RFC 6-Mediterranean Corridor TAG RAG (EEIG RFC 6 Copyright; Andrea Galluzzi Managing Director) Budapest 19 th November 2015

Similar documents
RFC User Satisfaction Survey 2017

Corridor Capacity. T. Vanbeveren C-OSS. easier, faster, safer

PCS User Manual for Pre-arranged Paths (PaPs) and for Corridor OSS (C-OSS) Part I - RU functions V0.1

RFC User Satisfaction Survey 2016

RFC User Satisfaction Survey 2017 Overall Results

Dossier Creation (Create New Dossier Wizard)

EIM s comments on Best practices and challenges of cross border infrastructure management

P R I M E. Platform of Rail Infrastructure Managers in Europe. General Presentation. November 2018

13174/15 AT/tl 1 DGE 2B

European Developments

P R I M E. Platform of Rail Infrastructure Managers in Europe. General Presentation. March 2018

Description of the issue Comments Responsible Timing State of Play end Nov. 16. Dec 2016, Implementation beginning of point

Completion of United States Syndicate Information Statements

Researcher information

User Satisfaction Survey 2017 Report Summary. Czech-Slovak Corridor Management Board Praha/Bratislava, November 8 th 2017

REPORT. Administrative Arrangement JRC DG MARE, Data Coverage Report

P R I M E. Platform of Rail Infrastructure Managers in Europe. General Presentation. June 2016

P R I M E. Platform of Rail Infrastructure Managers in Europe. General Presentation. April 2017

Agenda #1 Welcome and general information adoption of the agenda. Michele Mario Elia

Introduction to CMIS Training Guide. Introduction to Events Creation & Management. Timetabling Team Estates and Buildings

How Can I Login to the Online Wait List System?

Hit Rail: Support to Interoperability

Completion of United States Syndicate Information Statements

Service withdrawal: Selected IBM ServicePac offerings

NetApp Cloud Volumes Service for AWS

P R I M E. Platform of Rail Infrastructure Managers in Europe. General Presentation. April 2016

Using the On-line Draft Timetable Review System (OTIS)

I-Portal Training. December 2016

E R T M S COMMUNICATION PLAN

UNIVERSITÀ DEGLI STUDI DI TORINO

RADIO SPECTRUM POLICY GROUP. 1 st Progress Report of the RSPG Working Group on Spectrum issues on Wireless Backhaul

ENTSO-E working to fulfill the 3 rd Package

Rail Freight Corridor North Sea Baltic offer

IRPS 2017 Manuscript & Platform Presentation Submission Process

Test Train & Loading Gauge

National Festivals & Participative Events Programme

Singapore Post Limited

Users manual for submission of on-line project applications and reports on the use of past grants

Review of the WMO DRR Programme activities in the area of MHEWS as a contribution to the WMO DRR Priority (2005 to present)

Employee Connect Help Guide

Global Antimicrobial Resistance Surveillance System (GLASS) Guide to uploading aggregated antimicrobial resistance data

IBM offers Software Maintenance for additional Licensed Program Products

evention Ticket Portal Tipico Frontend Manual

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017

LOGGING IN. Your account has been assigned a temporary password which you will need to change when you next login.

User Guide of PIP System for Employers

AmeriCorps Member Online Time Sheet Instructions

2017 Medicare Online Application Rewrite: Key Updates

Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

INTRODUCTION AND PREPARATIONS BEFORE THE START: The Boundaries and the Size of each required paragraph in the Submission Form:

Results Framework Management System (RFMS)

IFRS Taxonomy 2018 Proposed Update 2 General Improvements

rdesk CRM v7.0 Release Notes

Griffin Training Enrollment Website

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

Views on the Framework for Improving Critical Infrastructure Cybersecurity

Security Awareness, Training, And Education Plan

ehaction Joint Action to Support the ehealth Network

F A Q Frequently Asked Questions

EAST Cohort 2 Serials & Journals. Kick-Off Webinar

WECC Criterion INT-001-WECC-CRT-3

How to submit and sign electronically your Online Travel Reimbursement Request (OTRR) User guide

OPERATING SYSTEMS. Systems with Multi-programming. CS 3502 Spring Chapter 4

Special Education Room and Board Reimbursement Claim User Guide

TERMS OF REFERENCE FOR: REGIONAL CLIMATE AND GREEN GROWTH CONSULTANT EASTERN AFRICA

hhh Grenadine Event Planner User's Guide

LINK System Customer Interface. Basic Nominations

STUDENT USER GUIDE Vesna Gasovski

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code

Santa Barbara County Assessor Business Property Statement E-Filing User Guide

CERTIFICATE IN LUXEMBOURG COMPANY SECRETARIAL & GOVERNANCE PRACTICE

Network Working Group. Obsoletes: draft-ietf-dhc-new-opt-msg-00.txt June 2000 Expires December 2000

Tips for Navigating the Lyon County Fair Blue Ribbon Fair Online Pre-entry System

Frequently Asked Questions

John Holland Contractor Management System. User Guide for Employee Registration

Speaker Packet Workshops & Breakouts

User Guide for Applicants PROJECT. DATE & VERSION 11 th Oct 2016, Version: 2.0. Scholarships Management System Applicant Portal

This guide is designed to help LHBs and GP Clusters to navigate the reporting tool. This guide will cover:

Introduction... 1 Portal functionalities... 2 How to view, enlarge, save or print a paystub... 5

Published: December 15, 2016 Revised: December 15, 2016

CSTD Working Group on improvements to the IGF Summary of the 3 rd meeting

N C MPASS. Non-Clinical Self-Scheduling & Registration. ( Learning & Meeting Events ) Version 6.8

BEEDS portal Bank of England Electronic Data Submission portal. User guide. Credit unions Version 1.2

Published: December 15, 2017 Revised: December 15, 2017

Monroe County Fair Online Entry Process

Employee Guide. Frequently Asked Questions & Answers

Third SafeSeaNet Data Quality quarterly report (October, November and December 2009)

USER MANUAL FOR CAB APPROVAL SYSTEM

Grid Code Planner EU Code Modifications GC0100/101/102/104

Delivery Management System

OTOLOGY EAR AUDIT USER GUIDE.

Employee-User Guide. The Answers to Frequently Asked Questions. Support

1 HOW TO LOGIN ENOC ISUPPLIER PORTAL HOW TO CHANGE EXISTING PASSWORD HOW TO UPDATE TRADE LICENSE HOW TO UPDATE - PROFILE...

Relationship between TAF TSI and transmission of TT data to the engines SŽDC solution

DRAFT. TRAC User Guide. Revised: October 6, 2008 Revision: 1.0

STANDARD PROCEDURE CONTRACT MANAGEMENT 13 USER S GUIDE DOCUMENT CONTROL

EMR Company Registration and User Management

Qualification Answering qualifications

Agency s REMIT Information System CEREMP Registration User Manual for Market Participants (for NRAs use)

Transcription:

RFC 6-Mediterranean Corridor TAG RAG (EEIG RFC 6 Copyright; Andrea Galluzzi Managing Director) Budapest 19 th November 2015

Corridor One Stop Shop TAG-RAG Budapest 19 November 2015

TOPICS Reserve Capacity 2016 Status Results of Timetable construction 2016 Preparation of Pre-constructed products for Timetable 2017 Information status on coordination of capacity restrictions 2017 Information status on implementation of PCS Next Generation 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

RESERVE CAPACITY STATUS 1 Late request for 260 days (Spain) 1 Ad-Hoc request for 45 days (Spain) Management board decision for reserve capacity based on : Not used PaPs by the corridor Possible needs for Ims NB of available days Market usuability

TIMETABLE 2016 FIGURES Number of requests received at COSS Number of conflicting requests 4 with RFC2 (use of priority rules) 2 with consultation process 9 without possible alternatives proposal Number of alternative proposals (Italy) Requests together with RFC2 Requests together with RFC7 2015 2016 37 77 2 15 2 10 4 Customers requesting capacity 8 10 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

TIMETABLE 2016 SECTIONS East/West. Offer/Requested 40% 35% 30% 25% 20% E/W Offer 15% 10% 5% 0% VPE SZ RFI SNCFR TPFERRO ADIF E/W Req 40% 35% 30% West/East. Offer/Requested Total path km PAP Requested 2 564 096 Feeder / Outflow 5 396 121 25% 20% 15% 10% W/E Offer W/E Req 5% 0% VPE SZ RFI SNCFR TPFERRO ADIF

TIMETABLE 2016 24% 28%

TIMETABLE 2016 15% Potential PaPs 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

TIMETABLE 2016 ALLOCATION STATUS (DRAFT) *Dossiers not accepted because customer is asking for too long dwelling time at Villa Opicina Nb request in which IMs are involved

TOP 4 PaPs Requested TIMETABLE 2016 PAP REQUESTS COVERAGE

TIMETABLE 2016 ALLOCATION STATUS Main remarks : Lack of harmonization at borders RU constraints no taken in account F/O impossible de offer due to capacity constraints Missing days according to RU request PCS problems with implementating different calendars / IMs Due to late draft offer some PCS technical problems arised. Train parametres not in line with the request (F/O diff / PaP) RU to behave in this topic 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

CID BOOK 4 TT2017 UPDATE Update according to RNE CID structure guidelines Update according to the just validated Framework for Capacity allocation document 30th October 2015 Partial update according to common RFCs CIDs text Update and fine tuning according to experiences of the members and the COSS 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

CID BOOK 4 TT 2017 MAIN CHANGES Nomination of the authorized applicant defined in the FCA : 30 days before the running day. Deadline for submitting the request to the COSS for ad-hoc requests 21 days before the running date. (FCA recommendation is 30 days) => Still under the decision of the management board of RFC6 in December Integration of Croatia member from November 2015 Definition of PaPs on Multi corridors and Paps on overlapping sections Acceptance of the offer by the applicant compromise COSS is approaching the applicant in order to make him accepting or refusing the offer in a short delay. For the management of AD-Hoc requests, the applicant will receive an offer not latter than 10 working days before the first day of train run. RFC6 is proposing to use the Flex PaP concept in Italy, Slovenia, Hungary. DECISON NEEDED 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

RFC6 PAP 2017 PROPOSITION 19 November 2015 TAG-RAG Budapest

RFC6 PAP 2017 PROPOSITION 19 November 2015 TAG-RAG Budapest

RFC6 PAP 2017 PROPOSITION Connections with RFC5 to be defined NOVARA 5 4 TREVISIO VILLA 9 MODANE 24 TORINO Same as VINCENZA 5 2016 OPPICINA 5 ALLESSANDRIA PADOVA 4 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

RFC6 PAP 2017 PROPOSITION ŠENTILJ 5 SEŽANA DIVAČA LJUBLJANA PRAGERSKO HODOŠ Overlapping section with RFC5 KOPER For the management of the overlapping section with corridor 5, I propose that RFC5 is managing PAP KOPER PRAGERSKO going to SENTILJ RFC6 is managing PAP KOPER PRAGERSKO going to HODOS 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

RFC6 PAP 2017 PROPOSITION KOMAROM GYOR ORISZEN TPETER BOBA FERENCVAROS ZAHONY Connecting section with RFC7 Managed by RFC6 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

COORDINATION OF CAPACITY RESTRICTIONS Coordination of capacity restriction meeting took place in October Period analysed : 2017-2018 Major works will take place at Ventimiglia station Further analysis of the impacts is needed Customer information meeting is under preparation Proposals sections to be coordinated Cerbere Gerona Granollers - Barcelona Port Bou Perpignan Narbonne Montpellier Nimes Figueres Vilafant Gerona - Barcelona Perpignan TP Ferro - Figueres Perpignan Inter Narbonne Montpellier Nimes Genoa Vintimiglia - Marseille Nimes Valence Lyon 2 routes Miramas Avignon (link to Lyon 2 routes) Lyon Amberieu Chambery Montmelian - Modane + Node of Lyon Modane Torino Vincenza Villa Opicina x 2 Villo Opicina Ljubljana Pragersko Hodos Hodos Orizenpeter 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

Track renewal on the Avigliana Torino S. Paolo section Modane Francia Italia Avigliana Collegno Torino S. Paolo Work typolgy: track renewal Affected line sections: - Avigliana TO S.Paolo - Collegno TO S.Paolo - Torino S.Paolo - Collegno Period: November, from night 2nd/3rd until 24th/25th night Duration: 210 of track interruption + 180 of simultaneous line (both tracks) interruption 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

Windows map for 2017 generic windows South Alps TAG-RAG Budapest

Generic windows 2017 South Alps TAG-RAG Budapest

Generic windows 2017 Slovenia 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

Generic windows 2017 Italy 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

PCS NEXT GENERATION IMPLEMENTATION PCS Next Generation is released 28th December 2015 Improvements of the user interface Functions facilitating the screen navigation RFC 6, 4, 2 are organizing a common training 27, 28 January in Bruxelles REGISTERING IS MANDATORY 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

PCS NEXT GENERATION 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR

PCS NEXT GENERATION PCS NG Test System: https://pcstest1.railneteurope.info/pcs/login Login: Company short name* Password: 09 * Company list available in the current test system page 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR