DESCRIPTION SITE SUITABILITY. Advantages. Disadvantages. Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log

Similar documents
Along the toe, top, face, and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow.

Appendix C.6. Best Management Practices for Construction Activities

Karvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material

Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc.

Top View. Side View Perspective View Front View

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan

Quick Reference Guide Storm Water Database Initial Setup

Surveys and Maps for Drainage Design

NON STRUCTURAL STORMWATER STRATEGIES (NJAC 7:8-5.3) - ATTACHMENT G

AutoCAD Civil 3D 2010 Education Curriculum Instructor Guide Unit 4: Environmental Design

Town North Sanitary Sewer Renewal PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

Solicitation Information

Travel Time and Time of Concentration

Soil Map Adams County Area, Parts of Adams and Denver Counties, Colorado ' 39''

FENCING, GEOTEXTILES & BARRICADE TAPES

DISTRIBUTION OF QUANTITIES

Chapter 16. Table of Contents

Granite Shoals, TX San Antonio, TX 78251

Understanding Topographic Maps

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

Storm Drain Modeling HY-12 Rational Design

OPEN CHANNEL HYDROLOGY AND DESIGN...

KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN

TRIMBLE WESTMINSTER BUILDING PROJECT / 2013

DESIGN MANUAL CHAPTER 5: Open Channel Hydraulics

Mailbox Installation and Damage Replacement Policy

UtilityScan. Quick Start Guide. A Fast Check List For Field Operation

Chapter V Earth Work & Quantities. Tewodros N.

INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items:

CertainTeed. Access Covers and Gratings. SELECTA Curb Units

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Lysimeters

TERRATUBE / HUESKER SOILTAIN GEOTEXTILE TUBES & GEOBAGS DATA SHEETS INDEX

Access Field Entrance Other Constructed Yes (Type)

Welcome. Valley View Industries. We Fit Nicely Inside Planograms. 4' Planogram of Valley View Products. Complimentary POP Signage

U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate

HEC-22 Inlets in INFOSWMM and H2OMAP SWMM v12

Engineering Geology. Engineering Geology is backbone of civil engineering. Topographic Maps. Eng. Iqbal Marie

Appendix E-1. Hydrology Analysis

ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL

HECRAS 2D: Are you ready for the revolution in the world of hydraulic modeling?

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS

Things you need to know BEFORE YOU START HOMEOWNER PROJECT GUIDE

DLA Review Printable Version

Evaluating Multiple Stormwater Analysis and Design Alternatives with StormCAD

BID ISSUE DATE: JUNE 2016

Geometric Layout for Roadway Design with CAiCE Visual Roads

Last Updated: September 08, 2016

CRUMPLER PLASTIC PIPE INC. CPP Pipe And Culverts

Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL

VOLUME & FLOW RATE CALCULATIONS

Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA

VDOT GEOPAK Drainage Training Manual

HG-1 FLUSHING SYSTEM WITH BUILT-IN (NODE) or BLUETOOTH PROGRAMMING CONSTRUCTION

Should Contours Be Generated from Lidar Data, and Are Breaklines Required? Lidar data provides the most

Storm Drain Modeling HY-12 Pump Station

This is a sample of what you get after it is processed. The yellow colors in this view come from the Classify Vegetation Height.tif background map.

2D Model Implementation for Complex Floodplain Studies. Sam Crampton, P.E., CFM Dewberry

Flow on terrains. Laura Toma csci 3225 Algorithms for GIS Bowdoin College

Grading and Volumes CHAPTER INTRODUCTION OBJECTIVES

2-D Hydraulic Modeling Theory & Practice

DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM

Knight Piésold. Knight Piésold

ContainTech Polypropylene Dimensional Data Expertise in Engineered Plastics Dated

SPEL Ecoceptor. SPEL Ecoceptor. In-Line In-Line Gross Gross Pollutant Trap (GPT)

Texas Department of Transportation BOOK 2 TECHNICAL PROVISIONS

Inspector for Stormwater Management. Department of Environmental Quality Office of Training Services

Tahoe Stormwater and BMP Performance Database Monitoring and Reporting Guidance Document APPENDICES

OSP Methodology Glow and Trespass

Agren Disclaimer. WaterwayBuilder Introduction

Digital Terrain Model V 6.5

Public Works 2017 Budget Presentation. Public Works What We Do

Erosion-3D. User manual - Samples. Ver GeoGnostics Software

3DReshaper Help DReshaper Beginner's Guide. Surveying

WinSLAMM v 10.2 User s Guide

HEC-RAS 3.0 January, 2001 Release Notes

Mailbox Policy for the Municipality of Fort Fairfield

Kris Lawrence, Propel Insurance Annual Conference, Spokane WA

Getting familiar with RECOVER

2. AREAL PHOTOGRAPHS, SATELLITE IMAGES, & TOPOGRAPHIC MAPS

Excel Sheets for Plan Production

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

Title: Improving Your InRoads DTM. Mats Dahlberg Consultant Civil

ANCHORS EARTH HARDWARE POLELINE AERIAL DROP HARDWARE ATTACHMENTS DROP GROUNDING HARDWARE BANDING TOOLS ANCHORS WALL FASTENERS

Volume and Surface Area Unit 28 Remember Volume of a solid figure is calculated in cubic units and measures three dimensions.

FIBER OPTIC HARDWARE STEVE PAULOV

Subdivision Application Form

What is a Topographic Map?

3-D Modeling Implementation

NOTE ACCT #41211 MTR # ACCT #41212 MTR # ACCT #41210 MTR # ACCT #41213 MTR # ACCT #41209 MTR # ACCT #41214 MTR #728841

CONTRACT ITEM NO. PROJECT TOTALS. Plan. As Const Inlet Type C (15 Foot) 5,586 5,103 70, , ,861

Wireless Telecommunication Facility. Project Narrative

Watershed Modeling Rational Method Interface. Learn how to model urban areas using WMS' rational method interface

Summary Listing of Ohio LTAP elearning Courses

MODRET VERSION 6.0 FOR WINDOWS 95. Setup Hydrograph Infiltration Routing Graphic Windows ReadMe

STRUCTURAL STABILITY ASSESSMENT REPORT

Transcription:

4.5-q FIBER ROLL Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log DESCRIPTION Fiber rolls are sediment control devices made from fibrous organic material, such as rice or coconut fibers, rolled inside a tubular mesh sock. A fiber roll may also be constructed by tightly rolling an erosion control blanket to form a multi-layer roll. Fiber rolls help reduce overland flow velocities by interrupting and intercepting runoff and capturing sediment on steep slope settings. Placing multiple strings of fiber rolls in a system along the contours of a slope provide a benefit by helping interrupt overland flow and intercepting sediment loads before they migrate to receiving surface waters. SITE SUITABILITY Along the toe, top, face, and at grade breaks of exposed and erodible slopes. Along sidewalks and curbs to prevent sediment from washing into streets and gutters. As check dams in unlined ditches. Around storm drains and drain inlets. Downslope of exposed soil areas. Around temporary material spoil and stockpiles, such as topsoil stockpiles (refer to Section 4.5-n Stockpile Management). On sloped pavements leading to a street, storm drain, or water course. Advantages They can be easily molded to fit undulating terrain. As inlet protection, fiber rolls can prevent sediment from entering storm drain systems during periods of low runoff. Easy to install, recyclable, and movable to different locations. Available in a variety of diameters and lengths. More effective and durable than sand bags. The rolls are less visually obtrusive than other erosion and sediment controls, such as silt fencing. Fiber rolls can be used to help establish permanent vegetation. BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater Treatment SCALE OF APPLICATION All SFR and MFR < 1 acre MFR 1-5 Acre and CICU < 5 acres MFR and CICU > 5 acres and all WQIPs TYPE OF APPLICATION Temporary Permanent Disadvantages Not effective during periods of high runoff, and not effective for channels. The volume of sediment that can be captured is small; once the area behind the fiber roll fills with sediment, runoff may allow sediment to flow over the roll. Need frequent inspection and maintenance, because they can be moved by flowing water if not properly staked or trenched in. Not appropriate for use on slopes subject to creep, slumping, or landslide. May 2014 4.5-q Fiber Roll Page 73

Difficult and cumbersome to move when saturated. Fiber rolls will eventually break down and decompose completely. DESIGN CONSIDERATIONS Do not rely upon fiber rolls to intercept and control concentrated stormwater flows. Ensure that fiber rolls are Certified Weed Free by the manufacturer. Do not use straw-filled fiber rolls, because of the possible inclusion of invasive-weed seed in the straw. Choose the appropriate size fiber roll by considering that larger rolls can trap a greater amount of sediment while smaller rolls are easier to handle. (Fiber roll diameters range from 9 to 20 inches.) When fabricating fiber rolls from erosion control blankets (such as using clean pine needles), construct the rolls to have at least an 8 inch diameter, and band them with degradable material every 4 feet. Pine needle wattles are also effective and can be created using clean pine needles and biodegradable geotextile fabric. For temporary BMPs in construction settings, control site runoff over paved surfaces (e.g. around drain inlets) by using weighted fiber rolls (fiber roll with gravel and organic mulch inside) or non-weighted fiber rolls with gravel bag weights placed on top. Be sure to fit the fiber roll tightly against the pavement and any concrete wall or edge, to prevent gaps. 4.5-q Fiber Roll May 2014 Page 74

Adjust spacing of fiber rolls according to ground slope and soil character. Use the following spacing as a general guide, but for loamy soils, place the rolls closer together, and for rocky soils, place the rolls farther apart. Slope Distance Apart (feet) 4:1 40 3:1 30 2:1 20 1:1 10 To increase effectiveness of fiber rolls, use them in combination with other surface soil erosion/re-vegetation practices, such as surface roughening, mulching, erosion control blankets, and hydraulic mulching. Do not rely on fiber rolls for sediment control over winter, because ice build-up can allow stormwater to flow over the fiber roll and render it ineffective. INSTALLATION Install fiber rolls prior to site disturbance. Install fiber rolls from the bottom of the slope upward, to capture any sediment unintentionally released during installation. Install fiber rolls along the contour, perpendicular to the slope direction. Turn the ends of each fiber roll upslope a minimum of 6 inches, to prevent runoff from flowing around the end of the roll. When rolls are installed abutting each other, overlap the ends at least 6 inches to create a tight join, to prevent sediment from escaping. Consider the slope of the hill when keying in fiber rolls. Key the roll to one-half the height of the fiber roll on steeper slopes and one-third the height of the fiber roll on less steep slopes. Remove rocks, clods, or other obstructions so the fiber roll has direct contact with the soil. Place excavated material on the uphill side of the key trench, to prevent downhill contamination. After placing the fiber roll in the trench, compact the excavated material along the base on the uphill side. Stabilize loose soil on the downhill side. Stake the rolls using two biodegradable wood stakes, one on each side of the fiber roll, placed every 3 to 4 feet and driven in perpendicular to the slope. Tie the stakes tightly together, above the fiber roll, to provide extra support. Use weighted fiber rolls or weigh down with gravel bags when used on paved surfaces. Use an additional row of wooden stakes on the downhill side of the fiber roll on highly erodible soils and on slopes 2:1 (run to rise) or greater. Fiber rolls at the toe of slopes greater than 5:1 (run to rise) should be at least 20 inches in diameter to be effective. An equivalent installation, such as stacked smaller diameter fiber rolls, can be used to achieve a similar level of protection. May 2014 4.5-q Fiber Roll Page 75

After removing fiber rolls, backfill and repair trenches, depressions, or other ground disturbances using excess sediment captured by the fiber roll. INSPECTION AND MAINTENANCE Remove sediment when deposits reach one-third the height of the barrier. Use sediment as fill material or remove from the site. Inspect fiber rolls prior to forecasted rain events and after rain events. Inspect daily during construction. Repair or replace split, torn, unraveling, slumping, or otherwise ineffective fiber rolls. Hay bales are not allowed in the Lake Tahoe Region due to the potential for carrying invasive weeds. 4.5-q Fiber Roll May 2014 Page 76

Fiber Rolls Figure THE TAHOE REGIONAL PLANNING AGENCY (TRPA) SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ELECTRONIC COPIES OF THIS DETAIL. May 2014 4.5-q Fiber Roll Page 77

4.5-q Fiber Roll May 2014 Page 78