Avanti HP Series Centrifuges Preinstallation

Similar documents
Installation Job Aid for Ethernet Routing Switch 3600 Series

E-Series Site Preparation Guide

BS 287 DUAL CHANNEL POWER SUPPLY. User Manual. January 2017 V1.0

PanelView Plus/VersaView CE Terminals and Display Modules

Temperature. Power requirements. Weight. Dimensions

BS 181 SINGLE CHANNEL POWER SUPPLY USER MANUAL

* * Agilent Power Distribution Unit (PDU) Installation Guide

Owner s Manual. Isolate. Restore. Inspire! Power Conditioners Audio / Video Power Isolation Units Rack Mount / Consumer Series

Installation RA5112-C-16A-C20. Basic Rack Power Distribution Unit

TOT Series Manual. North American CE and UK Models. CE Models. UK Models. North American Models

Metered Rack PDU Rack PDU, Metered, Zero U, 20A, 120V, (24) NEMA 5-20R

Line reactors SINAMICS. SINAMICS G130 Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation

Customer Responsibilities

Installation and Maintenance

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

Metered Rack PDU Rack PDU, Metered, Zero U, 10A, 230V, (16) C13

Installation Job Aid for VSP 4450GTX-HT- PWR+

Installation Job Aid for VSP 4850GTS

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

Metered Rack PDU Rack PDU, Metered, Zero U,12.5kW,208V,(30)C13, (6)C19; 10' Cord

Automated Tuner System Power Distribution Hub

TOT Series Manual. North American and International Models - without optional faceplate. Receptacle Panel of International Models, CE model shown

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

BS 181 SINGLE CHANNEL POWER SUPPLY USER MANUAL

S66 Series Electronic Fan Speed Control

Site Preparation CHAPTER

Metered Rack PDU Rack PDU, Metered, Zero U, 5.7kW,208V,(36)C13& (6)C19; 10' Cord

Installing the Cisco MDS 9020 Fabric Switch

Latex 110 Printer. Site preparation guide

Siemens Industrial s

Installing the Tracer MP503 Input/Output Module Ordering number: ,

Dell MD1280 Storage Enclosure Getting Started Guide

ICS Entrance Management Sign Installation Guide. Version 1.0

ATS-16 HV USER MANUAL. Automatic Transfer Switch 16A / 230Vac V090318

icore Kiosk system Installation Guide

Haze 800 DMX. User Guide. English

Protect It! 7-Outlet Surge Protector, 6 ft. Cord, 1080 Joules, Diagnostic LED, Light Gray Housing

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

GOLDENI. Owners Manual & Safety Instructions. English. model# GOLDi600. Copyright 2017 Smart Grow Technologies, INC All Rights Reserved

PS 289 DUAL CHANNEL POWER SUPPLY USER MANUAL

TAM Air Isothermal Calorimeter. Site Preparation Guide

Junos WebApp Secure 5.0 Hardware Guide

Protect It! 7-Outlet Surge Protector, 7-ft. Cord, 2520 Joules, Fax/Modem Protection, RJ11

Installation Instructions

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Aruba JL311A Cable Guard Installation Instructions

Back-UPS RS APC Back-UPS RS 800VA 120V Black

Customer Responsibilities

Pre-Installation Guide

Mounting Instruction. Industrial Ethernet Workgroup Switch MACH104 Full Gigabit Family. Mounting Instruction MACH104 Release 07 07/2014

Protect It! 7-Outlet Surge Protector, 6-ft. Cord, 1080 Joules, Fax/Modem Protection, RJ11

Table of Contents. Safety. Attention. Warnings

Installation Instructions

Protect It! 10-Outlet Surge Protector, 8 ft. Cord with Right-Angle Plug, 2395 Joules, Tel/DSL Protection, Black Housing

HPE Port and 48-Port Switches Quick Setup Guide

Isobar 12-Outlet Network Server Surge Protector, 15 ft. Cord, 3840 Joules, Diagnostic LEDs, 1U Rack-Mount, Metal Housing

Lightspeed Advanced Reporting Bottle Rocket Hardware Installation Guide

INSTRUCTION MANUAL RA 55 RACK ADAPTER RACK ADAPTER FOR MST SERIES POWER MODULES

Installation, Operation, and Service Manual SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET

Isobar 4-Outlet Surge Protector, 6 ft. Cord with Right-Angle Plug, 3330 Joules, Diagnostic LEDs, Metal Housing

MFJ-1164B AC Line RFI Filter

G5 PDU Installation Guide

Installation Manual INTELLIGENT SERVER. Model name: BMS-LSV6UL

Power Supply (48Vdc, 2.5A)

ChemiDoc and ChemiDoc MP Imaging Systems with Image Lab Touch Software Installation Qualification Protocol (IQ)

Site Readiness Guide. September 2015

Site Readiness Guide. October 2017

Protect It! 10-Outlet Surge Protector, 8 ft. Cord with Right-Angle Plug, 2395 Joules, Tel/DSL Protection, Black Housing

Isobar 8-Outlet Surge Protector, 12 ft. Cord with Right-Angle Plug, 3840 Joules, Diagnostic LEDs, Metal Housing

INSTRUCTION MANUAL. Instruction Manual. Analog Multi-Tube Vortexer Digital Multi-Tube Vortexer

LVN5200A-R2, rev. 1, Hardware Installation Guide

5.8kW Single-Phase Switched PDU, 208/240V Outlets (8 C13 & 6 C19), L6-30P, 15ft Cord, 2U Rack-Mount, TAA

Controller Specifications

Customer Responsibilities

3 Uninterruptible Power Systems

Configurable Output Distribution. 120V / 208V / 240V 60Hz. User Manual English

ATS22D62Q soft starter-ats22-control 220V-power 230V(15kW)/ V(30kW)

INTELLIGENT SERVER. Model: BMS-LSV6E

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

User Safety. Electrical Safety. Phaser 4500 Laser Printer

Installing the IPS 4345 and IPS 4360

Hardware Reference Guide For Thin Clients

MOBILE CONNECTOR - GEN 2 OWNER'S MANUAL

USER MANUAL INSTALLATION MANUAL. Isolation transformers. ITR Isolation Transformer 7000 W 230V/32A

SMART Mobile Stand for interactive displays

Variable-Speed Vortex Mixer

K1F037MCH cam voltmeter switch - 3L and 3L-N A - for Ø 22 mm

ATS22D88S6U. ATS22D88S6U soft starter-ats22-control110v-power 208V(25hp)/230V(30hp)/460V(60hp)/575V(75hp) Product data sheet Characteristics.

NI PXIe-1062Q Power Supply Shuttle

FLEX Ex Spring Clamp Terminal Base

Isobar 6-Outlet Surge Protector, 6 ft. Cord with Right-Angle Plug, 3300 Joules, Diagnostic LEDs, Metal Housing

ABL1RPM24100 regulated SMPS - single phase V input - 24 V output W

±15 V Current-Limited Power Supply

ATS22C17Q. Main. Range of product Altistart 22. Component name. Factory setting current. Utilisation category. IP degree of protection

ATS01N103FT soft starter for asynchronous motor - ATS01-3 A V KW

ATS22D75Q soft starter-ats22-control 220V-power 230V(18.5kW)/ V(37kW)

ATS22C11S6U soft starter-ats22-control110vpower208v(30hp)/230v(40hp)/460v(75hp)/575v(100h

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W.

Basketball Shot Clock Set LX2180 Manual

ATS22D47S6U. Main. Range of product Altistart 22. Component name. Factory setting current. Utilisation category. IP degree of protection

Transcription:

J3HP-TB-001AC May 2009 Avanti HP Series Centrifuges Preinstallation INTRODUCTION Purchase of an Avanti HP series high performance centrifuge includes installation and Basic Instrument Training for two operators. This guide is provided to assist you in preparing your laboratory and the designated operators so that installation and training can be completed in a manner that allows for efficient implementation and successful operation of the centrifuge. SPECIFICATIONS WEIGHT 310 kg (680 lb) Avanti HP-30I 290 kg (640 lb) Avanti HP-26XP series Number of electrical outlets required: 1 DIMENSIONS Height (door closed):.................... 116 cm Height (door open) Avanti HP-30 I:...................... 141 cm Avanti HP-26XP series:............... 149 cm Width:................................ 71 cm Depth (including air diverter extending from back panel):........................ 102 cm CONTROL FEATURES Ambient temperature............. +16 C to 38 C Humidity restrictions........ <95%, noncondensing PHYSICAL DATA Electrical supply......................... Class I Maximum heat dissipation into room under steady-state conditions...... 2.0 kw (6900 Btu/h) Installation (overvoltage) category.............. II Pollution degree............................ 2 * POWER REQUIREMENTS Nominal Instrument Voltage Rating Single-phase, 200/208/240 V Line Frequency/ Current 50/60 Hz/ 24A INSTALLATION REQUIREMENTS Installation Category Plug Included yes This centrifuge is classified as installation category II. Ventilation The centrifuge must have adequate air ventilation to ensure compliance to local requirements for vapors produced during centrifuge operation. Biosafety Considerations If sample containment is required, Beckman Coulter can provide a Class II or III biosafety cabinet specially designed to house the centrifuge. Contact your local Beckman Coulter office for more information. Electrical Requirements The Avanti HP series centrifuge comes with a permanently attached three-wire UL/CSA approved cord with a NEMA type 6-30P plug. The Avanti HP series centrifuge requires a single grounded outlet: 50/60 Hz single-phase, 180 V to 264 V, 30 A. In order for loading not to exceed 80% of the nominal service capacity, only one Avanti HP centrifuge should be installed per circuit. * Normally only nonconductive pollution occurs; occasionally, however, a temporary conductivity caused by condensation must be expected. 2009 Beckman Coulter, Inc.

Wire Insulation Color Required Wire Connections Terminal Harmonized Symbol North American Figure 1 shows the power connection required for Avanti HP series centrifuges. The single-phase system includes earth ground and two power leads with 30 ampere circuit breakers. Green/ Yellow Earth ground 30-ampere Circuit Breaker Light Blue Brown Neutral Live or Line Power to the centrifuge should originate directly from a main power line transformer at a power source known to be clear of erratic loads, spikes, and electromagnetic interference. Make sure that there are properly rated thermal circuit breakers at the wall service panel to protect the centrifuge circuit. Do not substitute fuses for the circuit breakers specified at the service panel. Prior to instrument purchase, the line voltage should be checked with a voltmeter and the appropriate instrument ordered. After delivery, verify that the voltage indicated on the centrifuge s name rating plate (on the back of the control head) agrees with the measured line voltage. If the measured voltage is not within the indicated range, contact your Beckman Coulter Field Service representative. Your representative can rewire the centrifuge to adapt it to the available line voltage. To ensure safety, the instrument should be wired to a remote emergency switch (preferably outside the room where the centrifuge is housed, or adjacent to the exit from that room), in order to disconnect the instrument from the main power source in case of a malfunction. N L L L Figure 1. Avanti HP Series Centrifuge Power Connection! Wall Outlet: Hubbell 9330, Bryant 96-30-FR, or Equivalent (NEMA 6-30 R) Earth Ground 30-ampere Circuit Breaker Measured Line Voltage WARNING To reduce the risk of electrical shock, this equipment uses a three-wire electrical cord and plug to connect the centrifuge to earth-ground. To preserve this safety feature, make sure that the matching wall outlet receptacle is properly wired and earth-grounded. Check that the line voltage agrees with the voltage listed on the name rating plate affixed to the centrifuge. 2 Avanti HP Series Preinstallation Instructions

Space Requirements The centrifuge dimensions are shown in Figure 2. In addition to space for the instrument itself, allow a 7.7-cm clearance on each side of the instrument and a 16-cm clearance behind the instrument for air circulation. The air diverter, shown in Figure 2, should touch (or nearly touch) the wall behind the centrifuge. The power cord should be placed to one side of the air diverter (as shown). To avoid damaging the power cord when installing or moving the centrifuge, be sure to move the cord out of the way before pushing the centrifuge against the wall. cm in. 86 34 Air Exit 141 55.5 or 149 58.5 (see GENERAL SPECIFICATIONS) Power Cable 1.8 m 6.0 ft. Air Diverter Depth: 16 6.25 Air Intake 86 34 116 45.5 71 28 Figure 2. Rear View and Dimensions Avanti HP Series Preinstallation Instructions 3

SUPPLIES FOR INSTALLATION Avanti HP series centrifuges come with a ship kit, which includes the following: Anchoring kit (includes hardware and installation instructions) Instruction manual and accompanying documents Foot pedal pad and air filter Document holder (magnetized) and adhesive tape We recommend that you order sufficient quantities of your required labware in advance to avoid delay in instrument operation. For your convenience, all Avanti HP series centrifuge supplies and accessories are described in the Beckman Coulter High Performance, High Speed, High Capacity Rotors, Tubes & Accessories catalog (BR-8102), which can be requested from your local sales office. SECURING THE CENTRIFUGE TO THE FLOOR For the Avanti HP series centrifuge to meet CE requirements, it must be secured to the floor using the anchoring hardware kit (part number 364996) shipped with the centrifuge. This will prevent the centrifuge from moving in the unlikely event of a rotor mishap. Instructions for installing the anchoring hardware (publication J325-TB-003) are packaged with the kit. Two steps are required for installation: 1. Drilling holes in the laboratory floor where the centrifuge will be located. The anchoring instructions include a full-sized template that shows where these holes must be drilled in relation to the wall behind the centrifuge. This step must be done by the customer. 2. Attaching the mounting brackets to the floor, and inserting shackles through the floor brackets and the brackets on the centrifuge frame. This step will be done by the Beckman Coulter Field Service representative during installation. NOTE The Beckman Coulter representative installing the centrifuge will need clearances of approximately 61 cm on each side of the instrument to attach the shackles through the brackets. After installation, the required clearances are 7.6 cm at the sides and 16 cm at the back of the instrument. NOTE Beckman Coulter representatives are not equipped to drill holes in your floor. The holes must be drilled before installation. BIO-SAFETY LEVEL 3 INSTALLATION For laboratories with epoxy aggregate floors, such as BSL-3 labs, a non-invasive installation kit (PN 393830) is available for Avanti J series centrifuges (except for the Avanti J-HC). The kit which consists of an adhesive-backed mounting plate, is CSA certified for use on epoxy aggregate floors only. ROTOR USE INFORMATION! CAUTION Do not use the Beckman Coulter JA-10, JS-7.5, JA-14, or JS-13 rotors in an Avanti HP series centrifuge before reading this information. All rotors used in Avanti HP series centrifuges must have drive pins in the rotor drive hole (see Figure 3). These drive pins engage with the centrifuge drive hub to ensure that the rotor does not slip during acceleration. Some Beckman Coulter J2 series rotors, including the JA-10, JS-7.5, JA-14, and the JS-13, were originally manufactured without drive pins because these rotors did not need pins to run in J2 series centrifuges. 4 Avanti HP Series Preinstallation Instructions

Check all J2 series rotors for drive pins before using them in an Avanti HP series centrifuge. To check for drive pins, hold the rotor up or turn it on its side and look into the drive hole. If you do not see two metal pins near the top of the hole, do not use the rotor in the Avanti HP. Call your local Beckman Coulter office for information on returning the rotor to the factory for upgrading. OPERATOR TRAINING REQUIREMENTS Immediately following the installation of your Avanti HP series centrifuge, a Beckman Coulter Field Service representative will train a maximum of two operators in basic instrument operation. Additional operators can be trained during later sessions (maximum of two per training session). Contact your local sales office for information. The successful implementation of your new Avanti HP series centrifuge depends upon the training that your operators receive. To ensure a focused and optimized training session, the following guidelines have been established: Basic Instrument Training requires a maximum of two (2) hours. It is imperative that the operators are available and uninterrupted throughout this initial training period. No more than two operators can be trained on the instrument at any given time. Learning is accelerated when the operators have hands-on instruction. With only one centrifuge control panel, this cannot be achieved with more than two operators. BECKMAN Rotor Drive Hole Drive Pins (Angled pins shown. Pins can also be vertical or horizontal.) Avanti HP Centrifuge Drive Shaft Hub Figure 3. Checking the Rotor for Drive Pins Avanti HP Series Preinstallation Instructions 5

Avanti HP Series Preinstallation Instructions 6

Preinstallation Checklist The following is a list of items necessary for installation of the Avanti HP series centrifuge system. Use this checklist to verify the items that you have and other items as you receive them. To ensure a successful installation, please confirm that you have these items prior to scheduling the installation with your local Beckman Coulter service office. AVANTI HP SERIES CENTRIFUGE Avanti HP Series Centrifuge Power requirements Space requirements Centrifuge instruction manual; preinstallation instructions Anchoring kit and anchoring instructions OPERATOR Up to 2 operators available for 2 hours training at time of installation ROTORS/CONSUMABLES Which rotors will be available at time of installation? What type of tubes and bottles will be on hand at time of installation? SERVICE Has a service contract been ordered? Instrument certification? Avanti HP Series Preinstallation Instructions 7

Beckman Coulter, Inc. 250 S. Kraemer Blvd. Brea, California 92821 Sales and Service: 1-800-742-2345 Internet: www.beckmancoulter.com 2009 Beckman Coulter, Inc. All rights reserved