API 17J, B, K, L1, L2 Flexible Pipe Standardization

Similar documents
API 17J, B, K, L1, L2 Flexible Pipe Standardization

Status Update February 2007

CGI Deliverables Approval and Maintenance Process

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down.

IEEE Maintenance Task Force 12 th July 2017 Berlin, Germany

Reported by Jim Moore, The MITRE Corporation, ,

Stakeholder consultation process and online consultation platform

Agenda and General Information

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

API Standards. For Industry, by Industry. Roland Goodman Manager, Upstream Standards American Petroleum Institute

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

Aligning Standards to Maximize Bluetooth Market

North American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Discussion July 12 th, 2017

ISO/IEC JTC 1 N 13145

Cyber Risk in the offshore energy space

Minutes of SC11 Winter Workshop Meeting January 22, 2008

ENGINEERING INTEGRITY Asset Integrity & Corrosion Control Consultants

ENGINEERING INTEGRITY Asset Integrity & Corrosion Control Consultants

Specification for TRAN Layer Services

Agenda and General Information

IGO/INGO Identifiers Protection Policy Implementation. Meeting with the IRT 9 March 2016

ISO Reference Data in database format

Meeting Minutes For the meeting of API SUBCOMMITTEE ON DRILLING STRUCTURES & EQUIPMENT (ECSOEM/SC8)

Gas-Lift Recommended Practices from API and ISO

Business Plan and Convener s Report ISO/IEC JTC 1/SC 22/WG 14 (The Programming Language C)

ISO/IEC JTC1/SC7 3810

ISO/IEC JTC 1 Special Working Group on Accessibility (SWG-A)

North American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Working Session January 16 th, 2018

CTI-TC. Monthly Meeting UPDATE ON MVP RELEASE FOR DRAFT SPECIFICATIONS. Session #1: 15:00:00 UTC July 21, 2016*

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast December 12, 2017

Subsea Performance Bolt Workshop

IEEE Maintenance Task Force 19 th March 2013, Orlando, FL

IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)

International Software & Systems Engineering Standards

Overview of ITU capacity building activities

Business Plan and Convener s Report ISO/IEC JTC 1/SC 22/WG 14 (The Programming Language C)

International Legal Metrology Update for the 2017 NCWM Interim Meeting in San Antonio

Chip Evans Global Services Manager 480 North Sam Houston Parkway, East Houston, TX USA

ISO/IEC TS Conformity assessment Guidelines for determining the duration of management system certification audits

IOGP. Supplementary Procedure for Development and Maintenance of ISO Standards as an ISO Liaison Member. Approved

From: Jean Johnson Sent: Wednesday, July 12, :06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson

American Petroleum Institute, 1220 L Street NW, Washington DC USA Tel Fax

Working Group Charter: Basic Profile 1.2 and 2.0

What's New in the world of Standards and Specifications

Study Data Reviewer s Guide. FDA/PhUSE Project Summary

Working Group Charter: Web Services Basic Profile

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Criticality control in SFP. Radwaste and Decommissioning

Markets Gateway Roadmap

Click ISO to edit Master title style Update on development of the standard

Revision to Emerald Book IEEE Std September 8, The motion passed unanimously with the change.

European Developments

IEEE 802 EC ITU standing committee

Maritime Cyber Security Project Work Plan. Maritime Cyber Security. Work Plan Draft

European Standardization

IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)

Data Quality Project Open Industry Meeting. Steven Wilson, BSI. What can we do to find lost customers and why do we want to do it?

ESP-RIFTS Joint Industry Project

Jim Cain Cain & Barnes, L. P.

EVM & Project Controls Applied to Manufacturing

INTERTANKO Vetting seminar 24 th October 2017

Publication Numbering Guidelines

Agenda and General Information

1.1. JTC 1/SC 22/WG 14 STATEMENT OF SCOPE Development and maintenance of ISO/IEC Standards related to the programming language C.

IIRSM UAE 68 th Branch Meeting. Name of Facilitator: Matt Cox Date: 7 th February, 2018

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015

RPS Work Item: Beta Testing of Message Standard

The Open Group Standards Process Part 1 - Overview. Copyright 2015 The Open Group

MHA LPI Date Correction Request Process

This is a preview - click here to buy the full publication TECHNICAL REPORT

ASME Section III New Developments

July RFC Editor Report. 69th IETF Meeting Chicago, Illinois. IETF 69 RFC Editor 1

IEEE YANG Data Model(s) Study Group Closing Report

ISO/IEC JTC1/SC7 /N3287

AMERICAN WATER WORKS ASSOCIATION 2013 DIVISION ANNUAL REPORT TO TEC

List of EA Publications. Documents

Case 1:98-cv CKK Document Filed 06/15/2006 Page 1 of 7 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

New underwater contactless metrology and inspection approach using photogrammetric integrated system

ACC ANSI Work Group Open Meeting. October 15, 2008 Arlington, VA

ISO/IEC JTC 1/SC 40/WG 1

DEVELOPMENTGUIDELINES ANDPROCESS

Information technology Guidelines for the application of ISO 9001:2008 to IT service management and its integration with ISO/IEC :2011

IEEE P1564 Voltage Sag Indices Task Force Meeting

CIMA Asia. Interactive Timetable Live Online

Information technology Extensions of Office Open XML file formats. Part 1: Guidelines

Draft Terms of Reference for ISO TC 46/SC 9 Working Group 10: ISO Project 3901, revision of the "International Standard Recording Code (ISRC)"

CTI-TC Working Session

2014 Bond Technology Update Progress of the Technology Network Infrastructure Upgrades Long Range Planning Committee March 4, 2015

State of OpenMP & Outlook on OpenMP 4.1

App Economy Market analysis for Economic Development

JCP Training: General Session. 5 May 2008 JavaOne - San Francisco Harold Ogle

Business Plan and Convener s Report ISO/IEC JTC 1/SC 22/WG 14 (The Programming Language C)

A Prototype Implementation of the Energy Industry Profile ( EIP ) Metadata Exchange Standard

ISO/IEC TR TECHNICAL REPORT

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

2017 ICANN-IETF MoU Supplemental Agreement Introduction

ISO/IEC ISO/IEC

Certification Standing Committee (CSC) Charter. Appendix A Certification Standing Committee (CSC) Charter

DetNet TSN Workshop. November 11, 2018 Bangkok, Thailand

Transcription:

API 17J, B, K, L1, L2 Flexible Pipe Standardization API C2 / SC17: 2017 Summer Status Report. Houston, TX Reporting Chair Krassy Doynov, Ph.D., ExxonMobil Production Company

Scope of Work and Status STANDARD NAME PUBLISHED STATUS API RP 17B 2-May-2014 to be updated 2018 Recommended practice for flexible pipe ISO 13628-11 19-Sep-2006 HOLD Specification for Unbonded Flexible Pipe API Spec 17J 2-May-2014 4 th edition Specification for Bonded Flexible Pipe API Spec 17K 1-Nov-2005 to publish 3 rd edition 2H 2017 Specification for flexible pipe ancillary equipment Recommended practice for flexible pipe ancillary equipment ISO 13628-10 1-Oct-2005 HOLD API Spec 17L1 23-Nov-2015 to be updated 2019 ISO 13628-16 HOLD API RP 17L2 5-March-2013 to be updated 2019 ISO 13628-17 The Ageing of PA-11 in Flexible Pipes API 17TR2 1-Jun-2003 HOLD to be updated 2018/2019

Status of JIP for the update of API 17TR2 The Ageing of PA-11 in Flexible Pipes SOW is to provide Guidelines for Qualification of Polyamides (PA11, PA12, ) in Flexible Pipes based on collecting field experience and integrity issues, and standardizing test procedures and acceptance criteria after performing round robin tests to ensure reproducibility. LAST Steering Committee meeting to be held on July 4th and 5th, 2017. LAST PA11 and PA12 aging tests being finalized to confirm reproducibility. DRAFT of 17TR2 is being prepared 10 JIP Participants: ExxonMobil, Total, Statoil, Woodside, PetroBras, GE Oil&Gas, Evonik, NOV Flexibles, Arkema and the JIP Manager 4Subsea Norway. K. Doynov will submit SRRR form for revision to 17TR2, upon JIP completion in 2017/2018.

Status of API 17K (ISO 13628-10 - on hold) API 17K (upcoming 3 rd edition) ballot comments addressed in Feb, 2017. Editorial comments received from the two-week postballot review, and addressed in March, 2017. New API 17K 3 rd edition queued with API editors for publishing on 4/5/2017; and expected to published in 2H17.

Status of API 17L1, L2 (ISO/FDIS 13628-16,17 on hold) The revision of API 17L1 and L2 is planned to be kicked off in 2H17 after publishing the 3rd edition of API 17K. The SOW will address: 135 Monogram comments (un-auditable areas), Technip s 31 technical comments received in 2014, and recent Industry Lessons Learned between 2012 and 2016. Anticipated Project duration 2 years.

Status of API 17J & 17B Revision (ISO 13628-2 &11 on hold) FPTG has bee involved in API 17J standard maintenance user clarifications Update API 17B with edits identified during the 17K Project to align with new API 17K. Estimated duration is 3-6 months. NOTE: 17B is the RP supporting both the 17J Spec and 17K Spec

Support of other API Standards 1) FPTG comments collected and sent to API 2RIM draft proposal 2) FPTG comments collected and sent to API 18TR3 draft proposal 3) Comments sent to API 17Q draft proposal. 4) Recommendations on how to improve API SC17 International Participation sent to André Mærli.

MEMBERSHIP: 17K Flexible Pipe Task Group 1 Wayne Morris wkmorris1@mmm.com 1 3M 2 Roger Hagen roger.hagen@mmm.com 3 Svein Are Løtveit loet@4subsea.com 4 Nils Gunnar Viko 2 4Subsea nils.gunnar.viko@4subsea.com 5 Christoffer Nilsen-Aas christoffer.nilsen-aas@4subsea.com 6 Roberto Biollo 3 BASSI OFFSHORE roberto.biollo@bassioffshore.eu 7 Emilien Rulence emilien.rulence@bureauveritas.com Bureau Veritas 8 Francois Migeon 4 francois.migeon@bureauveritas.com Marine & Offshore 9 Aymeric David aymeric.david@bureauveritas.com 10 Gergely Szekely gergely.szekely@fluid.contitech.hu 11 Tibor Nagy 5 ContiTech Rubber Tibor.Nagy@fluid.contitech.hu 12 István Grepaly istvan.grepaly@fluid.contitech.hu 13 Jorge Suarez 6 DNV-GL Jorge.A.Suarez@dnvgl.com 14 Kam Zandiyeh 7 Dunlop Oil & Marine Kam.Zandiyeh@fluid.contitech.co.uk 15 Jo Wiggers Jo.Wiggers@fluid.contitech.co.uk 16 Don Johnson 8 ETA dwjohnson@etainc.org 17 Krassy Doynov Krassimir.Doynov@Exxonmobil.com 9 ExxonMobil 18 Richard Shepherd rsmailhome@gmail.com 19 David Barnard 10 Clearwater FPC david.barnard@clearwaterfpc.com 20 Erik Bendiksen 11 NOV Flexibles Erik.Bendiksen@nov.com 21 Trond Sundby Petroleum Safety trond-e.sundby@ptil.no 12 22 Langøy Morten Andre Authority Morten.Langoy@ptil.no 23 Francois-Regis Pionetti Francois-Regis.PIONETTI@saipem-sa.com 24 Giaccobi Stephane 13 SAIPEM Stephane.GIACCOBI@saipem.com 25 Cyrille Mengeot Cyrille.MENGEOT@saipem.com 26 Sunil Dutt sdutt@technip.com 14 Technip 27 Jesus Arrieche jarrieche@technip.com 28 Ludovic Assier 15 TOTAL ludovic.assier@total.com 29 Vincent Lagarrigue Vincent.Lagarrigue@trelleborg.com 16 Trelleborg Industrie 30 Jean-Noel Vincent Jean-Noel.Vincent@trelleborg.com SAS 30 David Ponchon david.ponchon@trelleborg.com 31 Remi Morvan 17 Wood Group Kenny Remi.Morvan@woodgroupkenny.com 32 Shankar Bhat 18 INTECSEA Shankar.Bhat@intecsea.com 33 Naiquan Ye 19 MARINTEK Naiquan.Ye@marintek.sintef.no 34 Benjamin Biausser 20 SBM Offshore Benjamin.Biausser@sbmoffshore.com 35 Charles B Paton 21 Shell charles.paton@shell.com 36 Jan Berger 22 Evonik jan.berger@evonik.com 37 Sarah Abercrombie 23 Weatherford sarah.abercrombie@weatherford.com 38 Terje Peder Stavang 24 Statoil tps@statoil.com 39 Rune Haakonsen rune.haakonsen@kogt.kongsberg.com 25 Kongsberg Oil&Gas 40 Torgrim Andersen torgrim.andersen@kogt.kongsberg.com 41 Andy Thompson 26 Techflow Flexibles Ltd andy.thompson@tff.uk.com 42 Yu Xian Hong 27 43 Yang Peng 27 45 Kent Caveny 28 Techflow Flexibles Yantai yuxianhong@yuelongchina.com Techflow Flexibles yangpeng@yuelongchina.com Yantai Kent Caveny Services kcservllc@comcast.net LLC

UPDATED TARGET DATES FOR NWI AND DELIVERABLES API 17K - New 3rd edition to be published in 2H2017. API 17B - 17K based update to be kicked off in 2H2017 after publishing API 17K API 17L1&L2 - Revision process to be kicked off in 2H2017 after publishing API 17K API 17TR2 - K. Doynov to submit SRRR form, after 17TR2 JIP completion ~ 2018

FUTURE MEETINGS & RESOURCE NEEDS PLANS FOR FUTURE FPTG MEETINGS 2H 2017: Kicking off API 17B, L1, L2 updates RESOURCE NEEDS 3Q 2017: API editorial help for 3 rd edition of API 17K