BGE Service Application Guidelines Residential Development Projects

Similar documents
INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

Setting up Residential Electrical Service with Cowlitz Public Utility District #I

Construction Guidelines. for Providing Communications Services

Multiple Dwellings $.25/sq ft Building of Non-Residential Occupancy (New Building) $.30/sq ft

UE CONNECTION APPLICATION - POLE to PIT (Underground Electricity Supply)

Lake Waccamaw Building Inspections Fees

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 450 Columbus Blvd, Suite 901 Hartford, CT 06103

Did you know you have a choice? What do you need to do? nienetworks.co.uk Connecting multiple supplies

Web Portal Ticket Entry Guidelines

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 165 Capitol Avenue Hartford, CT 06106

Water Company Lay Application

U. S. Postal Service National Delivery Planning Standards A Guide for Builders and Developers

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

Introduction. We are excited about the possibility of bringing Google Fiber to your city and look forward to working with you.

Application for Water and/or Sewer Connections

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

BUILDING PERMIT FEE SCHEDULE

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

Terms of Agreement for Residential Fiber Optic Services

Mississippi 811, Inc. Membership Information

NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY

PUBLIC WORKS ORGANIZATIONAL CHART

Los Anseles W Department of 5* Water & Power

Network Online Services Connect Application Guide

VILLAGE OF CORNWALL-ON-HUDSON FEE SCHEDULE 2017

Request for Quotation Amendment #: 1

Access Field Entrance Other Constructed Yes (Type)

Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage

Client Utility Package

CITY OF CORINTH, TEXAS WIRELESS SERVICES (SMALL CELLS) DESIGN MANUAL

Dear Exhibitor,

Accounts Receivable Customer

Reliability & Resiliency in the US Capitol Region/Hardening the Grid One Year after Hurricane Sandy

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

IDEA Campus Energy UNIVERSITY OF MARYLAND Securing Our Networked Utility Infrastructure

SRP DEMAND MANAGEMENT STUDY

Advanced Two-Way Metering. Looking Forward

9/30/2014. Oregon Public Risk Manager s Conference October Retention and Public Records Requests. Facts

FACILITY COMPONENTS - MIDDLE SCHOOL

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

Oncor Residential/Small Commercial Project Requirements

RE: Docket Electric Infrastructure, Safety, and Reliability Plan FY 2013 Responses to Commission Data Requests Set 2

UTILITY NOTIFICATION CENTER OF COLORADO CONVERSION TO TIER ONE MEMBERSHIP REGISTRATION

INTERNET & NETWORK CONNECTIVITY

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Registration & Log In Guide Government Portal

SRP SMART ENERGY SAVER STUDY

**MANDATORY FORM** BOOTH NUMBER. Please visit to complete your order online. Online rates apply ONLY to orders made online.

PAYMENT AUTHORIZATION FORM

Quick-Ticket Guidelines

Subdivision Application Form

APPLICATION FOR SOIL AND LOT EVALUATION

Meter Enclosure and Equipment Standards

Advanced Two-Way Metering. C o m m u n i t y O u t r e a c h - S t a f f R e p o r t

OWNER PROPERTY DISCLOSURE

CONDITIONS OF SERVICE

CPS ENERGY Customer Web Portal User Guide. September 2018

POSITION PAPER. QUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester Release.

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

Application for Utility Services

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

Stem Beach Solar 1041 Application

ITU G.hn The low cost technology for real time Metering and SCADA communication

WHAT IS MISSOURI ONE CALL SYSTEM?... 2 WHO SHOULD BECOME A UTILITY MEMBER?... 2 BILLING AND FEES... 3 BILLING DISPUTES... 3

NATE Exam Administration Script

Mississippi 811, Inc. Membership Information

CHARTER TOWNSHIP OF ALLENDALE, OTTAWA COUNTY, MICHIGAN WIRELESS COMMUNICATION FACILITIES APPLICATION

QUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

Hitachi s experience in developing Smart Grids Shin-ichi INAGE Renewable Energy & Smart Grid Division, Hitachi Ltd.

TOWN OF FARMINGTON FEE SCHEDULE 2017

New Connections Multiple properties, Industrial and Commercial Application form

Subscriber Registration Instructions. Updated 8/31/16

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

Checklist for Submission to Utility

TOWN OF FARMINGTON FEE SCHEDULE 2018 Adopted by Town Board Resolution #80 of 2018

SALE LEASE CALL CENTER

CenterPoint Energy P O Box 1700 Houston, TX

POWER INFRASTRUCTURE PLAN 2016

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

Revisions to the Right-of-Way Management Ordinance for Wireless Providers Implementing SB1004

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

Power Infrastructure Plan

APPLICATION FOR DARK FIBRE OPTIC SERVICE

WebPortal Ticket Entry

Central Telephone Company d/b/a CenturyLink Section S. Valley View Blvd. Original. Sheet No. 1 Las Vegas, Nevada Canceling Sheet No.

Table of Contents. Page 2 of 10 OVERVIEW... 3 REQUIRED FIELDS... 4 LOGIN... 5 MEMBERS... 6 INCOME / CUSTOMER INFORMATION... 7 HOUSING INFORMATION...

Absent: Kevin W., Chris

TELECOMMUNICATION FACILITIES SITING AND CONSULTATION POLICY

Computer Network Design Guide Existing Systems 1 / 6

PROSPECTUS ALTERATION PHILLIP BURTON FEDERAL BUILDING & U.S. COURTHOUSE SAN FRANCISCO, CA

Daily briefing. October 16, Columbia Gas ColumbiaGas.com

Frequently Asked Questions

R1 R2 R3 C/I RC/I AP LR SC/I RP SP RESIDENTIAL *Single-Family Dwelling,

3300 kw, Tier 3, Chilled Water, 70,000 ft 2

Daily briefing. October 14, Columbia Gas ColumbiaGas.com

CPS ENERGY Customer Web Portal User Guide. February 2018

Transcription:

BGE Service Application Guidelines Residential Development Projects To the Developer Following is important information to assist you in applying for BGE gas and/or electric service and completing the BGE Service Application for Residential Development Projects for five or more lots or units. Please advise your builder to submit a service application for each house in the development. It is important to note that if you are applying for gas and/or electric service for four or fewer lots or units, you must complete the BGE Service Application for Residential Single Projects. If you are applying for gas and/or electric service for a condominium or apartment project, please complete the BGE Service Application for Commercial & Industrial Projects. Completing the Service Application In order for BGE to meet your requested service date, we strongly recommend that you submit the service application as early as possible in your planning process. It is very important that you complete all the requested information on the service application. Do not skip or omit any of the items. This may cause unnecessary delay of your project. Jobs are subject to cancellation if you do not respond to requests for information or if initial site work does not progress. In addition, it is essential that you enter your company s name accurately on the service application. When you are asked for the Legal Name of Company, please provide the official name of your company as it appears on file with the State of Maryland Attorney General s Office. Your company s legal name will also appear on your Charter or Articles of Incorporation. Meter Location and Traffic Protection Requirements When selecting your desired electric and/or gas meter location, it is necessary to follow BGE s meter configuration and traffic protection requirements. For these requirements, please consult the BGE Gas & Electric Metering Manual or the Customer Information Booklet. These publications are available online at www.bge.com under the heading of <Business> and <New Construction Services>. Your BGE representative will also discuss these requirements with you. Submitting Other Important Information To ensure the proper processing of your service application, it is necessary for BGE to receive the following information: A completed copy of the BGE Service Application for Residential Development Projects A Site Plan to scale (1 = 100 at a minimum) showing the following: All on-site utilities (water, sewer, septic area, storm drain, etc.) Proposed meter location, if available (gas and/or electric) Existing BGE poles and pole numbers, if available Driveway and property lines REV. 4/2015 More important information is continued on the next page. An Exelon Company

You may submit a hard copy of the Site Plan, an electronic file on diskette, or a CD-ROM in one of four BGE approved formats: Microstation (.dgn) (all releases) AutoCAD (.dwg) (releases prior to Version 14).dxf format.pdf format If temporary service is needed, complete the section regarding Temporary Service If BGE facility relocation is necessary, complete the section regarding Relocation Service BGE s Outdoor Lighting Program If street lighting is required or you are interested in BGE s private area lighting program, visit www.bge.com/outdoorlighting. Please complete and submit the application. Small Generator Connection If your project entails small generator interconnection (solar panels, wind turbines, interconnected generators, etc.) visit www.bge.com/energychoices - Small Generator Interconnection. Please complete and submit the Interconnection Request Application in addition to this application. Working Near Power Lines The law requires that before anyone begins work that may bring people, equipment, or other objects within 10 feet of overhead power lines, they must notify BGE at 410-685-0123. Please refer to www.bge.com under the heading of <Business> and <New Construction Services> then <Additional Resources> for information on the Maryland High Voltage Line Act. In order to prevent any scheduling delays once you submit your service request, please submit a complete set of site plans with your service application as soon as possible. If you would like additional information about applying for BGE Service, visit New Construction Services at www.bge.com. Also available online are the BGE Gas & Electric Metering Manual and the Customer Information Booklet. REV. 4/2015 2

BGE Service Application for Residential Development Projects Use this application for five or more lots/units; gas and/or electric infrastructure only. Today s Date: / / Requested Permanent Service Date: / / Service Request #: (mm/dd/yy) (mm/dd/yy) (For BGE internal use) Lead time for an individual job will vary depending on the scope of the work and weather conditions. Within 10 days of receipt of this application, the BGE representative assigned to your job will contact you to discuss the project. Please print or type. 1. Development Information: Subdivision Name: Number of Lots/Units: Main Entrance Street Name: City: State: Zip: County: ADC Map Page: ADC Grid: Type of Construction: q Single family houses q Town houses q Duplex Stage of Construction: q Planning q Land cleared q Curbs/gutters/roads staked q House(s) started Before selecting meter locations, consult the BGE Gas & Electric Metering Manual or Customer Information Booklet for meter configuration and meter/traffic protection requirements. NOTE: If project also includes condo/apartments, complete the BGE Service Application for Commercial & Industrial Projects for this portion of the project. 2. Developer Information: Legal Name of Company: Address: City: State: Zip: Phone: Fax: Cell Phone: Email: Federal Tax ID #: 3. Person BGE will contact to discuss the Project and send communications regarding changes affecting the status of the job: Name: Title: First MI Last Company: Address: City: State: Zip: Phone: Fax: Cell Phone: Email: 4. Person BGE will contact to set up site meeting: Project or Site Manager: First MI Last Company: Phone: Fax: Cell Phone: Email: REV. 4/2015 An Exelon Company

5. Service Information: Are you interested in natural gas service if it is available? q Yes q No Do you need temporary power during construction? q Yes q No If yes, please complete the Temporary Service section. Do you require BGE facility relocation? (transformer, pole, guy wire, etc.) q Yes q No If yes, please complete the Relocation Service section. Do you require street lighting or are you interested in private area lighting (roadway, parking lot, common area, etc.) through BGE s Outdoor Lighting Program? q Yes q No If yes, visit www.bge.com/outdoorlighting. Please complete and submit the application. Does your project entail small generator interconnection? (Solar panels, wind turbines, interconnected generators, etc.) q Yes q No If yes, visit www.bge.com/energy choices - Small Generator Interconnection. Please complete and submit the Interconnection Request Application in addition to this application. Will the community have a lighted entry sign or gatehouse? q Yes q No 6. Electric Load Information (typical of each house/unit): Size of permanent service: q 100A q 200A q 400A q Other Appliances (check all that apply): q Standard Residential Load (lighting, refrigeration, freezer, dishwasher) q Range q Clothes Dryer q Pool heater/spa: (kw load) q Water Heater q Tankless Water Heater: (kw load) q Other: (kw load) Electric Heat: q Yes q No (If no, indicate type): q Oil q Propane Type of electric heating: q Heat Pump/number of units: Geothermal? q Yes q No Unit one: Tons and kw Auxiliary Unit two: Tons and kw Auxiliary Unit three: Tons and kw Auxiliary q Baseboard: kw # of Thermostats q Electric: kw Central Air Conditioning: (If using above Heat Pump for heating and cooling, skip central A/C selection) q Number of A/C units: Unit one: Tons Unit two: Tons Unit three: Tons REV. 4/2015 2

7. Natural Gas Load Information: Gas Pressure Requested: q Standard (1/4 PSIG) q 2 PSIG NOTE: Verify with your BGE representative that the available gas main pressure will support a 2 PSIG interior piping system. Appliances (check all that apply): Gas Type of Load Proposed Gas Load Quantity Total Gas Load 1. Comfort Heat Btu Btu 2. Heat Pump Aux. Heat Btu Btu 3. Range Btu Btu 4. Water Heater Btu Btu 5. Tankless Water Heater Btu Btu 6. Dryer Btu Btu 7. Pool Heater Btu Btu 8. Generator Btu Btu 9. Gas Fireplace Btu Btu 10. Outdoor Grill Btu Btu 11. Other: Btu Btu Btu Btu Btu Btu 8. Builder List (if other than Developer): Builder Name/Company: Point of Contact: Phone: Email: Builder Name/Company: Point of Contact: Phone: Email: 9. If there is any other information that BGE needs to know about your project, please note below: REV. 4/2015 3

10. Before you submit your application: To ensure that BGE can quickly and easily process your service application, please refer to the information checklist below: q Project Address - Your complete U.S. Postal address of where the work is to be performed. q Site Contact - Person BGE will contact to discuss the project, and send communications to regarding changes affecting the status of the job. q Electric Load Requirements - If you do not know your electrical load requirements, you will need to consult with an electrician. q Gas Load Requirements - If you do not know your gas load requirements, you will need to consult with a plumber and/or mechanical contractor. q Billing Information - As it pertains to construction and consumption charges. q Site Plan - (An electronic site plan is preferred, if available. See page 2 of instructions for approved formats.) q A site Plan to scale (1 = 100 at a minimum) showing the following: q Existing and proposed utilities (water, sewer, septic area, storm drain, underground fiber optic cables, underground cable TV, gas and electric mains, etc.) q Existing BGE poles and pole numbers, meters and/or pad mounted transformer locations q Driveway, sidewalk, and property lines q Street names and lot numbers q Buildings/houses q Fences q Easement designations, wetland boundaries and designations q Wells and drain fields q Woods, trees, rivers and streams Ways to submit a service application: Email service application and complete set of plans to: SitePlans@bge.com Fax service application and complete set of plans to: 443-213-6574 Have questions? Call the BGE New Business Department 800-233-1854 Or visit the BGE website at www.bge.com Mail service application and complete set of plans to: BGE - Customer Planning Department Service Application Unit 1068 N. Front Street, Room 501 PO Box 1475 Baltimore, MD 21203-1475 REV. 4/2015 4

Supplemental Service Please indicate if you require Temporary or Relocation Service and complete the information requested. Be sure to include a site plan showing the proposed location of the Temporary and/or Relocation Service. q Temporary Service: q Not Applicable Service Request # Date temporary service is needed: / / (For BGE internal use) (mm/dd/yy) Purpose of temporary service: Address: Load information: Electric heat kw A/C Unit Tons Other: Person responsible for Construction Charges: q Check here if Temporary and Permanent Service Construction billing is the same. If not, complete the following: Legal Name of Company: Address: Phone: Fax: Email: Cell Phone: Person Responsible for Payment: Title: Federal Tax ID #: Person responsible for electric and/or gas monthly Consumption Service Billing: q Check here if Temporary and Permanent Service Construction billing is the same. If not, complete the following: Legal Name of Company: Address: Phone: Fax: Email: Cell Phone: Person Responsible for Payment: Title: Federal Tax ID #: q Relocation Service: q Not Applicable Service Request # Date relocation is needed: / / (For BGE internal use) (mm/dd/yy) Address: Description of relocation work required: Person responsible for Relocation/Remove Charges: q Check here if Relocation and Permanent Service Construction billing is the same. If not, complete the following: Legal Name of Company: Address: Phone: Fax: Email: Cell Phone: Person Responsible for Payment: Title: Federal Tax ID #: REV. 4/2015 5