RFC 6-Mediterranean Corridor TAG RAG (EEIG RFC 6 Copyright; Andrea Galluzzi Managing Director) Budapest 19 th November 2015
Corridor One Stop Shop TAG-RAG Budapest 19 November 2015
TOPICS Reserve Capacity 2016 Status Results of Timetable construction 2016 Preparation of Pre-constructed products for Timetable 2017 Information status on coordination of capacity restrictions 2017 Information status on implementation of PCS Next Generation 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
RESERVE CAPACITY STATUS 1 Late request for 260 days (Spain) 1 Ad-Hoc request for 45 days (Spain) Management board decision for reserve capacity based on : Not used PaPs by the corridor Possible needs for Ims NB of available days Market usuability
TIMETABLE 2016 FIGURES Number of requests received at COSS Number of conflicting requests 4 with RFC2 (use of priority rules) 2 with consultation process 9 without possible alternatives proposal Number of alternative proposals (Italy) Requests together with RFC2 Requests together with RFC7 2015 2016 37 77 2 15 2 10 4 Customers requesting capacity 8 10 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
TIMETABLE 2016 SECTIONS East/West. Offer/Requested 40% 35% 30% 25% 20% E/W Offer 15% 10% 5% 0% VPE SZ RFI SNCFR TPFERRO ADIF E/W Req 40% 35% 30% West/East. Offer/Requested Total path km PAP Requested 2 564 096 Feeder / Outflow 5 396 121 25% 20% 15% 10% W/E Offer W/E Req 5% 0% VPE SZ RFI SNCFR TPFERRO ADIF
TIMETABLE 2016 24% 28%
TIMETABLE 2016 15% Potential PaPs 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
TIMETABLE 2016 ALLOCATION STATUS (DRAFT) *Dossiers not accepted because customer is asking for too long dwelling time at Villa Opicina Nb request in which IMs are involved
TOP 4 PaPs Requested TIMETABLE 2016 PAP REQUESTS COVERAGE
TIMETABLE 2016 ALLOCATION STATUS Main remarks : Lack of harmonization at borders RU constraints no taken in account F/O impossible de offer due to capacity constraints Missing days according to RU request PCS problems with implementating different calendars / IMs Due to late draft offer some PCS technical problems arised. Train parametres not in line with the request (F/O diff / PaP) RU to behave in this topic 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
CID BOOK 4 TT2017 UPDATE Update according to RNE CID structure guidelines Update according to the just validated Framework for Capacity allocation document 30th October 2015 Partial update according to common RFCs CIDs text Update and fine tuning according to experiences of the members and the COSS 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
CID BOOK 4 TT 2017 MAIN CHANGES Nomination of the authorized applicant defined in the FCA : 30 days before the running day. Deadline for submitting the request to the COSS for ad-hoc requests 21 days before the running date. (FCA recommendation is 30 days) => Still under the decision of the management board of RFC6 in December Integration of Croatia member from November 2015 Definition of PaPs on Multi corridors and Paps on overlapping sections Acceptance of the offer by the applicant compromise COSS is approaching the applicant in order to make him accepting or refusing the offer in a short delay. For the management of AD-Hoc requests, the applicant will receive an offer not latter than 10 working days before the first day of train run. RFC6 is proposing to use the Flex PaP concept in Italy, Slovenia, Hungary. DECISON NEEDED 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
RFC6 PAP 2017 PROPOSITION 19 November 2015 TAG-RAG Budapest
RFC6 PAP 2017 PROPOSITION 19 November 2015 TAG-RAG Budapest
RFC6 PAP 2017 PROPOSITION Connections with RFC5 to be defined NOVARA 5 4 TREVISIO VILLA 9 MODANE 24 TORINO Same as VINCENZA 5 2016 OPPICINA 5 ALLESSANDRIA PADOVA 4 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
RFC6 PAP 2017 PROPOSITION ŠENTILJ 5 SEŽANA DIVAČA LJUBLJANA PRAGERSKO HODOŠ Overlapping section with RFC5 KOPER For the management of the overlapping section with corridor 5, I propose that RFC5 is managing PAP KOPER PRAGERSKO going to SENTILJ RFC6 is managing PAP KOPER PRAGERSKO going to HODOS 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
RFC6 PAP 2017 PROPOSITION KOMAROM GYOR ORISZEN TPETER BOBA FERENCVAROS ZAHONY Connecting section with RFC7 Managed by RFC6 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
COORDINATION OF CAPACITY RESTRICTIONS Coordination of capacity restriction meeting took place in October Period analysed : 2017-2018 Major works will take place at Ventimiglia station Further analysis of the impacts is needed Customer information meeting is under preparation Proposals sections to be coordinated Cerbere Gerona Granollers - Barcelona Port Bou Perpignan Narbonne Montpellier Nimes Figueres Vilafant Gerona - Barcelona Perpignan TP Ferro - Figueres Perpignan Inter Narbonne Montpellier Nimes Genoa Vintimiglia - Marseille Nimes Valence Lyon 2 routes Miramas Avignon (link to Lyon 2 routes) Lyon Amberieu Chambery Montmelian - Modane + Node of Lyon Modane Torino Vincenza Villa Opicina x 2 Villo Opicina Ljubljana Pragersko Hodos Hodos Orizenpeter 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
Track renewal on the Avigliana Torino S. Paolo section Modane Francia Italia Avigliana Collegno Torino S. Paolo Work typolgy: track renewal Affected line sections: - Avigliana TO S.Paolo - Collegno TO S.Paolo - Torino S.Paolo - Collegno Period: November, from night 2nd/3rd until 24th/25th night Duration: 210 of track interruption + 180 of simultaneous line (both tracks) interruption 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
Windows map for 2017 generic windows South Alps TAG-RAG Budapest
Generic windows 2017 South Alps TAG-RAG Budapest
Generic windows 2017 Slovenia 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
Generic windows 2017 Italy 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
PCS NEXT GENERATION IMPLEMENTATION PCS Next Generation is released 28th December 2015 Improvements of the user interface Functions facilitating the screen navigation RFC 6, 4, 2 are organizing a common training 27, 28 January in Bruxelles REGISTERING IS MANDATORY 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
PCS NEXT GENERATION 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR
PCS NEXT GENERATION PCS NG Test System: https://pcstest1.railneteurope.info/pcs/login Login: Company short name* Password: 09 * Company list available in the current test system page 19 November 2015 TAG-RAG Budapest RFC 6 MEDITERRANEAN CORRIDOR