Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process

Similar documents
Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Standard INT Dynamic Transfers

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Standard INT Dynamic Transfers

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

Table of Contents. TOP TOP BA Data Request and Specification Guidelines. Operating Procedure

Agreements and Queue Management

Standard COM-002-2a Communications and Coordination

Standard INT Interchange Authority Distributes Arranged Interchange

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation

Appendix 1 Interconnection Request INTERCONNECTION REQUEST

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

SPP RTO Compliance Forum Western Area Power Administration March 11, 2015

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

5. Effective Date: The first day of the first calendar quarter after applicable regulatory approval.

Agreements and Queue Management

Standard Development Timeline

Cyber Security Reliability Standards CIP V5 Transition Guidance:

Standard CIP Cyber Security Critical Cyber As s et Identification

Generator Interconnection Process. Wholesale Transmission Overview

New Brunswick 2018 Annual Implementation Plan Version 1

March 15, 2011 VIA ELECTRONIC FILING

Joint Transmission Planning Base Case Preparation Process

Introduction. ADSTF Report of Lessons Learned from the Implementation of the 2028 ADS Anchor Data Set Task Force February 22, 2019

Alberta Reliability Standards Compliance Monitoring Program. Version 1.1

Small Hydro Regulatory and Permitting Requirements California

Standard CIP Cyber Security Critical Cyber As s et Identification

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Physical Security Reliability Standard Implementation

EIM Entity Readiness Criteria May 6, 2015

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013

History of NERC December 2012

MOD Transmission Reliability Margin Implementation Document

Standards Authorization Request Form

TransWest Express Transmission Project Interregional Transmission Project Submittal

Interconnection and Transmission

Bryan Carr PMP, CISA Compliance Auditor Cyber Security. Audit Evidence & Attachment G CIP 101 Salt Lake City, UT September 25, 2013

Standard Development Timeline

bcuc British Columbia Utilities Commission

Québec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan Annual Implementation Plan

ELECTIVE INTERCONNECTION FACILITIES

Section 10 of BPM for TPP- Generator modeling webinar

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

Standard CIP 007 4a Cyber Security Systems Security Management

Standard CIP Cyber Security Electronic Security Perimeter(s)

2014 Annual Compliance Assessment

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company

Standard CIP Cyber Security Security Management Controls

Standard CIP 005 2a Cyber Security Electronic Security Perimeter(s)

CIP Cyber Security Security Management Controls. Standard Development Timeline

Standard CIP-006-3c Cyber Security Physical Security

Specific topics covered in this brief include:

MeMOrAnduM Of understanding

Standard CIP 005 4a Cyber Security Electronic Security Perimeter(s)

A.I Task Order 1 - Technical and Analytical Services 1. SCOPE OF WORK. Deliverablc(s): CPUC Implementation Plan Filed. EXHIBIT A: Scope of Services

Cyber Security Incident Report

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Standard CIP 007 3a Cyber Security Systems Security Management

Records Retention Policy

History of NERC August 2013

Standard CIP Cyber Security Electronic Security Perimeter(s)

Proposed Improvements for NERC MOD Standards July 10, 2012

Standard CIP 004 3a Cyber Security Personnel and Training

Project Presentation April, 2017

Standard TOP Transmission Operations

WON Security Guideline

WECC Criterion INT-001-WECC-CRT-3

WECC Internal Controls Evaluation Process WECC Compliance Oversight Effective date: October 15, 2017

Electric Program Investment Charge Joint IOU Stakeholder Webinar

Reliability Coordinator Procedure

Rocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Certification Program

Standard CIP-006-4c Cyber Security Physical Security

BPM Change Management Meeting

ACH Audit Guide for Third-Party Senders Step-by-Step Guidance and Interactive Form For Internal ACH Audits Audit Year 2017

Standard Development Timeline

Security Standards for Electric Market Participants

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

Standard CIP-006-1a Cyber Security Physical Security

NERC Overview and Compliance Update

SOUTHERN CALIFORNIA EDISON COMPANY

Standard CIP Cyber Security Systems Security Management

EU Code of Conduct on Data Centre Energy Efficiency

Standard Development Timeline

NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Resource Adequacy Pre-Market Simulation Training Workshop

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP

Page 1 of 15. Applicability. Compatibility EACMS PACS. Version 5. Version 3 PCA EAP. ERC NO ERC Low Impact BES. ERC Medium Impact BES

Critical Cyber Asset Identification Security Management Controls

Standard CIP Cyber Security Systems Security Management

Silicon Valley Power:

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Transcription:

California Independent System Operator & Hetch Hetchy Water and Power of the City and County of San Francisco Joint Transmission Planning Base Case Preparation Process This is a living document. Please modify as optimal methods are found. Must use version control and signature page for updates to become effective. June 2017

Table of Contents 1 Introduction... 1 1.1 Purpose... 1 1.2 Transmission Planning Base Cases... 1 2 Annual Transmission Planning Base Case Development Process... 2 2.1 Roles and Responsibilities... 2 2.2 Transmission Planning Modeling Assumptions and Responsibilities... 2 Transmission Project Modeling... 2 Generation... 3 Demand... 3 Outage Information... 3 Firm Transmission Service and Interchange... 3 Distributed Energy Resource Model... 3 2.3 Annual Transmission Planning Base Case Development Process... 4 Appendix A. Modeling Requirements... A-1 Appendix B. WECC Base Case Development Process... B-1 Appendix C. Evidence Retention... C-1

1 Introduction 1.1 Purpose The purpose of this document is to (i) provide an overview of the Transmission Planning Base Cases used by Hetch Hetchy Water and Power (HHWP) of the City and County of San Francisco (CCSF); (ii) provide details of the assumptions used in the Annual Transmission Planning Base Cases; and (iii) provide an overview of the process used in the development of Annual Transmission Planning Base Cases. HHWP is owned and operated by CCSF. CCSF is registered as a Transmission Planner under the name of HHWP; thus HHWP is also used in this document to refer to CCSF. CCSF and the California Independent System Operator (CAISO) entered into a Planning Coordinator Agreement dated May 14 th, 2015. Attachment 2 of this agreement describes how the CAISO and CCSF anticipated coordinating with each other while carrying out their respective responsibilities as Planning Coordinator and Transmission Planner. This process provides additional details on coordination related to transmission planning and MOD-032 modeling data for power system modeling and analysis. 1.2 Transmission Planning Base Cases HHWP s Transmission Planners (TP) participate in the development of the Annual Transmission Planning Base Cases and the review of Western Electricity Coordinating Council (WECC) base cases through Pacific Gas and Electric (PG&E) as the Area Coordinator. The Annual Transmission Planning Base Cases are developed using the best available information at the time of the update. The Annual Transmission Planning Base Cases follow the California Independent System Operator (CAISO) Transmission Planning Process (TPP) timeline and use the assumptions included in the CAISO TPP Study Plan. These base cases are used to perform Transmission Grid Assessment and to develop the Transmission Expansion Plan. To maintain consistency, all the other base cases developed throughout the year use the approved Annual Transmission Planning Base Cases as the starting cases. The base cases are modified based upon the objective of the study and the study assumptions. This document includes details of the assumptions used and the process followed for developing the Annual Transmission Planning Base Cases. 1

2 Annual Transmission Planning Base Case Development Process This section provides an overview of the Annual Transmission Planning Base Case Development Process. This process is completed on a yearly basis in order to keep the HHWP system model up-to-date and consistent with the changes that have occurred throughout the year. The Annual Transmission Planning Base Cases serve as an input into the CAISO annual TPP process and are used as starting cases for other transmission planning studies throughout the year including WECC base cases, and base cases used in load and generation interconnection studies. The process is broken up into several rounds. Each round builds off the previous round in a chronological fashion. 2.1 Roles and Responsibilities HHWP s Transmission Planners are responsible for maintaining all models and modeling data related to CCSF s ownership of transmission, resources and loads directly connected to HHWP s transmission system. 2.2 Transmission Planning Modeling Assumptions and Responsibilities The HHWP Transmission System model will comply with the requirements in WECC s Data Preparation Manual, as well as other requirements applicable to CCSF described in the CAISO- PGE MOD-032-1 Requirements document posted on the CAISO web site. This section provides additional information on what assumptions are made and what level of detail is required for modeling the various aspects of the base cases created. Transmission Project Modeling Existing system model will be based upon as-built design and equipment test reports. Future capacity projects approved by HHWP will reflect the most up-to-date information available for both scope and in-service dates. Future maintenance projects in-service dates are based upon the latest information on the schedule of the maintenance projects. The maintenance projects that have a firm plan to be implemented and are either under construction or scheduled to be under construction will be modelled in the cases based upon the scope of work provided by the maintenance team. 2

Generation a. Models Existing generator models will reflect the latest models provided by HHWP. Future Generators or modifications to existing generators will be modeled based upon HHWP project status using the latest generator models available. Future projects that have a status of in construction will be modeled in future base cases. The exception to this will be based upon the Renewable Portfolio Standard (RPS) needs. If the in construction list of generation does not meet the RPS needs, additional generation will be modeled to meet these needs. This additional generation shall be based upon most likely to occur generation that is still moving forward. Typically a Large Generator Interconnection Agreement (LGIA) or Power Purchase Agreement (PPA) would be the next set of criteria for modeling based on RPS needs. b. Dispatch Generation dispatch for existing units will be based either on historical information (if available) or based upon Net Qualifying Capacity (NQC) values. Future renewable generation dispatch will be based upon the CAISO TPP Study Plan for the given scenario. Demand 1 HHWP s demand models will comply with the requirements in WECC s Data Preparation Manual, as well as other requirements found in the CAISO-PGE MOD-032-1 Requirements document posted on the CAISO web site. Outage Information Planned outages that are at least 6 months in duration will be modelled based upon the planned dates of outages using the outage information provided by HHWP and CAISO. Firm Transmission Service and Interchange Known commitments for Firm Transmission Service and Interchange will be modelled based upon the information provided by the CAISO. Distributed Energy Resource Model Modelling assumptions for modelling Energy Efficiency (EE), Demand Response (DR), Distributed Generation (DG), Electric Vehicles (EV), storage are under development and will be added to this document in the future. 1 CCSF demand is served through PG&E distribution substations; therefore PG&E is responsible for bus bar level models derived from California Energy Commission (CEC) load forecast. 3

2.3 Annual Transmission Planning Base Case Development Process PG&E, as the WECC Area Coordinator, is responsible for compiling full base case data sets for Northern California. HHWP is responsible for providing its transmission system model updates to PG&E at least once a year, usually around October, to accurately capture HHWP s transmission system model in the annual transmission planning base case development process. HHWP is also responsible for providing comments, as necessary, to PG&E, as the WECC Area Coordinator, regarding the HHWP system models. 4

Version History Version Change By Date CAISO HHWP Joint Process Document for MOD-032-1 Catalin Micsa and 1.0 Requirement R1 Implementation and Compliance, 6/2/2017 Lesley Kayser-Sprouse initial version Technical Review Reviewed By Name Signature Date Senior Advisor Regional Transmission Engineer, Regional Transmission North (CAISO) Catalin Micsa Original Signed 6/2/2017 Operations & Transmission Planning Engineer, HHWP Lesley Kayser-Sprouse Original Signed 6/2/2017 Approval Approved By Name Signature Date Manager, Regional Transmission North, Infrastructure Development (CAISO) Division Manager, HHWP Jeffrey Billinton Original Signed 6/2/2017 Margaret Hannaford Original Signed 6/2/2017 5

Appendix A. Modeling Communications Entities responsible for providing data should send it to: PC ISO at: GridModelingData@caiso.com TP HHWP at: LKayser-Sprouse@sfwater.org and/or WGibson@sfwater.org As WECC Area Coordinator, data may also be submitted to PG&E: TP PG&E at: AreaCoordinator@pge.com or GenModel@pge.com as applicable A-1

Appendix B. WECC Base Case Development Process PG&E, as the WECC Area Coordinator, will be responsible for the WECC Base Cases Development Process, and follows the CAISO-PGE MOD-032-1 Requirements document posted on the CAISO web site. HHWP will provide PG&E with its updated models at least once a year and will participate in WECC base case review, as necessary. B-1

Appendix C. Evidence Retention The following evidence for demonstrating compliance with MOD-032 will be retained for a period of 4 years unless one of the following is true: 1. Last audit performed by the Compliance Enforcement Authority was over 4 years ago, then at a minimum, maintain evidence from the last audit until a new audit is performed. 2. Maintain evidence for a longer period of time if asked by the Compliance Enforcement Authority, as part of an investigation. 3. If an applicable entity is found non-compliant, it shall keep information related to the non-compliance, at a minimum, until mitigation is complete and approved. The following documents need to be retained: Documentation showing that HHWP and CAISO jointly developed required modeling data requirements and reporting procedures; Modeling requirements document; Posting and reporting procedures for modeling requirements documents; and Written notification regarding technical concerns with data submitted under R2, including the technical basis or reason for the technical concerns. C-1