordinances is hereby amended and reenacted so as to read as follows:

Development Application

Facebook West Campus. Planning Commission Meeting February 25, 2013

{(. }.) Ordinance Fact Sheet 'P..o... ~~

Procedure to be Heard by the City of Forest Hills Board of Zoning Appeals

PLANNING COMMISSION JUNE 7, 2018 PUBLIC HEARING

epermits Requesting Permits & Scheduling Inspections

City of Clearwater Planning and Development Department Instructions for using epermit Planning Applications

Bowling Green, KY Stormwater Best Management Practices October Appendix F EPSC Certified Contractor Forms

Request Conditional Use Permit (Colleges & Universities, public or private) Staff Planner Ashby Moss

BID. Electronically Submitting a Building Permit Application Using COJ s Building Inspection Division s Electronic Permitting and Plan Review System

The South Dakota Unified Certification Program Agreement. 700 Broadway Ave. Pierre, SD

Crystal Springs Upland School Transportation Demand Management Plan. March 2016

Guidance of NOP Certification system Page 1/8

TRANSIT CENTER DISTRICT PLAN

Revised Dear Board of Zoning Appeals Applicant:

R1 Variation Zones. CODE AMENDMENT Q&A UPDATE October 6, 2016 CPC CA ENV ND. Department of City Planning

PUBLIC WORKS ORGANIZATIONAL CHART

ARLINGTON COUNTY, VIRGINIA

UNIFORM GUIDELINES RED LIGHT CAMERA ENFORCEMENT

Missouri Housing Development Commission Certified Property Management Agent Program

Revised 2018 LESLIE KARR MANAGER, CURRENT PLANNING. Attachment. Dear Preliminary Plat Applicant:

REQUEST FOR PROPOSALS For Uniform Services

Environmental Impact Questionnaire

eservices Users Guide

PUBLIC PORTAL USER GUIDE Permits /Address Search tool

Application for Water and/or Sewer Connections

the City of Palm Bay Brevard County Florida held on November

Southwest Florida Water Management District Application and Response Submittal Guide

C-BPVCA ADMINISTRATIVE PROCEDURES DELEGATED TO ASME CONFORMITY ASSESSMENT STAFF

Online Permitting Manual

CHARTER TOWNSHIP OF ALLENDALE, OTTAWA COUNTY, MICHIGAN WIRELESS COMMUNICATION FACILITIES APPLICATION

TOWN OF WAXHAW, NC FEE SCHEDULE Effective: December 20, 2016

Development Application Online. HowTo guide for applicants

RoDARS Form User Guide. City of Toronto Road Disruption Activity Reporting System

Protocol and Guideline for Establishing Wireless Telecommunication Facilities Within City of Brampton

DOCUMENT NAME: etrakit Process Manual etrakit Process Manual

EL DORADO COUNTY SURVEYOR FEE SCHEDULE FOR SERVICES

Variance Project Black Flag Attachments:

ITEM 43. Simpson dba Basecamp Environmental

Temporary Traffic Control (Maintenance of Traffic) Training Handbook

Concur Expense QuickStart Guide for CRC. Concur Technologies Version 1.2

etrakit User Manual City of Oceanside A guide for using the online permitting system, etrakit

Christchurch City Council. Your Guide to Submitting a Building Application via Online Services

Division C Land Development Division

CITY OF TURLOCK BUSINESS LICENSE APPLICATION. Phone # (209) Fax # (209) TDD # (800)

Traffic Impact Analysis Shotwell Road Residential Clayton, NC

Concur Standard Basic End-User Guide. Concur Technologies Version 1.0

1. Home Page: WEB TRAINING SCREEN SHOTS

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

City of Santa Rosa SPECIAL EVENT PERMIT APPLICATION

ICE. Office of Investigations SEVP. Recertification

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT. Environmental Resource Permit Application and Response Submittal Guide

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 22, 2017

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan

ELECTRONIC RECORDING MEMORANDUM OF UNDERSTANDING

Request for Qualifications for Audit Services March 25, 2015

2017 CORN MAZE SERVICE AGREEMENT & VENDOR APPLICATION

Crossroads Hollywood MOU invoice 7 messages

B. Employees are expected to make personal calls on non-work time and to ensure that friends and family members are aware of the City s policy.

User Guide to Mesquite s Citizen Access Portal (CAP) Planning and Zoning Division Uploading Documents for Review

ANRC II. Eligibility requirements Authority Requirements for accreditation Review of application...

OIML-CS PD-05 Edition 2

GUIDE TO CERTIFICATION

WEBSITE DEVELOPMENT & DESIGN PRICING

CITY OF FORT COLLINS TYPE 1 ADMINISTRATIVE HEARING FINDINGS AND DECISION. Ryan Sagar 1196 Grant Street, Suite 313 Denver, CO 80203

REQUEST FOR PROPOSALS Rolling Plains Management Corporation Request for Proposal Cellular Phone Services

King County Ombudsman Whistle-Blowers Office Complaint

CELLULAR TELEPHONE EQUIPMENT AND SERVICES POLICY

Adopt a resolution (Attachment 16) approving amendments to the North 40 Specific Plan.

County of Loudoun. Department of Planning and Zoning MEMORANDUM

APPLICATION FOR SOIL AND LOT EVALUATION

Request for Proposal for Technical Consulting Services

APPLICATION FOR DARK FIBRE OPTIC SERVICE

TEXAS MEDICARE (TRAILBLAZERS) CHANGE FORM MR085

Schools and Libraries (E-rate) Program FCC Form 474 (SPI) User Guide

Provider Portal User Guide. Version 2.5.1

REQUEST FOR PROPOSALS ZONING ORDINANCE

Simplifying Threshold Volume Requirements for USPS Return Services. SUMMARY: To minimize customer confusion and ensure consistent

Cell Phone Policy. 1. Purpose: Establish a policy for cell phone use and compensation allowance.

Certification Requirements and Application Procedures for Persons and Firms.

Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements

CERTIFIED ASSOCIATION EXECUTIVE APPLICATION

Council on Dairy Cattle Breeding

Customer Name: (As Listed on License) Principal(s) Name: (Must be Listed on License as Principal)

SITE DESCRIPTION. Vicinity

Change Healthcare CLAIMS Provider Information Form *This form is to ensure accuracy in updating the appropriate account

A. Facilities and critical systems employees subject to afterhours call out.

Section 3.0 Financial Requirements

The Co-operatives Act, 1996 Continuance (Jurisdictional)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

City of North Kansas City Request for Proposals Microsoft Office 365

Concur Getting Started QuickStart Guide. Concur Technologies Version 1.2

MSI Permit Tracking Version 3.0

Washington State Construction Crane Certifier Program

Transcription:

PUBLIC WORKS DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003-6325 253-835-2700; Fax 253-835-2709 www.cityoffederalway.com TRAFFIC CONCURRENCY INFORMATION What is a Concurrency Application? The City uses the concurrency application to look at new development's impact on the transportation network. The purpose of the test is to verify if there is adequate capacity in the transportation network and identify possible mitigation for failing intersections. The test uses the City's adopted level of service standards (LOS) as identified in the Comprehensive Plan as a basis for determining whether new development can proceed. Concurrency application is required for all development permits within the city that generate new trips in the PM peak hour, except for development exempt under FWRC 19.90.060 of the Transportation Concurrency Management Ordinance. All new development must pass concurrency test before completing other land use processes. When is a Concurrency Application Required? An application must be submitted concurrent with a development activity permit application such as Land Use application. The City will perform the concurrency analysis on a first come first serve basis. The applicant may request a concurrency feasibility analysis at any time. However, since a concurrency feasibility analysis application is not tied to a development permit, a Capacity Reserve Certificate (CRC) will not be issued. What needs to be submitted with the Concurrency Application? Completed Concurrency Application and Fees To scale site plan Vicinity map Independent Trip Generation to be considered (if available). All required information in the Concurrency Application must be filled out or the application will be returned. Traffic Division staff will review the completeness of the application and contact the applicant if further information is needed. The application will be vested at the time the Concurrency Application is deemed complete. How much is my concurrency permit application fees? And when do I pay this fee? Application fees for the concurrency application will be based on the total new trips the development is estimated to generate. The Public Works Department uses information provided (project size and land use type) in the preapplication application to estimate the number of trips and the appropriate application fee as outlined in Table 1 below. Concurrency permit application fees must be paid concurrent with the underlying land use application submittal. This fee may change if the proposed development is significantly different than the project scope as provided in the preapplication application. At the applicant's discretion, the applicant may hire their own Engineer licensed in the State of Washington to calculate the trip generation. Table 1 2017 FW Concurrency Application Fee Net New PM Peak Hour Trips Less than 10 11-50 51-500 Total Concurrency Application Fee (2017 rates) Greater Than 500 $1,620.00 $4,650.00 $8,505.00 $13,635.00

Am I finished with this process after I paid the concurrency permit application fee? No. The concurrency review process is the first phase of your development project's process with the Public Works Department. Once staff has completed the concurrency analysis, the applicant and/or owner will be notified of the result (Pass or Fail). If the project Passes the concurrency test, staff will issue a Capacity Reserve Certificate (CRC) allowing the project to proceed to other applicable development permit processes. If the project Fails the concurrency test, staff will propose mitigation measure(s) to address the LOS failure at that particular intersection(s). Examples of potential mitigation measures could be: Construct turn lanes Modify or construct a new traffic signal Other traffic control measures (such as channelization improvements) The applicant has 30 calendar days to review and response to staff proposed mitigation. Within that period, the applicant must either accept staff recommended mitigation or propose alternative mitigation measures for any LOS failure. Once an agreement has been reached on the mitigation measures, staff will issue a Capacity Reserve Certificate (CRC), allowing the project to proceed with other applicable permit processes. However, if the applicant fails to respond with the 30 days period, a Denial letter will be issue and the project will not be approved. If my project fails the concurrency test, what are my options? 1. Accept staff proposed mitigation measure(s), 2. Reduce the size of the development or change the type of uses to reduce the trip generation rate until the standard is met; 3. Delay the application until additional improvements have been identified by the City in the 6-Year (TIP) or constructed by others; 4. Propose appropriate mitigation to include Transportation Demand Management (TDM) measures. The proposed mitigation measures shall be constructed and approved concurrent with the development, typically prior to issuance of a certificate of occupancy. Depending on what option is chosen, the applicant may have to restart the concurrency application process again. Can I appeal the Concurrency Denial Notice? Yes. The applicant may appeal the concurrency denial notice as part of the appeal process for the underlying Development Permit application. How long does a Capacity Reserve Certificate last? As long as there is activity on the Development Permit and you do not change the trip generation characteristics of the development (no increase in net new trips is incurred from a change in the project), the CRC Certificate vests the development s new trips for the life of the project. If the project's size changes significantly as determine by the Public Works Department staff, the applicant may need to go through the process again and pay another concurrency application fee. What if my project changes? Any thing that changes the trip generation rates can generate a need for an amendment to the process, and this process may start over. If the trip generation is greater than 10% of the original estimated trip generated rates the project will require an amendment and the process starts over. Please be conservative and as specific about your project as you can. If you have any questions please ask. What if I do not have a development permit ready for my project? Staff can provide the same level of analysis as a feasibility study for the project. However, the estimated trips generated by the project analyzed will not be reserved or vested. If you decide to proceed with the project, staff will revise the analysis using any transferable data at our hourly rate.

Does this mean we will never have to prepare a Traffic Impact Analysis? No. The Public Works staff will calculate your trips and identity impacts to the City Transportation system. The following are examples of additional requirements the applicant may need to hire an Engineer to complete: Parking Demand and Utilization Queuing and gap analysis Specialized Land Use and Trip Generation Sight Distance Analysis Neighborhood Traffic Impacts Design of Mitigation Improvements (such as signals, turn lanes, access, or new roads) Traffic impacts over 100 trips in other peak hours (morning and weekends) What is the Concurrency Permit Process? A flow chart diagram of the process is depicted on the back page. If you have any additional questions, please contact Sarady Long, Senior Transportation Planning Engineer (253) 835-2743 or sarady.long@cityoffederalway.com. C:\TR Media Information\2017 Media\Concurency Permit Process Rev. Jan2017.doc

CONCURRENCY PERMIT PROCESS (START) - Applicant submit Concurrency application with appropriate fee CITY * performs trip generation/assignment CITY * performs concurrency analysis PASSED Concurrency Result FAIL CITY * proposes mitigation for failing intersections CITY issues Concurrency Reserve YES Applicant accepts mitigation? NO To Development Permit process CITY issues Denial letter NO Applicant proposes alternative mitigation YES * Denotes tasks that may be prepared by the applicant. Staff reviews and approves all applicant-prepared materials.

PUBLIC WORKS DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003-6325 253-835-2700; Fax 253-835-2709 www.cityoffederalway.com 2017 TRAFFIC CONCURRENCY REVIEW APPLICATION APPLICATION NO(S) Date Project Name Property Address/Location Parcel Number(s) Project Description PROPERTY OWNER Name: Address: Phone/Fax: City/State/Zip: Email: Signature: Cell: APPLICANT (If different than Owner) Name: Address: Phone/Fax: City/State/Zip: Email: Signature: Cell: Type of Development permit to be applied for: Commercial Multifamily (MF) Subdivision Short Subdivision Single Family (SF) None (Feasibility only) Other Approval for City to perform Concurrency analysis: Yes No If NO: Applicant s Traffic Engineer must perform Concurrency analysis consistent with City procedures; however, the application fee remains the same. L:\DEPT\PW\TRA\Concurrency\CN Template\Final Template\FW Concurency Application Rev. Dec2016.doc

Required Information Application is incomplete and will be returned if not filled out. Gross Square Feet (Commercial) Existing Proposed Number of Dwelling Units Existing Proposed Number of Employees Existing Proposed Parcel size (acres or square footage) Existing Proposed Has the property previously been reviewed for concurrency? Yes No If yes, date of original application Concurrency Permit No: Is this an amendment to an existing Concurrency Certificate? Yes No Will the project be phased? Development Build-Out Year I have read the above information regarding expiration deadlines and appeal process. I further understand that issuance of a concurrency certificate is not a guarantee that the City will issue a development permit or building permit. Note: - Commercial subdivisions and other projects constructed in phases shall be evaluated for concurrency as each phase is submitted for applicable development permits. - Once the concurrency test result has been determined, any changes to the development project require additional review will be billed on an hourly basis. Property Owner/Agent Signature Date Estimated Number of New Trip Generated by Project per Pre-application Summary: If the applicant s engineer has prepared a trip generation analysis, please provide the following. If not, staff will calculate the trip generation based on the above information. Existing PM Peak Hour Trips (if applicable) Proposed PM Peak Hour Trips Net New PM Peak Hour Trips CONCURRENCY TEST EXPIRATION (FWRC 19.90) A Concurrency Reserve Certificate (CRC) is valid until the underlying development permit expires, is withdrawn or cancelled, whichever occurs first. In that case, a new concurrency application would be required. A Concurrency Reserve Certificate is valid only for the specific development approval consistent with the development parameters and City file number within the CRC issued. A Concurrency Reserve Certificate (CRC) runs with the land, and cannot be transferred to a different parcel. I have read the above information regarding expiration deadlines. I further understand that issuance of a concurrency certificate is not a guarantee that the City will issue a development permit or building permit. Property Owner/Agent Signature Date Permit Submittal: The following items are required for all applications: Completed and signed Concurrency Application Concurrency Application Fee paid (See Below) SUBMITTAL REQUIREMENTS STAFF USE ONLY Net New PM Peak Hour Trip Less than 10 11-50 51-500 Greater than 500+ 2017 Application Fee $1,620.00 $4,650.00 $8,505.00 $13,635.00 L:\DEPT\PW\TRA\Concurrency\CN Template\Final Template\FW Concurency Application Rev. Dec2016.doc