Modeling Detention Ponds Malaysian Example (v2009)

Similar documents
This loads a preset standard set of data appropriate for Malaysian modeling projects.

WMS 9.1 Tutorial Storm Drain Modeling SWMM Modeling Learn how to link a hydrologic model to the SWMM storm drain model

WMS 10.0 Tutorial Storm Drain Modeling SWMM Modeling Learn how to link a hydrologic model to the SWMM storm drain model

Storm Drain Modeling HY-12 Rational Design

Learn how to link a hydrologic model to the SWMM storm drain model

Watershed Modeling Rational Method Interface. Learn how to model urban areas using WMS' rational method interface

Ducks on the Pond: Stormwater Management Basin Analysis Using AutoCAD Civil 3D and Autodesk SSA

Introduction to Bentley PondPack

Build a MODRAT model by defining a hydrologic schematic

Tutorial 6 - Subdivision - Pre Development

WMS 10.0 Tutorial Watershed Modeling MODRAT Interface Schematic Build a MODRAT model by defining a hydrologic schematic

Storm Drain Modeling HY-12 Analysis with CAD

Multi-Stage Outlet Structures

WMS 8.4 Tutorial Watershed Modeling MODRAT Interface Schematic Build a MODRAT model by defining a hydrologic schematic

Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox

Bentley OpenRoads Workshop 2017 FLUG Fall Training Event

Evaluating Multiple Stormwater Analysis and Design Alternatives with StormCAD

Storm Drain Modeling Defining HY-12 Storm Drain Networks with Shapefiles and LandXML files

Watershed Modeling HEC-HMS Interface

URBAN & RURAL RUNOFF ROUTING APPLICATION GETTING STARTED MANUAL

v. 9.1 WMS 9.1 Tutorial Watershed Modeling HEC-1 Interface Learn how to setup a basic HEC-1 model using WMS

WMS 8.4 Tutorial Watershed Modeling MODRAT Interface (GISbased) Delineate a watershed and build a MODRAT model

v. 8.4 Prerequisite Tutorials Watershed Modeling Advanced DEM Delineation Techniques Time minutes

WMS 10.0 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

Storm Drain Modeling HY-12 Pump Station

PCSWMM 2002 EXTRAN Block PAT AVENUE Storm Drainage Design

v Modeling Orange County Unit Hydrograph GIS Learn how to define a unit hydrograph model for Orange County (California) from GIS data

Questions and Answers

Tutorial Hydrodynamics in sewers

Cross Sections, Profiles, and Rating Curves. Viewing Results From The River System Schematic. Viewing Data Contained in an HEC-DSS File

xpwspg 2010 Modeling

Objectives This tutorial shows you how to define data for and run a rational method model for a watershed in Orange County.

Watershed Modeling Maricopa Predictive HEC-1 Model. Watershed Modeling Maricopa County: Master Plan Creating a Predictive HEC-1 Model

v Modeling Orange County Rational Method GIS Learn how to define a rational method hydrologic model for Orange County (California) from GIS data

WMS 9.1 Tutorial GSSHA Modeling Basics Stream Flow Integrate stream flow with your GSSHA overland flow model

What s new in Civil Designer 2015

Hydrologic Modeling using HEC-HMS

LD20493 From AutoCAD Civil 3D to Storm and Sanitary Analysis - Pond Design Using Volume-Grading Tools

Objectives Divide a single watershed into multiple sub-basins, and define routing between sub-basins.

VERSION 2016 Service Pack 1, 17.1 (Officially Released 6 April 2016)

What's New in this Version

v Prerequisite Tutorials GSSHA Modeling Basics Stream Flow GSSHA WMS Basics Creating Feature Objects and Mapping their Attributes to the 2D Grid

H y d r o C A D. Owner's Manual

Storm Water Management Model User's Manual Version 5.1

Watershed Modeling Advanced DEM Delineation


Modeling CULTEC Chambers in HydroCAD - Using the Chamber Wizard

SMS v Culvert Structures. SRH-2D Tutorial. Prerequisites. Requirements. Time. Objectives

Building a new model in wspg2010

Efficiency and Accuracy of Importing HEC RAS Datafiles into PCSWMM and SWMM5

Modeling Storm Sewer Networks in the City of Newport News, Virginia Using Two Different Software Solutions

NEW xpswmm & xpstorm 2017

Watershed Modeling Maricopa County: Master Plan Creating a Predictive HEC-1 Model

WMS 9.1 Tutorial GSSHA Modeling Basics Post-Processing and Visualization of GSSHA Model Results Learn how to visualize GSSHA model results

WMS 10.1 Tutorial GSSHA Modeling Basics Post-Processing and Visualization of GSSHA Model Results Learn how to visualize GSSHA model results

MEMORANDUM. Corona Subdivision XP Storm Evaluation. Date: March 5, Curt Bates, City of Petaluma. David S. Smith, P.E., WEST Consultants, Inc.

Required: 486DX-33, 8MB RAM, HDD w. 20 MB free, VGA, Win95. Recommended: Pentium 60, 16 MB RAM, SVGA, Win95 or NT

WinSLAMM v 10.0 User s Guide. Input/Output

Connecting 1D and 2D Domains

PCSWMM 2002 RUNOFF Block PAT AVENUE Storm Drainage Design

HEC-22 Inlets in INFOSWMM and H2OMAP SWMM v12

Automatic Discretization and Parameterization of Watersheds using a Digital Elevation Model

Linear Routing: Floodrouting. HEC-RAS Introduction. Brays Bayou. Uniform Open Channel Flow. v = 1 n R2/3. S S.I. units

ISIS Free & ISIS Professional Quick Start Guide

Modelling with AR&R 2016

Culvert Studio User's Guide

ISIS 1D. Quick Start Guide. Cost effective, integrated software solutions ch2mhill.com/isis

12d Model Training Notes Training Modules for 12d Model

MODRET VERSION 6.0 FOR WINDOWS 95. Setup Hydrograph Infiltration Routing Graphic Windows ReadMe

STORM WATER MANAGEMENT MODEL USER S MANUAL. Version 5.0

Module 9. Lecture 3: Major hydrologic models-hspf, HEC and MIKE

Pipe Networks CHAPTER INTRODUCTION OBJECTIVES

Appendix E-1. Hydrology Analysis

Introduction to xpswmm2010

Coastal and Hydraulics Laboratory

Watershed Modeling National Streamflow Statistics Program (NSS) Interface

12d Stormwater Design Part 1

2D Model Implementation for Complex Floodplain Studies. Sam Crampton, P.E., CFM Dewberry

AutoCAD Civil 3D 2010 Education Curriculum Instructor Guide Unit 4: Environmental Design

SMS v Culvert Structures with HY-8. Prerequisites. Requirements. Time. Objectives

EPANET Tutorial. Project Setup Our first task is to create a new project in EPANET and make sure that certain default options are selected.

VDOT GEOPAK Drainage Training Manual

HEC-RAS 3.0 January, 2001 Release Notes

Prof. B.S. Thandaveswara. The computation of a flood wave resulting from a dam break basically involves two

Stormwater Design - Part 2

v Water Distribution System Modeling Working with WMS Tutorials Building a Hydraulic Model Using Shapefiles Prerequisite Tutorials None

Chapter 2 Surfer Tutorial

Travel Time and Time of Concentration

Evolution of an Integrated 1D/2D Modeling Package for Urban Drainage

Stepwise instructions for getting started

PACIFIC CENTER Anaheim, California

Watershed Modeling Using Online Spatial Data to Create an HEC-HMS Model

Spatial Hydrologic Modeling Using NEXRAD Rainfall Data in an HEC-HMS (MODClark) Model

SMS v Weir Flow. SRH-2D Tutorial. Prerequisites. Requirements. Time. Objectives

Harris County Flood Control District HEC-RAS 2D Modeling Guidelines (Standardizing HEC-RAS 2D Models for Submittal Within Harris County)

Documentation for Velocity Method Segment Generator Glenn E. Moglen February 2005 (Revised March 2005)

HEC-RAS 2D Flood Modelling Tutorial

Civil 3-D PROFILE CREATION

George Mason University Department of Civil, Environmental and Infrastructure Engineering. Dr. Celso Ferreira Prepared by Lora Baumgartner

TUFLOW 1D/2D SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Background Data

Transcription:

Modeling Detention Ponds Malaysian Example (v2009) This tutorial demonstrates the usability of xpswmm and xpstorm for simulating detention basins in urban areas. This fictitious example includes the use of background images and surface data that enhance the modeling experience. A comparison of pre and post is also provided in the tutorial as engineers often reduce peak flows of developed sites to pre existing peak flows. In addition the example uses the Global Storms capability to show the ease that the critical storm can be determined and the results displayed for many events. Files Used: Detentionpond.xp sample model with most of the data entered for this tutorial Malaysian_Detention_Pond_Example.dwg background drawing for this tutorial Preexisting-10yr.dat File of gauged flows for comparison in Review Results OpenDrain.jpg digital picture of roadside open drain Pond.jpg - digital picture of pond Riser outlet.jpg - digital picture of weir Load the model Detentionpond.xp. Model Description This model uses the time area method for hydrology which requires % impervious, subcatchment slope, time of concentration (Tc) and infiltration parameters in addition to the subcatchment area. The watershed slope is % as opposed to the default of m/m by using the configuration parameter CATSLOPE=%. The infiltration method is Initial and Proportional losses. To model the pre development hydrologic condition the subcatchment representing the total area was assigned a 5% impervious value and a Tc of 35 min. The post development hydrology breaks up the total site area in to 8 subcatchments with 65% impervious and a Tc of 5 min is used. The 10-yr storm with a total of about 84 mm in 1 hr is already applied to each of the subcatchments. www.lestarisoftware.com 1

Pre Existing Flow Case A single subcatchment has been drawn for the entire site and it drains to the node Pre Dev. The centroid of this polygon is at the centre of the whole catchment. The thin dashed line is the catchment connection showing the node to which this area drains. Execute the model to have this area produce runoff for the 10-year storm. To solve the model choose Solve from the Analyze menu or press the F5 key on the keyboard. Select the node with the pointer tool and choose the Review Results tool from the toolstrip. The maximum flow for this area before the development with the Pond is about 1.1 cms. This hydrograph has been previously saved to a text file by exporting the text/data only from the export dialog. This will be used later in the tutorial as a comparison to the post development condition. www.lestarisoftware.com 2

Post Development Model The post development model is configured by inactive the node called Pre Dev (in post development model it was changed to Pond) or selecting the checkbox for the 1 st sub catchment. This will turn off the subcatchment and remove the check in the box. The model can now be run by selecting Solve from the Analyze menu or simply press the F5 key on the keyboard. In this run we have all of the subcatchments contributing fast responding hydrographs because of the high percent impervious and the small time of concentration. After the model is run select all the subcatchments using the Select All Nodes icon from the right hand toolstrip and exclude the node Pond by holding the <Ctrl> key and selecting it. This will avoid a warning message that no results exist for the node Pond since we unchecked the subcatchment for that node. Now Select Review results to view the hydrographs. These 8 hydrograph represent the hydrologic response that is sent to various nodes on open drains. www.lestarisoftware.com 3

Switch to the Hydraulics mode by selecting the Hdr icon on the toolstrip. The links which are active in this mode now show with their labels and take on their attributes. In the Runoff mode where they were inactive they showed as hidden dashed lines. The links labeled Lx where x is a number such as L14 are open drains that are approximately 2 m deep and 1 m wide. They are created by using the trapezoidal conduit shape with zero side slopes as shown in the dialog below. These open drains have the same roughness value but vary in slope and inverts as they follow the land and drain to the Pond. At roadways and in high traffic areas they would be covered. A photo of a typical open drain covered in a traffic area is shown below. www.lestarisoftware.com 4

Select the link culvert then Review Results to see the hydrograph for the developed case. The thin blue line is the gauged flows which were crested previously by exporting the hydrograph from the Pre Dev node. This hydrograph is the pre development flow for the 10-year storm. This hydrograph from Review Results is shown below. Post Flow Pre Flow Notice that the new peak flow (thick green line) is higher than the pre existing condition (thin blue line) and that the peak is earlier. These effects are generally due to the increased impervious percentage and the smaller time of concentration. www.lestarisoftware.com 5

In xpswmm2009, you can Import catchment, links & nodes from CAD file to xpswmm model After import the catchment from CAD, you can assign catchment to a particular node by drag the centriod of the catchment to a node. xpswmm calculate catchment areas using calculation tool under Tools, Calculate Node, Catchment Area. You can use the Calculate Link Tool to calculate Conduit slopes, Lengths & Cross Sections. www.lestarisoftware.com 6

Detention Description The proposed model has the hydrographs routed in the open drains to the proposed detention pond. The detention pond is created by adding storage to a node. All nodes have a default surface area of 1.2 m 2. The default is approximately the size of a typical manhole and the default can be modified in the Hydraulics mode Job Control. The default is overwritten by selecting Storage in the node dialog. The data that creates the Pond s storage characteristics are found in the Stepwise Linear storage option. Select Stepwise Linear to view the data for the storage in the retention basin. It is good modeling practice to define the storage from the bottom of the pond all the way to the Spillcrest elevation of the node. This node has a spillcrest of 48.7 and an invert of 44.7 for a difference of 4 m. The storage data shown above is from depth of 0 to depth of 4 m which covers the entire height of the node. You will also notice that the initial depth in the node is set to 1.8 m. This initial depth starts the node at the control elevation of 46.5 m which is equal to the elevation of the lowest item in the control structure. Basin optimization option If you set the max allowable Q in Culvert --> Program will allow only up to user defined max Q through culvert (not more than that) and will adjust the basin Level accordingly. No pipe design will happen. If you set the target HGL at basin --> program will upsize (design) the pipe if required to maintain the user defined target HGL at basin. Pipe design never happen for downsizing, it s always for up sizing. www.lestarisoftware.com 7

Control Structure The control structure is contained in the multilink (dashed line) named CTRL leaving the Pond and draining to the node called Riser. The multilink allows multiple conduits in parallel but also is the object where pumps, orifices, weirs and special conduits can be entered. In this model we have a weir selected as the only exit for the detention basin. Select the weir #1 to see the weir data. 0.25m 0.25m Weir example The weir has a length of 1.0 m and a crest of 46.5 m. Changing the weir length will alter the flow out of the detention basin. Selecting appropriate storage characteristics and control structure will allow an optimization of the system and permit the post condition model to have a peak flow that does not exceed the pre existing condition. Reducing the Peak Flow Change the weir length to 0.4 m and rerun the model. Pre Post www.lestarisoftware.com 8

Use Review Results to see the hydrograph for the culvert link. By reducing the flow out of the detention basin we have also raised the peak water level in the detention basin. This higher water level could have an impact on the model by raising the water level due to backwater effects. Pond level = 47.694m From Output File *==========================================* Storage Junction Data *==========================================* MAXIMUM OR PEAK OR CROWN DEPTH STORAGE JUNCTION JUNCTION CONSTANT SURFACE CONSTANT VOLUME ELEVATION STARTS NUMBER OR NAME TYPE AREA (M2) (CUBIC MET.) (M) FROM -------------- -------- ---------------- --------------- --------- ----------- Pond Stage/Area 970.0000 2838.9602 48.7000 Node Invert *==================================* Variable storage data for node Pond *==================================* Data Elevation Depth Area Volume Point meters meters m^2 m^3 ===== ========= ====== =========== ============ 1 44.7000 0.0000 450.0000 0.0000 2 45.2000 0.5000 515.0000 241.0674 3 45.7000 1.0000 580.0000 514.6565 4 46.2000 1.5000 645.0000 820.7626 5 46.7000 2.0000 710.0000 1159.3827 6 47.2000 2.5000 775.0000 1530.5140 7 47.7000 3.0000 840.0000 1934.1550 8 48.2000 3.5000 905.0000 2370.3041 9 48.7000 4.0000 970.0000 2838.9602 Available storage = 2838.96-1934.16 = 904.8m3 Note: If you feel that the pond is too big, you can readjust the pond size & rerun the model to check all requirements are fulfill. www.lestarisoftware.com 9

Dynamic Long Section Animation of the HGL The hydraulic grade line (HGL) can be animated over time by selecting the Dynamic Long Section View from the Results menu, or the F9 key on the keyboard or by selecting the icon from the toolstrip. Select the node Pond then while holding the Shift key select the node Inlet D. Using the Shift key while selecting nodes allows xpswmm to select from the first point to the next selection. After selecting this string of links and nodes choose Dynamic Long Section View. Press the solid triangle icon on the toolstrip to play the simulation. Stop the simulation using the pause or stop button when you see the flooded symbol at inlet F. When the HGL reaches the ground water can escape the system out of the top of the node. This water can be lost from the system, stored locally, or linked to a 2D simulation of overland flows. In the default case the water is lost from the system and reported as flooded losses. This flooding at Inlet F is a result of creating too small of a weir and causing a high water level in the detention basin. Selecting a slightly larger weir would remove this small amount of flooding. Preventing Flood Losses at Nodes Select the node Inlet F. Choose the Ponding Allowed option. This option stores water above the Spillcrest and return it to the same node as capacity increases. No water is lost from the system in this case and the model operates close to the real world where water would pond then return to the system. www.lestarisoftware.com 10

Rerun the model with the new setting of ponding allowed at node Inlet F. Using XP-Tables to Review Model Results Select XP-Tables by choosing XP-Tables from the results menu, by pressing the F2 key on the keyboard or selecting the XP-Tables icon on the toolstrip. Select the table Node Flooding using the tab in the lower right corner if it is not the current table in the window. This table shows that Inlet F stored about 13.78 m 3 in the ponding allowed storage starting from the spillcrest elevation. This surface flooding lasted about 7 minutes. No other flooding occurred. Select the other tables using the tabs to view their data and results. Selecting the XP-Tables icon on the toolstrip will allow you to activate other tables or create new tables. The tables can contain a mixture of data and results and are completely user definable. www.lestarisoftware.com 11

(Table 1 export out from XP Table) Flooded Volume Lost, ft3 or m3 The cumulative total of water lost caused by flooding at the node. This water is lost from the system and not routed any further. It is included in the continuity report as outflows just like an outfall and does not directly cause continuity error. Maximum Junction Volume, ft3 or m3 The maximum junction or node volume at any time during the simulation. It does not include the volume of connected conduits. www.lestarisoftware.com 12

Using Global Storms to Model Multiple Rainfall Events Multiple rainfall events can be simulated using a feature of xpswmm called Global Storms. Global Storms is accessed by selecting the Global Storms button from the Runoff Job Control as shown in the screen capture below. Select the Global Storms button from the Runoff Job Control. Then select the 3 storms named 30, 60 and 120 meaning the 30, 60 and 120 minute storms. The multipliers for each storm represent the total depth for each of the storm durations. With 3 storms selected the model must solve each case for a total of 3 runs. These runs will be together in a batch with the Global Storms tool. The global storms also allow the model results to be compared side by side. The analysis engine shown to the right shows that multiple runs are being performed such as the 1/3 that is shown in this image. When the run is complete view the hydrographs for the culvert link. With Global storm turned on the Review Results graph will show the results from all of the model runs. Note: The Gauged data does not show in Review Results when multiple results are shown. www.lestarisoftware.com 13

From the graph we can see that the most critical storm for this model is the 10-year 60-minute duration. It results in the highest outflow from the Pond. The XP-Tables tool also compares results from multiple storms when the Global Storms is used. The table will create an additional row whenever results are to be displayed. We can see from the results below that the only location with flooding is node Inlet F and the only occurrence of flooding is with the 60-minute duration storm. User can export Table below from XP- Table Table 2: Data & Results Data Results Name Width m Area ha Impervious PercenSlope Infiltration Reference Freeboard m Flood Loss m^3 MainDrain1 IP 20 percent 2.57 0 MainDrain2 IP 20 percent 3.02 0 Inlet B 1 0.243 65 1 IP 20 percent 2.84 0 Inlet D 1 0.506 65 1 IP 20 percent 1.65 0 Inlet H 1 0.993 65 1 IP 20 percent 0.36 0 Inlet G 1 0.678 65 1 IP 20 percent 0.08 0 Inlet F 1 0.668 65 1 IP 20 percent 0 0.007 Inlet A 1 0.324 65 1 IP 20 percent 1.87 0 Inlet C 1 0.442 65 1 IP 20 percent 1.19 0 Inlet E 1 0.303 65 1 IP 20 percent 0.7 0 Pond IP 20 percent 1 0 Riser IP 20 percent 3.7 0 MainDrain3 IP 20 percent 2.99 0 Lake IP 20 percent 3.5 0 IP 20 percent = Initial and Proportion Loss of 20 percent www.lestarisoftware.com 14

Set parameters like Conduit Length & Maximum Flow with Spatial Report. The results can export to dxf file via Export network via Dxf file Superimpose dxf network file back to CAD background file. www.lestarisoftware.com 15

Plot Profile & export via dxf file Compared flow in & out from Pond. Flow from L8 + L11 go into Pond & discharge out via Culvert. For more information visit www.lestarisoftware.com or contact us: Lestari Software Enterprise No. 5-2, Jalan Temenggung 5/9, Bandar Mahkota Cheras, 43200 Cheras, Selangor Tel (03) 9010 4368 Fax (03) 9010 4328 E mail: info@lestarisoftware.com www.lestarisoftware.com 16