Table of Contents. TOP TOP BA Data Request and Specification Guidelines. Operating Procedure

Similar documents
Reliability Coordinator Procedure

Reliability Coordinator Procedure PURPOSE... 1

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision

Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1

Project Consideration of Commission Directives in Order No. 693

Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process

Standards Authorization Request Form

Peak Reliability IRO Project Overview Oct 25, 2016

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities

Table of Contents. Purpose. Meter Data Acquisition and Processing Procedure. Procedure No Version No. 1.3 Effective Date 2/14/2018

Peak Reliability Coordination Services in the West March 30, 2018

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Table of Contents. Purpose. Certification of Metering Facilities. Procedure No Version No. 1.4 Effective Date 2/14/2018. Operating Procedure

1. Responsibilities. Settlement Quality Meter Data (SQMD) Plan Submission & Approval Process (External) Operating Procedure

Certification Program

Reliability Standard Audit Worksheet 1

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Reliability Standard Audit Worksheet 1

Supervisory Control and Data Acquisition (SCADA) Performance Criteria Transmission Maintenance Procedure No. 6

New Brunswick 2018 Annual Implementation Plan Version 1

Stakeholder Comments Template

EIM Entity Readiness Criteria May 6, 2015

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

CAISO RIG Acceptance Test Procedure

Reliability Standard Audit Worksheet 1

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

REAL-TIME MONITORING DATA SPECIFICATION

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP

RIMS: Transmission Implementation Module

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

FNM Expansion Training Webinar

Introduction to Generation Availability Data System (GADS) Wind Reporting

Settlement Files Publication Contingency Provisions

Bulk Electric System Definition Changes and Reporting

NB Appendix CIP NB-0 - Cyber Security Recovery Plans for BES Cyber Systems

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

Business Practice Manual for Managing Full Network Model. Version 1213

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

Standards Authorization Request Form

Agreements & Queue Management

ERO Certification and Review Procedure

DRAFT Reliability Standard Audit Worksheet 1

Business Practice Manual for Managing Full Network Model. Version 910

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Agreements and Queue Management

Registration & Certification Update

Standard INT Dynamic Transfers

Interconnection Re-MAT September 11, 2013

Joint Transmission Planning Base Case Preparation Process

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

_ Dear Secretary Bose: The attached. Folsom, CA

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Standard INT Dynamic Transfers

Competitive Solicitation Process Enhancements. Status Update / Issue Paper

NERC and Regional Coordination Update. Operating Committee Preston Walker January 9, 2018

COM Communications and Coordination

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018

TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES October 16, 2014 Meeting from the ISO Headquarters Folsom, California

Generator Interconnection Process. Wholesale Transmission Overview

BPM Change Management Meeting

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

Agreements and Queue Management

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

Powerex EIM Implementation Informational Call. Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017

Reliability Standard Audit Worksheet 1

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide

Generation, Transmission, and End User Facilities

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service

Model Parts and Assembly. Jay Britton Britton Consulting LLC

Outage Coordination External Workshop. Jason Ausmus Manager, Operations Planning

From: Laura Manz, Vice President of Market & Infrastructure Development

Unofficial Comment Form

Interconnection and Transmission

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

CIP V5 Implementation Study SMUD s Experience

Unofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols

Québec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan Annual Implementation Plan

Reliability Standard Audit Worksheet 1

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Procedure For NPCC Bulk Electric System Asset Database

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010

OVERVIEW: KEY APPLICATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

WON Security Guideline

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Alberta Reliability Standards Compliance Monitoring Program. Version 1.1

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013

Section 10 of BPM for TPP- Generator modeling webinar

March 15, 2011 VIA ELECTRONIC FILING

Reliability Standard Audit Worksheet 1

Standards Authorization Request Justification

Date adopted/approved 02/08/2013 Custodian (entity responsible for maintenance and upkeep) Data Exchange Work Group. Web URL: Previous name/number

SDG&E s Accomplishments and Future Plans

149 FERC 61,157 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING STIPULATION AND CONSENT AGREEMENT

Proposed Improvements for NERC MOD Standards July 10, 2012

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

Standard Development Timeline

Business Practice Manual Change Management Meeting

Transcription:

No. 3140 Table of Contents Purpose... 2 Responsibilities... 2 2. Scope/Applicability... 4 2.1 Background... 4 2.2 Scope / Applicability... 4 3. Detail... 5 3.1... 5 Introduction... 5 3.2 Data Specification Distribution... 6 3.3 Applicable Entity Obligations... 6 3.4 Data Format... 6 3.5 Questions and Comments... 9 4. Supporting Information... 10 Operationally Affected Parties... 10 References... 10 Definitions... 10 Version History... 11 5. Periodic Review... 11 Review Criteria... 11 Frequency... 11 Incorporation of Changes... 11 Appendix 3140A - TOP-003 TOP - BA Data Request and Specifications for Data Provision... 11 Page 1 of 11

No. 3140 Purpose Provides a documented specification to applicable NERC functional entities of the data necessary for California ISO to perform its Balancing Authority and Transmission Operator Planning Analyses, Real-time monitoring, and Real-time Assessments. It is also data which is necessary for Pacific Gas & Electric (PGAE), Southern California Edison (SCE), San Diego Gas & Electric (SDG&E), Trans Bay Cable (TBC) and Valley Electric (VEA) to perform Transmission Operator Planning Analyses, Real-time monitoring, and Real-time Assessments for their respective areas. Responsibilities California ISO (ISO) Adjacent BAs Adjacent TOPs PA&E, SCE, SDG&E, TBC, VEA As applicable the ISO may be responsible for requirements as a NERC Registered Balancing Authority (BA), Transmission Operator (TOP), Planning Authority (PA) or Transmission Service Provider (TSP). All neighboring BAs which have formed an Adjacent BA or Interconnected Control Area Operating Agreement with the ISO and share critical data and information regarding adjacent and shared facilities refer to publicly posted list: http://www.caiso.com/documents/guide- InterconnectedControlAreaorInterconnectedBalancingA uthorityareaoperatingagreements_icaoaoribaaoa _.pdf All neighboring TOPs, which have formed interconnected operating agreements with PGAE, SCE, SDG&E, TBC or VEA, share critical data and information regarding adjacent and shared facilities. The registered TOPs under the Transmission Control Agreement (TCA) and Coordinated Functional Registration (CFR) Agreement with the ISO Pacific Gas & Electric, Southern California Edison, Trans Bay Cable, Valley Electric Association refer to publicly posted CFR agreements: Page 2 of 11

No. 3140 AEPCO, HHWP, SVP Participating Generators Participating Transmission Owners (PTOs) Distribution Providers Load Serving Entities http://www.caiso.com/rules/pages/compliance/default. aspx The registered TOPs within the ISO BA footprint which are not under the TCA or the CFR Agreements Arizona Electric Power Cooperative (AEPCO), Hetch Hetchy Water and Power, Silicon Valley Power refer to WECC Functional Entity mapping. All registered GOs and/or GOPs under any type of Participating Generator agreement with the ISO, including Pseudo-ties and Dynamic Transfer resources refer to WECC Functional Entity mapping and publicly posted Master Control Area Generating Capability List - http://www.caiso.com/documents/mastercontrolareag eneratingcapabilitylist.xls. All registered TOs under the Transmission Control Agreement with the ISO list posted at http://www.caiso.com/rules/pages/contractsagreements /Default.aspx. All registered DPs within the ISO BA and/or TOP footprint refer to WECC Functional Entity mapping. All load serving entities under a Utility Distribution Company or Metered Sub System Agreement with the ISO refer to publicly posted ISO Operating 4510A Load Shed Calculation Guideline Public Page 3 of 11

No. 3140 2. Scope/Applicability 2.1 Background In order to ensure that the Transmission Operator (TOP) and Balancing Authority (BA) have data needed to fulfill their operational and planning responsibilities, TOP-003-3 states that each Transmission Operator and Balancing Authority shall maintain a documented specification for the data necessary for it to perform its Operational Planning Analyses, Real-time monitoring, and Real-time Assessments. 2.2 Scope / Applicability Scope of this document is consistent with the scope of Peak RC s IRO-010-2 Data Request and Specification. APPLICABILITY: Balancing Authorities, Generation Owners, Generation Operators, Load Serving Entities, Transmission Operators, Transmission Owners, Interchange Authorities, Distribution Providers. This data request applies specifically to the below listed Registered Entities that are classified in the Responsible Party column of Operating Attachment 3140A TOP-003 TOP - BA Data Request and Specification according to the following legend: AF = Applicable to Adjacent Facilities SF = Applicable to Shared Facilities DT = Applicable to Dynamic Transfer Entities NE = Applicable to Neighboring Entities WB = Applicable to Within the Balancing Authority area WT = Applicable to Within the Transmission Operator area NA = Not Applicable - if California ISO does not need this data to be submitted by another entity: Registered Entity Responsible Party Adjacent BAs: APS, BANC, BPA, CENACE, IID, AF, SF, DT*, LADWP, NEV, PACE-PACW, SRP, TID and WALC NE *Note only applicable for entities currently hosting Dynamic Transfer resources Adjacent TOPs: AEPCO, APS, BPA, CENACE, HHWP, AF, SF, NE IID, LADWP, MID, NEV, PACE-PACW, SMUD, SRP, SVP, TID, WALC and WASN Page 4 of 11

No. 3140 Interconnected TOPs within ISO BAA: AEPCO, HHWP, WB SVP All registered TOPs under a Coordinated Functional WT Registration (CFR) Agreement with the ISO: PGAE, SCE, SDG&E, TBC and VEA All registered GOs and/or GOPs under a Participating WB, DT Generator (or similar) Agreement with the ISO or an interconnection agreement with PGAE, SCE, SDG&E or VEA All registered TOs under the Transmission Control WT Agreement with the ISO All registered DPs within the ISO BA and/or TOP WB, WT footprint All load serving entities under a Utility Distribution WB Company or Metered Sub System Agreement with the ISO This data specification documents the BA and TOP requirements (TOP-003-3 R1, R2, R3, R4) which will be maintained by ISO and in accordance with the CFR Agreements between the ISO and PGAE, SCE, SDG&E, TBC and VEA (for TOP-003-3 R1 and R3). TOPs, which are not a party to the CFR Agreement with the ISO, are responsible for maintaining their own TOP-003-3 Data Request and Specifications document. 3. Detail 3.1 Introduction A detailed list of data and information needed by the BA or TOP is captured in Operating Attachment 3140A TOP-003 TOP - BA Data Request and Specification. The data requested includes, but is not limited to, non-bes and external network data, notification of current Protection System and Special Protection System status or degradation that impacts System reliability, real-time facility data, schedule type data, facility outage information, and electronic modeling data. The periodicity for providing data and the deadline by which the respondent is to provide the indicated Page 5 of 11

No. 3140 data are specified in Operating Attachment 3140A TOP-003 TOP - BA Data Request and Specification. 3.2 Data Specification Distribution To meet NERC Reliability Standard TOP-003-3 R3, an electronic notification shall be distributed to the applicable entities that this data request and specification is in effect and available. California ISO s primary methods for posting the data specifications are 1) posting on www.peakrc.org in the TOP-003 library and 2) posting with Operating s on www.caiso.com. Entities which subscribe to notifications via Peak RC s TOP-003 library or to Market Notices on http://www.caiso.com will receive electronic notifications of any future revisions to this data request and specification. 3.3 Applicable Entity Obligations Each applicable entity shall satisfy the obligations of the documented specifications in accordance with (TOP-003-3, R5, 5.1, 5.2, 5.3) by using: A mutually agreeable format. A mutually agreeable process for resolving data conflicts. A mutually agreeable security protocol. 3.4 Data Format Each applicable entity that is required to provide data to California ISO, PGAE, SCE, SDG&E, TBC and/ or VEA shall appoint at least one contact who is responsible for working with TOP-003-3 implementation items in order to provide the requested data in the specified format. If applicable, contacts for each section are preferred. Please maintain TOP-003-3 contacts on www.peakrc.org. The specified formats and security protocols below have been previously recognized as mutually agreeable. The appointed contact person shall notify California ISO via the email procedurecontrol@caiso.com of any instances where the specified formats or security protocols are not agreeable to the entity. California ISO will collaborate with the entities and involved PTOs (PGAE, SCE, SDG&E, TBC and/or VEA) to resolve data conflicts in a mutually agreed upon manner that ensures System reliability. The formats for the data to be delivered are as follows: Inter Control Center Protocol Data (ICCP): Real time Analog and Status point data as detailed in Operating Attachment 3140A TOP-003 TOP - BA Data Request and Specification. Page 6 of 11

No. 3140 The data provider must include data quality along with the data. This data quality shall follow the ICCP Data Quality Standards as described in the IEC ICCP User s Guide (870-6-505). If real-time ICCP data transfer is unavailable for any reason, the responsible entity will provide critical real-time system data via phone to the TOP or BA s real-time desk. Data or data points that are considered critical may change based on current system conditions. It is expected that the RC and Responsible Parties will communicate and coordinate on which data is needed at a particular time as well as a periodicity for providing updates until the normal data communication methods are back in place. California ISO s and/or applicable PTO s (PGAE, SCE, SDG&E, TBC and/or VEA) technical staff will work with each entity s technical staff on ICCP implementation. The ISO currently retrieves Real-Time Balancing Authority calculated data from neighboring entities via ICCP from the EHV Data Pool. Outage Coordination Process: COS is the primary mechanism that the California ISO uses to submit outages to Peak RC. Adjacent BAs and TOPs shall continue to submit outages to Peak RC and communicate outages via email to California ISO s Operations Planning Engineers. Scheduled and unscheduled outages for the ISO s Participating Transmission Owners and Participating Generators shall continue to be submitted in accordance with the California ISO s technical specifications located at: http://www.caiso.com/market/pages/outagemanagement/de fault.aspx, which are consistent with the ISO s Business Practice Manual (BPM) for Outage Management posted at: https://bpmcm.caiso.com/pages/bpmdetails.aspx?bpm=out age%20management, and are implemented according to the ISO s 3200 series Operating s posted at: http://www.caiso.com/rules/pages/operatings/def ault.aspx Contacts are contained in the distribution restricted ISO Operating 3210F CAISO Outage Coordination Contact Information that is shared with the RC and NERC registered adjacent and interconnected BAs and TOPs. Page 7 of 11

No. 3140 California ISO s technical staff will work with each entity s technical staff on WSDL, XSD, and XML implementation. Topology Update Process for the West-wide System Model (WSM): The ISO retrieves WSM data from neighboring entities via the WSM update process. The ISO evaluates the nature of the changes implemented in these areas as represented in the PEAK Reliability model and selectively updates the ISO Full Network Model as needed. Entities within the ISO Balancing Authority and Transmission Operator areas must submit model updates per the instructions in Operating Attachment 3140A TOP-003 TOP - BA Data Request and Specification. Note: EIM market participants are an exception. EIM entities submit the CIMXML export of their entire model to the ISO along with description of incremental model changes implemented in that model. ISO processes implement the incremental changes in the ISO representation of the EIM entity s model. Adjacent BAs and TOPs shall continue to submit WSM topology updates through the RC Model Update Process. Model updates for the ISO s Participating Transmission Owners and Participating Generators shall continue to be submitted to ptomodelupdaterequest.@caiso.com for transmission projects and genmodelupdaterequest@caiso.com for generation projects in accordance with the ISO s Business Practice Manual (BPM) for Managing the Full Network Model.: https://bpmcm.caiso.com/pages/bpmdetails.aspx?bpm=managing%20full %20Network%20Model. These email addresses direct information to both the ISO and the RC model update processes. California ISO needs full and complete data and information well in advance of the time that the Market Participant expects its new or modified facilities to connect to or disconnect from the grid. See the current Full Network Model Schedule posted on the public website at: http://www.caiso.com/market/pages/networkandresourcemodel ing/default.aspx. ISO s Transmission Registry Business user documentation is located at the following link: Page 8 of 11

No. 3140 http://www.caiso.com/pages/documentsbygroup.aspx?groupid= 6CB3BA36-B21A-47E6-BAA9-BF76090A087E. Other Data Formats: Other data formats and submittal processes include, but are not limited to, the use of email, use of the EHV data pool, upload to Peak s secure website www.peakrc.org, RMT messages and phone calls to California ISO Operators. Operating Attachment 3140A TOP-003 TOP - BA Data Request and Specification - contains the specific data California ISO and/or applicable PTO s (PGAE, SCE, SDG&E, TBC and/or VEA) requires from each Responsible Party and contains columns which denote the: Request Number Used for document coordination and communication purposes. Responsible Party Applicable entity or entities responsible for ensuring their data is being provided to California ISO. Data Request Effective Date Date by which specified data is to begin being provided to California ISO. Data Source Type Transmission, Generation, Operations, etc. Data Item Specific data being requested. Data Transfer Method Method by which data is provided to California ISO. Data Update Frequency Periodicity for providing the specified data. Notes Additional clarifying information 3.5 Questions and Comments California ISO and the Participating Transmission Owners under the CFR Agreement with the ISO currently receive the data necessary to perform their reliability functions. This request formalizes the documentation that these parties will utilize in the future to request and receive data. California ISO and the applicable PTOs will work with each entity to address questions, requests for clarification or to address issues related to the technical nature of the data. Refer to CAISO s TOP-003 contacts maintained on PeakRC.org. All other data specification inquiries should be sent to California ISO at operationscompliance@caiso.com, legal and compliance inquiries can be sent to compliance@caiso.com. Page 9 of 11

No. 3140 4. Supporting Information Operationally Affected Parties AEPCO, APS, BANC, BPA, CENACE, HHWP, IID, LADWP, MID, NEV, PACE-PACW, PGAE, Peak RC, SCE, SDG&E, SMUD, SRP, SVP, TBC, TID, VEA, WALC, and WASN; Public References Resources studied in the development of this procedure and that may have an effect upon some steps taken herein include but are not limited to: CAISO Tariff NERC Standards TOP-003-3 Transmission Control Agreement (TCA) Coordinated Functional Registration (CFR) Matrix http://www.caiso.com/rules/pages/contracts Agreements/Default.aspx CFR Agreements Definitions Unless the context otherwise indicates, any word or expression defined in the Master Definitions Supplement to the CAISO Tariff shall have that meaning when capitalized in this Operating. The following additional terms are capitalized in this Operating when used as defined below:. Page 10 of 11

No. 3140 Version History Version Change Date 1.0 Original BA/TOP Data Request 1/1/17 1.1 Updated data request to be consistent with Peak RC DR 12.2 4/1/17 effective 4/1/2017. Added new item 1.14; collapsed items which are only applicable to the ISO in sections 3.6.2, 3.6.3, 3.6.7; clarified requirements throughout the document. 2.0 Split OP 3140 table content into spreadsheet format; Verified consistency with Peak RC s DR v13.1 effective 12/8/17. Refer to yellow highlighted changes throughout document Added AEPCO as an Operationally Affected Party 12/31/17 5. Periodic Review Review Criteria Will be reviewed based on current Peak RC Data Request requirements. Will provide to PTOs for review and comment in advance of changes being implemented. Otherwise there are no additional specific review criteria identified for this procedure, follow instructions in s 5510 and 5520. Frequency Review as recommended in s 5510 and 5520. Incorporation of Changes There are no specific criteria for changing this document, follow instructions in s 5510 and 5520. Appendix 3140A - TOP-003 TOP - BA Data Request and Specifications for Data Provision Page 11 of 11