Bentley in Construction 3 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
The Need For Innovation Success in construction is elusive Independent Project Analysis (IPA) study of 318 projects > $2B: 65% of projects FAILED, experiencing either: > 25% cost overrun > 25% schedule slip Significant underperformance of the asset once constructed 4 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Work Packaging The Industry Best Practice 5 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Extensive Industry Research Volume I: Recommended Process Volume II: Implementation Guidance CII/COAA AWP Implementation Resource IR 272-2 400 pages of guidance, tools, and templates Volume III: Case Studies and Expert Interviews 6 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Incredible Results Advanced Work Packaging: July 2013 Case Study Findings 7 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Irresistible Benefits To Advanced Work Packaging 25% productivity improvement 10% decrease in total installed cost Greater schedule & cost certainty Improved: Safety performance Quality Contractor profitability Stakeholder alignment R IS K P R O FI T 8 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Only Bentley Has The Capabilities To Make Advanced Work Packaging A Reality Interoperability Information Management and Insight Construction Computing Chaos Work Package Server Enabling Enhanced Execution 9 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
i-models and ProjectWise Facilitating Engineering Work Packages PDMS PIPING STRUCTURAL DGN ELECTRICAL DWG P&ID SP3D BUILDING RVT ENGINEERING WORK PACKAGES 10 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
ConstructSim Facilitating Installation Work Packages PDMS PIPING STRUCTURAL DGN DWG ELECTRICAL P&ID SP3D RVT BUILDING Work Package Server ENGINEERING WORK PACKAGES INSTALLATION WORK PACKAGES 11 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Information and Change Management Gap PDMS PIPING STRUCTURAL DGN DWG ELECTRICAL SP3D P&ID RVT BUILDING ENGINEERING WORK PACKAGES INSTALLATION WORK PACKAGES 12 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Filling The Gap & Making ADVANCED Work Packaging a Reality PDMS PIPING DGN STRUCTURAL DWG ELECTRICAL SP3D P&ID RVT BUILDING ENGINEERING WORK PACKAGES CONSTRUCTION WORK PACKAGES INSTALLATION WORK PACKAGE 13 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
ProjectWise Construction Work Package Server Comprehensive Construction Information Management Data Relationships (e.g. relate engineering, material, inspection and construction data, documents, tasks) Instantly Access Project Delivery Data Automated Work Packaging Change Manage, Assemble, Publish For Distribution Construct More Consistently and More Safely Holistic Reporting and Insight Continuous feedback Operate More Confidently Through Actionable Awareness Realization of Best Practices Increase Safety Decrease TCI 10% 14 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
15 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated Secure login to selected project
The Complete Project At Your Fingertips A convenient Web interface to the complete installation information and work package activities across the project lifecycle 16 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Real-Time Project Status at a Glance 30-Day Look Back Performance vs. Plan Issued Work Packages 17 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Work Packaging With The Click of a Mouse These tabs show more detailed information about the WP. (i.e. Schedule, tasks etc.) Progress and budget tracking. Rolled up into progress and budget reports. Assemble and publish using predefined templates 18 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Keep Everyone in the Loop at All Times Material Lists Progress Reporting Progress Test Certificates Configurable Reports / Scorecards / Dashboards Pressure Test Record Drawings Not Yet Released Expedited Reports Spools Not Yet Fabricated 19 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
20 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated Create work areas and work packages leveraging the visual acuity of the 3D model while working online or disconnected
When offline, synchronize changes back to the server to update work areas and work packages, avoidiswork When selection complete the total number of hrs required conflicts and maintain project insightto complete the work package is show here All components and activities are now part of the work package 21 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated Adding components to a work package is helped by the use of color, here the green means these components are not in a current work package and can be added
Precise Progressing Quantities can either be reviewed or progressed Details of components and associated tasks Hours can either be reviewed or progressed Percent complete can either be reviewed or progressed 22 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Instant Updates From The Field 23 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Scalable, Modular Solution 24 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Impressing The Industry Terry Erhart, Global Construction Processes & Technology Director at Hatch, said, ProjectWise Construction Work Package Server will assist the project team to meet its scheduled dates, and will provide timely project status that will increase Construction Management staff efficiency, will reduce man-hours, both in the home office and at the site, and will assist in improving overall field productivity. 25 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated
Making Advanced Work Packaging Work For You Proven Extensive supporting research Solution shaped by 5 major EPCs Advantageous Potential 10% decrease in total installed cost Improved safety Flexible Deployable on-site or as a managed service Affordable 26 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated