Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

Similar documents
Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

~m"ifir ~ ~ ~1~ItI~UI ~ ~ ~ 4~~lut"11 ~iif>"f ~ ~~. ~ltt9l~i~~'1! ~ W "ip".~.: 26/10/2009-~. m. ti. ~/, l( b -(59 ~:

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

Distribution List R.K.M. Powergen Pvt. Ltd. Jindal Power Ltd. Athena Chhattisgarh Power Pvt Ltd SKS Power Generation (Chhattisgarh) Ltd.

2. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafi Marg New Delhi FAX No

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

List of members of TCC

Q3 FY Press & Analysts Meet Mumbai January 28, 2016

Indian Power Grid Developments

FY PRESS MEET

Tower-C, DLF Cyber City, Phase-II Gurgaon Phone : , ,

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

Distribution List : Sterlite Energy Ltd. Jindal India Thermal Power Ltd. Navabharat Power Private Limited GMR Kamalanga Energy Ltd.

Summary record of discussions of the Standing Committee Meeting on Power System Planning in Eastern Region held on at NRPC, New Delhi.

State-wise Gross State Domestic Product by Industry of Origin (at Prices) % Share to Total State GSDP at Constant Prices

A summary on the deliberations on each application is as under:

DetaiJed of MSPGCL (Mahagenco) Commissioned generating stations having PPA with MSEOCL. Dlof Commissioning. 11termal

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II)

Structure & Functions of POWERGRID. Dr. S. K. Agrawal General Manager (POWRGRID) AUGUST 2008 SKA 1

Appendix 08: Details of Location under Each Category

Applications Granted Medium Term Open Access (MTOA) by POWERGRID

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Advanced Ultra Power Transmission Consultancy

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

9.Telecommunication. India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited)

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Controllers Address, Phone No., Fax No. &

"'-- :...:. ~ ~ ~ '''''tlr'

Smart Cities & Urban Development

CALL LOGGING PROCESS

Contact Details: Distributors

SPANNING POWER GLOBALLY. Since 1953

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook)

Dev Projects Pvt. Ltd.

List containing names and addresses of AD Cat. II licenced by Kanpur Regional Office. Sr /1207, Ansari Road, Sahaaranapur (U.P.

Three Phase UPS Systems

Employer Registration Help File

Single Phase Industrial UPS System. series. Range: 10 to 300 kva CEMENT POWER STEEL & METAL OIL & GAS

Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist

Mother and Child Tracking System. Achievements and Challenges

Copy: with a request to kindly make it convenient to attend the above meeting

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

About Us: Encl: Details of Shree Technocrat Communication System

Railway Board, Zones, Production Units - Unit Wise Login Credentials for Project Saksham. S.No Unit Username Password

Minutes for 8 th Connectivity & Long Term Access Meeting with Northern Region Constituents held on 20/01/2016 at NRPC Office, Delhi.

Modernisation of Transmission System In MSETCL

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

CANARA BANK NRI CELL, CIRCLE OFFICE 1ST FLOOR, RED CROSS BHAVAN SACHIVALAYA MARG BHUBANESWAR : ODISHA, INDIA E MAIL ID:

Toshiba Supports Make in India with our Experience and Technology

Status of LOAs issued to power utilities by CIL sources (As on ) (Provisional) Qty. For Which MoU Is Signed (Mt)

MSETCL- AN OVERVIEW Zalte UG Director (Operations) M.E. Elect.

Employer Registration

POWER TRANSMISSION IN INDIA 2018

GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS

Performance Assessment of Electricity Distribution Utilities in India An Insight into Performance for FY 14 FY 16 and Outlook for FY 17

Video Door Phone Collection 2017

DESIGN YOUR WORLD WITH YOUNG ENERGY

SPONSORSHIP DETAILS OF MADHYA PRADESH AS ON 01 JAN 2015

Highlights of Telecom Subscription Data as on 31 st October, 2018

NTPC Ltd. WRHQ Mumbai Vendor Payments From To

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

Address and Tel.No. of the Director, Legal Metrology GOI

2. Pradhan Mantri Gram Sadak Yojana (PMGSY)

ITC HOLDINGS, CORP. Edison Electric Institute 9

Highlights of Telecom Subscription Data as on 28 th February, 2018

SMART WIREFREE. Home Automation Solutions

Maharashtra The Enduring Leader

Inspired By Nature List Price w.e.f. 1st July 2017

This booklet has been prepared with the support under the GoI-UNDP Disaster Risk Reduction Programme ( )

Distributor Process Manual.

CONTACTS DETAILS OF CODE COMPIANCE OFFICERS / NODAL OFFICERS FOR PUBLIC GRIEVANCE

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

Reliance Infrastructure Ltd.

Manitoba Hydro TSR Facility Study Meeting CapX Transmission Owners Proposal/Study Approach

1200 West 7th Street, Los Angeles, CA Smart.

Chairman & MD, 40impeccable years of serving the Indian Industry

For internal circulation of BSNL only 1

College of Engineering, Pune (An autonomous Institute of Government of Maharashtra) Board of Technical Education Delhi

Hitachi Hi-Rel Worldwide. Pan India Presence. Hitachi Hi-Rel Power Electronics Pvt. Ltd. Manufacturing Plant Andhra Pradesh.

Delivering Smart Grid/ Distribution Solutions. Press & Analysts Meet 06 November, 2012

SJ700i Series Low Voltage Inverter 415 V Class 30 kw to 450 kw

For internal circulation of BSNL only

TransWest Express Transmission Project Interregional Transmission Project Submittal

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study

Shyam Indus Power Solutions Pvt. Ltd. June 2014

JSONRecharge API Document

Distribution List: Constituents of Southern region.

Next Generation Scada Architectures

TSR A & B - FACILITIES STUDY REPORT

ENGINEERING PROCUREMENT CONSTRUCTION GREEN POWER TRANSMISSION. Niche DRIVES VALUE. Techno Electric & Engineering Company Limited

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

Presentation to Local/State/Federal Agency Mtg November 10, 2015

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

SDG&E s Accomplishments and Future Plans

Agenda for Connectivity/Long term Access to Generation projects in Northern Region

Tax Information Exchange System (TINXSYS) (For CTD Officials)

Transcription:

Proposed transmission system in WR for various generation projects in Jharkhand, Orissa, West Bengal, Chhattisgarh, M.P. and Maharashtra and other NTPC projects System studies have been carried out to identify transmission system strengthening for transfer of power from various generation complexes in Jharkhand, Orissa, West Bengal, Chhattisgarh, M.P and Maharashtra and other NTPC projects to major load centers in WR. The most of the capacity of the above generation complex includes generation projects of various IPPs who have applied for long term open access. Complex wise capacity is as under: IPPS Complex NR WR Jharkhand 2834 1640 Orrisa 2664 2875 West Bengal 1200 800 MP 1173 1897 Maharashtra 300 3500 Chhattisgarh 430 762 UMPP & NTPC projects Tilaiya (Jharkhad) NTPC UMPP Projects (Barh-II, Nabinagar JV, Rihand-IV, Vindhyachal-IV and Mauda 1700 800 760 2327 Total 11061 14601 A) Power transfer from generation projects in Jharkhand, Orissa, West Bengal and Madhya Pradesh For transfer of power from generation projects in Eastern Region a high capacity 765kV corridor between Jharsaguda (Orrisa) and a pooling station near Dharamjaygarh in Chhattisgarh is considered. This pooling station is proposed to be established by LILO of Ranchi WR Pooling Point 765kV 2xS/c lines at Dharamjaygarh. For onward dispersal of power and keeping in view the quantum of power transfer, Dharamjaygarh is proposed to be interconnected with Pooling station near Jabalpur through 765kV

2XS/c lines along with establishment of 400/765KV 3x1500MVA substation near Jabalpur. Power from various IPPS viz. RIL (Shadol) (1050 MW) and Today Home (1000 MW) is proposed to be pooled at Jabalpur Pooling Stations. For onward transfer of power beyond Jabalpur Pooling Stations, 765 kv high capacity Corridor between Jabalpur Pool-Bina is considered. For transfer of power towards western part of WR, a parallel high capacity 765kV corridor between Bina and Baroda via Indore is considered. Further, to facilitate immediate connectivity of generation projects and smooth operation of high capacity corridors, interconnection of Pooling station near Jabalpur having interconnection with 400kV Damoh as well as Jabalpur through a D/c lines is proposed. For transfer of Power from Vindhyachal-IV STPP (1000 MW) and Rihand-IV STPP(1000 MW), it is proposed to develop a 400/765kV pooling station near Vindhychal to pool the power from above generation projects. For onward transfer of power, it is proposed to develop a parallel 765 kv corridor between Vindhyachal Pooling and Gwalior via Satna. In addition, transfer of power from Jaiprakash Asscciates Ltd (1320 MW), interconnection between Generation project and Satna 400kV station through 400 kv D/c (Triple) is considered. Further, for transfer of power beyond Bina from the generation projects in Vindhyachal/Rihand complex as well as Jharkhand/Orrisa and MP, a 765 kv corridor between Bina and Vadodra via Indore is considered. Accordingly, following transmission system is proposed: Establishment of 765/400 kv, 3x1500 MVA sub station near Dharamjaygarh Dharamjaygarh - Pooling Station near Jabalpur 1200kV 2xS/c LILO of Ranchi WR Pooling station 765 kv 2XS/c at Dharamjaygarh Establishment of 765/400 kv, 3x1500 MVA Pooling Station near Jabalpur Pooling Station near Jabalpur - Bina 765kV 2xS/c Establishment of 765/400 kv, 2x1500 MVA sub station Pooling Station near Vindhyachal Pooling Station near Vindhyachal Satna - Gwalior 765kV 2xS/c Gwalior -Jaipur 765kV 2xS/c Pooling Station near Vindhyachal Rihand-IV 400kV D/c (Triple) Bina-Indore 765 kv 2 nd S/c Indore- Baroda 765 kv 2xS/c

Pooling Station near Jabalpur Jabalpur 400 kv D/c (Triple) Pooling Station near Jabalpur Damoh 400 kv D/c Establishment of 765/400 kv 3x1500 MVA S/s at Vadodra Estimated Cost : Rs 11500 Cr B) Power transfer from IPP projects in Champa Janjgir and Raigarh Complex in Chhattisgarh In order to facilitate transfer of power from generation projects in Raigarh and Champa-Janjgir complex, establishment of 765/400kV Pooling station near Raigarh and Champa is considered. Further, interconnection amongst Raigarh, Champa Pooling Station and WR Pooling station near Sipat through 765 kv 2xS/c lines are considered. Considering serious ROW constraint beyond Raigarh/Raipur and quantum of power transfer, for onward transmission of power beyond Raigarh, it is proposed to interconnect Raigarh and Raipur through 1200kV transmission lines. In addition, keeping in view of serious ROW constraint and quantum of power transfer beyond Raipur, it is proposed to develop a parallel high capacity corridor through Raipur-Wardha-Aurangabad 1200kV 2xS/c lines (Wardha-Aurangabad 1200kV corridor is already covered as a part of Mundra tr,. system). Beyond Aurangabad, for transfer of power towards western part, development of following tr. corridor is considered. Aurangabad- Padghe 765kV 2xS/c Aurangabad- Vaodoara 765kV 2xS/c Establishment of 3x1500 MVA,765/400 kv Padghe Substation For transfer of Power from Maharashtra Energy Generation Limited (4000 MW) near Shahpur Distt. Raigad in Maharashtra, it is proposed to interconnect the project with Padghe and Pune through 765 kv lines. Accordingly, following transmission system is proposed: Pooling station near Raigarh Pooling Station near Raipur 1200kV 2xS/c Pooling Station near Raipur - Wardha 1200kV 2xS/c line Wardha Aurangabad 1200kV 2 nd S/c line Establishment of 765kV Pooling Station near Champa-Janjgir WR Pooling station near Sipat - Pooling Station near Champa-Janjgir 765 kv 2xS/c line

Pooling station near Raigarh - Pooling Station near Champa-Janjgir 765 kv 2xS/c line Pooling station near Raigarh - WR Pooling station near Sipat 765 kv S/c line Establishment of 400/765/1200kV, 3x3000MVA Pooling station near Raigarh and Pooling Station near Raipur Aurangabad- Padghe 765kV 2xS/c line Aurangabad- Vaodoara 765kV 2xS/c line Establishment of 3x1500 MVA,765/400 kv Padghe Substation Operation of Wardha-Aurangabad line at 1200 kv level Establishment of 1200/765kV 2x3000MVA substation each at Wardha and Aurangabad Estimated Cost : Rs 14000 Cr C) Power transfer from Mauda generation project in Maharashtra NTPC has proposed to set up Mauda TPS(2x500MW) near Wardha/Nagpur in Maharashtra by 2011-12 as a regional projects. In addition, a no. of generation projects have been envisaged around Koradi/Khaperkheda by Maharahtra State and other IPPs. Keeping in view the transmission system developmental plan of Maharahtra state, it is proposed to interconnect Mauda with Nagpur as well as Khaperkheda through 400 kv D/c line. In view of the above, following transmission system is proposed as a part of Mauda Transmission system: Mauda Nagpur 400 kv D/c line Mauda Khaperkheda 400 kv D/c line Nagpur- Wardha 400 kv D/c line Establishment of 400/220 kv,2x315 MVA Substation at Nagpur Estimated Cost : Rs 270 Cr