Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation

Similar documents
Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation

SMA POWER+ SOLUTION TS4

PV Rapid Shutdown device

2.1 MANAGEMENT UNIT INSTALLATION

Installation/User Manual

INSTALLATION AND SAFETY MANUAL

FHOTON WI-FI MODULE Owner's Manual

Enphase S-Series Microinverter and Engage Cable Safety

M250 (M LL) Safety

M215 (M215-60) Safety

M215 Safety (M LL-S22-IG / S23-IG / S24-IG)

M215-Z Safety Information (M LL-IG-ZC)

Conext CL-60 Inverter Firmware Upgrade Process

GRID-TIED SOLAR INVERTER 1.5KW ~ 6.0KW V.1.2

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

DOWNLOAD PDF ENPHASE M250 INSTALLATION GUIDE

ILUMEN PID SOLUTION INDOOR OUTDOOR ILUMEN PIDBOX MINI INSTALLATION MANUAL. Ilumen PIDbox mini Version 1.5

sonnen Installation Practical

DTS 310. DIN Rail Mounted, Indoor Rated Revenue Grade Electrical Sub-meter. Page 1. Measurlogic MQ A

Installing the Enphase Envoy-S Metered

Torque Series LCD Remote Panel Installation/Operation Manual Model: TQ-DSP-12/24

XBR V4 INSTALLATION AND USER GUIDE

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

System Design Guide. APsystems YC Photovoltaic 3-Phase Grid-connected Microinverter. APsystems. Version 1.1 3/15

Meikai N220/N300 Micro-Inverter Installation and Operation Manual

PM Series Power Meter

InnoMedia Business VoIP ATA Models

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

User Manual. 3KW/5KW PV Inverter

Rev1 QP-10-IM21UL/Rev Rev2 QP-10-IM21UL/Rev Rev3 QP-10-IM21UL/Rev Rev4 QP-10-IM21UL/Rev4

Rapid Shutdown Requirements for NEC 2017

Test Asset Optimization Services Power Line Utilization Module (PLUM) DATA SHEET

Installation Guide for America Solar Wholesale Photovoltaic Modules

RADEON /RADEON VE Getting Started...

Model 2657A-LIM-3 LO Interconnect Module

Residential Storage Solution for North America. Accessory: Rapid Shut-down System (RSS) Features:

PV Module Installation Instructions

PV Monitoring System. PLC Box and Data Logger USER MANUAL

User Manual. 1.5KW~5KW PV Inverter. Version: 1.1

Installation / User Manual

Installation / User Manual

See instructions to download and install the latest version of LinkBoxLON and the user's manual at

W POWER OUTPUT RANGE 99.4% THE OPTIMIZED SOLUTION FULLY INTEGRATED LINEAR PERFORMANCE WARRANTY COMPATIBLE WITH MOST TRINA MODULES

DRAFT. Application Note: Modbus/RS485 Wiring for Conext Core XC Series Inverters. 1.0 Introduction DANGER. 1.1 Related Documents

Installation/User Manual

See instructions to download and install the latest version of LinkBoxMB and the user's manual at

Please take serious note of the following warnings:

TSP-BCM48, TSP-BCM48A. Operating Instruction Manual. Page 1 of 13

Installing and Managing the Switch

Worldwide Energy and Manufacturing USA, Co., LIMITED Add: RM 1708 C1, NAN FUNG TOWER, 173 DES VOEUX RD CENTRAL, HK. Installation Manual

MC 11 EB-2 Power supply cabinet with external bus, AC version

SoliTek Standard Photovoltaic module (PV) Documentation and Installation Manual

MOBILE CONNECTOR - GEN 2 OWNER'S MANUAL

Microinverters And The Solar Industry

See instructions to download and install the latest version of LinkBoxMB and the user's manual at

Product Manual. Surge Protected Metal 7- Port USB 2.0 Hub DIN RAIL Mount Kit NEC Chip

Installation/User Manual

CVU-200-KIT. 200 V Bias Tee Kit. Description. Parts list / October 2014 *P A* 1

OPERATING PROCEDURES for the UPS-S2 Universal Power Supply Series 2

CEM M-RS485 INSTRUCTION MANUAL (M014B A)

QUICK START GUIDE: MTC 6 Industrial PC. 1 Introduction. MTC 6 commissioning by skilled personnel only

Conext EasyConfig Tool

Smart Grid Tie Microinverter User Manual

Rhino Buffer Module PSM24-BFM600S. Operating Instructions

Communication Interface for SMA Inverters SMA BLUETOOTH PIGGY-BACK


SolarEdge Installation Guide MAN Cover goes here (right-side [odd] page) hotovoltaikforum.co

Model 7705 Control Module

Model 8020-STC. Kelvin Standard Triaxial Connector Card. Description / October 2014 *P * 1

EC Series. Safety Guide

See instructions to download and install the latest version of LinkBoxMB and the user's manual at

See instructions to download and install the latest version of LinkBoxMB and the user's manual at

SPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS

User's Guide. MiniTec TM Series Model MN25 MultiMeter

Installing Enphase M250 and M215 Microinverters

3700 SERIES USER MANUAL

+Cam Quick Start Guide

Installing the Cisco AS5400XM Universal Gateway

CHILICON POWER GATEWAY

W POWER OUTPUT RANGE

ENVIRONMENTAL PROTECTION

ABB Three Phase String inverter

Altivar 61/71 Adjustable Speed Drives Heatsink Fan Kits VZ3V1212 and VZ3V1216

PIM-Mini Pulsed Current Source Operation Manual

NTS-protect. Description of GPS antenna and NTS time server connection via system lightning protector system /NTS-3000, NTS-4000, NTS-5000/

Installation and Operations Manual Micro-Inverter M S

See instructions to download and install the latest version of LinkBoxEIB and the user's manual at

Conergy PH Series Modules. Solar module user manual

Wireless 5G HDMI Transmitter, Receiver & 4 Port Switch With 1080p and 3D compatible

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER!

BCM2 Series Branch Circuit Monitors Quick Setup Guide

Model 2380 Rack-Mount Kit

Installation and Operations Manual INVOLAR MAC250 Microinverter

CVU-3K-KIT. 3 kv Bias Tee Kit. Description. Parts list / October 2014 *P * 1

HV-CS kv Edge Mount Triaxial Jack

Smart Wireless THUM Adapter

PowerMust Office Uninterruptible Power System

MU110-6U. Analog output module 6 channel. User guide

Installation RA5112-C-16A-C20. Basic Rack Power Distribution Unit

Transcription:

Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation INTERACTIVE INSTALLATION AND SAFETY MANUAL FOR TS4: SMART MODULES AND RETROFIT CLICK TO CONTINUE It is highly recommended to view in full screen mode

THE INTERACTIVE MANUAL This manual contains action buttons, designated to help you navigate around and find the most relevant information for your installation ON THIS SIDE: You ll see clarification, additional information, and links for external pages Next Back Home Goes to the next page Goes to the previous page Goes to the product selection page CLICK TO CONTINUE

READ THIS FIRST IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS LETHAL VOLTAGE MAY BE PRESENT IN ANY PV INSTALLATION This manual contains important instructions for installation and maintenance of the Tigo Energy product models TS4-L, TS4-O, TS4-S, TS4-M, TS4-R-M, TS4-R-S, TS4-R-O, ES-GTWY-020, Cloud Connect, Cloud Connect Advanced and related Tigo Energy software applications. Risk of electric shock, do not remove cover, disassemble, or repair, no user serviceable parts inside. Refer servicing to qualified service personnel. Before installing or using the Tigo Energy System, please read all instructions and warning markings on the Tigo Energy products, appropriate sections of your inverter manual, photovoltaic (PV) module installation manual, and other available safety guides. Failure to adhere to these instructions may result in injury or death, damage to the system or voiding the factory warranty. To reduce risk of fire and shock hazard, install this device with strict adherence to National Electric Code (NEC) ANSI/NFPA 70 and/or local electrical codes. When the photovoltaic array is exposed to light, it supplies a DC voltage to the Tigo Energy Module Maximizer. The Module Maximizers and Smart Modules start in the ON state and their output voltage may be as high as the PV module open circuit voltage (Voc) when connected to the module. The installer should use the same caution when handling electrical cables from a PV module with or without the Tigo Energy Module Maximizer attached. Installation must be performed by trained professionals only. Tigo Energy does not assume liability for loss or damage resulting from improper handling, installation, or misuse of products. Remove all metallic jewelry prior to installing the Tigo Energy Module Maximizers or Smart Modules to reduce the risk of contacting live circuitry. Do not attempt to install in inclement weather. Do not operate the Tigo Energy Module Maximizers or Smart Modules if they have been physically damaged. Check existing cables and connectors, ensuring they are in good condition and appropriate in rating. Do not operate Tigo Energy Module Maximizers or Smart Modules with damaged or substandard wiring or connectors. Tigo Energy Module Maximizers must be mounted on the high end of the PV module back-sheet or racking system, and in any case above ground. Do not connect or disconnect under load. Turning off the Inverter and/or the Tigo Energy products may not reduce this risk. Internal capacitors within the inverter can remain charged for several minutes after disconnecting all power sources. Verify capacitors have discharged by measuring voltage across inverter terminals prior to disconnecting wiring if service is required. Service Personnel: Check the voltage of the array after activating the Tigo Energy PV-Safe function on the MMU prior to performing service. Always assume Module Maximizers and Smart Modules are in ON state, or may turn on when restarting.

TS4 PLATFORM: BASE This manual covers the installation steps for the Tigo TS4 family of products, both integrated and add-on versions. GUIDE: Long Strings Optimization Rapid Shutdown Monitoring WHERE TO BUY: CLICK HERE Module integrated TS4 Add-on TS4-R

TS4 PLATFORM: COVER SELECTION The TS4 covers contain your module level electronics: GUIDE: Long Strings Optimization TS4-L* TS4-O Rapid Shutdown Monitoring WHERE TO BUY: CLICK HERE TS4-S TS4-M *TS4-L is available only for the module-integrated TS4

COMMUNICATION ORDERING INFORMATION: Cloud Connect Kit comes with: The Cloud Connect is your data logger and safety control unit. The Gateway is an antenna that communicates with your smart modules or add-on devices. It is always recommended to install communication accessories, to utilize the full potential of your TS4, however it is only mandatory in order to enable monitoring and safety features, such as Rapid Shutdown. 1 Gateway 1 Power supply: 2 different options: 1. Wall Outlet 2. DIN Rail Additional Gateways available separately Select your model of Cloud Connect: Cloud Connect and Gateway Cloud Connect Advanced and Gateway WHERE TO BUY: CLICK HERE REMINDER: When using TS4-O and TS4 -L, Cloud Connect is only required where rapid shutdown and/or monitoring capabilities are needed

TABLE OF CONTENTS 1. System Overview & Product Description 2. Installing Gateways 3. Installing Cloud Connect 4. Installing and Mapping 5. Online Configuration 6. Commissioning 7. Rapid Shutdown 8. Connecting Modbus Accessories PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN

1. SYSTEM OVERVIEW: TS4-B (TS4 BASED MODULES) Gateway (GTWY) DESIGN RULES: 1 CLOUD CONNECT: - Up to 7 GTWYs and 360 PV modules - All Smart Modules in the same string must be assigned to the same CC 1 GTWY: - Up to 120 PV modules - Modules must be within 10m-15m Next Gateway (33-50 ft.) from the GW, depending on roof topology and material Internet For further information CLICK HERE Inverter Cloud Connect (CC) Tigo s Monitoring Software for Systems Management CC AND GTWY CALCULATOR: For the number of CCs and GTWYs required for your project CLICK HERE Smart Module Powered by Tigo

1. SYSTEM OVERVIEW: TS4-R Gateway (GTWY) DESIGN RULES: 1 CLOUD CONNECT: - Up to 7 GTWYs and 360 PV modules - All Smart Modules in the same string must be assigned to the same CC 1 GTWY: - Up to 120 PV modules - Modules must be within 10m-15m (33- Next Gateway 50 ft.) from the GW, depending on roof topology and material Internet For further information CLICK HERE Inverter Cloud Connect (CC) Tigo s Monitoring Software for Systems Management CC AND GTWY CALCULATOR: For the number of CCs and GTWYs required for your project CLICK HERE TS4-R with Monitoring, Safety and/or Optimization

1. SYSTEM OVERVIEW & PRODUCT DESCRIPTION TS4-M: MONITORING: The TS4-M provides continuous system-wide monitoring for fleets to make customer support and fleet workflow on track MORE INFORMATION: Click here to learn more, watch a video and see the TS4 platform datasheet. Diodes Monitoring TS4-S: SAFETY: The TS4-S provides the necessary safety and monitoring services required by municipalities Diodes Monitoring Safety TS4-O: OPTIMIZATION: In addition to safety, monitoring, and PV2.0 synchronization, TS4-O optimizes each PV module when its performance is affected by shade or mismatch Diodes Monitoring Safety Optimization TS4-L: LONG STRINGS: The TS4-L is the complete Smart Module solution. It is ideal for systems requiring fully optimized performance at the module level, monitoring, safety, and longer strings CLICK HERE to see the TS4-L string sizing info. Diodes Monitoring Safety Optimization Long Strings

2. INSTALLING GATEWAYS (GTWY) INSTALLATION: 1. Connect all GTWY cables before powering ON Cloud Connect Gateway attaches to module frame using provided bracket 50ft (15m) Locate Gateway near center of array or each sub-array 2. Mount GTWY on back of PV module using provided bracket, or bolt to the racking system 3. Powering ON Cloud Connect and preform GTWY test from the Tigo SMART App RS-485 communication cable is recommended: 2 x twisted pair, sunlight resistant of direct burial. MORE INFORMATION Gateway Hardware Guide Gateway Placement Guide Communication Cable Guide Connect multiple Gateways in series and leave terminating resistor only in final Gateway.

3. INSTALLING THE CLOUD CONNECT OPTIONAL Connect an External Switch for PV-Safe Network Wired Ethernet and Wi-Fi connections 1 WHERE TO PLACE: - On a wall or beam - Next to the inverter - Out of direct sunlight 3 CONNECTIONS: 1. Internet connection, using one of the options: 2. Gateway Ethernet Port Built in Wi-Fi Wi-Fi connection is configured using the Tigo SMART app Connect using RS485 cable RS485 for 3rd party Modbus devices Wireless Capabilities Use Wi-Fi for your Internet connection and for commissioning with a smartphone - + B A 2 Gateway Plug in GTWY(s) cable after all the GTWY(s) are connected in series (next page) - + B A + - B A - + Power Supply 24Vdc input For Rapid Shutdown, install on the same AC panel as the inverter 3 3. Power supply: 2 options: DIN Rail Power Supply Wall Socket Power Supply CLICK HERE for details Complete CC menu options in 7. Commissioning CLICK HERE for Tigo SMART app guide *In case CC is mounted in a metal enclosure, extend this antenna out of the box in order to use Wi-Fi as an Internet connection

CLOUD CONNECT WIRING REFERENCE Cloud Connect with DIN rail power supply Cloud Connect with DC transformer Connect DC leads from power supply to Cloud Connect Connect AC and DC ground wires to DIN rail Connect AC power input to power supply Connect DC leads from power supply to Cloud Connect Click here for the Cloud Connect installation quick start guide

TABLE OF CONTENTS 1. System Overview & Product Description 2. Installing Gateways 3. Installing CCA 4. Installing and Mapping 5. Online Configuration 6. Commissioning 7. Rapid Shutdown 8. Connecting Modbus Accessories PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN

1. SYSTEM OVERVIEW: TS4-B (TS4 BASED MODULES) Gateway (GTWY) DESIGN RULES: 1 CLOUD CONNECT ADVANCED: - Up to 7 GTWYs and 360 PV modules - All Smart Modules in the same string must be assigned to the same CCA 1 GTWY: - Up to 120 PV modules - Modules must be within 10m-15m Next Gateway (33-50 ft.) from the GW, depending on roof topology and material Internet For further information CLICK HERE Inverter Cloud Connect Advanced (CCA) Tigo s Monitoring Software for Systems Management CCA AND GTWY CALCULATOR: For the number of CCAs and GTWYs required for your project CLICK HERE Smart Module Powered by Tigo

1. SYSTEM OVERVIEW: TS4-R Gateway (GTWY) DESIGN RULES: 1 CLOUD CONNECT ADVANCED: - Up to 7 GTWYs and 360 PV modules - All Smart Modules in the same string must be assigned to the same CCA 1 GTWY: - Up to 120 PV modules - Modules must be within 10m-15m Next Gateway (33-50 ft.) from the GW, depending on roof topology and material Internet For further information CLICK HERE Inverter Cloud Connect Advanced (CCA) Tigo s Monitoring Software for Systems Management CCA AND GTWY CALCULATOR: For the number of CCAs and GTWYs required for your project CLICK HERE TS4-R with Monitoring, Safety and/or Optimization

1. SYSTEM OVERVIEW & PRODUCT DESCRIPTION TS4-M: MONITORING: The TS4-M provides continuous system-wide monitoring for fleets to make customer support and fleet workflow on track MORE INFORMATION: Click here to learn more, watch a video and see the TS4 platform datasheet. Diodes Monitoring TS4-S: SAFETY: The TS4-S provides the necessary safety and monitoring services required by municipalities Diodes Monitoring Safety TS4-O: OPTIMIZATION: In addition to safety, monitoring, and PV2.0 synchronization, TS4-O optimizes each PV module when its performance is affected by shade or mismatch Diodes Monitoring Safety Optimization TS4-L: LONG STRINGS: The TS4-L is the complete Smart Module solution. It is ideal for systems requiring fully optimized performance at the module level, monitoring, safety, and longer strings CLICK HERE to see the TS4-L string sizing info. Diodes Monitoring Safety Optimization Long Strings

2. INSTALLING GATEWAYS (GTWY) Installation: 1. Connect all Gateway cables before powering on Cloud Connect 50ft (15m) 2. Install Gateway on back of PV module using provided bracket or by bolting to the racking system 3. Power on Cloud Connect and perform Gateway test from Tigo SMART App Gateway attaches to module frame using provided bracket Locate Gateway near center of array or each sub-array RS-485 communication cable is recommended. 2 twisted pair, sunlight resistant or direct burial More Information: Gateway Hardware Guide Gateway Placement Guide Communication Cable Guide Connect multiple Gateways in series and leave terminating resistor only in final Gateway.

3. INSTALLING THE CLOUD CONNECT ADVANCED (CCA) OPTIONAL Connect an External Switch for PV-Safe Network Wired Ethernet and Wi-Fi connections 1 WHERE TO PLACE: - On a wall or beam - Next to the inverter - Out of direct sunlight 3 CONNECTIONS: G B A - + B A G B A - + 1. Internet connection, using one of the options: 2. Gateway Ethernet Port Built in Wi-Fi Wi-Fi connection is configured using the Tigo SMART app Connect using RS485 cable RS485 For 3 rd party devices Wireless Capabilities Use Wi-Fi for your Internet connection and for commissioning with a smartphone RS485 For 3 rd party devices Gateway Plug in GTWY(s) cable after all the GTWY(s) are connected in series (next page) 2 Power Supply 24Vdc input 3 For Rapid Shutdown, install on the same AC panel as the inverter 3. Power supply: 2 options: DIN Rail Power Supply Wall Socket Power Supply CLICK HERE for details CLICK HERE for Tigo SMART app guide *In case CC is mounted in a metal enclosure, extend this antenna out of the box in order to use Wi-Fi as an Internet connection

CLOUD CONNECT ADVANCED (CCA) WIRING REFERENCE CCA with DIN rail power supply CCA with DC transformer Connect DC leads from power supply to CCA Connect AC and DC ground wires to DIN rail Connect AC power input to power supply Connect DC leads from power supply to CCA Click here for the Cloud Connect installation quick start guide

4. INSTALLING & MAPPING 1 Remove 1 barcode sticker from the TS4 junction box or add-on TEMPLATES: Create your site map using Tigo s string list template To view and download, CLICK HERE Another option is to first map your site online (see next page). At the end, you ll be able to download a 2 Place the sticker on the map, string list or construction drawing, in the exact position you are going to place modules in the field or on the roof. physical map of your system to help map the barcodes NOTE: If you re installing 50 modules or less and don t need an exact physical 3 Place PV modules in a way matches the map you made using barcodes. Also record the serial numbers of the GTWY(s) position you may skip the mapping step and go straight to commissioning MAKE SURE you take the junction box s label or the TS4-R label, NOT the module s

4. INSTALLING & MAPPING: TS4-R 1 Mount the optimizer on the top right corner of the PV module 2 Connect the PV cables from the module to the short leads of the TS4-R 3 Connect the long output cables of the optimizers in series to form strings, as you would with standard PV modules

5. CONFIGURE THE SYSTEM ONLINE 1 CLICK HERE http://installations.tigoenergy.com/ Click on 3 Follow the wizard instructions 2 ** For smart module systems with less than 50 panels, this step can be done after the physical installation

6. COMMISSIONING To commission the Tigo equipment there are 3 simple steps that need to be completed: 1. NETWORK TEST 2. GATEWAY TEST 3. DISCOVERY For systems with multiple Cloud Connect units, these tests need to be performed on each individual Cloud Connect. Network and Gateway tests can run at the same time on different CCs. However, Discovery must be initiated on Cloud Connects one by one, making sure GTWY discovery stage is complete before moving to the next one. This may take several minutes to several hours depending on the size of the system. Note: The discovery process can be initiated for sites with more than 50 Smart Modules only after the online configuration of the system has been completed and downloaded by the Cloud Connect.. This step requires an Internet connection. To Commission the system using your smartphone, download the Tigo SMART app and follow its instructions. CLICK HERE to view the manual. VERIFY RAPID SHUTDOWN FUNCTIONALITY Verify rapid shutdown functionality after the discovery process is completed. Switch off the AC main and make sure voltage drops below 30V within 10 seconds. Power the system on after testing using: 2. Control -> 2.2. Modules ON CC MENU: 1. Status 1.1. Modules 1.1.1. Signal 1.1.2. Voltage 1.1.3. Power 1.2. Date / Time 1.3. Unit ID 1.4.Version 1.5. Config (internal use only) 2. Control 2.1. Discovery 2.2. Modules ON 2.3. Push Data 2.4. Restart 2.5. Gateway Test 2.6. Replace GW 2.7. H/W Test (internal use only) 3. Network 3.1. Display IP 3.2. Test 3.3. Configure 3.4. Set Proxy 3.5. Renew Click for description

7. RAPID SHUTDOWN TS4-L, TS4-O, and TS4-S with Kaco Blueplanet Smart Inverter and Gateway are a solution to meet NEC 2014 690.12 Rapid Shutdown requirements, when combined with a DC disconnect at the inverter. When Rapid Shutdown is initiated, the voltage across PV conductors will drop below 30V within 10 seconds at the module level. Rapid Shutdown is activated by taking 2 simple actions. To activate rapid shutdown (with most inverters order of actions doesn t matter): 1. Switch off DC disconnect as well to disconnect capacitors. 2. Switch OFF AC main to deactivate system. In the inverter s box you ll find 2 red labels to mark the Rapid Shutdown equipment. Place one sticker next to the inverter s DC switch and the other on the AC main breaker. Both labels must be visible! Only a properly installed, configured, and tested system will perform Rapid Shutdown properly. CLICK HERE for more info about Rapid Shutdown

8. CONNECTING MODBUS DEVICES (OPTIONAL) INSTALLATION: 1. Verify device settings for AC meter, inverter, etc. in its own installation manual 2. Connect devices to RS-485 port on CC or CCA (note: similar devices can be connected in series) G B A 3. Contact Tigo Tech Support to activate a connected device To Modbus device To GTWY 1.408.402.0802 ext. 2 00800.CALL.TIGO(2255.8446) support@tigoenergy.com G B A To Modbus device To GTWY RECOMMENDED SETTINGS: 9600 baud rate 8 bits data 1 stop bit No parity

TECHNICAL SPECIFICATIONS SMART MODULE WITH TS4-B BASE TS4 COVERS ELECTRICAL RATINGS DIODES TS4-D MONITORING TS4-M SAFETY TS4-S OPTIMIZATION TS4-O LONG STRINGS TS4-L INPUT Rated DC Input Power 375W 375W 375W 475W 475W Maximum V OC @ STC 90V 52V 52V 75V 75V Maximum Short Circuit Current (I SC ) 12A 12A 12A 12A 12A Minimum V MP N/A 16V 16V 16V 16V Max Input Voltage @ Lowest Temp N/A 66V 66V 90V 90V OUTPUT Output Power Range 0-375W 0-375W 0-375W 0-475W 0-475W Output Voltage Range 0 - V OC 0 - V OC 0 - V OC 0 - V OC 0 - V OC Communication Type N/A 802.15.4 2.4GHz 802.15.4 2.4GHz 802.15.4 2.4GHz 802.15.4 2.4GHz Rapid Shutdown Capability (NEC 2014 690.12) Need additional RS device Need additional RS device Yes Yes Yes Impedance Matching Capability No No No Yes Yes Output Voltage Limit No No No No Yes Maximum System Voltage 1500V 1500V 1500V 1500V 1500V All TS4 covers are 1500V compatible. Specify system voltage when ordering (1000V / 1500V) for appropriate cables & connectors Rapid shutdown requires TS4-S or higher, installed with Cloud Connect and Gateway

TECHNICAL SPECIFICATIONS RETROFIT UNIT WITH TS4-R BASE TS4-R ELECTRICAL RATINGS MONITORING TS4-R-M SAFETY TS4-R-S OPTIMIZATION TS4-R-O INPUT @ STC Rated DC Input Power 375W 375W 475W Maximum V OC @ STC 52V 52V 75V Maximum Short Circuit Current (I SC ) 12A 12A 12A Minimum V MP 16V 16V 16V Maximum Input Voltage @ Lowest Temperature 66V 66V 90V OUTPUT Output Power Range 0-375W 0-375W 0-475W Output Voltage Range 0 - V OC 0 - V OC 0 - V OC Communication Type 802.15.4 2.4GHz 802.15.4 2.4GHz 802.15.4 2.4GHz Rapid Shutdown Capability (NEC 2014 690.12) Need additional RS device Yes Yes Impedance Matching Capability No No Yes Output Voltage Limit No No No Maximum System Voltage 1500V 1500V 1500V All TS4 covers are 1500V compatible. Specify system voltage when ordering (1000V / 1500V) for appropriate cables & connectors Rapid shutdown requires TS4-S or higher, installed with Cloud Connect and Gateway

TECHNICAL SPECIFICATIONS MECHANICAL SPECIFICATIONS TS4-B and TS4-R Mechanical Operating Temperature Range Storage Temperature Range Cooling Method Dimensions (with cover) Weight (base without cover) Outdoor Rating Cabling Type Output Length Cable Options Cable Cross-Section Connectors UV Resistance -40 C to +75 C (-40 F to +167 F) -40 C to +75 C (-40 F to +167 F) Natural Convection 152.5mm x 108mm x 25.3mm 270g IP67, NEMA 3R PV1-F, PV wire Standard 1.0m, other lengths on request 1000V rated 1500V rated 7.15 ± 0.25 mm (1000V) 6.4 ± 0.2mm, 7.05 ± 0.2mm (1500V) MC4, MC4 compatible, Amphenol, EVO2 500hr with UV light between 300-400nm @65C Maximum String Voltage 1500V UL/IEC 1 1 All TS4 covers are 1500V compatible. Specify max system voltage when ordering modules with TS4 bases for appropriate cables & connectors.

YOU RE GOOD TO GO! For more details on designing and installing solutions powered by Tigo, please visit: Tigo Academy Agora Or contact us at: support@tigoenergy.com 1.408.402.0802 #2 GOOD LUCK! Tigo Customer Care